Professional Documents
Culture Documents
Excavation
Excavation
2-Control Measures
The basic methods of protecting workers against trench cave-ins are sloping,
benching & shoring. Permit issuer & receiver
in joint consultation shall decide whether to guard the
excavation walls by:
a) Sloping and benching the ground.
b) Shoring.
c) Some other equivalent means.
d) A stairway, ladder, ramp or other safe means of egress shall be located in
trench excavations that are 1 .2m (4 feet) or more in depth.
𝟐-𝐎𝐛𝐬𝐞𝐫𝐯𝐚𝐭𝐢𝐨𝐧𝐬:
𝟒-𝐈𝐦𝐩𝐚𝐜𝐭𝐬:
𝟓-𝐑𝐞𝐜𝐨𝐦𝐦𝐞𝐧𝐝𝐚𝐭𝐢𝐨𝐧𝐬: