Kemptville Water Pollution Control JLR No.: 29475-000.

1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 1 of 32
December 6, 2023

Kemptville Water Pollution Control Plant Expansion – Phase A

ADDENDUM NO. 7
December 6, 2023

Tender Closing Date: December 13, 2023

This Addendum forms part of the Contract Documents and amends the original drawings and specifications.
Tenderers are reminded to acknowledge on the Form of Tender that this Addendum has been received.

BIDDER QUESTIONS
Question #1:
After speaking with dewatering contractors, they have informed us that lowering the groundwater levels in
bedrock can only be done through hydraulic connection through fractures, fissures, and weathered rock. If
a dewatering system is installed at the perimeter, and then where are fissures or fractures within the centre
of the excavation that are not connected to this dewatering system, additional wells and other modifications
to the dewatering system will be required. This is unquantifiable at time of tender, and request that any
dewatering caused by unconnected fissures and fractures to be dealt with via a change orders.

Answer #1:
Based on Thurber’s investigations, the majority of the dewatering effort is anticipated to come from
the upper fractured portion of the bedrock that is hydraulically connected (horizontally in the x-y
plane). The dewatering system must be designed taking this hydraulic connection into account, as
supported by the data presented in Thurber’s hydrogeological report, and the dewatering wells
must be deeper than the excavation base to ensure the groundwater level has been lowered at the
centre of the excavation. If additional pumping is required to respond to upward inflow from the
excavation base due to unforeseen vertical fractures that are water-bearing, the potential validity
of a change order will be investigated.

Question #2:
When referencing the provided information in the Hydrogeological Report, it indicates the daily limit of daily
water taking cannot exceed 1,129,000 L/day. With the drawdown rates, stormwater allowances, and safety
factor applied, this limits how many structures can be worked on at the same time. It appears unrealistic
to be able to work on any other new building prior to backfilling the new Headworks, Primary Clarifier and
Aeration Building from the provided estimated peak flows. Also, there is construction sequencing
constraints of having to build and fully commission the new Primary Clarifiers, Aeration Tanks, Headworks,
Digesters, and all of the yard piping prior to retrofitting the existing plant to their new function. With the
imposed dewatering limits, and construction sequencing limitations, the construction duration is going to
take significantly longer than what has been allotted.

Answer #2:
The Contractor may submit a request to the Owner to apply for an increase the PTTW water taking
limit. The Contractor and their Hydrogeological specialist shall provide any information to support
the Owner’s request to the MECP. The final decision to amend the PTTW will be at the discretion
of the MECP.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 2 of 32
December 6, 2023

Question #3:
Reference Section 4.3, Table 4.13, and section 4.4.2 of the Hydrogeological Report. No filtered samples
were taken of the ground water, and as such, there was several exceedances with respect to metals, and
dissolved solids. Typically speaking, with the control of suspended solids, most of these exceedances will
go away. Talking to the dewatering contractors, there is no proper way to build and/or quote a treatment
system until we know for sure the concentrations of any dissolved metals within the ground water. Typically
speaking, these treatment systems are also astronomical in price with high operating costs. Considering
the volume of water required for dewatering of excavated structures shown in Table 5.2 (1.1 million litres
per day), this is an unquantifiable risk to be putting on the General Contractor.

Answer #3:
The Hydrogeological Report recommends treatment for TSS prior to discharge to the ground
surface. The dissolved metal concentrations all met the guidelines. They only exceeded the
guidelines when the water had high TSS due to turbidity. Treatment for dissolved metals should
not be required.

Question #4:
During the site visit it was noted that the Hydro service relocation would be completed by March 2024 which
would then allow work on site to commence. The 110 week project duration is noted to commence upon
award of contract. Will the project duration be extended to reflect the date that Hydro relocation is
completed as there is a significant penalty clause and the project duration will not be sufficient?

Answer #4:
Depending on the timing of the contract award and progress of the hydro contract, the start of the
contract duration can be revisited at contract award.

Question #5:
Regarding the proof testing for the rock anchors, please confirm if proof testing for each individual rock
anchor is required? Typically, for a project of this size, proof testing is done for 10% of the rock anchors.

Answer #5:
Proof testing of each rock anchor is required. Section 02451 has been updated in this addendum.

Question #6:
Please provide quantities & locations for concrete repair.

Answer #6:
Refer to attached Section 00310 in this Addendum.

Question #7:
Reference section 15012, Mechanical Demolition, Will the plant operators isolate and lower the channels
and tanks prior to cleaning.

Answer #7:
Contractor to coordinate with plant operators for isolation and lowering of channels and tanks prior
to cleaning. Contractor will be responsible for removal of any remaining liquid and debris in tanks
and channels following the lowering by plant operators.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 3 of 32
December 6, 2023

Question #8:
Section 08362 part 2.9 I understand the first portion 2.9.1 and then in 2.9.2 it asks for explosion proof
jackshaft. The number one and two can’t be combined. It is either one or the other…

Would you please ask what is the environment? We can’t add a separate control panel to an explosion
proof operator.

Answer #8:
Explosion proof jackshift required.

Question #9:
Section 1/A230A shows waterproofing membrane under the basement slab at the headworks building.
Please confirm the type of waterproofing and how it is applied at this location. Is this waterproofing applied
to the mud slab under the basement slab, before the basement slab is poured?

Answer #9:
Provide GCP Preprufe Waterproofing system or approved alternate. Waterproofing system to be
applied to the mud slab under the basement slab prior to basement slab pour.

Question #10:
Please confirm that there is no waterproofing membrane below foundation slab as per sections 1-A230A
and 1-A830A.

Answer #10:
Waterproofing membrane below foundation slab as shown on drawing 1-A230A and 1-830A is
required. Provide GCP Preprufe waterproofing system or approved alternate.

Question #11:
4/A300A shows a new scupper at grid x3.D. Is this a replacement scupper or a new scupper cut into the
existing parapet?

Answer #11:
Scupper located at gridline x3.D is a new scupper to be cut into the existing parapet

Question #12:
For pricing purposes what is the approximate slab to slab (top of floor slab to under side of ceiling slab) of
the of the existing service building at the ground floor as shown on 3/A300A. Required to calculate area of
new CMU block wall Pa1.

Answer #12:
Slab to slab height at the ground floor of the existing service building is approximately 4400mm, to
be verified on site.

Question #13:
Please provide epoxy flooring specifications.

Answer #13:
Refer to specification 09900 – Painting, section 2.1.8.

Question #14:
Since there is no spec for epoxy paint, please confirm that there are no walls to receive epoxy paint.

Answer #14:
There are no walls receiving epoxy paint. Refer to specification 09900 – Painting, section 2.1.8.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 4 of 32
December 6, 2023

Question #15:
Since there is no spec for epoxy paint, please confirm that there are no doors to receive epoxy paint.

Answer #15:
Doors to receive alkyd semi-gloss finish. Refer to specification 09900 – Painting, section 2.1.8.

Question #16:
Please confirm that there are no doors to receive gloss finish.

Answer #16:
Doors to receive alkyd semi-gloss finish. Refer to specification 09900 – Painting, section 2.1.8.

Question #17:
Reference Section 02060 - Selective Structure Demolition, Item 1.1.1.5. Please confirm exterior slabs,
walls around new Tertiary Filters are to remain since the existing tanks are not being modified to be Tertiary
Filters.

Answer #17:
Correct

Question #18:
Reference drawings C002A, C003A, and C004A. The existing 150mm dia watermain that runs to the west
of the 250mm dia West Quad FM is being replaced by a new 150mm dia WM in the same location of the
existing watermain. In an effort to save money on the overall price, we recommend allowing the new
watermain to be installed just to the west of the existing watermain to avoid the installation of a temporary
watermain.

Answer #18:
Based on the contractor sequencing, the new watermain could be installed direct west of the
existing watermain to avoid temporary watermain; however contractor will need to coordinate
installation of all infrastructure and maintain water to the existing plant at all times.

Question #19:
Reference drawing C004A. There are several forcemains that are wrapping around the Odour Control
Units. When referencing Section X-X in OPSD 1103.010 for thrust block information, measurement C will
cause the thrust block to extend up and over the height of the pipe. Measurement d of the innermost radius
bend would also cause the thrust block to cover the bend bolts of the next radius bend. How is this going
to be possible since all the runs of pipe in this area will be in a common trench? Please provide guidance
with this thrust block requirement.

Answer #19:
All pipes to be mechanically restrained. Refer to revisions to Section 02714.

Question #20:
Reference Section 02315, items 3.4.9, 3.5.2.3.1, 3.5.2.3.4 talk about excess soil going off site, and testing
of excess soil. Item 1.3.1 and at the site visit, it was indicated that excess soil is to remain on site. Please
clarify, all excess soil is to remain on site. Also confirm, since all excess soil is remaining on site, no soil
testing of existing soil is required.

Answer #20:
Section 02315 has been revised. All soils to remain onsite.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 5 of 32
December 6, 2023

Question #21:
Please clarify if the existing 200mm East Quad forcemain is in conflict when it crosses the new forcemains
as it turns towards the existing headworks. No grades are given for the existing forcemain past the
connection point.

Answer #21:
The existing East Quad forcemain at this location has a invert of approx. 88.50m which is above
the new forcemains. See attached as-built (DWG C-001 of Project No. 375175, Prepared by CH2M
Hill, July 2008).

Question #22:
Please provide the separation between the existing 150mm watermain alignment and the new 150
watermain alignment. Can the new watermain be installed adjacent to the existing, or will a conflict cause
the existing to be removed prior to the install of the new watermain.

Answer #22:
Based on the contractor sequencing, the new watermain could be installed direct west of the
existing watermain to avoid temporary watermain; however contractor will need to coordinate
installation of all infrastructure and maintain water to the existing plant at all times.

Question #23:
Please confirm pipe thickness of stainless-steel pipe to be used inside the valve chambers.

Answer #23:
SS piping within valve chambers to specification 15349 and data sheet for 316 Stainless Steel Pipe
(SS-3)

Question #24:
Please provide thickness and rebar detail for the concrete generator pad and the odor control unit’s
concrete pad.

Answer #24:
Generator Pad shown on structural drawing S920A. Odour Control Pad shown on structural
drawing S250A

Question #25:
Please provide invert elevations for the forcemains at the two valve chambers.

Answer #25:
Inverts of FM’s at Chamber 1 to be approx. 85.70m and FM at Chamber 2 to be approx. 87.50.
Contractor to coordinate exact inverts.

Question #26:
Does the ‘NEW 100mm RSE FORCEMAIN (ADMIN)’ connect to the new shallow invert trench?

Answer #26:
Correct. The New 100mm RSE FM will exit the SIT

Question #27:
Please confirm location of 50mm water service to new Headworks Building. It is not shown on Civil
drawings.

Answer #27:
Delete note on drawing C004A “50mm Service Water” near headworks building.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 6 of 32
December 6, 2023

Question #28:
Civil drawings C003A to C006A show new granular around the existing and prosed WPCP. Please clarify
if either of both detail 4/C008A and 5/C008A apply and where.

Answer #28:
Delete Detail 5/C008A. All vehicle areas to be constructed as per detail 4/C008A

Question #29:
Drawing C004A show the east end of the SIT parallel to the existing WPCP. Will the process pipes enter
the SIT through the side wall of the SIT? Is an end cap/wall required at the end of the SIT at this location?

Answer #29:
Pipe will enter the SIT through the side and end cap required

Question #30:
A note on drawing C002A states 'EXISTING CHANNEL TO BE REMOVED. REFER TO STRUCTURAL
DRAWING'. Please provide this structural drawing number.

Answer #30:
Existing channel to remain. Note to be deleted. Refer to drawing revisions below.

Question #31:
Reference Addendum #3, Q/A #13, and drawing C003A TP 17 & 18. With the pipe invert at EL 88.73 for
the now 800mm MLO, this will give less than a foot of cover on the pipe when comparing it with finished
grades on drawing C005A. Please confirm that construction, and regular plant traffic loads will be okay at
this depth of cover. We will need to have fully loaded concrete trucks driving, bulldozers spreading gravel,
floats removing construction equipment from site, etc. all over this pipe.

Answer #31:
Pipe to be revised to a DR13.5, This should be a minimum of 300mm of cover under all of the
roadways which should provide sufficient cover for traffic. Contractor to confirm cover requirements
for traffic loading with specific pipe manufacturer.

Question #32:
DE004A - shows a retaining wall 30m long x 600mm high, please confirm if this needs to be demolished

Answer #32:
This is an older as-built. The retaining wall does not currently exist.

Question #33:
Reference drawing C008A, Granular Roadway Structure and Granular Driveway Structure details. Both
show Granular B as the sub base. Referencing Section 02723, Item 2.1.1, it calls for Granular B Type II
for the Granular Sub-Base. Referencing Section 02701, Item 2.1.3.1.1 calls for Granular B Type I within
building foundations and footings, and Type II in all other areas. Please confirm whether Granular B Type
I is acceptable in the roadway for both Granular Roadway Sub-Base and for pipe trench backfill.

Answer #33:
Granular B type II is required for roadway subbase and pipe trench

Question #34:
Is the Stainless Steel piping in Valve Chamber 1 and 2 to be tested as yard piping? If not please provide
criteria for testing of this pipework?

Answer #34:
Yes
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 7 of 32
December 6, 2023

Question #35:
Have details been provided for the installation of the mechanical sit trenches (precast service tunnels)?
Elevation of precast
Trench granular base
Waterproofing requirements?

Has there been a review of the possible interference between the shaft and services, clearance
requirements crossing above or below new & existing services?

Answer #35:
Please review drawings and specifications

Question #36:
Part 1.11.4 of spec section 01810 provides the average and max flows for the 4 pumping stations. As per
part 1.11.5 the contractor to consider completing work in the dry weather and after hours to reduce the
volume of flow to be managed. For pricing purposes please provide a minimum hourly flow rate that needs
to be managed for each of the 4 pump stations.

Answer #36:
Flows from each pumping station can be expected to be at minimum (nighttime off peak flow):
• Bridge Street – 20 L/s, constant flow
• Colonnade – 40 L/s, every hour for five minutes
• EQ SPS – 40 L/s, every hour for four minutes
• Tempo – 40L/s, every hour for four minutes

Question #37:
To help calculate the diversion pumping of pump station flows, please provide the locations of the four
pump stations.

Answer #37:
Bridge Street -- 3 Bridge Street North,
Colonnade -- 302 Ryan’s Well Drive
EQ SPS -- 128 County Road 44
Tempo -- 272 County Road 44

Question #38:
If vacuum trucks are used for bypass, is the flow discharged at the closest available San MH or at the
WPCP?

Answer #38:
See attached for potential routes to the nearest San MHs:
• Equinelle SPS – 1.66km from wet well to nearest sanitary manhole County Rd 44 @ North
of Kemptville Public School.
• Tempo SPS – 310m from wet well to nearest sanitary manhole in NGMC South parking
lot.
• Bridge St SPS – 920m from wet well to nearest sanitary manhole Wellington @ Westerra
Way.
• Colonnade SPS – 605m from wet well to nearest sanitary manhole Wellington @ West of
Westerra Way.

Vac trucks for bypassing can also discharge at the WPCP.


Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 8 of 32
December 6, 2023

Question #39:
The bridge Street SPS has a high flow, that may make vacuum truck bypass, unfeasible. For pricing
purposes, what in the minimum hourly bypass flow rate acceptable, assuming the work is done in dry
weather and a night? Please advise on possible bypass flows options at this SPS. Has this SPS been
bypassed previously? Is pumping to San sewer an option? If yes, please provide distance and grades.

Answer #39:
Bridge Street SPS is not set up to bypass, there has never been a bypass at Bridge St, and there
is no authorization to bypass in the ECA. Any overflow from Bridge Street to Kemptville Creek
would be classified as a Spill by the MECP and not a viable option. Pumping to a sanitary sewer
may be considered, subject to the review and approval of the Owner.

Question #40:
Reference Addendum #3, Answer #53.
a) Can the various pumping station shutdowns downs occur simultaneously, concurrently or will there
be restrictions on timing and durations.
b) Will the shutdowns occur during the day or at night.
c) Our subcontractors need to know the expected line pressure or pump discharge pressure for
system below.
1. East Quad.
2. Bridge Street.
3. Northwest Quad, and
4. Equinelle.

Answer #40:
a) Contractor to develop Bypass Plan for Owner’s review and approval. Bridge Street SPS and
Colonnade SPS each require isolated shutdowns. Equinelle SPS and Tempo SPS can potentially
be shut down at the same time, however this is dependant on the Contractor’s Bypass Plan and
the Owner’s review and approval.
b) Contractor to develop Bypass Plan for Owner’s review and approval.
c) See below pump discharge pressures:
Bridge Street SPS – 300 kPa
Colonnade SPS – 130 kPa
Equinelle SPS – 130 kPa
Tempo SPS – 130 kPa

Question #41:
Please confirm the wet well capacity at the four pumping stations.

Answer #41:
Bridge Street SPS – 47 m3
Colonnade SPS – 15 m3
Equinelle SPS – 15 m3
Tempo SPS – 67.79 m3

Question #42:
Please confirm if hydrovac trucks can access the wet wells at the pumping stations.

Answer #42:
Yes
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 9 of 32
December 6, 2023

Question #43:
Re: waterproofing. Could you please confirm that the below slab waterproofing membrane will only be
required within the Digester building and headworks in areas where Xypex is not included in the concrete
mix.

Answer #43:
Crystalline waterproofing is being provided as indicated in the Contract Documents. The below slab
waterproofing membrane will be provided where shown on the Contract Documents. A product
clarification is being issued for the below slab applications.

Question #44:
Please confirm if substantial performance of the plant can be achieved with the existing boilers in place.
Additionally, Please confirm which upgrades to the existing service building need to be in place to achieve
substantial performance of the plant.

Answer #44:
Substantial Performance remains as defined in the Contract Documents and the Construction Act.

Question #45:
On drawing E004 heat trace schedule no. 12 tell us 100-SS-DG c/w TC 8030 but on PID802A it shows TC-
8030 on 150-SS-DG line. Please confirm if 100-SS-DG should read 150-SS-DG?

Answer #45:
Should read 150-SS-DG. Refer drawing E004A and addendum #6.

Question #46:
LCP-4001/4004/4007 show the list of required parts as PID401A / I017A [ 1, 2, 5, 12, 13, 20, 21, 22 ]
From what I can see, these are the local control panels for the heater control panels HCP 4001/4004/4007,
which also have the same required parts (I017A [ 1, 2, 5, 12, 13, 20, 21, 22 ]), and the circuit diagram shown
on I023A. Please provide a wiring diagram for LCP 4001/4004/4007, as it appears to only have pilot light
indicators, with the power control function in the HCP.

Answer #46:
Refer to drawing I023A for LCP 4001/4004/4007 wiring diagram detail.
LCP-4001/LCP-4004/LCP-4007 requirement is PID401A / I017A [1, 2, 13].
HCP 4001/4004/4007 list is to remain.

Question #47:
LCP-8031 appears to be in a hazardous location, but required a Precision Digital display, as per table on
I017.
Please confirm if this is in fact inside a hazardous region, and if so, what manufacturer of pilot lights and
operators is acceptable.

Answer #47:
Refer to Addendum #6. LCP-8031 will be outside of the hazardous location.

Question #48:
Is the MCC Supplier just to supply breakers for future equipment or are they also to leave enough space to
allow for future VFD's and Starters to be mounted integral to the MCC, or is it the intent to mount the future
VFD's and Starters remote to the MCC 200?

Answer #48:
Refer to drawings E301A and E311A. Refer to drawing note 16 on E311A.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 10 of 32
December 6, 2023

Question #49:
Can you please confirm the size of the sliding gate, drawing E008 indicates that it would be about 24’6” x
6’, but the plan view on the civil drawing set shows 20’ x 6’. Can you please confirm the dimensions?

Answer #49:
Refer to Civil drawings and specs for sliding gate dimensions.

Question #50:
16276 Liquid Filled Transformer - Please confirm delivery schedule for HONI provided transformer.

Answer #50:
Schedule has not been confirmed.

Question #51:
Reference drawing 3/P301A, the 100-SS-CNT “connected mid-point in the trench, refer to civil
drawings” Whereas C004A, shows it passing over the SIT Trench and entering the Headworks in
the North. Please clarify what is required.

Answer #51:
Centrate line to be removed from Sit Trench and piped to headworks raw sewage receiving
chamber. Refer to civil drawings & sketch SKP201A-1.

Question #52:
Reference section 01020, item 1.11.2 “Initial supply of chemicals to start-up and test new systems will be
the Contractor’s responsibility.” As we are cognizant of the design, the engineers must provide consumption
rates, or provide a quantity to carry.

Answer #52:
Contractor is to assume that the ferric sulfate dosing concentration for the facility is constant at
0.71mglL. Contractor to price chemical consumption as required based on the plant influent flows
of: Average Day Flow: 5250m3/day and Peak Day Flow: 15,000m3/day.

Refer to revised Section 17501 attached in this Addendum:

Question #53:
Reference section 15060, item 1.1.2, “The Contractor is required to retain the services of a third-party pipe
support engineer to design the pipe supports in accordance with the requirements noted herein.” Please
confirm if this applies to the Yard Piping.

Answer #53:
This applies to the pipe supports in the valve chambers, but otherwise does not apply to buried
piping.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 11 of 32
December 6, 2023

Question #54:
Reference section, 11345, the named supplier has the following qualifications, please confirm these are
acceptable.
a. Item 2.5.1 and 2.5.2; Section 17051, 2.1.1 – We are providing our standard enclosure and our
standard control panel components.
b. Item 2.5.1 and 2.5.2; Section 16805, 2.3 – We are providing our standard motor starter for the
0.75 HP mixer motor. It will be supplied with overload protection.
c. Item 2.5.1 and 2.5.2; Section 16812 – We are providing our standard Lenze VFD. We are
providing a separate disconnect.
d. Item 2.6 – A suction drum wand is not recommended. The pump needs flooded suction.

Answer #54:
This is acceptable. Drawing from the bottom of the tote in lieu of a suction drum wand is acceptable.
Ensure all appurtenances are provided to accommodate drawing polymer from this location.

Question #55:
Reference drawing PM010A, detail 2. The casing is no longer sized, Corrosion Services, Markham
have recommended that the casing be 250mm and 300mm respectively, please confirm this is
acceptable.

Answer #55:
This is acceptable. Contactor is required to provide all components in accordance with Detail 2 on
PM010A to suit the larger size. Contractor to coordinate sizing and installation requirements with
civil contractor.

Question #56:
On drawing ME005A show the classification of the explosion proof areas as zones 1 and zones 2 but you
have a general notes telling us that zone 2 will be rated to zone 1. Are you sure this is required to change
all zone 2 back to zone 1? This note increase cost significantly between Zone 1 material and Zone 2
material.

Answer #56:
The note is correct and will remain unchanged.

Question #57:
we’re looking for your consideration as equals to the following:

- Southampton Industrial for MUAs (Section 11581). Alberta based custom air handling unit
manufacturer with a specific focus on explosion proof units. https://www.southampton-industrial.com/
- Camfil for Odour control units (Section 15784). Market leader in molecular filtration. JLR have used
Camfil on many projects and have specifically used their molecular filtration at YOW. (see attached for the
general product line)

Answer #57:
Camfil will be an acceptable alternate for Odour Control Units. Contractor must meet associated
specification for any alternate equipment to be approved.

Question #58:
Reference drawings MID001A, M301A and ng MID001A has the natural gas lines as 65mm, 75mm, and
200mm, whereas M301A has the line as 100mm. Please confirm which sizes are correct.

Answer #58:
Refer to sketch SKMID001A-1 and SKM301A-1 for line size modification.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 12 of 32
December 6, 2023

Question #59:
On PID 201A shows three lines 250-SS-RSE but on drawing P201A it shows four 250-SS-RSE going into
the Raw sewage receiver chamber, which drawing is corrected?

Answer #59:
PID201A is correct. Refer to SKP201A-1.

Question #60:
Are seismic calculations required for the equipment in 11380?

Answer #60:
The facility is a post disaster facility and the equipment needs to be operational following a seismic
event. Refer to revisions to Section 15241 below.

Question #61:
Section11380 states that Drive Sprockets shall be non-metallic Nylon-6 construction. In the same section
under 2.3 Design Data, Data Table 2 – General Requirements has Drive Sprockets material as UHMW-PE
or Polyurethane c/w 316 stainless steel hubs. Can you please confirm Drive Sprockets material may be
either UHMW-PE or Polyurethane c/w 316 stainless steel hubs?

Answer #61:
This will be acceptable.

Question #62:
Please provide spec and detail for the “insulated gas tight aluminum plate and frame” of the overflow
chamber on drawings 2/P803A, A812A, 4/A014A.

Answer #62:
Refer to detail 1 on S015A.

Question #63:
Reference section 15500, Fire Extinguishers. Two of our suppliers have stated that the specified product:
“5 lb. Pyro-Chem ABCR” is no longer produced. Please specify an acceptable alternative.

Answer #63:
Refer to Section 15500 revisions below.

Question #64:
Reference section 01810, item 1.10.4.17. Temporary Boilers, to enable us to allow for temporary piping,
please provide the record drawings of the existing heating and Natural Gas for the Mechanical Services
Building basement.

Answer #64:
See attached record drawings of the boiler room (DWG M6 and M7, Kemptville WPCP Contract
No. 2, prepared by Gore & Storrie Ltd., December 1991).

Question #65:
To move each Boiler Model AF2LW-015-GG-30 into the basement after the Factory Acceptance Test will
require Boilersmith to remove the Digester Gas fuel train, (with fuel train junction box attached) prior to
shipment, including the wiring to the Electrical Junction Box mounted onto the fuel train piping. The electrical
wires will be clearly identified as to which terminal they connect to in the fuel train junction box. The
installation contractor will mount the digester gas fuel train and re-connect the electrical wiring. Please
confirm this is acceptable.

Answer #65:
This is acceptable. Refer to answer #45 from Addendum 6.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 13 of 32
December 6, 2023

Question #66:
To move Boiler Model CF3LW-200/4-G-30 after the Factory Acceptance Test into the basement will require
Boilersmith to remove the Natural Gas Fuel train with mounting brackets (with fuel train junction box still
attached), the rear flue gas box, the burner with combustion chamber, burner control panel with mounting
brackets, ALL wiring, and ALL hot water trim. The side handhole / cleanout assemblies may be removed if
necessary. The installation contractor will re-mount and electrically connect all items that were removed
prior to shipment. All electrical wiring will be clearly identified as to which terminal they re-connect to in the
burner control panel, water trim items, fuel train junction box and burner. Please confirm this is acceptable.

Answer #66:
This is acceptable. Refer to answer #46 from Addendum 6.

Question #67:
Section 15625, 1.1.2, Boilersmith (manufacturer = supplier) will not be responsible for system
design. Boilersmith scope of supply will be limited to supply of two 15 BHP Natural Gas / Digester gas fired
boilers (that meet current CSA standards (B149.1, B149.6, B149.3) and TSSA amendment documents (FA-
2020 and DLB-20, that meet current codes and standards, supply startup and provide training for
Boilersmith supplied equipment. Please confirm this is acceptable.

Answer #67:
This is acceptable.

Question #68:
Section 15625, 1.3.3.4.3 TSSA Fuel Safety Field approval will be supplied by the installation contractor.
TSSA Fuel Safety Site inspections includes the entire boiler room, not just the boilers. Labels are not affixed
to the boilers until the entire room passes inspection. From experience, TSSA field approval labels will not
be affixed to the boilers unless the entire room passes inspection. Please confirm this is acceptable.

Answer #68:
This is acceptable. The entire system will require TSSA approval, and it will be the responsibility
of the contractor to coordinate and ensure that this is provided.

Question #69:
Section 15625, 1.1.3.6 Exception is taken to temporary outdoor storage. Boilersmith Ltd. Limited Warranty
does not allow for boilers to be stored outdoors. Boilers will NOT be shipped in weather tight containers.
Boilers will be shrink wrapped prior to shipment. The shrink wrap is not suitable for outdoor storage. Please
confirm this is acceptable.

Answer #69:
Refer to Section 15625 revisions below.

Question #70:
Section 15625, 1.1.3.7 Comment Division 16 and Division 17 are supplied by others. Interface with SCADA
will be as per Section 15625 October 2023 Paragraph 2.8 (hardwired only). Please confirm this is
acceptable.

Answer #70:
This is acceptable.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 14 of 32
December 6, 2023

Question #71:
Section 15625, 1.6.6 Comment; Boilersmith will make ready two boilers to fire test for Factory Acceptance
Test. The third boiler will be ready to fire test for the Factory Acceptance Test after the first two boiler
Factory Acceptance Tests are completed. Testing of the third boiler may not take place on the same day
as the first two boilers. Please confirm this is acceptable.

Answer #71:
This is acceptable.

Question #72:
Section 15625, 1.6.5 Comment; All boilers cannot be test fired at the same time. Test firing for Factory
Acceptance Test testing will occur over two days. Please confirm this is acceptable.

Answer #72:
This is acceptable.

Question #73:
Section 15625, 1.6.6 Control systems will be tested individually for each boiler in accordance with an
approved Factory Acceptance Test testing procedure. Please confirm this is acceptable.

Answer #73:
This is acceptable.

Question #74:
Section 15625, 1.6.10 Exception; Boilers are fabricated and tested in accordance with applicable standards.
Please confirm this is acceptable.

Answer #74:
Clause 1.6.10 will remain unchanged, and the requirements therein will need to be provided.

Question #75:
Section 15625, 1.9.1 Exception, Boilersmith Ltd. Limited warranty will be modified to include parts and
labour and will be 12 months from date of first startup of either fuel, but not to exceed 18 months from date
of shipment or 18 months from date the boilers are made ready to ship, as requested by the contractor,
whichever comes first. Please confirm this is acceptable.

Answer #75:
Clause 1.9.1 will remain unchanged, and the requirements therein will need to be provided.

Question #76:
Section 15625, 2.2.3 Comment; ESA Equipment Electrical inspection is included for the 15 BHP digester
Gas fired boilers. The 200 BHP packaged boiler is ULC listed and does not require a TSSA equipment
inspection. Some electrical will be disconnected prior to shipment. A Site ESA electrical inspection by others
may be required after equipment has been re-assembled. Please confirm this is acceptable.

Answer #76:
It is understood that the boiler will still require TSSA inspection. All electrical systems to have all
proper ESA certifications and inspections required for operation. If additional inspections are
required, the contractor is to ensure all required inspections are provided.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 15 of 32
December 6, 2023

Question #77:
Section 15625, 2.2.4 Exception; American Boiler Manufacturers Association and Canadian Gas Association
label will not be supplied. Please confirm this is acceptable.

Answer #77:
This is acceptable.

Question #78:
Section 15625, 2.2.4 Comment - TSSA Fuel Safety Field approval and Field approval label, for the Digester
Gas fired boiler, is required. Boilersmith will supply a label that will be completed at time of site test firing,
prior to TSSA inspection. Please confirm this is acceptable.

Answer #78:
This is acceptable.

Question #79:
Section 15625 2.3 Comment; Boiler Capacity – Efficiency means Combustion Efficiency. Please confirm
this is acceptable.

Answer #79:
This is acceptable.

Question #80:
Section 15625 2.3.2 Comment Digester Gas analysis will be supplied by others. Please confirm this is
acceptable.

Answer #80:
Clause 2.3.2 will remain unchanged, and the requirements therein will need to be provided. The
contractor is required to complete the digester gas analysis as stated in the specifications.

Question #81:
Section 15625 2.4.8 Exception: The AF2 Series boiler does not include a 400 mm diameter hinged rear
access door. The rear flue gas box is hinged for full rear tube access and inspection of the furnace. A 50
mm observation glass is included at the rear, below the flue gas box. Please confirm this is acceptable.

Answer #81:
This is acceptable.

Question #82:
Section 15625 2.4.10 Exception: Boilersmith standard hot water trim will be supplied as per Section 15625
paragraph 2.5 BOILER HOT WATER TRIM. Please confirm this is acceptable.

Answer #82:
Clause 2.4.10 will remain unchanged, and the requirements therein will need to be provided. All
safeties listed in the specification and required by code are to be provided.

Question #83:
Section 15625 2.6.1 Comment; The two Natural Gas / Digester Gas fired boilers require TSSA Fuel
Safety Field approval. The Natural Gas only fired 200 BHP boiler has a ULC packaged listing label
and does not require TSSA Fuel Safety Field approval. Please confirm this is acceptable.

Answer #83:
It is understood that the boiler will still require TSSA inspection. If additional inspections are
required, the contractor is to ensure all required inspections are provided.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 16 of 32
December 6, 2023

Question #84:
Section 15625 2.7.7 Comment: An Autoflame mini Mk8 will be used. Please confirm this is acceptable.

Answer #84:
This is acceptable.

Question #85:
Section 15625 2.8.1 Comment; Division 17 is supplied by others. There is no PLC in Boilersmith Ltd.
Scope of Supply. Please confirm this is acceptable.
1. Section 17002. Section 17002 is not included and will be supplied by others. Please confirm this is
acceptable.
2. Section 17051 is only supplied as it relates to the burner control panel. Please confirm this is
acceptable.
3. Section 17500 There is no PLC included in Boilersmith Ltd.’s Scope of supply. Please confirm this
is acceptable.

Answer #85:
This is acceptable.

Question #86:
Section 15625 2.8.3.7 Comment; Final Indicator lights will be determined at time of submittal. Please
confirm this is acceptable.

Answer #86:
Final number of indicator lights can be confirmed during the shop drawing process; however, the
ones listed are to be included for the purposes of the Tender requirements (e.g.: Cost, schedule).

Question #87:
Section 15625 2.8.3.8 Comment - Final Dry Contacts will be determined at time of submittal. Please confirm
this is acceptable.

Answer #87:
Final number of dry contacts can be confirmed during the shop drawing process; however, the ones
listed are to be included for the purposes of the Tender requirements (e.g.: Cost, schedule).

Question #88:
Section 15625 3.1 Comment Installation – some items will be performed at time of first startup. Please
confirm this is acceptable.

Answer #88:
As much of the installation work as possible is to be completed before start-up. Work noted that is
not possible to complete prior to start-up is to be discussed on a case-by-case basis during
construction during the submittal review phase.

Question #89:
Section 15625 3.1.10 Comment -Test All Gas piping – DO NOT TEST FUEL TRAINS at system piping test
pressure. Damage may occur. Please confirm this is acceptable.

Answer #89:
Refer to Section 15030 revisiosn below.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 17 of 32
December 6, 2023

Question #90:
Section 15625 3.2.1 Comment: Factory Acceptance Test may occur over two days. Please confirm this is
acceptable.

Answer #:
This is acceptable.

Question #91:
Section 15625 3.2.2 and 3.2.3 Comment –. Only two boilers can be test fired at the same time. There is no
interconnecting wiring between boilers. Please confirm this is acceptable.

Answer #91:
This is acceptable.

Question #92:
Section 15625 3.2.5 Comment: All boilers will be ready to review. Only two boilers can be set up to fire on
the same day. Factory Acceptance Test testing of the third boiler may occur the next day. Please confirm
this is acceptable.

Answer #92:
This is acceptable.

Question #93:
Section 15625 3.2.7 Exception; Boilersmith will not be responsible for any costs associated with extending
and/or revisiting the plant. Packaged boilers and burners will be set up and made ready as per reviewed
submittal. A Factory Acceptance Test document will be submitted for review prior to Factory Acceptance
Test testing. Pre-Factory Acceptance Test testing will be based on the Factory Acceptance Test document.
Please confirm this is acceptable.

Answer #93:
Clause 3.2.7 will remain unchanged, and the requirements therein will need to be provided.

Question #94:
Section 15625, 3.2.9 Comment; Only the natural gas flow meter and combustion analyzer will have
calibration certificates. Please confirm this is acceptable.

Answer #94:
Clause 3.2.9 will remain unchanged, and the requirements therein will need to be provided.

Question #95:
Section 15625, 3.3 Comment; Control Narrative – Programming the Remote PLC for Remote boiler control
is supplied by the Installation Contractor. Please confirm this is acceptable.

Answer #95:
This is acceptable.

Question #96:
Section 15625, 3.3 Comment; A digester gas permissive is required from the plant for both Local and
Remote control. The permissive can be either a 24v DC control signal or a remote dry contact. Please
confirm this is acceptable.

Answer #96:
A dry contact is acceptable per Section 15625, subsection 2.8.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 18 of 32
December 6, 2023

Question #97:
The Answer to Q&A # 45 of addendum # 3 states that the 'gas line to be installed by the utility company,
coordinated and paid by the contractor'. Our understanding from Part 1.1 of spec section 15347 is that gas
piping on site upstream of the incoming gas meter is by the utility and the Contractor to be responsible to
coordinate installation of upgraded gas service by local utility. Assume all costs of coordination, but not pay
the utility company. Please clarify.

Answer #97:
The gas piping upstream of the gas meter is to be provided by the gas company. All piping
downstream of the gas meter is to be provided by the contractor. Contractor is to assume all costs
associated with coordinating with the gas company. Refer to Sketch SKMID001A-1

Question #98:
Could you please clarify if IMFO Vertical Single Wall Storage tank or SAFE Dual wall storage tank is
required for Ferric Sulfate Tank TAG: TH-901.
In Section 11253 – Chemical Storage Tank – TAG: TH-901 IMFO vertical single wall IMFO tank is specified.
In Drawing: P802 a dual wall storage tank with leak detector is specified.
Please note: 8700 Gallons capacity tank is available as SAFE Dual wall storage tank. We can provide a 2”
drain for this tank. Please see the following web link: https://www.polyprocessing.com/tank-
specifications/our-tank-offerings/safe-tank-system/
The IMFO Vertical Single Wall Storage tank capacity is 8500 gallons. Leak detector is not available for it
as it has one wall only.

Could you please confirm the 8700 gallons SAFE dual wall tank with 2” drain is acceptable.

Answer #98:
Refer to Section 11253 revisions below.

Question #99:
Reference Addendum #3, Answer #14; With reference to the Process mains over the expansion joints on
drawing S601A, please provide a wall detail, or confirm not required.

Answer #99:
There is no drawing S601A.

Question #100:
Re: Concrete pipe supports the structural dwgs note to see the process plans to locate the concrete pipe
supports. We have reviewed the process plans and have not found any concrete pipe supports located.
Please clarify if there are concrete pipe supports and where (qty)

Answer #100:
Detail 10/S011A has been removed, refer to drawing revisions below.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 19 of 32
December 6, 2023

Question #101:
Please refer to dwg ME005A with regards to the zone 2 requirements for MAU 201. As per the schedule,
the MAU-201 requires to be suitable for zone 2 space.
Could you please confirm this with the engineer and the reason behind the zone 2 compliance?
If it is outside of the building, can we have a unit that does not require zone 2 compliance?

Answer #101:
Refer to Addendum #6, Question #38.

Question #102:
Can you please confirm what access control the owner would be using to ensure compatibility with card
readers & keypads

Answer #102:
Contractor to review, coordinate and establish existing system type and ensure that new devices
installed are compatible with the existing system. Contractor to provide commissioning of new
devices added to existing system with security system specialist. Security system integration will
be coordinated with the Owner.

Question #103:
Section 16414, Part 2 indicates that the ATSs have been pre-purchased. Can you confirm if the ATSs have
been pre-purchased, or if the contractor is responsible to supply the ATSs?

Answer #103:
ATS is not pre-purchased. All products listed in Section 16414 Part 2 shall be provided by the
Contractor. Refer to Section revisions below.

Question #104:
Specification section 16133, 3.1.10 says “Provide OCAL conduits for all fire detection systems in process
areas and outdoors.” The general notes on drawing E030A do not mention OCAL conduit for the fire alarm
cables, these notes say “RED COLOURED RGS CONDUITS (WITH SEALANT TO MEET THE
HAZARDOUS REQUIREMENTS FOR RATED AREAS) OR EMT CONDUIT IN NON-RATED AREAS.”
Can you confirm if OCAL is required for the fire detection system in process areas and outdoors?

Answer #104:
Refer to Addendum #3 Question #69

Question #105:
PSH-8010 is stating a range that seems out of context with the type of sensor. The sensors are available
in inches of water column. Please provide necessary range for this sensor.

Answer #105:
Refer to addendum #7 drawing I003A.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 20 of 32
December 6, 2023

SPECIFICATIONS
General
Item No. 1 Appendix E (System Integration Proposal)

1.1 Delete Appendix E and replace with attached Appendix E.

Item No. 2 Section 00213 (Instructions to Bidders)

2.1 Delete Clause 1.19.1 and replace with new Clause 1.19.1:

“.1 The Bidder is to hold in force and may not revoke their bid for a period of
ninety (90) calendar days following the Bid Opening.”

Item No. 3 Section 00310 (Tender Breakdown)

3.1 Delete Section 00310 and replace with attached Section 00310. Section revisions
include the following:

.1 Updated cost for the System Integration (Excelpro) item.

.2 Addition of Item “Concrete Repairs of Existing Structures” and addition of


Table A (Concrete Repairs of Existing Structures)

Civil
Item No. 4 Section 02714 (Watermains)

4.1 Delete subsection 2.3 and replace with new subsection 2.3:

“2.3 PIPE AND JOINT RESTRAINT

.1 All pipes to be mechanically restrained.”

Item No. 5 Section 02315 (Excavation, Trenching and Backfilling)

5.1 Delete Clause 3.5.2.3.1, replace with “Reserved”


Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 21 of 32
December 6, 2023

Item No. 6 Section 02451 (Rock Anchors)

6.1 Under Subsection 1.2 (Definitions), Delete the following:

“Maximum Test Load: The maximum load to which the rock anchor is subjected
during testing. Recommended as 1.33 x DL for performance load tests. The
maximum test load shall not exceed 0.8 x ultimate tensile strength of the rock
anchor bar. For pre-production load tests, test to two times allowable bond
stress.”

And replace with:

“Maximum Pre-production Anchor Test Load: The maximum load to which the
rock anchor is subjected during pre-production testing. The maximum test load
shall not exceed 0.8 x ultimate tensile strength of the rock anchor bar. Testing to
be completed to the nominal grout-to-ground bond strength for the rock anchor
configuration and dimensions.

Maximum Production Anchor Test Load: The maximum load to which the rock
anchor is subjected to as part of production testing (Proof Load Test). Test shall
not exceed 0.9 x DL for production load tests. The maximum test load shall not
exceed 0.8 x ultimate tensile strength of the rock anchor bar.”

6.2 Under subsection 1.2 (Definitions), Delete the following:

“Performance Load Test – Rock anchor load test performed to verify the design
of the rock anchor system and the construction methods proposed, prior to
installation of production rock anchors.”

And replace with:

“Performance Load Test – Also, referred to Verification Test. Rock anchor load
test performed to verify the design of the rock anchor system and the construction
methods proposed, prior to installation of production rock anchors.”

6.3 Under subsection 1.3 (References), delete the following:

“.8 Post Tensioning Institute Publications:


.1 Recommendations for Prestressed Rock and Soil Anchors”

And replace with:

“.8 Post Tensioning Institute Publications:


.1 PTI DC35.1-14 – Recommendations for Prestressed Rock and
Soil Anchors”

6.4 Under subsection 1.6 (Existing Conditions), Add the following clause 1.6.6:

“.6 The production load testing of rock anchors is to be completed prior to the
placement of the reinforcing and concrete base slab. The Contractor will be
responsible for providing the associated provisions to allow for the test to be
completed without reliance on the final structure.”
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 22 of 32
December 6, 2023

6.5 Under 1.8 – Rock Anchor Design Criteria, Add the Following clause 1.8.11:

“11. Design of the rock anchors must consider the maximum pre-production
test loads in their design.”

6.6 Under 1.12 – Construction Submittals, Add the Following clause 1.12.14:

“.14 Production Load Testing Plan (Proof Test Plan): Detailed plans for the
proposed rock anchor load testing method for production rock anchors. This shall
include all drawings, details, and structural design calculations necessary to clearly
describe the proposed test method, reaction load system capacity and equipment
setup, types and accuracy of apparatus to be used for applying and measuring the
test loads and Rock Anchor top movements in accordance with PART 3.”

6.7 Add the Following Section 3.4:

“3.4 Production Load Tests (Proof Testing)


.1 Provide production load tests for 100% of Rock Anchors to a
tested load not to exceed the Maximum Production Anchor Test Load.
.2 Complete production load testing of the anchors prior to the
placement of the reinforcing and concrete base slab.
.3 Complete production load testing on production rock anchors in
accordance with the recommendations in PTI DC35.1-14 for ‘Proof
Testing’. The maximum load shall be applied and tested in accordance
with the definition of the Design Load (DL) within this specification
(0.9 x DL).
.4 Acceptance of the test results is based on the recommendations
with PTI DC35.1-14.”

Mechanical
Item No. 7 Section 11253 (Chemical Storage Tanks)

7.1 Delete Clause 2.2.2 and replace with new Clause 2.2.2:

“.2 Tanks shall be rotationally-molded, double wall, high density cross-linked


polyethylene, one-piece seamless construction, cylindrical in cross-section and
vertical with flat bottoms. Where indicated, tanks shall be provided with ancillary
mechanical fittings and accessories. The assembly consists of one cylindrical,
closed top inner primary tank and one cylindrical, open top containment outer tank.
The assembly shall be designed to prevent rainwater and debris from entering the
containment tank. Tanks to be marked to identify the manufacturer, date of
manufacture and serial numbers must be permanently embossed into the tank”

7.2 Delete Clause 2.2.11 and replace with new Clause 2.2.11:

“.11 Specified Product: Poly Processing company SAFE-Tank upright doubled


walled high density cross-lined polyethylene tanks.”

Item No. 8 Section 11382A (Gate Schedule)

8.1 Replace Gate Schedule with attached updated Gate Schedule.


Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 23 of 32
December 6, 2023

Item No. 9 Section 15030 (Testing)

9.1 In clause 3.1.1, delete the design pressure entry for NG Natural Gas and replace
with “14”.

9.2 In clause 3.1.1, delete the test pressure entry for NG Natural Gas and replace with
“100”.

Item No. 10 Section 15100.1 (Process Valve Schedule)

10.1 Replace Process Valve Schedule with attached updated Process Valve Schedule.

Item No. 11 Section 15100-E (Swing Check Valve Data Sheet (Type E)

11.1 Delete Specified product “Apco Series 6000” and replace with “Apco Series 250”.

Item No. 12 Section 15241 (Vibration Isolation and Seismic Control Measures)

12.1 Add clause 1.1.3

“.3 This specification section applies to Division 11 and Division 15.”

Item No. 13 Section 15412 (Plumbing Pumps)

13.1 Add the following clause 2.2.17:

“.17 EQ Sump Pump System Controller (Pump P-407):


.1 Controls: provide complete control package for operation of the
pumps as described below. Provide floats as required by the Pump
System Controller sections below. Pump controllers shall be
provided in S/S NEMA 4X, wall mounted, hinged enclosures.
Controller to have integral starters, disconnects, pilot lights,
pushbuttons and selector switch. Cabling between pump controllers
rated spaces will be provided by EYS sealed conduit. At a minimum,
provide the following operator interface devices on the panel door:
.1 Hand-Off-Auto 3-position selector switch
.2 Running pilot light (green)
.3 Fault/Alarm pilot light (amber)
.4 Overload/Fault reset pushbutton
.5 Other devices as required for Operator interface without needing
to open the panel.
.2 Intent:
.1 Shall manage a sump pit in with a single pump arrangement.
.2 Pumps shall have a run-time meter.
.3 Shall provide basic feedback to a remote PLC system.
.4 One (1) three phase 600V power source will be provided to the
Pump Controller, which will then directly drive the sump pump as
required. Provide control transformer to derive control power
inside the panel.
.3 In the automatic mode:
.1 Logic to operate the sump pump in the event of high water level
condition.
.4 In the manual mode:
.1 Start, stop and overload reset shall be provided for the sump
pump under manual operator supervision.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 24 of 32
December 6, 2023

.5 Fault Monitoring:
.1 Control panel shall detect for ground faults within the
submersible pump and fault/lockout the pump from service
accordingly.
.2 Pump shall have its own internal overloads per Ontario Electrical
Safety Code requirements.
.6 Level Monitoring:
.1 A two-float system:
.1 Three (3) Xylem ENM-10 floats complete with intrinsically
safe barrier relays for start/stop control.
.2 Additional controls requirements in panel:
.1 Push to test LED pilot light for pump “Running” and
“Overload/GFI fault” status.
.3 PLC control integration requirements (monitoring only):
.1 The pump shall start and run when the high-level float is
activated and run until the low-level float is de-
activated. The third float is for a high-high level alarm.
.2 Dry contacts to allow 120V PLC based control monitoring of
the following:
.1 General Fault Annunciation
.1 One general fault contact to remotely annunciate
any of the following conditions:
.1 Pump overload/fault
.2 Loss of System Power Available (i.e. breaker is
tripped).
.3 High-High Level
.4 Panel temperature alarm (if the panel is heated)
.7 All pumps and water level sensors and control panels are located in
a Zone 2 area and to be suitably rated for the area.
.8 Control panel to be S/S NEMA 4X rated suitable for an outdoor
environment. Control panel to be insulated and come complete with
integral heater and thermostat to meet outdoor environmental
conditions. Monitor the temperature of the panel via a thermostat for
alarm back to the plant PLC, per above.”

Item No. 14 Section 15412A (Plumbing Pump Schedule)

14.1 Add “Type 6” to the Type column for pump I.D. P-208.

Item No. 15 Section 15412A (Plumbing Pump Schedule)

15.1 Replace Plumbing Pump Schedule with attached updated Plumbing Pump
Schedule.

Item No. 16 Section 15500 (Fire Protection)

16.1 Add following Clause 2.1.3

".3 Alternate Manufacturers: Kidde"


Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 25 of 32
December 6, 2023

Item No. 17 Section 15625 (Hot Water Boilers)

17.1 Delete clause 1.1.3.6 and replace with the following clause 1.1.3.6

“.6 The supplier is responsible for shipping materials to site in an appropriate


manner to minimize damage to the equipment. Contractor to coordinate with
supplier on shipping and storage requirements. Contractor to store the equipment
in a suitable location as recommended by the manufacturer. On-site indoor stage,
in the boiler room or otherwise, may not be possible, and contractor is to provide
all necessary storage requirements.’

17.2 Delete clause 2.3.1.4 and replace with the following clause 2.3.1.4:

Dual Fuel Dual Fuel Natural Gas Boiler


BLR-901 BLR-802 BLR-903

“.4 Natural Gas Pressure: 14 kPa (2 psig) 14kPa (2 psig) 14 kPa (2 psig)”

Item No. 18 Section 15800A (Louvre Schedule)

18.1 Replace Louvre Schedule with attached updated Louvre Schedule.

Item No. 19 Section 15930A (Mechanical Control Valve Schedule)

19.1 Replace Mechanical Control Valve Schedule with attached updated Mechanical
Control Valve Schedule.

Electrical
Item No. 20 Section 16414 (Automatic Transfer Switch)

20.1 Revise the title of Part 2 – Products to delete “(Pre-purchased Materials)”.


Subsection title to read “PART 2 – Products”

Item No. 21 Section 17501 (Sequence of Operations)

21.1 Delete Section 17501 and replace with attached revised Section 17501.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 26 of 32
December 6, 2023

DRAWINGS
Civil
Item No. 22 Drawing C004A (SITE SERVICING PLAN)

22.1 Delete the note “50mm Service Water” located east of Headworks Building:

Item No. 23 Drawing C008A (DETAILS)

23.1 Delete Detail 5/C008.

Item No. 24 Drawing C002A (REMOVALS)

24.1 Delete callout “EXISTING CHANNEL TO BE REMOVED. REFER TO


STRUCTURAL DRAWING”.

Item No. 25 Drawing C007A (DETAILS)

25.1 Valve Chamber 1 – Section:

.1 Revise Top of Chamber Elevation = 89.40m

.2 Bottom of Chamber Elevation = 85.30m

25.2 Valve Chamber 2 – Section:

.1 Revise Top of Chamber Elevation = 90.00m

.2 Bottom of Chamber Elevation = 87.00m

Structural
Item No. 26 Drawing S011A (STANDARD DETAILS)

26.1 Delete Detail 10/S011A – Typical Pipe Saddle Detail 1, as it is not required on the
project.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 27 of 32
December 6, 2023

Mechanical
Item No. 27 Drawing MID001A (MECHANICAL & INSTRUMENTATION SITE WIDE BOILER
SYSTEM)

27.1 Revise drawing as per sketch SKMID001A-1.

Item No. 28 Drawing P201A (PROCESS HEADWORKS BUILDING GROUND FLOOR PLAN)

28.1 Revise drawing as per sketch SKP201A-1.

Item No. 29 Drawing M301A (MECHANICAL SERVICE BUILDING BASEMENT HVAC PLAN)

29.1 Revise drawing as per sketch SKM301A-1.

Item No. 30 Drawing P401A (PROCESS PRIMARY TANKS PRIMARY CLARIFIERS LAYOUT)

30.1 Revise drawing as per sketch SKP401A-1, for the addition of the equalization
sump pump, and removal of sluice gate motorized tag SGA-401.

Electrical
Item No. 31 Drawings PID403A (EQUALIZATION TANKS, PROCESS AIR & COAGULANT DOSING
SYSTEM)

31.1 Replace entire drawing with the attached revised drawing PID403A. Drawing
revisions include the following:

.1 Add P-407 and LCP-4014. Refer to drawing for details.

Item No. 32 Drawings ME002A (MOTOR STARTER & CONTROL LIST SHEET 2 OF 4)

32.1 Replace entire drawing with the attached revised drawing ME002A. Drawing
revisions include the following:

.1 Add P-407 to Motor Starter & Control List. Refer to drawing for details.

Item No. 33 Drawings ME003A (MOTOR STARTER & CONTROL LIST SHEET 3 OF 4)

33.1 Replace entire drawing with the attached revised drawing ME003A. Drawing
revisions include the following:

.1 Re-organize motor starter and control list to accommodate addition of P-


407 to table.

Item No. 34 Drawings ME004A (MOTOR STARTER & CONTROL LIST SHEET 4 OF 4)

34.1 Replace entire drawing with the attached revised drawing ME004A. Drawing
revisions include the following:

.1 Re-organize motor starter and control list to accommodate addition of P-


407 to table.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 28 of 32
December 6, 2023

Item No. 35 Drawings E002A (SITE PLAN)

35.1 Replace entire drawing with the attached revised drawing E002A. Drawing
revisions include the following:

.1 Replace conduit layout detail for power duct between Digester and Electrical
Service Building. Refer to drawing for details.

Item No. 36 Drawings E004A (HEAT TRACE DETAILS)

36.1 Replace entire drawing with the attached revised drawing E004A. Drawing
revisions include the following:

.1 Replace “100-SS-DG” with “150-SS-DG” to TC-8030 on Heat Trace Schedule


(No.12) for Digester Gas on Digester Roof. Refer to schedule for details.

Item No. 37 Drawings E0011A (FACILITY SINGLE LINE DIAGRAM)

37.1 Replace entire drawing with the attached revised drawing E011A. Drawing
revisions include the following:

.1 Add Drawing Note 7. Text to read “Each ATS is to provide a "dry contact, generator
start" signal to a control terminal box within JBP-001.”

.2 Add Drawing Note 7 bubble at ATS-001 & ATS-002.

.3 Add MCP-8001 and associated wiring and appurtenances. Refer to drawing for
details.

Item No. 38 Drawings I001A (TABLE OF PANELS SHEET 1 OF 2)

38.1 Replace entire drawing with the attached revised drawing I001A. Drawing revisions
include the following:

.1 Add LCP-4014 to the Table of Panels and Electrical Equipment. Refer to table for
details.

Item No. 39 Drawings I002A (TABLE OF PANELS SHEET 2 OF 2)

39.1 Replace entire drawing with the attached revised drawing I002A. Drawing revisions
include the following:

.1 Re-organize table of panels to accommodate addition of LCP-4014 to


table.

Item No. 40 Drawings I003A (TABLE OF DEVICES SHEET 1 OF 2)

40.1 Replace entire drawing with the attached revised drawing I003A. Drawing revisions
include the following:

.1 Replace Notes column to read “Range: 0 to 1 Bar” for PIT-8020, PSH-8010, PSH-
8031, PSH-8033, PSL-8032 & PSL-8034. Refer to table for details.
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 29 of 32
December 6, 2023

Item No. 41 Drawings E202A (SINGLE LINE DIAGRAM AND PANEL SCHEDULES SHEET 2 OF 2)

41.1 Replace entire drawing with the attached revised drawing E202A. Drawing
revisions include the following:

.1 Add Drawing Note 3. Text to read “Local Control Panel to have integral
disconnect.”

.2 Add P-407 (Equalization Wet Well Drain Pump) and LCP-4014. Refer to drawing
Detail 4/E202A for details.

.3 Add P-407 to circuit 1/3/5 in DP-201. Refer to drawing for details.

Item No. 42 Drawings I200A (CONTROL BLOCK DIAGRAM 1 OF 2)

42.1 Replace entire drawing with the attached revised drawing I200A. Drawing revisions
include the following:

.1 Add PFP-200 and associated cabling to CP-2000. Refer to drawing for details.

Item No. 43 Drawings I201A (CONTROL BLOCK DIAGRAM 2 OF 2)

43.1 Replace entire drawing with the attached revised drawing I201A. Drawing revisions
include the following:

.1 Add Drawing Note 1. Text to read “Contractor to provide for routing of signal
cable from LCP-4014 via LCP-4013 to CP-2000.”

.2 Add LCP-4014 and associated cabling. Refer to drawing for details.

Item No. 44 Drawings I203A (IO TABLES – PLC-200 (CON’TD))

44.1 Replace entire drawing with the attached revised drawing I203A. Drawing revisions
include the following:

.1 Add DI-260, “Equalization Wet Well Drain Pump - General Alarm”, for LCP-4014
to PLC-200 Component I/O List. Refer to drawing for details.

Item No. 45 Drawings I204A (IO TABLES – PLC-200 (CON’TD))

45.1 Replace entire drawing with the attached revised drawing I204A. Drawing revisions
include the following:

.1 Add DO-11, “Active Power Factor Panel – Inhibit”, for PFP-200 to PLC-200
Component I/O List. Refer to drawing for details.

Item No. 46 Drawings E311A (GROUND FLOOR HOUSE SERVICES PLAN)

46.1 Replace entire drawing with the attached revised drawing E311A. Drawing
revisions include the following:

.1 Revise Drawing Note 16 to now read “MCC-310 is future and not included in this
contract. Contractor to coordinate the installation of MCC-300 to facilitate the
future installation of MCC-310. Provide housekeeping pad as shown for future
MCC-310. Coordinate the branch breaker in MCC-300 to facilitate feeding MCC-
310 at a later date. The branch breaker for MCC-310 inside MCC-300 is to be
provided as part of this contract; refer to E301A.”
Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 30 of 32
December 6, 2023

Item No. 47 Drawings I300A (CONTROL BLOCK DIAGRAM)

47.1 Replace entire drawing with the attached revised drawing I300A. Drawing revisions
include the following:

.1 Add PFP-100 & PFP-300, and associated cabling to CP-3000. Refer to drawing
for details.

Item No. 48 Drawings I302A (IO TABLES CONT’D– PLC-300)

48.1 Replace entire drawing with the attached revised drawing I302A. Drawing revisions
include the following:

.1 Add DO-40, “Active Power Factor Panel – Inhibit”, for PFP-100 to PLC-300
Component I/O List. Refer to drawing for details.

.2 Add DO-41, “Active Power Factor Panel – Inhibit”, for PFP-300 to PLC-300
Component I/O List. Refer to drawing for details.

Item No. 49 Drawings I410A (POWER AND INSTRUMENTATION PLAN)

49.1 Replace entire drawing with the attached revised drawing I410A. Drawing revisions
include the following:

.1 Add Drawing Note 13. Text to read “Provide two (2) dedicated 103mm PVC
sleeves for the integral cables for drain pump. Secure sleeves to the underside of
the concrete slab using S/S hardware and S/S fasteners. Sleeves to stub up
through the concrete slab beneath the local control panel. Coordinate with
Structural.”

.2 Add Drawing Note 12 bubble on future pumps P-404, P-405, P-406, and
associated disconnects. Refer to drawing for details.

.3 Add pump P-407 and LCP-4014. Refer to drawing for details.

.4 Add Drawing Note 13 bubble on pump P-407. Refer to drawing for details.

Item No. 50 Drawings I800A (CONTROL BLOCK DIAGRAM)

50.1 Replace entire drawing with the attached revised drawing I800A. Drawing revisions
include the following:

.1 Add PFP-800 and associated cabling to CP-8000. Refer to drawing for details.

Item No. 51 Drawings I802A (COMPONENT LIST & IO TABLES CONT’D – PLC-800)

51.1 Replace entire drawing with the attached revised drawing I800A. Drawing revisions
include the following:

.1 Add DO-43, “Active Power Factor Panel – Inhibit”, for PFP-800 to PLC-800
Component I/O List. Refer to drawing for details.

ATTACHMENTS
The following documents are attached at the end of this Addendum:

• Section 00310 (Tender Breakdown)


Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 31 of 32
December 6, 2023

• Section 11382A (Gate Schedule)


• Section 15100.1 (Process Valve Schedule)
• Section 15412A (Plumbing Pump Schedule)
• Section 15800A (Louvre Schedule)
• Section 15930A (Mechanical Control Valve Schedule)
• Section 17501 (Sequence of Operations)
• Appendix E - System Integration Proposal, Water Pollution Control Plant, Prepared By Excelpro
Automation, December 2023
• New Sketches:
o SKMID001A-1
o SKP201A-1
o SKM301A-1
o SKP401A-1
• Revised Drawings:
o PID403A
o ME002A
o ME003A
o ME004A
o E002A
o E004A
o E011A
o I001A
o I002A
o I003A
o E202A
o I200A
o I201A
o I203A
o I204A
o E311A
o I300A
o I302A
o I410A
o I800A
o I802A
• Record Drawing C-001, Project No. 375175, Prepared by CH2M Hill, July 2008
• Potential Routes from existing Sanitary Pumping Stations to nearest Maintenance Holes
• Record Drawings M6 and M7, Kemptville WPCP Contract No. 2, prepared by Gore & Storrie Ltd.,
December 1991.

END OF ADDENDUM NO. 7

Mike Finley, P.Eng.


Director of Public Works & Environmental Services
Municipality of North Grenville

cc: All Plan Takers


Kemptville Water Pollution Control JLR No.: 29475-000.1
Plant Expansion – Phase A Owner No.: NG23-44
ADDENDUM NO. 7
Page 32 of 32
December 6, 2023

Addenda to Date:
Addendum 1 October 17, 2023
Addendum 2 November 3, 2023
Addendum 3 November 16, 2023
Addendum 4 November 23, 2023
Addendum 5 November 28, 2023
Addendum 6 December 4, 2023
Kemptville Water Pollution Control Section 00310
Plant Expansion – Phase A TENDER BREAKDOWN Page 1 of 6
JLR No. 29475-000.1 December 2023

BREAKDOWN OF ITEMS AND PRICES

The following detailed breakdown of items and prices will be submitted in accordance with section 1.7 of the
Instructions to Bidders following the Tender Closing Time and does not need to be submitted with the Bid Form. A
further breakdown of these items will be determined with the successful Contractor after execution of the Contract for
the purpose of progress payment certificates.

The BREAKDOWN TOTAL at the end of this table should equal the Bid Price in the Bid Form .

Item Description Amount


(excl. HST)
1. VARIOUS SITE WIDE UPGRADES
General Requirements (Div 1)
a. Mobilization and demobilization at the Place of the Work including
temporary offices and conveniences, other temporary facilities,
reinstatement, and other items not required to be incorporated into the
Work (sixty percent (60%)) to be paid upon complete mobilization and
forty percent (40%) to be paid upon complete demobilization)

NOTE: Total for this item shall not exceed two percent (2%) of
Breakdown Total
b. Bonding
c. Insurance
Civil Works (Div 2)
d. Erosion & Sedimentation Control
e. Site Removals
f. Site Excavation (Earthworks)
g. Site Ditching & Grading
h. Excavation Dewatering
i. Yard Piping
j. Reinstatement and Landscaping
k. Fencing and Gates
l. Other not covered in “d” to “l”
Electrical (Div 16)
m. Site-Wide Electrical Servicing
n. Site Security Surveillance System
Item #1 Subtotal $

2. 200 SERIES – NEW HEADWORKS BUILDING


a. Div 3 (Concrete)
b. Div 4 (Masonry)
c. Div 5 (Metals)
d. Div 6 (Wood and Plastics)
e. Div 7 (Thermal and Moisture Protection)
f. Div 8 (Doors and Windows)
g. Div 9 (Finishes)
ISSUED FOR ADDENDUM #7
Kemptville Water Pollution Control Section 00310
Plant Expansion – Phase A TENDER BREAKDOWN Page 2 of 6
JLR No. 29475-000.1 December 2023

Item Description Amount


(excl. HST)
h. Div 11 (Equipment)
i. Div 15 A (Mechanical Process)
j. Div 15 B (Mechanical HVAC)
k. Div 16 (Electrical)
l. Div 17 (Plant Automation)
m. Other not included in above
Item #2 Subtotal $

3. 300 SERIES – EXISTING SERVICE BUILDING


a. Div 3 (Concrete)
b. Div 4 (Masonry)
c. Div 5 (Metals)
d. Div 6 (Wood and Plastics)
e. Div 7 (Thermal and Moisture Protection)
f. Div 8 (Doors and Windows)
g. Div 9 (Finishes)
h. Div 11 (Equipment)
i. Div 15 A (Mechanical Process)
j. Div 15 B (Mechanical HVAC)
k. Div 16 (Electrical)
l. Div 17 (Plant Automation)
m. Other not included in above
Item #3 Subtotal $

4. 400 SERIES – NEW PRIMARY CLARIFIERS


a. Div 3 (Concrete)
b. Div 4 (Masonry)
c. Div 5 (Metals)
d. Div 6 (Wood and Plastics)
e. Div 7 (Thermal and Moisture Protection)
f. Div 8 (Doors and Windows)
g. Div 9 (Finishes)
h. Div 11 (Equipment)
i. Div 15 A (Mechanical Process)
j. Div 15 B (Mechanical HVAC)
k. Div 16 (Electrical)
l. Div 17 (Plant Automation)
m. Other not included in above
Item #4 Subtotal $

ISSUED FOR ADDENDUM #7


Kemptville Water Pollution Control Section 00310
Plant Expansion – Phase A TENDER BREAKDOWN Page 3 of 6
JLR No. 29475-000.1 December 2023

Item Description Amount


(excl. HST)
5. 500 SERIES – NEW AERATION TANKS
a. Div 3 (Concrete)
b. Div 4 (Masonry)
c. Div 5 (Metals)
d. Div 6 (Wood and Plastics)
e. Div 7 (Thermal and Moisture Protection)
f. Div 8 (Doors and Windows)
g. Div 9 (Finishes)
h. Div 11 (Equipment)
i. Div 15 A (Mechanical Process)
j. Div 15 B (Mechanical HVAC)
k. Div 16 (Electrical)
l. Div 17 (Plant Automation)
m. Other not included in above
Item #5 Subtotal $

6. 600 SERIES – EXISTING AERATION TANKS


a. Div 3 (Concrete)
b. Div 4 (Masonry)
c. Div 5 (Metals)
d. Div 6 (Wood and Plastics)
e. Div 7 (Thermal and Moisture Protection)
f. Div 8 (Doors and Windows)
g. Div 9 (Finishes)
h. Div 11 (Equipment)
i. Div 15 A (Mechanical Process)
j. Div 15 B (Mechanical HVAC)
k. Div 16 (Electrical)
l. Div 17 (Plant Automation)
m. Other not included in above
Item #6 Subtotal $

7. 700 SERIES – NEW TERTIARY FILTER BUILDING


a. Div 3 (Concrete)
b. Div 4 (Masonry)
c. Div 5 (Metals)
d. Div 6 (Wood and Plastics)
e. Div 7 (Thermal and Moisture Protection)
f. Div 8 (Doors and Windows)
g. Div 9 (Finishes)
h. Div 11 (Equipment)
ISSUED FOR ADDENDUM #7
Kemptville Water Pollution Control Section 00310
Plant Expansion – Phase A TENDER BREAKDOWN Page 4 of 6
JLR No. 29475-000.1 December 2023

Item Description Amount


(excl. HST)
i. Div 15 A (Mechanical Process)
j. Div 15 B (Mechanical HVAC)
k. Div 16 (Electrical)
l. Div 17 (Plant Automation)
m. Other not included in above
Item #7 Subtotal $

8. 800 SERIES – DIGESTER BUILDING


a. Div 3 (Concrete)
b. Div 4 (Masonry)
c. Div 5 (Metals)
d. Div 6 (Wood and Plastics)
e. Div 7 (Thermal and Moisture Protection)
f. Div 8 (Doors and Windows)
g. Div 9 (Finishes)
h. Div 11 (Equipment)
i. Div 15 A (Mechanical Process)
j. Div 15 B (Mechanical HVAC)
k. Div 16 (Electrical)
l. Div 17 (Plant Automation)
m. Other not included in above
Item #8 Subtotal $

9. 900 SERIES – ELECTRICAL SERVICES


a. Div 3 (Concrete)
b. Div 4 (Masonry)
c. Div 5 (Metals)
d. Div 6 (Wood and Plastics)
e. Div 7 (Thermal and Moisture Protection)
f. Div 8 (Doors and Windows)
g. Div 9 (Finishes)
h. Div 11 (Equipment)
i. Div 15 A (Mechanical Process)
j. Div 15 B (Mechanical HVAC)
k. Div 16 (Electrical)
l. Div 17 (Plant Automation)
m. Other not included in above
Item #9 Subtotal $

10. Other General Work Not Related to Above


a. Div 3 (Concrete)
ISSUED FOR ADDENDUM #7
Kemptville Water Pollution Control Section 00310
Plant Expansion – Phase A TENDER BREAKDOWN Page 5 of 6
JLR No. 29475-000.1 December 2023

Item Description Amount


(excl. HST)
b. Div 4 (Masonry)
c. Div 5 (Metals)
d. Div 6 (Wood and Plastics)
e. Div 7 (Thermal and Moisture Protection)
f. Div 8 (Doors and Windows)
g. Div 9 (Finishes)
h. Div 10 (Specialties)
i. Div 11 (Equipment)
j. Div 12 (Furnishings)
k. Div 13 (Special Construction)
l. Div 14 (Conveying Systems)
m. Div 15 A (Mechanical Process)
n. Div 15 B (Mechanical HVAC)
o. Div 16 (Electrical)
p. Div 17 (Plant Automation)
q. Other not included in above
Item #10 Subtotal $

SUBTOTAL (ITEMS #1 to #10 inclusive) $

Concrete Repairs of Existing Structures (Sum of Table A below) $


Systems Integration (Excelpro) $ 524,833.96
Cash Allowances (Section 01210) $ 130,000.00
Provisional Item: Supply and installation of Centrifuge Dewatering $
System, including associated equipment, piping and other
appurtenances.
Contingency $ 3,000,000.00
BREAKDOWN TOTAL $

ISSUED FOR ADDENDUM #7


Kemptville Water Pollution Control Section 00310
Plant Expansion – Phase A TENDER BREAKDOWN Page 6 of 6
JLR No. 29475-000.1 December 2023

TABLE A: Concrete Repairs of Existing Structures

The following concrete repairs and miscellaneous scope of work may be completed on whole or in part at the
Owner’s discretion to address repairs that they deem required as part of the work. These items are in addition to the
noted scope of work identified on the Drawings and Technical Specifications and is intended to be used on the
project site.

Description Quantity (A) Unit Cost (B) Amount (A x B)

Horizontal Concrete Patch Repairs within Liquid


Retaining and Basement Structures (per Section 5 m2 $ ________ /m2 $
03380)
Vertical Surface Concrete Patch Repairs within
Liquid Retaining and Basement Structures (per 5 m2 $ ________ /m2 $
Section 03380)
Shallow Depth Horizontal Repairs within Liquid
Retaining and Basement Structures (per Section 5 m2 $ ________ /m2 $
03380)
Shallow Depth Vertical Surface Repairs within
Liquid Retaining and Basement Structures (per 5 m2 $ ________ /m2 $
Section 03380)
Horizontal Concrete Patch Repairs outside of
Liquid Retaining and Basement Structures (per 10 m2 $ ________ /m2 $
Section 03380)
Vertical Surface Concrete Patch Repairs outside
of Liquid Retaining and Basement Structures (per 10 m2 $ ________ /m2 $
Section 03380)
Shallow Depth Horizontal Repairs outside of
Liquid Retaining and Basement Structures (per 10 m2 $ ________ /m2 $
Section 03380)
Shallow Depth Vertical Surface Repairs outside of
Liquid Retaining and Basement Structures (per 10 m2 $ ________ /m2 $
Section 03380)
Crack Injection (Per Section 03390) 50 m $ ________ /m $
20M Horizontal Adhesive Dowels x 1000mm long,
embedded 450mm with Hilti HIT RE-500 V3 50 $ ________/each $
Adhesive
20M Vertical Adhesive Dowels x 1000mm long,
embedded 450mm with Hilti HIT RE-500 V3 50 $ ________/each $
Adhesive
Total (Table A) $

END OF SECTION

ISSUED FOR ADDENDUM #7


KEMPTVILLE WPCP EXPANSION DESIGN SECTION: 11382
KEMPTVILLE, ON GATE SCHEDULES PHASE A
JLR No.: 29475-000 SHEET 1 OF 2
SIZE DESIGN HEAD INVERTS ELECTRICAL FIELD WORK
STEM OPERATOR ACTUATOR
I.D. DESCRIPTION MOUNTING TYPE WxH SERVICE SEATING UNSEATING GATE OPERATOR POWER VOLTS PHASE SUPP. INST. WIRED COMM. COMMENTS
TYPE TYPE OPERATION
mm m m m m HP V BY BY BY BY
RAW
HG 201 GRIT TANK HAND GATE SURFACE MOUNTED 750X1500 N/A 1.5 N/A N/A N/A 89.600 N/A 0 0 0 M M N/A G
SEWAGE
RAW
HG 202 GRIT TANK HAND GATE SURFACE MOUNTED 750X1500 N/A 1.5 N/A N/A N/A 89.600 N/A 0 0 0 M M N/A G
SEWAGE
RAW
HG 203 GRIT TANK HAND GATE SURFACE MOUNTED 750X1500 N/A N/A 1.5 N/A N/A 90.175 N/A 0 0 0 M M N/A G
SEWAGE
RAW
HG 204 GRIT TANK HAND GATE SURFACE MOUNTED 750X1500 N/A N/A 1.5 N/A N/A 90.175 N/A 0 0 0 M M N/A G
SEWAGE
RAW
HG 205 WEIR GATE HAND GATE SURFACE MOUNTED 1300X2500 N/A 1.06 N/A N/A N/A 88.850 N/A 0 0 0 M M N/A G
SEWAGE
RAW
HG 206 WEIR GATE HAND GATE SURFACE MOUNTED 1300X2500 N/A 1.06 N/A N/A N/A 88.850 N/A 0 0 0 M M N/A G
SEWAGE
RAW
HG 207 WEIR GATE HAND GATE SURFACE MOUNTED 1300X2500 N/A 1.06 N/A N/A N/A 88.850 N/A 0 0 0 M M N/A G
SEWAGE
RAW
HG 401 PRIMARY CLARIFIER NO. 1 HAND GATE SURFACE MOUNTED 300X1100 N/A 1.03 N/A N/A N/A 88.350 N/A 0 0 0 M M N/A G
SEWAGE
RAW
HG 402 PRIMARY CLARIFIER NO. 1 HAND GATE SURFACE MOUNTED 300X1100 N/A 1.03 N/A N/A N/A 88.350 N/A 0 0 0 M M N/A G
SEWAGE
RAW
HG 403 PRIMARY CLARIFIER NO. 1 HAND GATE SURFACE MOUNTED 300X1100 N/A 1.03 N/A N/A N/A 88.350 N/A 0 0 0 M M N/A G
SEWAGE
RAW
HG 404 PRIMARY CLARIFIER NO. 2 HAND GATE SURFACE MOUNTED 300X1100 N/A 1.03 N/A N/A N/A 88.350 N/A 0 0 0 M M N/A G
SEWAGE
RAW
HG 405 PRIMARY CLARIFIER NO. 2 HAND GATE SURFACE MOUNTED 300X1100 N/A 1.03 N/A N/A N/A 88.350 N/A 0 0 0 M M N/A G
SEWAGE
RAW
HG 406 PRIMARY CLARIFIER NO. 2 HAND GATE SURFACE MOUNTED 300X1100 N/A 1.03 N/A N/A N/A 88.350 N/A 0 0 0 M M N/A G
SEWAGE
RAW
HG 407 PRIMARY CLARIFIER NO. 3 HAND GATE SURFACE MOUNTED 300X1100 N/A 1.03 N/A N/A N/A 88.350 N/A 0 0 0 M M N/A G
SEWAGE
RAW
HG 408 PRIMARY CLARIFIER NO. 3 HAND GATE SURFACE MOUNTED 300X1100 N/A 1.03 N/A N/A N/A 88.350 N/A 0 0 0 M M N/A G
SEWAGE
RAW
HG 409 PRIMARY CLARIFIER NO. 3 HAND GATE SURFACE MOUNTED 300X1100 N/A 1.03 N/A N/A N/A 88.350 N/A 0 0 0 M M N/A G
SEWAGE
RAW
HG 410 PRIMARY CLARIFIER INFLUENT CHANNEL HAND GATE EMBEDDED 650X1200 N/A N/A N/A N/A N/A 88.350 N/A 0 0 0 M M N/A G
SEWAGE
RAW
HG 411 PRIMARY CLARIFIER INFLUENT CHANNEL HAND GATE EMBEDDED 650X1200 N/A N/A N/A N/A N/A 88.350 N/A 0 0 0 M M N/A G
SEWAGE
PRIMARY
HG 501 AERATION TANK NO. 1 HAND GATE SURFACE MOUNTED 300X1100 N/A 0.65 N/A N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 502 AERATION TANK NO. 1 HAND GATE SURFACE MOUNTED 300X1100 N/A 0.65 N/A N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 503 AERATION TANK NO. 1 HAND GATE SURFACE MOUNTED 300X1100 N/A 0.65 N/A N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 504 AERATION TANK NO. 1 HAND GATE SURFACE MOUNTED 300X1100 N/A N/A 0.86 N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 505 AERATION TANK NO. 1 HAND GATE SURFACE MOUNTED 300X1100 N/A N/A 0.86 N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 506 AERATION TANK NO. 1 HAND GATE SURFACE MOUNTED 300X1100 N/A N/A 0.86 N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 507 AERATION TANK NO. 2 HAND GATE SURFACE MOUNTED 300X1100 N/A 0.65 N/A N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 508 AERATION TANK NO. 2 HAND GATE SURFACE MOUNTED 300X1100 N/A 0.65 N/A N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 509 AERATION TANK NO. 2 HAND GATE SURFACE MOUNTED 300X1100 N/A 0.65 N/A N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 510 AERATION TANK NO. 2 HAND GATE SURFACE MOUNTED 300X1100 N/A N/A 0.86 N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY

Tuesday, December 5, 2023 12:56:30 PM


HG 511 AERATION TANK NO. 2 HAND GATE SURFACE MOUNTED 300X1100 N/A N/A 0.86 N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 512 AERATION TANK NO. 2 HAND GATE SURFACE MOUNTED 300X1100 N/A N/A 0.86 N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 513 AERATION TANK NO. 3 HAND GATE SURFACE MOUNTED 300X1100 N/A 0.65 N/A N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 514 AERATION TANK NO. 3 HAND GATE SURFACE MOUNTED 300X1100 N/A 0.65 N/A N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 515 AERATION TANK NO. 3 HAND GATE SURFACE MOUNTED 300X1100 N/A N/A N/A N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 516 AERATION TANK NO. 3 HAND GATE SURFACE MOUNTED 300X1100 N/A N/A 0.86 N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 517 AERATION TANK NO. 3 HAND GATE SURFACE MOUNTED 300X1100 N/A N/A 0.86 N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 518 AERATION TANK NO. 3 HAND GATE SURFACE MOUNTED 300X1100 N/A N/A 0.86 N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 519 AERATION TANK HAND GATE EMBEDDED 750X1100 N/A N/A N/A N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT
PRIMARY
HG 520 AERATION TANK HAND GATE EMBEDDED 750X1100 N/A N/A N/A N/A N/A 88.725 N/A 0 0 0 M M N/A G
EFFLUENT

NOTE:
WIDTH DISPLAYED IN THE SIZE COLUMN IS INDICATING OPENING WIDTH. OVERALL GATE WIDTH IS TO BE DETERMINED BY GATE
MANUFACTURER SUCH THAT GATE WILL SEAL THE STATED OPENING. HEIGHT INDICATES DESIRED GATE DOOR HEIGHT THIS DOES
NOT INCLUDE FRAME DIMENSIONS.

FIELD WORK NOTATION

PLOT DATE:
M = MECHANICAL CONTRACTOR
E = ELECTRICAL CONTRACTOR
G = GENERAL CONTRACTOR
EX = EXISTING EQUIPMENT
KEMPTVILLE WPCP EXPANSION DESIGN SECTION: 11382
GATE SCHEDULE PHASE A
KEMPTVILLE, ON JLR No.: 29475-000 SHEET 2 OF 2
SIZE DESIGN HEAD INVERTS ELECTRICAL FIELD WORK
STEM OPERATOR ACTUATOR
I.D. DESCRIPTION MOUNTING TYPE WxH SERVICE SEATING UNSEATING GATE OPERATOR POWER VOLTS PHASE SUPP. INST. WIRED COMM. COMMENTS
TYPE TYPE OPERATION
mm m m m m HP V BY BY BY BY
HG 601 FINAL CLARIFIER NO. 3 HAND GATE SURFACE MOUNTED 1000X900 EFFLUENT N/A N/A N/A N/A N/A 88.725 N/A 0 0 0 M M N/A G

HG 605 FINAL CLARIFIER NO. 4 HAND GATE SURFACE MOUNTED 1000X900 EFFLUENT N/A N/A N/A N/A N/A 88.725 N/A 0 0 0 M M N/A G

HG 609 FINAL CLARIFIER NO. 1 HAND GATE SURFACE MOUNTED 1000X900 EFFLUENT N/A N/A N/A N/A N/A 88.725 N/A 0 0 0 M M N/A G

HG 610 FINAL CLARIFIER NO. 2 HAND GATE SURFACE MOUNTED 1000X900 EFFLUENT N/A N/A N/A N/A N/A 88.725 N/A 0 0 0 M M N/A G
RAW
SG 201 SCREENING SLUICE GATE SURFACE MOUNTED SELF-CONTAINED 750X1650 RISING 1.6 1 HAND CRANK OPEN/CLOSE 89.600 93.000 0 0 0 M M N/A G
SEWAGE
RAW
SG 202 SCREENING SLUICE GATE SURFACE MOUNTED SELF-CONTAINED 750X1650 RISING 1.6 1 HAND CRANK OPEN/CLOSE 89.600 93.000 0 0 0 M M N/A G
SEWAGE
RAW
SG 203 SCREENING SLUICE GATE SURFACE MOUNTED SELF-CONTAINED 750X1650 RISING 1.6 1.6 HAND CRANK OPEN/CLOSE 89.600 93.000 0 0 0 M M N/A G
SEWAGE
RAW
SG 204 SCREENING SLUICE GATE SURFACE MOUNTED SELF-CONTAINED 750X1650 RISING 1.6 1.6 HAND CRANK OPEN/CLOSE 89.600 93.000 0 0 0 M M N/A G
SEWAGE
RAW TYPICAL OPERATING OPEN ELEVATION TO BE 89.750, FULL CLOSED
SG 205 PRIMARY INFLUENT WEIR GATE SURFACE MOUNTED SELF-CONTAINED 1000X550 RISING 1.06 N/A HAND CRANK N/A 89.100 92.500 0 0 0 M M N/A G
SEWAGE ELEVATION TO BE 90.200
RAW TYPICAL OPERATING OPEN ELEVATION TO BE 89.750, FULL CLOSED
SG 206 PRIMARY INFLUENT WEIR GATE SURFACE MOUNTED SELF-CONTAINED 1000X550 RISING 1.06 N/A HAND CRANK N/A 89.100 92.500 0 0 0 M M N/A G
SEWAGE ELEVATION TO BE 90.200
RAW TYPICAL OPERATING OPEN ELEVATION TO BE 89.750, FULL CLOSED
SG 207 PRIMARY INFLUENT WEIR GATE SURFACE MOUNTED SELF-CONTAINED 1000X550 RISING 1.06 N/A HAND CRANK N/A 89.100 92.500 0 0 0 M M N/A G
SEWAGE ELEVATION TO BE 90.200

Tuesday, December 5, 2023 12:56:33 PM


NOTE:
WIDTH DISPLAYED IN THE SIZE COLUMN IS INDICATING OPENING WIDTH. OVERALL GATE WIDTH IS TO BE DETERMINED BY GATE
MANUFACTURER SUCH THAT GATE WILL SEAL THE STATED OPENING. HEIGHT INDICATES DESIRED GATE DOOR HEIGHT THIS DOES
NOT INCLUDE FRAME DIMENSIONS.

FIELD WORK NOTATION

PLOT DATE:
M = MECHANICAL CONTRACTOR
E = ELECTRICAL CONTRACTOR
G = GENERAL CONTRACTOR
EX = EXISTING EQUIPMENT
KEMPTVILLE WPCP EXPANSION DESIGN SECTION: 15100
KEMPTVILLE, ON PROCESS VALVE SCHEDULE PHASE A
JLR No.: 29475-000 SHEET 1 OF 5

DATASHEET OPERATION ELECTRICAL FIELD WORK


I.D. DESCRIPTION SIZE LINE SIZE NORMAL POWER VOLTS PHASE SUPP. INST. WIRED COMM. COMMENTS
No. OPERATOR FLUID
mm mm POSITION V BY BY BY BY
VC 201 GRIT PUMP 2 CHECK VALVE E SWING ARM 100 100 GRIT SLURRY N/A 0 0 0 M M N/A G

VC 202 GRIT PUMP 1 CHECK VALVE E SWING ARM 100 100 GRIT SLURRY N/A 0 0 0 M M N/A G

VC 405 PRIMARY SCUM CHECK VALVE E1 BALL CHECK 100 100 SCUM N/A 0 0 0 M M N/A G

VC 406 PRIMARY SLUDGE CHECK VALVE E1 BALL CHECK 100 100 PRIMARY SLUDGE N/A 0 0 0 M M N/A G

VC 707 EFFLUENT PUMP CHECK VALVE E SWING ARM 200 200 EFFLUENT WATER N/A 0 0 0 M M N/A G

VC 801 SLUDGE RECIRCULATION PUMP NO.3 CHECK VALVE E1 BALL CHECK 100 100 SLUDGE N/A 0 0 0 M M N/A G

VC 802 SLUDGE RECIRCULATION PUMP NO.4 CHECK VALVE E1 BALL CHECK 100 100 SLUDGE N/A 0 0 0 M M N/A G
CENTRATE STORAGE TANK SUMP PUMP NO. 1 CHECK SWING ARM
VC 803 E 100 100 CENTRATE N/A 0 0 0 M M N/A G
VALVE
CENTRATE STORAGE TANK SUMP PUMP NO. 2 CHECK SWING ARM
VC 804 E 100 100 CENTRATE N/A 0 0 0 M M N/A G
VALVE
VF 201 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 250 250 RAW SEWAGE OPEN 0 0 0 M M N/A M C/W EPOXY COATING

VF 202 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 250 250 RAW SEWAGE OPEN 0 0 0 M M N/A M C/W EPOXY COATING

VF 203 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 300 300 RAW SEWAGE OPEN 0 0 0 M M N/A M C/W EPOXY COATING

VF 204 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 300 300 RAW SEWAGE CLOSED 0 0 0 M M N/A M C/W EPOXY COATING

VF 205 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 300 300 RAW SEWAGE OPEN 0 0 0 M M N/A M C/W EPOXY COATING

VF 206 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 300 300 RAW SEWAGE CLOSED 0 0 0 M M N/A M C/W EPOXY COATING

VF 207 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 300 300 RAW SEWAGE CLOSED 0 0 0 M M N/A M C/W EPOXY COATING

VF 208 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 300 300 RAW SEWAGE CLOSED 0 0 0 M M N/A M C/W EPOXY COATING

VF 209 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 300 300 RAW SEWAGE CLOSED 0 0 0 M M N/A M C/W EPOXY COATING

VF 210 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 250 250 RAW SEWAGE OPEN 0 0 0 M M N/A M C/W EPOXY COATING

VF 211 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 250 250 RAW SEWAGE OPEN 0 0 0 M M N/A M C/W EPOXY COATING

VF 212 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 250 250 RAW SEWAGE OPEN 0 0 0 M M N/A M C/W EPOXY COATING

Tuesday, December 5, 2023 12:48:22 PM


VF 213 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 250 250 RAW SEWAGE CLOSED 0 0 0 M M N/A M C/W EPOXY COATING

VF 214 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 250 250 RAW SEWAGE CLOSED 0 0 0 M M N/A M C/W EPOXY COATING

VF 215 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 250 250 RAW SEWAGE CLOSED 0 0 0 M M N/A M C/W EPOXY COATING

VF 216 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 250 250 RAW SEWAGE CLOSED 0 0 0 M M N/A M C/W EPOXY COATING

VF 217 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 250 250 RAW SEWAGE CLOSED 0 0 0 M M N/A M C/W EPOXY COATING

VF 218 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 250 250 RAW SEWAGE CLOSED 0 0 0 M M N/A M C/W EPOXY COATING

VF 219 RAW SEWAGE FE DRAIN A LEVER 75 75 RAW SEWAGE CLOSED 0 0 0 M M N/A G

VF 220 RAW SEWAGE FE DRAIN A LEVER 75 75 RAW SEWAGE CLOSED 0 0 0 M M N/A G

VF 221 RAW SEWAGE FE DRAIN A LEVER 75 75 RAW SEWAGE CLOSED 0 0 0 M M N/A G

VF 222 RAW SEWAGE TO PRIMARY CLARIFIERS A CHAIN WHEEL 500 500 RAW SEWAGE OPEN 0 0 0 M M N/A G

VF 223 RAW SEWAGE TO PRIMARY CLARIFIERS A CHAIN WHEEL 500 500 RAW SEWAGE OPEN 0 0 0 M M N/A G

FIELD WORK NOTATION

PLOT DATE:
M = MECHANICAL CONTRACTOR
E = ELECTRICAL CONTRACTOR
G = GENERAL CONTRACTOR
EX = EXISTING EQUIPMENT
KEMPTVILLE WPCP EXPANSION DESIGN SECTION: 15100
KEMPTVILLE, ON PROCESS VALVE SCHEDULE PHASE A
JLR No.: 29475-000 SHEET 2 OF 5

DATASHEET OPERATION ELECTRICAL FIELD WORK


I.D. DESCRIPTION SIZE LINE SIZE NORMAL POWER VOLTS PHASE SUPP. INST. WIRED COMM. COMMENTS
No. OPERATOR FLUID
mm mm POSITION V BY BY BY BY
VF 224 RAW SEWAGE TO PRIMARY CLARIFIERS A CHAIN WHEEL 500 500 RAW SEWAGE OPEN 0 0 0 M M N/A G

VF 225 SCREENING CONVEYOR DRAIN VALVE D LEVER 75 75 RAW SEWAGE CLOSED 0 0 0 M M N/A G

VF 226 HYDRO CYCLONE ISOLATION VALVE NO.1 A CHAIN WHEEL 100 100 GRIT SLURRY OPEN 0 0 0 M M N/A G

VF 227 HYDRO CYCLONE ISOLATION VALVE NO.2 A CHAIN WHEEL 100 100 GRIT SLURRY OPEN 0 0 0 M M N/A G

VF 238 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 300 300 RAW SEWAGE OPEN 0 0 0 M M N/A M C/W EPOXY COATING

VF 239 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 300 300 RAW SEWAGE CLOSED 0 0 0 M M N/A M C/W EPOXY COATING

VF 240 RAW SEWAGE ISOLATION VALVE A HANDWHEEL 250 250 RAW SEWAGE OPEN 0 0 0 M M N/A M C/W EPOXY COATING
7
HANDWHEEL C/W EPOXY COATING
VF 241 RAW SEWAGE ISOLATION VALVE A
7 250 250 RAW SEWAGE OPEN 0 0 0 M M N/A M

VF 401 PRIMARY SLUDGE PUMPING ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE OPEN 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 402 PRIMARY SLUDGE PUMPING ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE OPEN 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 403 PRIMARY SLUDGE PUMPING ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE OPEN 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 404 PRIMARY SLUDGE PUMPING ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE OPEN 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 405 PRIMARY SLUDGE PUMPING ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE OPEN 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 406 PRIMARY SLUDGE PUMPING ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE OPEN 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 407 PRIMARY SLUDGE PUMPING ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE CLOSED 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 408 PRIMARY SLUDGE PUMPING ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE CLOSED 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 409 PRIMARY SLUDGE PUMPING ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE OPEN 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 410 PRIMARY SLUDGE PUMPING ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE CLOSED 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 411 PRIMARY SLUDGE PUMPING ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE CLOSED 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 412 PRIMARY SLUDGE FE ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE OPEN 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 413 PRIMARY SLUDGE FE ISOLATION VALVE A


7 LEVER 75 75 SLUDGE CLOSED 0 0 0 M M N/A G

Tuesday, December 5, 2023 12:48:33 PM


VF 414 PRIMARY SLUDGE FE ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE OPEN 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 424 RAS ISOLATION VALVE A HANDWHEEL 150 150 WAS OPEN 0 0 0 M M N/A G

VF 425 RAS ISOLATION VALVE A HANDWHEEL 150 150 WAS OPEN 0 0 0 M M N/A G 7
VF 426 RAS ISOLATION VALVE A HANDWHEEL 150 150 WAS OPEN 0 0 0 M M N/A G

VF 501 RAS ISOLATION A SQUARE NUT 200 200 RAS OPEN 0 0 0 M M N/A G SQUARE NUT C/W VALVE BOX AND EXTENSION

VF 502 RAS ISOLATION A SQUARE NUT 200 200 RAS OPEN 0 0 0 M M N/A G SQUARE NUT C/W VALVE BOX AND EXTENSION

VF 503 RAS ISOLATION A SQUARE NUT 200 200 RAS OPEN 0 0 0 M M N/A G SQUARE NUT C/W VALVE BOX AND EXTENSION

VF 504 BLOWER ISOLATION VALVE C2 HANDWHEEL 250 250 PROCESS AIR OPEN 0 0 0 M M N/A G

VF 505 BLOWER ISOLATION VALVE C2 HANDWHEEL 250 250 PROCESS AIR OPEN 0 0 0 M M N/A G

VF 506 BLOWER ISOLATION VALVE C2 HANDWHEEL 250 250 PROCESS AIR OPEN 0 0 0 M M N/A G

VF 507 AERATION TANK UNWATERING VALVE H HANDWHEEL (PEDESTAL) 150 150 UNWATERING CLOSED 0 0 0 M M N/A G C/W EPOXY COATING

FIELD WORK NOTATION

PLOT DATE:
M = MECHANICAL CONTRACTOR
E = ELECTRICAL CONTRACTOR
G = GENERAL CONTRACTOR
EX = EXISTING EQUIPMENT
KEMPTVILLE WPCP EXPANSION DESIGN SECTION: 15100
KEMPTVILLE, ON PROCESS VALVE SCHEDULE PHASE A
JLR No.: 29475-000 SHEET 3 OF 5

DATASHEET OPERATION ELECTRICAL FIELD WORK


I.D. DESCRIPTION SIZE LINE SIZE NORMAL POWER VOLTS PHASE SUPP. INST. WIRED COMM. COMMENTS
No. OPERATOR FLUID
mm mm POSITION V BY BY BY BY
VF 508 AERATION TANK UNWATERING VALVE H HANDWHEEL (PEDESTAL) 150 150 UNWATERING CLOSED 0 0 0 M M N/A G C/W EPOXY COATING

VF 509 AERATION TANK UNWATERING VALVE H HANDWHEEL (PEDESTAL) 150 150 UNWATERING CLOSED 0 0 0 M M N/A G C/W EPOXY COATING

VF 511 AERATION ISOLATION C2 HANDWHEEL 200 200 PROCESS AIR CLOSED 0 0 0 M M N/A G

VF 513 AERATION ISOLATION C2 HANDWHEEL 200 200 PROCESS AIR CLOSED 0 0 0 M M N/A G

VF 515 AERATION ISOLATION C2 HANDWHEEL 200 200 PROCESS AIR CLOSED 0 0 0 M M N/A G

VF 517 AERATION ISOLATION C2 HANDWHEEL 200 200 PROCESS AIR CLOSED 0 0 0 M M N/A G

VF 519 AERATION ISOLATION C2 HANDWHEEL 200 200 PROCESS AIR CLOSED 0 0 0 M M N/A G

VF 521 AERATION ISOLATION C2 HANDWHEEL 200 200 PROCESS AIR CLOSED 0 0 0 M M N/A G

VF 614 RAS ISOLATION VALVE A HANDWHEEL 150 150 RAS OPEN 0 0 0 M M N/A G
7 7
VF 615 RAS ISOLATION VALVE A HANDWHEEL 150 150 RAS OPEN 0 0 0 M M N/A G

VF 617 PRIMARY SLUDGE ISOLATION VALVE A HANDWHEEL 100 100 RAS CLOSED 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 707 EFFLUENT PUMP ISOLATION B3 HANDWHEEL 200 200 EFFLUENT WATER OPEN 0 0 0 M M N/A G

VF 708 EFFLUENT PUMP ISOLATION B3 HANDWHEEL 200 200 EFFLUENT WATER OPEN 0 0 0 M M N/A G

VF 709 EFFLUENT FE ISOLATION C HANDWHEEL 200 200 EFFLUENT WATER OPEN 0 0 0 M M N/A G

VF 710 EFFLUENT FE ISOLATION C HANDWHEEL 200 200 EFFLUENT WATER OPEN 0 0 0 M M N/A G

VF 713 EFFLUENT BYPASS ISOLATION C HANDWHEEL 150 150 EFFLUENT WATER CLOSED 0 0 0 M M N/A G

VF 714 EFFLUENT VALVE C HANDWHEEL 300 300 EFFLUENT WATER CLOSED 0 0 0 M M N/A G

VF 721 WASHWATER PLUG VALVE A HANDWHEEL 150 150 WASHWATER OPEN 0 0 0 M M N/A G ADDED UNDER ADDENDUM 5
7 7
VF 722 WASHWATER PLUG VALVE A HANDWHEEL 150 150 WASHWATER OPEN 0 0 0 M M N/A M ADDED UNDER ADDENDUM 5
PRIMARY DIGESTER TANK NO. 2 DSL SUCTION ISOLATION HANDWHEEL VALVE OPERATOR UPDATED PER ADDENDUM NO. 7
VF 801 A 100 100 SLUDGE OPEN 0 0 0 M M N/A G
VALVE 1
PRIMARY DIGESTER TANK NO. 2 DSL SUCTION ISOLATION
7 7
VF 802 A CHAINWHEEL 100 100 SLUDGE CLOSED 0 0 0 M M N/A G
VALVE 2
PRIMARY DIGESTER TANK NO. 2 DSL FILL ISOLATION

Tuesday, December 5, 2023 12:48:29 PM


HANDWHEEL VALVE OPERATOR UPDATED PER ADDENDUM NO. 7
VF 803
VALVE 1
A 100 100 SLUDGE OPEN 0 0 0 M M N/A G
7
PRIMARY DIGESTER TANK NO. 2 DSL FILL ISOLATION
VF 804
VALVE 2
A 7 CHAINWHEEL 100 100 SLUDGE CLOSED 0 0 0 M M N/A G
PRIMARY DIGESTER TANK NO. 2 DSL FILL ISOLATION HANDWHEEL VALVE OPERATOR UPDATED PER ADDENDUM NO. 7
VF 805 A 100 100 SLUDGE CLOSED 0 0 0 M M N/A G
VALVE 3
PRIMARY DIGESTER TANK NO. 2 RSL TRANSFER ISOLATION HANDWHEEL VALVE OPERATOR UPDATED PER ADDENDUM NO. 7
VF 806 A 100 100 SLUDGE CLOSED 0 0 0 M M N/A G
VALVE
VF 807 DSL RECIRC PUMP NO. 3 INLET ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE OPEN 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 808 DSL RECIRC PUMP NO. 4 INLET ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE OPEN 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 809 DSL RECIRC PUMP NO. 3 DISCHARGE ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE OPEN 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 810 DSL RECIRC PUMP NO. 4 DISCHARGE ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE OPEN 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 811 DSL SLUDGE HEX ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE OPEN 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 812 DSL SLUDGE HEX ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE OPEN 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

VF 813 DSL SLUDGE HEX BYPASS ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE CLOSED 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7

FIELD WORK NOTATION

PLOT DATE:
M = MECHANICAL CONTRACTOR
E = ELECTRICAL CONTRACTOR
G = GENERAL CONTRACTOR
EX = EXISTING EQUIPMENT
KEMPTVILLE WPCP EXPANSION DESIGN SECTION: 15100
KEMPTVILLE, ON PROCESS VALVE SCHEDULE PHASE A
JLR No.: 29475-000 SHEET 4 OF 5

DATASHEET OPERATION ELECTRICAL FIELD WORK


I.D. DESCRIPTION COMMENTS 7
No. 7 OPERATOR
SIZE LINE SIZE
FLUID
NORMAL POWER VOLTS PHASE SUPP. INST. WIRED COMM.
mm mm POSITION V BY BY BY BY
VF 814 DSL ISOLATION VALVE A HANDWHEEL 100 100 SLUDGE CLOSED 0 0 0 M M N/A G VALVE OPERATOR UPDATED PER ADDENDUM NO. 7
7 CHAINWHEEL
VF 820 DIGESTED SLUDGE LOADING TRUCK ISOLATION VALVE A 100 100 SLUDGE OPEN 0 0 0 M M N/A G
CENTRATE STORAGE TANK SUMP PUMP NO. 1 ISOLATION HANDWHEEL VALVE OPERATOR UPDATED PER ADDENDUM NO. 7
VF 821 A 100 100 CENTRATE OPEN 0 0 0 M M N/A G
VALVE
CENTRATE STORAGE TANK SUMP PUMP NO. 2 ISOLATION HANDWHEEL VALVE OPERATOR UPDATED PER ADDENDUM NO. 7
VF 822 A 100 100 CENTRATE OPEN 0 0 0 M M N/A G
VALVE
VF 835 DIGESTER ISOLATION VALVE A CHAINWHEEL 150 150 SLUDGE N/A 0 0 0 M M N/A G

VF 836 DIGESTER ISOLATION VALVE A CHAINWHEEL 150 150 SLUDGE N/A 0 0 0 M M N/A G 7
VF 837 DIGESTER GAS ISOLATION VALVE A2 LEVER 150 150 DIGESTER GAS OPEN 0 0 0 M M N/A G

VF 838 DIGESTER GAS ISOLATION VALVE A2 LEVER 100 100 DIGESTER GAS OPEN 0 0 0 M M N/A G

VF 839 EXISTING HEAT EXCHANGER SLUDGE ISOLATION VALVE A CHAINWHEEL 100 100 SLUDGE N/A 0 0 0 M M N/A G

VF 840 SLUDGE ISOLATION VALVE A CHAINWHEEL 100 100 SLUDGE N/A 0 0 0 M M N/A G

VF 841 SLUDGE ISOLATION VALVE A CHAINWHEEL 100 100 SLUDGE N/A 0 0 0 M M N/A G

VF 842 SLUDGE ISOLATION VALVE A CHAINWHEEL 100 100 SLUDGE N/A 0 0 0 M M N/A G

VF 843 DIGESTER GAS FLAME TRAP ASSEMBLY 15348 N/A 100 100 DIGESTER GAS N/A 0 0 0 M M N/A G

VF 843 SLUDGE ISOLATION VALVE A CHAINWHEEL 100 100 SLUDGE N/A 0 0 0 M M N/A G

VF 844 SLUDGE ISOLATION VALVE A CHAINWHEEL 100 100 SLUDGE N/A 0 0 0 M M N/A G

VF 845 SLUDGE ISOLATION VALVE A CHAINWHEEL 100 100 SLUDGE N/A 0 0 0 M M N/A G

VF 846 DIGESTER GAS ISOLATION VALVE A CHAINWHEEL 100 100 DIGESTER GAS OPEN 0 0 0 M M N/A G

VF 847 DIGESTER GAS SAMPLE ROOM ISOLATION VALVE NO.1 A2 CHAINWHEEL 100 100 DIGESTER GAS OPEN 0 0 0 M M N/A G

VF 848 DIGESTER GAS SAMPLE ROOM ISOLATION VALVE NO.2 A2 CHAINWHEEL 100 100 DIGESTER GAS OPEN 0 0 0 M M N/A G

VF 854 SLUDGE HOLDING TANK ISOLATION VALVE A LEVER 75 75 SLUDGE OPEN 0 0 0 M M N/A G ADDED UNDER ADDENDUM 5

VF 910 NG PLUG VALVE A HANDWHEEL 75 75 NATURAL GAS OPEN 0 0 0 M M N/A G ADDED PER ADDENDUM NO. 7

Tuesday, December 5, 2023 12:48:37 PM


VF 911 NG PLUG VALVE A HANDWHEEL 75 75 NATURAL GAS OPEN 0 0 0 M M N/A G ADDED PER ADDENDUM NO. 7

VF 912 DG PLUG VALVE A HANDWHEEL 100 100 DIGESTER GAS OPEN 0 0 0 M M N/A G ADDED PER ADDENDUM NO. 7

VFC 206 EFFLUENT WATER WASH SOLENOID VALVE I1 SOLENOID 25 25 EFFLUENT CLOSED 5 W 120 1 M M E M ZONE 2, REFER TO ME006,

VFC 208 EFFLUENT WATER WASH SOLENOID VALVE I1 SOLENOID 25 25 EFFLUENT CLOSED 5 W 120 1 M M E M ZONE 2, REFER TO ME006, 7
VFC 209 GRIT TANK 1 SOLENOID VALVE I1 SOLENOID 40 40 EFFLUENT CLOSED 5 W 120 1 M M E G ZONE 2, REFER TO ME006,

VFC 211 GRIT TANK 2 SOLENOID VALVE I1 SOLENOID 40 40 EFFLUENT CLOSED 5 W 120 1 M M E G ZONE 2, REFER TO ME006

VFC 213 GRIT CLASSFIER SOLENOID VALVE I1 SOLENOID 20 20 EFFLUENT CLOSED 5 W 120 1 M M E G ZONE 2, REFER TO ME006

VFC 241 HEADWORKS TRAP SEAL PRIMER I1 SOLENOID 25 25 EFFLUENT WATER CLOSED 20 W 120 1 M M E G

VFC 401 PRIMARY SLUDGE CONTROL VALVE A ELECTRIC 2-POSITION 100 100 RAW SEWAGE N/A 0.25 120 1 M M E G

VFC 402 PRIMARY SLUDGE CONTROL VALVE A ELECTRIC 2-POSITION 100 100 RAW SEWAGE N/A 0.25 120 1 M M E G

VFC 403 PRIMARY SLUDGE CONTROL VALVE A ELECTRIC 2-POSITION 100 100 RAW SEWAGE N/A 0.25 120 1 M M E G

FIELD WORK NOTATION

PLOT DATE:
M = MECHANICAL CONTRACTOR
E = ELECTRICAL CONTRACTOR
G = GENERAL CONTRACTOR
EX = EXISTING EQUIPMENT
KEMPTVILLE WPCP EXPANSION DESIGN SECTION: 15100
KEMPTVILLE, ON PROCESS VALVE SCHEDULE PHASE A
JLR No.: 29475-000 SHEET 5 OF 5

DATASHEET OPERATION ELECTRICAL FIELD WORK


I.D. DESCRIPTION SIZE LINE SIZE NORMAL POWER VOLTS PHASE SUPP. INST. WIRED COMM. COMMENTS
No. OPERATOR FLUID
mm mm POSITION V BY BY BY BY
VFC 404 PRIMARY SCUM 3-WAY VALVE A1 ELECTRIC 100 100 SCUM N/A 0.5 120 1 M M E G

VFC 409 TANK 1 AERATION GRID CONTROL VALVE 1 C2 ELECTRIC 2-POSITION 200 200 PROCESS AIR N/A 0.25 HP 120 1 M M E G

VFC 410 TANK 1 AERATION GRID CONTROL VALVE 2 C2 ELECTRIC 2-POSITION 200 200 PROCESS AIR N/A 0.25 HP 120 1 M M E G

VFC 411 TANK 2 AERATION GRID CONTROL VALVE 1 C2 ELECTRIC 2-POSITION 200 200 PROCESS AIR N/A 0.25 HP 120 1 M M E G

VFC 412 TANK 2 AERATION GRID CONTROL VALVE 2 C2 ELECTRIC 2-POSITION 200 200 PROCESS AIR N/A 0.25 HP 120 1 M M E G

VFC 413 TANK 3 AERATION GRID CONTROL VALVE 1 C2 ELECTRIC 2-POSITION 200 200 PROCESS AIR N/A 0.25 HP 120 1 M M E G

VFC 414 TANK 3 AERATION GRID CONTROL VALVE 2 C2 ELECTRIC 2-POSITION 200 200 PROCESS AIR N/A 0.25 HP 120 1 M M E G

VFC 614 RAS 3-WAY VALVE A1 ELECTRIC MODULATING 200 200 WAS N/A 1 HP 600 3 M M E G

VFC 807 DIGESTED SLUDGE TO HEX CONTROL VALVE A ELECTRIC 2 POSITION 100 100 SLUDGE OPEN 0.25 HP 120 1 M M E G

VFC 808 RECIRCULATED SLUDGE RETURN CONTROL VALVE A ELECTRIC 2 POSITION 100 100 SLUDGE OPEN 0.25 HP 120 1 M M E G

VFC 809 RECIRCULATED SLUDGE RETURN CONTROL VALVE A ELECTRIC 2 POSITION 100 100 SLUDGE OPEN 0.25 HP 120 1 M M E G

VFC 820 SLUDGE HOLDING TANK INLET CONTROL VALVE A ELECTRIC 2-POSITION 100 100 SLUDGE OPEN 0.25 HP 120 1 M M E G

VFC 821 POLYMER WATER SUPPLY SOLENOID VALVE I SOLENOID 25 25 SEPARATED WATER CLOSED 20 W 120 1 M M E G

VFC 822 SLUDGE CONVEYOR NO.1 WASH WATER SOLENOID VALVE I SOLENOID 25 25 SEPARATED WATER CLOSED 20 W 120 1 M M E G

VFC 840 CENTRIFUGE EFFLUENT WATER CONTROL VALVE I SOLENOID 25 25 EFFLUENT WATER CLOSED 20 W 120 1 M M E G

VFC 841 DIGESTER CONTROL BUILDING TRAP SEAL PRIMER I SOLENOID 25 25 EFFLUENT WATER CLOSED 20 W 120 1 M M E G

VFC 845 DIGESTED SLUDGE 3 WAY CONTROL VALVE A1 N/A 100 100 DIGESTED SLUDGE N/A 0.5 120 1 M M E G ADDED UNDER ADDENDUM 5

VFC 941 FERRIC SULFATE TANK ISOLATION D3 ELECTRIC 2-POSITION 50 50 FERRIC SULFATE N/A 5 W 120 1 M M E G

VPC 901 FERRIC SULFATE BACK PRESSURE VALVE J1 N/A 50 50 FERRIC SULFATE N/A 0 0 0 M M N/A G

VPC 902 FERRIC SULFATE BACK PRESSURE VALVE J1 N/A 50 50 FERRIC SULFATE N/A 0 0 0 M M N/A G

VPR 201 BOOSTER PUMP PRESSURE RELIEF VALVE J N/A 25 25 EFFLUENT N/A 0 0 0 M M N/A G

Tuesday, December 5, 2023 12:48:26 PM


VPR 802 DIGESTER GAS RELIEF VALVE 15384 N/A 100 100 DIGESTER GAS N/A 0 0 0 M M N/A G RELIEF SETTING TO BE 18" W.C.

VPR 803 DIGESTER GAS RELIEF VALVE 15384 N/A 100 100 DIGESTER GAS N/A 0 0 0 M M N/A G RELIEF SETTING TO BE 18" W.C.

VPR 804 DIGESTER GAS BACK PRESSURE REGULATOR 15384 N/A 100 100 DIGESTER GAS N/A 0 0 0 M M N/A G RELIEF SETTING TO BE 18" W.C.
DUAL PRESSURE DIGESTER GAS SAFTEY SELECTOR N/A
VPR 805 15384 100 100 DIGESTER GAS N/A 0 0 0 M M N/A G
VALVE
VPR 807 SLUDGE HEAT EXCHANGER PRESSURE RELIEF VALVE J N/A 100 100 SLUDGE N/A 0 0 0 M M N/A G

VPR 901 FERRIC SULFATE PUMP PRESSURE RELIEF J1 N/A 50 50 FERRIC SULFATE N/A 0 0 0 M M N/A G

VPR 902 FERRIC SULFATE PUMP PRESSURE RELIEF J1 N/A 50 50 FERRIC SULFATE N/A 0 0 0 M M N/A G

FIELD WORK NOTATION

PLOT DATE:
M = MECHANICAL CONTRACTOR
E = ELECTRICAL CONTRACTOR
G = GENERAL CONTRACTOR
EX = EXISTING EQUIPMENT
KEMPTVILLE WPCP EXPANSION DESIGN SECTION: 15412
KEMPTVILLE, ON
PLUMBING PUMP SCHEDULE PHASE A
JLR No.: 29475-000 SHEET 1 OF 1

EC5 EngCAD Database Data Exported on: 12/4/2023 2:51:29 PM


OPERATING POINT 'A' OPERATING POINT 'B' MOTOR FIELD WORK
FLUID
I.D. DESCRIPTION TYPE RPM COMMENTS
FLOW TDH EFF. FLOW TDH EFF. TYPE RATING VOLT PH
SUPPLIED BY INSTALLED BY WIRED BY COMM. BY
L/s m % L/s m % HP V

P 205 BIN ROOM SUMP PUMP TYPE 2 5.25 5.0 2.5 7.3 SANITARY 1.1 600 3 M M E G

P 206 PIPE GALLERY SUMP PUMP TYPE 2 5.25 5.0 2.5 7.3 SANITARY 1.1 600 3 M M E G
7
P 208 EFFLUENT BOOSTER PUMP 40 95 78.5 EFFLUENT 3510 1 600 0 M M E E

P 407 EQUILIZATION DRAIN PUMP TYPE 2 5.25 5.0 7.5 3 PRIMARY 1 600 3 M M E G TYPE 2
EFFLUENT
P 811 CENTRATE TRANSFER PUMP NO.1 TYPE 2 2.17 10.5 7.5 6 CENTRATE 1.7 600 3 M M E G

P 812 CENTRATE TRANSFER PUMP NO.2 TYPE 2 2.17 10.5 7.5 6 CENTRATE 1.7 600 3 M M E G

P 816 DIGESTER SANITARY SUMP PUMP NO.1 TYPE 2 5.25 5.0 2.5 7.3 SANITARY 1.1 600 3 M M E G DUPLEX CONTROLS

P 817 DIGESTER SANITARY SUMP PUMP NO.2 TYPE 2 5.25 5.0 2.5 7.3 SANITARY 1.1 600 3 M M E G DUPLEX CONTROLS

P 819 MUNICIPAL HOT WATER RECIRC PUMP TYPE 5 20 1.5 MUNICIPAL 28 120 1 M M E G
HOT WATER

Tuesday, December 5, 2023 11:40:40 AM


FIELD WORK NOTATION

PLOT DATE:
M = MECHANICAL CONTRACTOR
E = ELECTRICAL CONTRACTOR
G = GENERAL CONTRACTOR
EX = EXISTING EQUIPMENT
KEMPTVILLE WPCP EXPANSION DESIGN SECTION: 15800
KEMPTVILLE, ON LOUVRE SCHEDULE PHASE A
JLR No.: 29475-000 SHEET 1 OF 1
EC5 EngCAD Database Data Exported on: 11/28/2023 12:39:11 PM
FREE NOMINAL SIZE
AIR FLOW MAX ΔP
I.D. DESCRIPTION AREA
WIDTH HEIGHT 7 DEPTH
L/s Pa m² mm mm mm
L 201 PIPE GALLERY INTAKE AIR LOUVRE 1180 10 0.38 900 800 150
L 202 PIPE GALLERY EXHAUST AIR LOUVRE 1180 11 0.35 900 800 150
7
L 203 ELECTRICAL ROOM INTAKE AIR LOUVRE 100 14 0.03 400 400 150
L 204 ELECTRICAL ROOM EXHAUST AIR LOUVRE 100 14 0.03 300 400 150
L 301 BOILER COMBUSTION AIR INTAKE LOUVRE 900 7 0.80 800 2000 150
L 302 BOILER ROOM VENTILATION AIR INTAKE 900 0.08 500 500 150
LOUVRE
L 303 PUMP ROOM EXHAUST AIR PENTHOUSE 2540 14 0.58 600X500 800 -
LOUVRE
L 304 BOILER ROOM EXHAUST AIR PENTHOUSE 2540 14 0.59 500X500 900 -
LOUVRE
L 305 DRIP TRAP ROOM AIR INTAKE LOUVRE 66 7 0.12 500 700 150
L 306 ELECTRICAL ROOM AIR INTAKE LOUVRE 612 14 0.24 1200 500 150
L 307 ELECTRICAL ROOM EXHAUST AIR LOUVRE 47 7 0.03 300 300 150
L 801 FERRIC SULPHATE INTAKE AIR LOUVRE 410 7 0.17 600 600 150
L 804 ELECTRICAL ROOM EXHAUST AIR LOUVRE 105 10 0.03 400 400 150
L 805 ELECTRICAL ROOM EXHAUST AIR LOUVRE 70 6 0.03 400 400 150

Tuesday, December 5, 2023 11:57:02 AM


L 808 FERRIC SULPHATE EXHAUST AIR LOUVRE 410 7 0.16 600 600 150

FIELD WORK NOTATION

PLOT DATE:
M = MECHANICAL CONTRACTOR
E = ELECTRICAL CONTRACTOR
G = GENERAL CONTRACTOR
EX = EXISTING EQUIPMENT
KEMPTVILLE WPCP EXPANSION DESIGN SECTION: 15930
KEMPTVILLE, ON MECHANICAL CONTROL VALVE SCHEDULE PHASE A
JLR No.: 29475-000 SHEET 1 OF 2
OPERATION ELECTRICAL FIELD WORK
FLOW
I.D. DESCRIPTION TYPE SIZE LINE SIZE NORMAL POWER VOLTS PHASE SUPP. INST. WIRED COMM. COMMENTS
OPERATOR FLUID
L/s mm mm POSITION W V BY BY BY BY
VFC 214 HYDRONIC CONTROL VALVE 3-WAY GLOBE 11.66 MODULATING 75 75 HOT WATER N/A 5 120 1 M M E G

VFC 215 HYDRONIC HEATER CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 216 HYDRONIC HEATER CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 217 HYDRONIC HEATER CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 218 HYDRONIC HEATER CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 219 HYDRONIC HEATER CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 220 HYDRONIC HEATER CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 221 HYDRONIC HEATER CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 222 HYDRONIC HEATER CONTROL VALVE 3-WAY GLOBE 0.13 MODULATING 20 20 HOT WATER N/A 10 120 1 M M E G

VFC 223 GLYCOL HEATING CONTROL VALVE PADDLE 1.69 2-POSITION 50 50 50%-PG OPEN 10 120 1 M M E G

VFC 224 MAU GLYCOL HEATING CONTROL VALVE 3-WAY GLOBE 9.53 MODULATING 75 75 50%-PG N/A 10 120 1 M M E G

VFC 301 HYDRONIC HEATING CONTROL VALVE PADDLE 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 302 HYDRONIC HEATING CONTROL VALVE PADDLE 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 303 HYDRONIC HEATING CONTROL VALVE PADDLE 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 304 HYDRONIC HEATING CONTROL VALVE PADDLE 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 305 HYDRONIC HEATING CONTROL VALVE PADDLE 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 306 HYDRONIC HEATING CONTROL VALVE PADDLE 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 307 HYDRONIC HEATING CONTROL VALVE PADDLE 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G
7
VFC 308 HYDRONIC HEATING CONTROL VALVE PADDLE 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 810 SLUDGE HEX HOT WATER CONTROL VALVE D2 ELECTRIC MODULATING 100 100 HOT WATER N/A 0.25 120 1 M M E G MOVED FROM PROCESS VALVE SCHEDULE PER ADDENDUM NO. 7

DIGESTER BUILDING HEATING WATER LOOP 3 WAY CONTROL


VFC 824 3-WAY GLOBE 5.17 MODULATING 75 75 HOT WATER N/A 10 120 1 M M E G
VALVE
VFC 825 HEATING WATER GLYCOL HEX 3 WAY CONTROL VALVE 3-WAY GLOBE 4.67 MODULATING 75 75 HOT WATER N/A 10 120 1 M M E G

VFC 826 SAMPLE ROOM HEATING COIL CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 827 FERRIC SULFATE HEATING COIL CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 828 DIGESTER MAU GLYCOL HEATING CONTROL VALVE 3-WAY GLOBE 4.50 MODULATING 75 75 50% PG N/A 10 120 1 M M E G

VFC 829 BASEMENT UNIT HEATER CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

Tuesday, December 5, 2023 12:06:44 PM


VFC 830 BASEMENT UNIT HEATER CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 831 BASEMENT UNIT HEATER CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 832 STAIRWELL CABINET UNIT HEATER CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 834 PROCESS AREA UNIT HEATER CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 835 PROCESS AREA UNIT HEATER CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 836 PROCESS AREA UNIT HEATER CONTROL VALVE 3-WAY GLOBE 0.13 MODULATING 20 20 HOT WATER N/A 10 120 1 M M E G

VFC 837 WASTE BIN ROOM UNIT HEATER CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 838 WASTE BIN ROOM UNIT HEATER CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 839 SAMPLE ROOM UNIT HEATER CONTROL VALVE PADDLE 0.13 2-POSITION 20 20 HOT WATER OPEN 5 120 1 M M E G

VFC 845 EXSTING DIGESTERS 3WAY PLUG VALVE A1 MODULATING 100 100 DIGESTED SLUDGE N/A 0.25 120 1 M M E G ZONE 2

FIELD WORK NOTATION

PLOT DATE:
M = MECHANICAL CONTRACTOR
E = ELECTRICAL CONTRACTOR
G = GENERAL CONTRACTOR
EX = EXISTING EQUIPMENT
KEMPTVILLE WPCP EXPANSION DESIGN SECTION: 15930
KEMPTVILLE, ON MECHANICAL CONTROL VALVE SCHEDULE PHASE A
JLR No.: 29475-000 SHEET 2 OF 2
OPERATION ELECTRICAL FIELD WORK
FLOW
I.D. DESCRIPTION TYPE SIZE LINE SIZE NORMAL POWER VOLTS PHASE SUPP. INST. WIRED COMM. COMMENTS
OPERATOR FLUID
L/s mm mm POSITION W V BY BY BY BY
VFC 846 POYLMER HX HOT WATER CONTROL VALVE 3WAY GLOBE MODULATING 50 50 HOT WATER N/A 5 120 1 M M E G

VFC 901 HOT WATER SUPPLY CONTROL VALVE TO EXISTING DIGESTER 3-WAY MODULATING 50 50 HOT WATER 10 120 1 M M E G

VFC 902 HOT WATER SUPPLY CONTROL VALVE TO HEADWORKS BUILDING 3-WAY MODULATING 75 75 HOT WATER 10 120 1 M M E G
HOT WATER SUPPLY CONTROL VALVE TO EXISTING PLANT
VFC 903 3-WAY MODULATING 100 100 HOT WATER 20 120 1 M M E G
HEATING
HOT WATER SUPPLY CONTROL VALVE TO NEW DIGESTER
VFC 904 3-WAY MODULATING 100 100 HOT WATER 20 120 1 M M E G
BUILDING

Tuesday, December 5, 2023 12:06:48 PM


FIELD WORK NOTATION

PLOT DATE:
M = MECHANICAL CONTRACTOR
E = ELECTRICAL CONTRACTOR
G = GENERAL CONTRACTOR
EX = EXISTING EQUIPMENT
Kemptville Water Pollution Control Section 17501
Plant Expansion – Phase A SEQUENCE OF OPERATIONS Page 1 of 15
JLR No. 29475-000.1 December 2023

General control requirements

.1 All equipment failures are to alarm.


.2 Trend all analogue signals, and log when each discrete signal changes state.
.3 Trend pump speeds when they are equipped with a VFD.
.4 Trend pump run times.
.5 Where control valves are integrated with SCADA, log when 2-position control valves change
position, and trend where they modulate.
.6 Trend daily volumes for each flow meter.
.7 Duty/Standby and lead/lag systems are to alternate their associated duty/standby or Lead/Lag
equipment on either an operator adjustable time basis or based on number of starts. Operators to
be able to switch between the two options.
.8 All equipment to have a remote manual control option such that the equipment can be put into
manual mode from SCADA, and have all parameters operated and adjusted by operators through
SCADA.
.9 The following OEM provided control systems are to have their screens integrated into the SCADA
system such that the operators are able to see the full function of the OEM system, and adjust all
parameters remotely.
.1 Screening system
.2 Grit removal system
.3 Tertiary Filter System
.4 Centrifuge system, including polymer dosing and conveyor operation.
.10 Failure Modes. Unless noted otherwise:
.1 If a duty pump fails, then the standby pump is to become the duty pump.
.2 No motorized equipment is on UPS, so upon loss of power, all motorized equipment will de-
energize, and will resume normal operation when power is restored.

Influent Sequence of Operation

.1 LIT-2010 to monitor the influent channel liquid level, and is to alarm when the liquid level rises
above 90.600m, where the liquid is higher than normal operating level and is in danger of going
into the bypass channel.
.2 LSH-2030 to provide warning at 90.575m and alarm at 90.600m.

Screening Sequence of Operation

.1 The mechanical bar screens and washer/compactor are controlled by the OEM control panels
supplied with the equipment. The panel is to be equipped with an emergency stop button and
operator interface terminal. A communications bus will be available to monitor the system and
alarms, as well as control all screening system functions from the WPCP SCADA system.

.2 Automatic Screen Operation:


.1 Activate a Screen when the “Screen Activation Liquid Level” is detected by the level sensor
upstream of the screens, or the “Maximum Pause Timer” has been reached.
.2 When a screen is activated, move the lamellae bars one rotation, and then stop.
.3 If the “Screen Activation Liquid Level” is still detected, there will be a 0-10s delay before
initiating a second screen rotation.
.4 If the “Screen Activation Liquid Level” is still detected after the second rotation, there will be
a 0-10s delay before initiating the screen is to run continuously until the level reading is
below the “Screen Activation Liquid Level”, minus deadband.
.5 If the “High Liquid Level” is detected, operate the screen in continuous mode until the high
liquid level is no longer detected for an operator adjustable time duration (0-10s).
.6 As a minimum, alarm to be provided for the following:

ISSUED FOR ADDENDUM #7


Kemptville Water Pollution Control Section 17501
Plant Expansion – Phase A SEQUENCE OF OPERATIONS Page 2 of 15
JLR No. 29475-000.1 December 2023

.1 Adjustable time delayed initiation of any high level switch, motion (under/zero speed)
sensor fault, or over/under current fault.
.2 Immediately upon activation of any E-stop, motor/drive faults.
.3 Adjustable time delayed annunciation of either the local control panel or HMI controller
left out of ‘Automatic System’ control (this warning shall also be operator adjustable
during planned and prolonged maintenance operations where nuisance alarms would
otherwise be likely).

.3 Washer Compactor Operation:


.1 A counter shall count each screen rotation.
.2 Once a preset number of screen rotations has occurred, activate the wash press, as follows:
.1 Wash press screw cycle to operate for a preset amount of time (1s-60s), and then pause
for a preset amount of time (adjustable between 0s-60s). The number of cycles shall be
adjustable by operators.
.2 Open wash press solenoid valves for a preset time duration during each cycle, not
exceeding the full cycle duration.
.3 If rotation of the washer compactor screw is no longer detected, while the washer
compactor is activated, activate an alarm and stop the washer compactor system.

.4 A local control panel provided by the OEM will allow for manual control of the screens and the
washer/compactor.
.1 Screens (Manual Control)
The Manual Control mode at the equipment Local Control Panel shall include the following
functions:
.1 Operator ability to manually initiate a screen rotation via field push button.
.2 Operator ability to manually operate the Compactor Screw Conveyor in either the forward
or reverse direction.
.3 Operator ability to manually operate either Compactor Wash Water Control Solenoid
Valve or place the device offline (not in AUTO mode).

.2 Control functions at the equipment HMI shall include:


.1 Adjustable setpoints for flow, pressure and process timers for automated operation. This
shall also include alarm delay timer adjustments, as required for nuisance free operation
of the Screening System.
.2 Assigning alarms and their annunciation priorities.
.3 Manual control of the screening compactor equipment directly from the touch screen
HMI. In this mode, manual switches from the Local Control Panel shall be ignored by the
PLC controller until the equipment is placed back into AUTO mode of operation at the
HMI.

.5 Failure Modes:
.1 Upon loss of communication with SCADA, system to continue to operate using the OEM
system controls, and continue to monitor and trend data. When connection with SCADA is
restored, OEM package to provide all logged information during the loss of communications
to SCADA.
.2 Upon loss of power, controls will continue to be on UPS power.

Grit Removal Sequence of Operation

.1 The grit removal system, including the grit pumps, blower, hydrocyclones, and classifier, are
controlled by an OEM panel. The local control panel will be supplied with an emergency stop
button and an operator interface with basic controls. A communications bus is available to

ISSUED FOR ADDENDUM #7


Kemptville Water Pollution Control Section 17501
Plant Expansion – Phase A SEQUENCE OF OPERATIONS Page 3 of 15
JLR No. 29475-000.1 December 2023

monitor the system and alarms, as well as control all grit removal system functions from the
WPCP SCADA system.

.2 Grit Tank Vortex Inducer


.1 Grit tank vortex inducers are to operate continuously, and their status is to be monitored by
the grit removal system HMI.

.3 Grit Removal
.1 Grit removal will be initiated on an operator adjustable timer (1-24 hours). Only one grit
pump is to operate at a time.
.2 When the grit removal cycle is initiated, activate the grit fluidization system for an operator
adjustable duration before pumping beings. Grit fluidization is to continue during the entire
cycle.
.3 Activate grit pump to pump grit slurry to its associated hydrocyclone, where excess water
overflows to drain, and the concentrated grit flows to the Grit Classifier.
.4 When the pump is activated, activate the Grit Classifier wash water function and the grit
classifier screw.
.5 Grit discharges into the bagging system, and the excess liquid in the grit classifier overflows
through a pipe drain to the inlet channel.
.6 When the grit removal cycle has ended, deactivate the grit pump and the grit classifier.
.7 If the grit classifier rope switch is pulled, immediate stop the grit removal cycle by
deactivating the grit pump and grit classifier and alarm.
.8 If rotation of the grit classifier screw is no longer detected while the grit classifier is in
operation, activate an alarm and stop the washer compactor system.
.9 Alarm monitoring and annunciation shall be provided for the following minimum
requirements:
(a) Adjustable time delayed initiation of any high level switch, low pressure switch, motion
(under/zero speed) sensor fault, or over/under current fault.
(b) Immediately upon activation of the rope switch, E-stop, motor/drive faults.
(c) Adjustable time delayed annunciation of either the local control panel or HMI controller
left out of ‘Automatic System’ control (this warning shall also be able to be operator
suspended during planned and prolonged maintenance operations where nuisance
alarms would otherwise be likely)

.4 A local controller is to be provided for the grit removal system for local manual control.

.5 Grit Removal (Manual Control)


Manual control features at the equipment Local Control Panel is to include:
.1 Manual operation of the Grit Tank Vortex Inducer or take the equipment off-line (i.e. not in
AUTO mode).
.2 Manual operation of each Grit Slurry Pump or take the equipment off-line. Initiating manual
operation of a pump shall direct the PLC controller to provide the same automated
interlocking and sequencing as AUTO mode. Manually taking a pump offline shall also
place the Pump Seal Water control solenoid valve offline.
.3 Manual operation of the Grit Classifier Screw Conveyor in either the forward or reverse
direction. Note that the reverse direction is non-latching in the reverse direction, requiring
the operator to hold, maintain and supervise this mode of operation in the field.
.4 Manual Operation of the Grit Classifier Wash Water Control Solenoid Valve or take the
equipment off-line (i.e. not in auto mode).

.6 Grit removal system touch screen HMI displays are to provide the following functions:
.1 Graphical depiction of the process flow diagram, complete with controlled or monitored
operation equipment status.
.2 Adjustable set-points for flow, pressure and process timers for AUTO mode. This shall also

ISSUED FOR ADDENDUM #7


Kemptville Water Pollution Control Section 17501
Plant Expansion – Phase A SEQUENCE OF OPERATIONS Page 4 of 15
JLR No. 29475-000.1 December 2023

include alarm delay timer adjustments as required for nuisance free operation of the Grit
Removal System.
.3 Alarm assignments and their annunciation priorities.
.4 Manual control of the Grit Removal system equipment. In this mode, manual switches from
the Local Control Panel shall be ignored by the PLC controller until the equipment is placed
back into AUTO mode.
.5 Internal historical log of all events, high or low limit alarms, starting and stopping any
process motor, and trending of all analogue signals associated with the grit removal system.

.7 Failure Modes
.1 Upon loss of communication with SCADA, system to continue to operate using the OEM
system controls, and continue to monitor and trend data. When connection with SCADA is
restored, OEM package to provide all logged information during the loss of communications
to SCADA.
.2 Upon loss of power, controls will continue to be on UPS power.

Septage Receiving Sequence of Operation

.1 Refer to P205 liquid levels if not explicitly stated below.


.2 Normal Operation
.1 Septage trucks will connect a discharge hose from the truck to the quick coupling connection
at the Septage Receiving Station.
.2 If stack light red trouble/wait
.3 If stack light green – in progress/go
.4 Operators will open valves on the truck, and then push the START button at the local HMI.
.5 START activation will open the control valve VFC-201 to allow septage into the Septage
Receiving Equalization Tank. If there is not 15m3 of available receiving volume in the tank,
then the VFC-201 will not open until this volume becomes available. If the tank is in the
middle of a flushing sequence, then the control valve will not open until this sequence has
been completed.
.6 Once the truck is empty, operators to push the “Stop” button.
.7 When the liquid level in the tank is above the High Liquid Level, then the duty pump will
activate until the level reaches 88.800.
.8 When the tank has reached a preset low liquid level, the duty pump will deactivate and the
flushing sequence will be initiated.

.3 Flushing Sequence:
.1 After the tank has been emptied of septage, a tank flushing sequence will be initiated.
.2 The septage inlet control valve shall remain closed during this sequence.
.3 The effluent water solenoid valves will open for the duration of the “Septage Flush Time”
timer (0-300s) to wash out the septage pipe and to spray down the walls of the septage
tank.
.4 After the “Septage Flush Time” timer has expired, then the duty septage pump will activate
at maximum speed to flush out solids in the discharge pipe.

.4 Septage Equalization Pumps (Manual Operation)


.1 Manual: When the duty pump is in Manual Mode, Automatic Mode for the pump will be
stopped. Manual mode will consist of an On/Off switch and a potentiometer for controlling
the pump speed.

.5 Failure Mode;
.1 Upon duty pump failure, standby pump to become lead pump.
.2 If loss of communications, system to stop operation, pumps to de-energize, valves maintain
their last position, and indication lights to show fault.

ISSUED FOR ADDENDUM #7


Kemptville Water Pollution Control Section 17501
Plant Expansion – Phase A SEQUENCE OF OPERATIONS Page 5 of 15
JLR No. 29475-000.1 December 2023

Equalization Sequence of Operation

.1 Flow measurement for the purposes of the equalization is the summation of all flows to the
primary clarifiers through FIT-2017, FIT-2018, and FIT-2019. This is achieved using the flow
meters in the raw sewage pipes leading to the primary clarifiers plus the WAS flow. For the
purposes of monitoring plant influent flows, the washwater, and centrate are subtracted from the
primary influent pipe flow meters.

.2 Plant flow is equalized after the primary clarifiers.

.3 Normal Operation: This condition occurs when the sewage inflow is at or less than
15,000m3/d and the Equalization Tanks are empty.
.1 Equalization of primary effluent is not required at these flows.
.2 During this operation, primary effluent shall flow by gravity from the primary clarifiers to the
aeration tanks and the equalization wet well sluice gate is to be closed at this time.

.4 High Flow Operation: When flow exceeds 15,000m3/d, the following functions are to occur:
.1 Open sluice gate SGA-401 to the Equalization Wet Well.
.2 Activate the Lead Equalization Pump.
.3 Open the control valve to the duty Equalization Tank.
.4 EQ Pumps P-404, P-405, and P-406 operate in a Lead/Lag/Standby configuration.
Modulate the Lead Pump speed based on flow meter FIT-4020, such that this flow matches
the totalized flow as totalized from FIT-2017, FIT-2018, and FIT-2019 less 15,000 m3/d (i.e.:
maximum flow rate of 15,000m3/d to the aeration tanks is maintained).
.5 When the duty Equalization Tank maximum level sensor limit is reached, equating to
5000m3 in the tank, close the valve to the duty tank and open the valve to the lag tank.
.6 When the flow to the primary clarifiers is less than 15,000m3/d minus deadband, close the
control valves to the equalization tanks, and deactivate the equalization pumps.
.7 EQ Drainage Pump P-407 is to energize to drain the remainder of the liquid in the EQ Wet
Well. P-407 to de-energize when it reaches Low-Low Liquid Level in the tank.
.8 Flow from the EQ Pumping Station is monitored by FIT-4020. If the lead pump is energized
and no flow is detected by FIT-4020, de-energize and remove pump from service, and
alarm.

.5 Return Flow Operation: This occurs when sewage inflows are at or less than 15,000m3/d, minus
user adjustable deadband, and the equalization tanks are not empty.
.1 Open the tank drain discharge control valve for the lead equalization tank. Modulate the
tank’s associated control valve (VFC-407 and VFC-408) position such that 15,000m3/d flow
to the primary clarifiers is not exceeded.

.6 Equalization Pumps (manual operation)


Manual control features are to include:
.1 Automatic: A local control panel will display “RUNNING”, “STOPPED”, and “FAULT”. and
include a HOA selector switch.
.2 Manual: When an EQ Pump is in Manual Mode, Automatic Mode for that pump will be
stopped. Manual mode will consist of an HOA selector switch and a potentiometer for speed
control.

.7 Failure Modes
.1 Should a level sensor in the tank fail, the overflow from the tanks are directed back to the grit
discharge channel.
.2 If Low Liquid Level in the EQ Wet well is detected while the EQ Pumps are operating, de-
energize EQ pumps, close valves VFC-405 and VFC-406, and alarm.
.3 If the system loses communications, then system to shut down and pumps are to de-
energize.

ISSUED FOR ADDENDUM #7


Kemptville Water Pollution Control Section 17501
Plant Expansion – Phase A SEQUENCE OF OPERATIONS Page 6 of 15
JLR No. 29475-000.1 December 2023

.4 Upon loss of power, valves will remain in their last position.


.1 Sump pump to be controlled by OEM control panel, as detailed in 15412. Panel to
provide general alarm back to SCADA.

Primary and Secondary Treatment Sequence of Operation

.1 Primary Clarification:
.1 Chain and flight longitudinal sludge collector and cross collectors shall operate continuously.
.2 Both the longitudinal and cross collectors are equipped with thermostatically controlled heaters
inside the drive cover.
.3 Chain and flight longitudinal sludge collector:
.1 Automatic: Momentary limit switches on each side of the tank to be monitored for
misalignment (i.e.: switches on each side of the tank signaled at different times), or no-motion
condition (i.e.: length of time between signals is too long) by the WPCP SCADA system. A
local control panel will display “RUNNING”, “OFF”, and “FAULT” and include a HOA selector
switch for each chain and flight system.
.2 Manual: When a sludge collector is in Manual Mode, Automatic Mode for that collector will be
stopped. Manual mode will consist of an On/Off switch.
.3 Failure Mode:
(1) If Misalignment or No-Motion is detected, chain and flight to de-energize and alarm.
(2) If loss of communication, chain and flights to continue to operate. No alarms will be sent.
.4 Chain and Flight Sludge Cross Collector
.1 Automatic: A local control panel will display “RUNNING”, “STOPPED”, and “FAULT” and
include a HOA selector switch for each chain and flight system.
.2 Manual: When a sludge collector is in Manual Mode, Automatic Mode for that collector will be
stopped. Manual mode will consist of an On/Off switch.
.3 Failure Modes:
(1) If loss of communication, chain and flights to shut down and de-energize.
.5 Primary Scum Pumping:
.1 The primary scum pump P-403 will be automatically controlled, with the option of manually
initiating a cycle using a button at the scum pit.
.2 Manual tipping troughs are used to collect scum and convey it to the scum pit.
.3 When level in the scum pit is initiated by the manual push button, the pump is to initiate a
removal cycle.
(1) 3-way motorized control valve to be placed in circulation mode.
(2) Pump is to be energized.
(3) After an operator adjustable set time (0-10 minutes), the 3-way valve to be placed in
discharge mode, so that scum is pumped to the digester.
(4) When liquid level in the scum pit reaches its low set point, the pump is to de-energize.
.4 If the cycle is initiated by the high level, then scum pumping sequence to skip recirculation in
the tank, and immediately begin pumping to remove scum.
.5 Automatic: A local control panel will display “RUNNING”, “STOPPED”, and “FAULT”,
“RECIRCULATING”, and “DISCHARGING”, and include a HOA selector switch and a “RUN
COMMAND”.
.6 Manual: When the scum pump is in Manual Mode, Automatic Mode will be stopped. Manual
mode will consist of an HOA selector switch for the pump and a manual square nut to
override the valve actuator.
.7 Failure Modes:
(1) If loss of communications scum pumping system to de-energize.
.6 One raw sludge pump will operate at a time. The two primary sludge pumps P-401 and P-402
will be connected by a suction header at the inlet of the pumps.
.1 The pumps will be staged in a Duty/Standby configuration.
.2 The pumps will operate on operator adjustable cycle (preset to 5 minute run and 60 minutes
between run times).
.3 When not operating, the primary clarifier sludge control valves are to be closed.

ISSUED FOR ADDENDUM #7


Kemptville Water Pollution Control Section 17501
Plant Expansion – Phase A SEQUENCE OF OPERATIONS Page 7 of 15
JLR No. 29475-000.1 December 2023

.4 When the system is to start pumping primary sludge, Primary Clarifier 1 Sludge Control Valve
VFC-401 will open, and then lead pump will activate for an operator adjustable time (Primary
Clarifier 1 Sludge Timer). At the end of the timer, pump will de-energize, and VFC-401 to
close.
.5 Once VFC-401 has closed, Primary Clarifier 2 Sludge Control Valve VFC-402 to open, and
then lead pump will activate for an operator adjustable time (Primary Clarifier 2 Sludge
Timer). At the end of the timer, pump will de-energize, and VFC-402 to close.
.6 Once VFC-402 has closed, Primary Clarifier 3 Sludge Control Valve VFC-403 to open, and
then lead pump will activate for an operator adjustable time (Primary Clarifier 3 Sludge
Timer). At the end of the timer, pump will de-energize, and VFC-403 to close.
.7 The primary sludge pumps are to alternate lead/lag positions based on an operator
adjustable number of start/stops.
.8 Primary sludge pumps and scum pump are not to discharge to the digester at the same time.
If the primary sludge pumps are operating and the scum pump receives a signal to energize,
then the primary sludge pumps are to de-energize and close valves VFC-401, 402, and 403.
Primary sludge pumps to resume normal operation when the scum pump has de-energized.
.9 If the scum pump is energized when the primary sludge pumps are called to energize,
primary sludge pumps are to wait until the scum pump has de-energized.
.7 The primary sludge pumps are also used to dewater the aeration tanks. When an aeration tank is
to be emptied, one of the primary sludge pumps is to be taken out of automatic mode. Manual
valves at the pumps will need to be adjusted such that the pump draws liquid from the aeration
tanks and discharges it upstream of the primary clarifiers. The pump can be energized locally, or
through remote manual mode in SCADA.
.8 Manual Mode:
.1 Automatic: A local control panel will display “RUNNING”, “STOPPED”, and “FAULT”. and
include a HOA selector switch.
.2 Manual: When a primary sludge pump is in Manual Mode, Automatic Mode for that pump will
be stopped. Manual mode will consist of an HOA selector switch and a potentiometer for
speed control.
.9 Failure Modes
.1 If loss of communications scum pumping system to de-energize and control valves to remain
in their last position.

.2 Aeration Tanks
.1 The blowers BL-501, BL-502 and BL-503 will operate in a Lead/Lag/Standby configuration.
.2 The air control valves to each of the aeration tanks (VFC-409 through VFC-414) will modulate
to maintain Dissolved Oxygen (DO) set point in the aeration tanks.
.3 Lead blower to modulate speed to maintain pressure set point of 410 mbar, as detected by
PIT-5010. If the lead blower is unable to maintain pressure, then the lag blower is to be
energized. Both lead and lag blowers are to operate at the same speed. If two blowers are
operating and they are at their lowest speed and pressure increases, then the lag blower is to
be de-energized.
.4 There will be a blower minimum speed set point to be set to achieve mixing within the
aeration tanks.
.5 Manual Mode:
.1 Automatic: A local control panel will display “RUNNING”, “STOPPED”, and “FAULT”. and
include a HOA selector switch.
.2 Manual: When a blower is in Manual Mode, Automatic Mode for that blower will be
stopped. Manual mode will consist of an HOA selector switch and a potentiometer for
speed control.
.6 Failure Mode:
.1 If loss of communications, then blowers to de-energize and valves to remain in their last
position.

ISSUED FOR ADDENDUM #7


Kemptville Water Pollution Control Section 17501
Plant Expansion – Phase A SEQUENCE OF OPERATIONS Page 8 of 15
JLR No. 29475-000.1 December 2023

.3 Final Clarifiers
.1 Controls for the existing final clarifiers are unchanged from existing control philosophy.
.1 Chain and flight longitudinal sludge collector and cross collector will operate continuously.
.2 Chain and flight longitudinal sludge collector:
.1 Automatic: Momentary limit switches on each side of the tank to be monitored for
misalignment (i.e.: switches on each side of the tank signaled at different times), or no-
motion condition (i.e.: length of time between signals is too long) by the WPCP SCADA
system. A local control panel will display “RUNNING”, “OFF”, and “FAULT” and include a
HOA selector switch for each chain and flight system.
.2 Manual: When a sludge collector is in Manual Mode, Automatic Mode for that collector
will be stopped. Manual mode will consist of an On/Off switch.
.3 Failiure Mode:
(1) If Misalignment or No-Motion is detected, chain and flight to de-energize and alarm.
(2) If loss of communication, chain and flights to de-energize.
.3 Chain and Flight Sludge Cross Collector
.1 Automatic: A local control panel will display “RUNNING”, “STOPPED”, and “FAULT” and
include a HOA selector switch for each chain and flight system.
.2 Manual: When a sludge collector is in Manual Mode, Automatic Mode for that collector
will be stopped. Manual mode will consist of an On/Off switch.
.3 Failure Modes:
(1) If loss of communication, chain and flights to de-energize.
.4 Scum from the final clarifiers will be collected manually using the scum troughs, which
connects to the wash water sump pits in the tertiary filter buildings.
.5 Control of existing activated sludge pumps will not be modified. New sludge pumps are to
be integrated with the existing sludge pumping system.
.6 Operators to be able to select which of the new clarifiers is in standby mode. Its associated
pump will then be the standby pump.
.7 The new activated sludge pump, either P-612 or P-613, will modulate speed to maintain flow
rate as detected by its associated flow meter, either FIT-6010 or FIT-6011, of:
.1 RAS Flow Tank 3 = Return Percentage 3 [%] * Final Effluent Flow [l/s]
.8 The RAS/WAS 3-way control valve VFC-614 for the new activated sludge pump will waste
flow to the primary clarifier based on pumping cycle time duration.
.1 When wasting cycle initiated, VFC-614 to divert from the RAS side to the WAS side.
.2 Duty pump to modulate to WAS pump speed.
.3 When operator set waste volume, as detected by FIT-6010 or FIT-6011, per cycle has
been achieved, VFC-614 to divert RAS back to the aeration tanks.
.4 Pump operate in RAS mode, modulating speed as noted above.
.9 RAS is monitored by FIT-6010 and FIT-6011. If the lead pump is energized and no flow is
detected by its associated flow meter, de-energize and remove pump from service, and
alarm.
.10 Manual Mode:
.1 Automatic: A local control panel will display “RUNNING”, “STOPPED”, and “FAULT”.
and include a HOA selector switch.
.2 Manual: When an activated sludge pump is in Manual Mode, Automatic Mode for that
pump will be stopped. Manual mode will consist of an HOA selector switch and a
potentiometer for speed control.
.11 Failure Modes
.1 If loss of communications, activated sludge pumping system to de-energize and valve to
remain in last known position.
.2 If loss of power, VFC-614 to remain in their last position until power returns.

.4 Scum Heaters

ISSUED FOR ADDENDUM #7


Kemptville Water Pollution Control Section 17501
Plant Expansion – Phase A SEQUENCE OF OPERATIONS Page 9 of 15
JLR No. 29475-000.1 December 2023

.1 Radiant scum heaters will be located at the south end of the primary clarifiers and will be
mounted above the scum trough. The heaters will be used to keep the scum fluid when
the outdoor temperature is colder.
.2 Operators are to be able to select once of the two following ways in which the scum
heaters are to automatically turn on.
.1 Outdoor Temperature: Scum heaters are to turn on when the outdoor temperature
drop below operator adjustable set point (preset to 5oC) minus deadband. Scum
heaters are to turn off when the outdoor temperature rises to above the set point plus
deadband.
.2 Schedule: Scum heaters to turn on/off based on an operator adjustable schedule.
Schedule to be adjustable daily for the calendar year.
.3 Manual Mode:
.1 Automatic: A local control panel will display “RUNNING”, “STOPPED”, and “FAULT”.
and include a HOA selector switch.
.2 Manual: When an activated sludge pump is in Manual Mode, Automatic Mode for that
pump will be stopped. Manual mode will consist of an HOA selector switch and a
potentiometer for speed control.
.4 Failure Modes
.1 If loss of communications scum heaters are to de-energize.
.2 If loss of power, scum heaters are to remain de-energized until primary or emergency
power is restored to the units.

Mixing Tank Sequence of Operation

.1 Controls for the existing Mixing Tank are unchanged from existing control philosophy.
.1 Flash mixer MIX-704 to run continuously at constant speed.
.2 Floc Mixer MIX-705 to run continuously at constant set speed.
.3 Manual Mode
.1 Automatic: A local control panel will display “RUNNING”, “STOPPED”, and “FAULT”.
and include a HOA selector switch for each mixer.
.2 Manual: When either mixer is in Manual Mode, Automatic Mode for that mixer will be
stopped. Manual mode will consist of an HOA selector switch.
.4 Failure Mode
.1 Upon loss of communication, mixers are to de-energize.

Tertiary Filter Sequence of Operation

.1 Controls for the existing tertiary filters are unchanged from existing control philosophy.
.1 The tertiary filter is a passive filtration process as flow passes downward through the media and
out an underdrain system.
.2 The filter is cleaned using a travelling bridge system with backwash pumps. The backwashing
sequence will operate on either an operator adjustable timer or on an integral high level switch.
.3 The tertiary filter will be controlled by the OEM control panel. The panel is equipped with an
emergency stop button and operator interface terminal. A communications bus is available to
monitor alarms and control functions from the WPCP SCADA system.
.4 Backwashing
.1 Once a backwash sequence is initiated, the travelling bridge will energize the backwash
pump P-724, skimmer pump (SKM-726), and washwater pumps (P-723).
.2 The travelling bridge stepper motor drive will stop at each cell for an operator adjustable
period of time to ensure each cell is fully backwashed.
.3 Backwash cycle to complete a full pass of the entire filter, even if liquid level drops below high
level switch.
.4 If high level switch is still activated at the end of a cycle, then the system is to complete
another backwash cycle.

ISSUED FOR ADDENDUM #7


Kemptville Water Pollution Control Section 17501
Plant Expansion – Phase A SEQUENCE OF OPERATIONS Page 10 of 15
JLR No. 29475-000.1 December 2023

.5 There is an integral high-high level switch to detect overflow.


.6 There is an integral low-low level switch to detect minimum water in the filter.
.7 Tertiary Filter Bypass
.1 At the end of the secondary clarifiers, there is an automatic hydraulic bypass, where if the
liquid level rises, it will flow over a weir, into a pipe, bypassing the Flash Mix Tank, the Floc
Tank, and the Tertiary Filter.
.2 The level sensor in the channel is to monitor the level in the channel. If liquid level reaches a
high level of 89.180m, system to alarm. SCADA to use level sensor to calculate bypass flow
rate and volume over weir.
.8 Manual Mode
.1 Automatic: A local control panel will display “RUNNING” light and HOA for each of the
Skimmer Pump, Washwater Pump, Backwash Pump, and Carriage Drive.
.2 Manual: When any individual piece is in Manual Mode, Automatic Mode for the entire
system will be stopped. Manual mode will consist of an HOA selector switch for each
component listed above. A “BACKWASH” push button is provided to manually initiate a
backwash.
.9 Failure Mode
.1 Upon loss of communication, Tertiary Filter System to shut down and de-energize.

Wash Water Sump Pump Sequence of Operation

.1 Controls for the existing wash water sump are unchanged from existing control philosophy.
.1 The washwater sump pumps (P-728 and P-729) are to operate in a lead/lag configuration.
.2 Liquid level in the tank is measured using LIT-7010.
.3 When high liquid level (88.300m) in the wash water sump pump is detected, then the lead
pump will activate.
.4 If the high-high liquid level (88.600m) in the tank is detected, then the lag pump will activate.
.5 If high-high-high liquid level (88.800m) in the tank is detected, then both pumps to start and
alarm to SCADA. This operation to be backed up by LSH-7011.
.6 When the tank reaches the low liquid level (88.000m), the pumps will deactivate.
.7 If tank reaches Low-Low liquid level (87.900m) turn off pumps and alarm. This level to be
backed up by LSL-7012.
.8 Washwater flow rate is monitored by FIT-7001. If a pump is energized and no flow is
detected by FIT-7001, de-energize and remove pump from service, and alarm.
.9 Failure Mode
.1 Upon loss of communication, pumps are to de-energize.

Tertiary Effluent Pumping Station Sequence of Operation

.1 The tertiary effluent pumping station is used to pump tertiary effluent from the new filters to
the channel upstream of the UV disinfection system.
.2 Four tertiary effluent pumps, P-731, P-732, P-733, and P-734 will operate in a
lead/lag/standby1/standby2 configuration and will operate to maintain a constant liquid level
within the Tertiary Effluent Wet Wells of 87.500m.
.3 The pumps will modulate to maintain liquid level in the wet wells as determined by LE-7013
and LE-7014. One sensor is to be the duty sensor and the other is to be the standby sensor.
.4 The lead pump will be capable of handling low flows. If the lead pump is at maximum speed,
and the level continues to rise, then the duty pump is to be energized.
.5 If both the lead and lag pump are operating at low speed, and the level continues to drop, lag
pump to de-energize.
.6 If at low flow, and the lead pump is at minimum speed set point, and liquid level in the tank
drops below the low liquid level set point (85.900m), the lead pump will de-energize.
.7 When the liquid level in the tank increases to high liquid level set point, the lead pump will
activate and modulate speed to maintain a consistent liquid level in the tank.

ISSUED FOR ADDENDUM #7


Kemptville Water Pollution Control Section 17501
Plant Expansion – Phase A SEQUENCE OF OPERATIONS Page 11 of 15
JLR No. 29475-000.1 December 2023

.8 Typically, both wet wells are online, and level is equalized between then. If one wet well is
taken offline, then the pumps and level sensors in that wet well are also to be taken offline.
.9 If the lead and lag pumps are not able to maintain the liquid level set point, and it continues to
rise, then the standby pump is to be energized, and an alarm is to be initiated.
.10 The lag pump is to be de-energized at a low speed set point.
.11 Manual Mode:
.1 Automatic: A local control panel will display “RUNNING”, “STOPPED”, and “FAULT”. and
include a HOA selector switch.
.2 Manual: When a pump is in Manual Mode, Automatic Mode for that pump will be stopped.
Manual mode will consist of an HOA selector switch and a potentiometer for speed
control.
.12 Failure Mode:
.1 If the lead sensor fails, the standby sensor is to become the lead sensor.
.2 If both wet wells are online and the sensors are detecting different levels by greater than
25mm, alarm to SCADA.
.3 If the lead and lag pumps are not able to maintain the liquid level set point, and it
continues to rise, then the standby1 pump is to be energized, and an alarm is to be sent
to SCADA.
.4 If loss of communications, then pumps are to maintain last known speed until
communications return.

Effluent Pumping Sequence of Operation

.1 The effluent pumps, P-712, P-713, P-714, and P-715 will modulate speed to maintain a
constant liquid level in the effluent holding tank.
.1 Pumps will operate in a lead/lag1/lag2/standby configuration.
.2 Operating liquid levels in the tank remain unchanged from their current configuration.
.3 At low flows, only the lead pump will be energized.
.4 If at low flow, and the lead pump is at minimum speed set point, and liquid level in the
tank drops below the low liquid level set point, the lead pump will stop.
.5 When the liquid level in the tank increases to high liquid level set point, the lead pump will
activate and modulate speed to maintain a consistent liquid level in the tank.
.6 When the liquid level in the tank increases to high liquid level, the lag pump is to activate
and both pumps will modulate pump speeds to maintain a consistent liquid level set point
in the tank.
.7 If both pumps are modulating at low-speed set point, then the lag pump will deactivate,
and the lead pump will modulate to maintain a consistent liquid level set point.
.8 If both the lead and lag1 pumps are operating and the liquid level increases beyond the
high liquid level set point, the lag2 pump will activate. All three pumps will modulate
speeds to maintain a consistent liquid level set point.
.9 If the three pumps are operating at a low-speed set point, then the lag2 pump will
deactivate, and the remaining two pumps are to modulate speeds to maintain a
consistent liquid level set point.
.10 If the lead, lag1, and lag2 pumps are operating, and the level increases to high liquid
level set point, a high-level alarm will be activated.
.2 If the liquid level in the Effluent Holding Tanks increases beyond 88.000m, such that it is
above the overflow pipe, then an emergency high level alarm will be activated. A portion of
the flow will then bypass to the Kemptville Creek. SCADA to calculate how much flow is
bypassing to the creek based on the crest height above the overflow weirs.
.3 Manual Mode:
.1 Automatic: A local control panel will display “RUNNING”, “STOPPED”, and “FAULT”. and
include a HOA selector switch.
.2 Manual: When a pump is in Manual Mode, Automatic Mode for that pump will be stopped.
Manual mode will consist of an HOA selector switch and a potentiometer for speed
control.

ISSUED FOR ADDENDUM #7


Kemptville Water Pollution Control Section 17501
Plant Expansion – Phase A SEQUENCE OF OPERATIONS Page 12 of 15
JLR No. 29475-000.1 December 2023

.4 Failure Mode:
.1 If both wet wells are online and the sensors are detecting different levels by greater than
25mm, alarm to SCADA.
.2 If the lead and lag pumps are not able to maintain the liquid level set point, and it
continues to rise, then the standby1 pump is to be energized, and an alarm is to be sent
to SCADA.
.3 If loss of communications, then pumps will be on a hardwired drain down system such
that on a high level signal from the ultrasonic sensor, the pumps are to turn on until the
low level switch is activated at which point the pumps are to de-energize.

Primary Digester Sequence of Operation

.1 Existing primary digester process and associated equipment to maintain existing sequence of
operation.
.2 Hot water:
.1 When the temperature of the sludge in the digester drops below 34.5oC, based on TT-
8012, energize Hot Water Recirc Pump P-809, and VFC-810 to be put in full recirculation
position.
.2 Hot water recirculation pump, P-809, to run continuously at constant speed.
.3 VFC-810 to modulate to maintain water recirculation temperature of 58oC as detected by
TT-8013.
.4 When temperature of the sludge in the digester increases to 35.5oC, de-energize P-809,
and VFC-810 to be put in full recirculation position.
.3 Sludge recirculation pumps, P-807 and P-808, will operate in a Duty/Standby configuration.
.4 Lead sludge pump shall operate continuously.
.5 When sludge is added to the digester, the liquid level will increase over the overflow weir and
will discharge by gravity to the secondary digester.
.6 An overflow pipe will also be connected to the overflow box, which will direct overflow sludge
back upstream of the primary clarifiers.
.7 Digester Mixer MIX-803 to operate on an operator adjustable schedule of 15 minutes every 1
hour.
.8 Level in the digester is measured using LIT-8011.
.9 Manual Mode For P-807 and P-808:
.1 Automatic: A local control panel will display “RUNNING”, “STOPPED”, and “FAULT”. and
include a HOA selector switch.
.2 Manual: When a pump is in Manual Mode, Automatic Mode for that pump will be stopped.
Manual mode will consist of an HOA selector switch and a potentiometer for speed
control.
.10 Manual Mode for P-809:
.1 Automatic: A local control panel will display “RUNNING”, “STOPPED”, and “FAULT”. and
include a HOA selector switch.
.2 Manual: When a pump is in Manual Mode, Automatic Mode for that pump will be stopped.
Manual mode will consist of an HOA selector switch.
.11 Manual Mode for MIX-803:
.1 Automatic: A local control panel will display “RUNNING”, “STOPPED”, and “FAULT”. and
include a HOA selector switch.
.2 Manual: When the mixer is in Manual Mode, Automatic Mode for the mixer will be
stopped. Manual mode will consist of an HOA selector switch and a potentiometer for
speed control.
.12 Failure Modes:
.1 Alarm if TT-8013 measure temperatures above 65oC.
.2 If TSHH-8014 measures temperatures at 65oC, alarm and de-energize P-809.
.3 Alarm if digester liquid level drops to low liquid level of 94.450m.
.4 Alarm if digester liquid level to high liquid level of 94.550m.
.5 Upon loss of communications:

ISSUED FOR ADDENDUM #7


Kemptville Water Pollution Control Section 17501
Plant Expansion – Phase A SEQUENCE OF OPERATIONS Page 13 of 15
JLR No. 29475-000.1 December 2023

.1 VFC-810 to maintain last position.


.2 Pump P-809 to de-energize.
.3 MIX-803 to de-energize.

Dewatering Sequence of Operation.

.1 When digested sludge from the secondary digester is ready for dewatering, operators to have
the Sludge Holding Tank filled using the secondary digester transfer pump M-803 and M-804.
.1 In SCADA operators are to call for the Sludge Holding Tank to be filled.
.2 Duty pump of either M-803 or M-804 to be energized.
.3 Control valve M-845 to move to discharging position and VFC-820 to open.
.4 Level in sludge holding tank is to be monitored using LIT-8030. When high liquid level
associated with the full volume to be dewatered for the day (87.600m) is achieved, then
sludge pumps to resume normal operation and valve M-845 to return to recirculation
mode.
.5 When tank is above 86.250m, the MIX-801 to be energized to maintain a homogeneous
mixture. Mixer to operate continuously while the liquid level in the tank is above
86.250m. If liquid level drops below 86.250m, mixer to de-energize.
.2 Once the sludge tank has been filled, operators may initiate a dewatering sequence through
SCADA. The centrifuge will be energized.
.3 The centrifuge dewatering system, including the Centrifuge Sludge Feed Pump No.1 (P-813),
the Polymer Dosign Pump (P-814), the Centrifuge (CNT-801 and CNT-802), and Sludge
Screw Conveyor 1 (SCV-801), are controlled by an OEM panel. The local control panel will
be supplied with an emergency stop button and an operator interface with basic controls. A
communications bus is available to monitor the system and alarms, as well as control all
centrifuge dewatering system functions from the WPCP SCADA system.
.4 The sludge pump on the dewatering skid will draw sludge from the Sludge Holding Tank and
pump sludge to the centrifuge.
.5 An emulsion polymer system will be used to add polymer to the liquid biosolids.
.6 Dry biosolids from the centrifuge will discharge into SCV-801 below the centrifuge and be
conveyed to Sludge Screw Conveyor 2 (SCV-802) to the waste bin. SCV-802 is a reversing
conveyor and will change direction after an operator adjustable amount of time
(approximately halfway through the dewatering process) to ensure that the waste bin is
evenly filled.
.7 Centrate from the centrifuge will flow by gravity to the centrate holding tank. Submersible
centrate pumps will be used in a lead/lag configuration to pump centrate back upstream of
the primary clarifiers.
.8 The centrifuge dewatering system will also control solenoid valves VFC-821, VFC-822, and
VFC-840 to provide effluent water transport water for the polymer, and effluent water for the
centrifuge and conveyor SCV-801 as required.
.9 The dewatering process will be automatically stopped either through an operator adjustable
dewatering volume as detected by the downstream sludge flow meter, or once low liquid level
(85.700m) in the sludge tank has been reached.
.10 Centrate Pumping:
.1 Centrate pumps P-811 and P-812 are to operate in a duty/standby configuration.
Operators to have the option of having both pumps be duty pumps, and they would
operate together at the same speed.
.2 Liquid level in the centrate tank is measured using LIT-8035.
.3 When the liquid level in the centrate pumping station reaches high liquid level of 86.200m
duty pump to energize. Pumps to modulate speed to maintain operator adjustable flow
rate as detected by FIT-8036.
.4 Duty pump to de-energize when low liquid level, 85.850m in the pumping station is
reached
.11 Manual Mode For P-811 and P-812:

ISSUED FOR ADDENDUM #7


Kemptville Water Pollution Control Section 17501
Plant Expansion – Phase A SEQUENCE OF OPERATIONS Page 14 of 15
JLR No. 29475-000.1 December 2023

.1 Automatic: A local control panel will display “RUNNING”, “STOPPED”, and “FAULT”. and
include a HOA selector switch for each pump.
.2 Manual: When a pump is in Manual Mode, Automatic Mode for that pump will be stopped.
Manual mode will consist of an HOA selector switch and a potentiometer for speed
control.
.12 Manual Mode for MIX-801:
.1 Automatic: A local control panel will display “RUNNING”, “STOPPED”, and “FAULT”. and
include a HOA selector switch.
.2 Manual: When a pump is in Manual Mode, Automatic Mode for that pump will be stopped.
Manual mode will consist of an HOA selector switch.
.13 Local manual operation for the centrifuge to be provided by the OEM supplier. All equipment
associated with the centrifuge skid to be able to be locally controlled.
.14 Failure Modes:
.1 Alarm if low-low liquid level in Sludge Holding Tank reaches 85.650m, backed up by
LSLL-8032.
.2 Alarm if low-low liquid level in the centrate pumping station reaches 85.850m, backed up
by LSL-8034.
.3 Alarm if high-high liquid level in the Sludge Holding Tank reaches 89.400m, backed up by
LSHH-8031, and shutdown centrifuge dewatering system.
.4 Alarm if high-high liquid level in the centrate pumping station reaches 89.400m, and is
backed up by LSH-8033, and de-energize M-803, M-804 and position control valve M-
845 to tank recirculation.
.5 If the Duty centrate pump is operating and no flow is detected by FIT-8036, take the duty
pump offline, and alarm to SCADA. Standby pump to become new Duty pump.
.6 Upon loss of communications:
.1 Centrifuge dewatering system to shut down.
.2 MIX-801, P-811, and P-812 to de-energize.
.3 VFC-820 to maintain last position.
.4 M-845 to change to recirculation position.
.5 If SCV-802 faults, centrifuge dewatering system to shut down.

Coagulant Addition Sequence of Operation

.1 Ferric sulfate is used on the site as the coagulant and for phosphorus removal.
.2 Ferric sulfate is to be continuously added to the mixed liquor channel upstream of the
existing final clarifiers.
.3 Ferric sulfate is to be flow paced based on the total influent flow as measured by
summing the flow rates of FIT-2017, FIT-2018, and FIT-2019.
.4 Ferric sulfate concentration are to be operator adjustable between 0.010 and 2
mL(coagulant)/L(sewage). Initial set point to be 0.071mL/L.
.5 The ferric sulfate dosing system is located in the new digester control building.
.6 The ferric sulfate pumps (P-408 and P-409) draw from a common pipe from the Ferric
Sulfate Tank TH-901. The pumps operate in a Duty/Standby configuration, and their
speed is to modulate to maintain the set concentration at the measured influent flow
rate.
.7 Level in tank TH-901 is monitored using an ultrasonic level sensor LIT-4029, and a
radar level sensor LIT-4026. The ultrasonic level sensor (LIT-4029) is to be the primary
sensor used for all alarms and controls. The radar level sensor (LIT-4026) is to be
used as a secondary level sensor and will:
.1 Monitor level and compare it against the level detected by LIT-4029. If the
difference between the two level sensors is too great, then an alarm will be
provided through SCADA.
.2 Be available as a backup sensor for alarms and controls if the primary sensor is
offline.

ISSUED FOR ADDENDUM #7


Kemptville Water Pollution Control Section 17501
Plant Expansion – Phase A SEQUENCE OF OPERATIONS Page 15 of 15
JLR No. 29475-000.1 December 2023

.8 Operators to be able to select which level sensor for the tank TH-901 is the primary
sensor and which is the secondary sensor.
.9 Ferric sulfate piping which has secondary containment is equipped with low point level
sensors. All the containment piping slopes back to the low point level sensors such
that if there is a leak in the primary piping, it will flow down to the low point where it is
detected and an alarm is issued.
.10 If a high level is detected by LSH-4021 or by LSH-4023, then SCADA to alarm and valve
VFC-941 is to close to mitigate the risk of additional leaks.
.11 If high level is detected by LSH-4022, then SCADA to alarm, and pumps P-408 and P-
409 are to de-energize to mitigate the risk of further leaking.

END OF SECTION

ISSUED FOR ADDENDUM #7


Water Pollution Control Plant Expansion
0

PROPOSAL:
Water Pollution Control Plant Expansion

PROPOSAL NUMBER:
214991 Rev. 04

PROPOSAL DATE:
December 1, 2023

515, Legget Dr, Suite 110


Kanata (Ontario), Canada
K2K 3G4
Tel.: 613 345-1502

www.excelpro.ca

Ottawa – Montreal – Trois-Rivières – Quebec


Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

December 1, 2023

Municipality of North Grenville


285, County Road 44
Kemptville (Ontario) K0G 1J0

Phone: 613-258-9569 ext.139


Email: mfinley@northgrenville.on.ca

Our proposal: Water Pollution Control Plant Expansion

Our reference number: 214991 Rev. 04

Attention: Mr. Mike Finley, P. Eng.

Mr. Finley,

We are pleased to present this proposal for the project called: Water Pollution Control Plant Expansion.

Excelpro Automation has provided solutions in the Automation, Controls & Industrial IT industry for over 30
years and provides engineering services for automated industrial systems. Whether it is a system or a
single component, the Excelpro team can provide a Total Single Source package including the necessary
services, state-of-the-art hardware, and expertise to ensure timely completion of your automation project.

We provide professional project management in turnkey projects, including installation and commissioning,
outsourced solutions, or on a T&M basis.

To simplify the reading of the text of this proposal, the expression Excelpro applies Excelpro Automation,
and the expression North Grenville applies to Municipality of North Grenville.

We thank you for your consideration and trust in Excelpro Automation., and we look forward to a mutually
beneficial relationship with Municipality of North Grenville.

If you have any questions or comments about this proposal, please contact us.

Sincerely,

Kunal Gaur Massil Chaker


Account Manager Application Analyst

Tel.: 905 546-6687 Tel.: 514 338-1562 ext 5220


kunal.gaur@excelpro.ca massil.chaker@excelpro.ca

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 1
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

EXCELPRO
Excelpro is an industrial process and control systems integrator, an electrical contractor, and a control panel
manufacturer. Excelpro's strength is its ability to offer a complete range of services for everything related
to automation and industrial electrical.

The Excelpro Group includes I.S.I Controls and Neksys, as well as Excelpro Electrical, AIA Automation,
Envitech Automation and Conrad Lavoie Electrical. Our team of nearly 400 employees is a mix of engineers,
project managers, programmers, technologists, technicians, electricians, assemblers, electrical designers
and industrial mechanics, located in our Montreal, Trois-Rivières, Quebec City, Sorel-Tracy, La Tuque and
Ottawa offices.

As an authorized system integrator for the main providers of software and industrial automation equipment,
Excelpro has developed various partnerships in order to offer various solutions as well as highly qualified
personnel trained and using state-of-the-art technology.

Excelpro provides services for System Integration, MES/IT/OT Development, SCADA programming,
PLC/HMI programming, DCS programming, control panels manufacturing, instrument calibration, machine
safety and industrial electrical installation. We are a licensed General Contractor in the province of Quebec
and a licensed Electrical Contractor in the provinces of Ontario and Quebec. We have Professional
Engineers with certification of authorization to operate in the provinces of Ontario and Quebec.

Since its foundation in 1989, Excelpro has been successfully meeting the automation and industrial
electrical needs of companies in many industries:

• Aerospace
• Agri-food
• Automotive industries
• Chemical process
• Consumer goods
• Government
• Health and healthcare
• Manufacturing industries
• Metals and mining
• Oil and gas
• Pharmaceutical
• Plastic extrusion
• Pulp and paper
• Waste and water treatment

For more information on Excelpro, please refer to the appendices of this document or visit our website at
www.excelpro.ca.

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 2
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

TABLE OF CONTENTS
SECTION 1 - PROJECT DESCRIPTION................................................................................................................ 4
1.1 DESCRIPTION ..................................................................................................................................................... 4
1.2 INPUTS ............................................................................................................................................................. 4
SECTION 2 - SCOPE OF WORK .......................................................................................................................... 4
2.1 WORK SUMMARY .............................................................................................................................................. 4
2.2 PLANTPAX LIBRARY SOLUTION ............................................................................................................................. 5
2.3 PROFESSIONAL SERVICES ..................................................................................................................................... 7
2.4 HARDWARE AND SOFTWARE SCOPE OF SUPPLY ........................................................................................................ 8
2.5 INSTALLATION.................................................................................................................................................... 9
2.1 START-UP, COMMISSIONING, WORKSHOPS AND VERIFICATIONS WITH CONSULTANT ....................................................... 9
2.2 TRAINING ......................................................................................................................................................... 9
2.3 TIMELINE AND PROJECT SCHEDULE ........................................................................................................................ 9
2.4 CLARIFICATIONS AND ASSUMPTIONS ...................................................................................................................... 9
2.5 EXCLUSIONS .................................................................................................................................................... 10
2.6 ADDITIONAL SERVICES ....................................................................................................................................... 10
SECTION 3 - PRICING SUMMARY .....................................................................................................................11
3.1 REFERENCE NUMBER 214991 REV. 04 ................................................................................................................ 11
3.2 PRICING ......................................................................................................................................................... 11
SECTION 4 - SPECIFIC CONDITIONS .................................................................................................................13
4.1 SCHEDULE OF PAYMENTS ................................................................................................................................... 13
4.2 LIQUIDATED DAMAGES ...................................................................................................................................... 13
4.3 END OF THE PROJECT ........................................................................................................................................ 13
APPENDIX A – SERVICES OFFERED ........................................................................................................................14

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 3
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

Section 1 - Project Description


1.1 Description
1.1.1 As North Grenville control systems integrator for the last 11 years, Excelpro has been invited to
provide a price for programming and IT work related to the control systems modifications and
expansion. This price will be included in the tender as a provision to be carried by the contractors.

1.2 Inputs
1.2.1 The proposed solution is based on the following:
 RFQ Package received from JL Richards for Phase A
 Email communications between Excelpro, JL Ricards and Municipality of North Grenville
 Excelpro pricing package and drawings received from JL Richards for Phase A on
October 11, 2023.
 Clarification meeting with JL Richards and Municipality of North Grenville on Oct 6, 2023.

Section 2 - Scope of Work


2.1 Work Summary
2.1.1 The previous version of this proposal presented two (2) possible solutions for this project. Both
solutions consisting of engineering services, PLC and SCADA programming, Industrial IT work and
hardware supply, commissioning, and start-up of the upgraded and expanded system.
2.1.2 As per discussion with North Grenville and JLR, only one of the proposed solutions is presented in
this revision.
2.1.3 The solution consists in programming services on the new ControlLogix PLCs for the plant
expansion using the Rockwell PlantPAX Library and migrating the iFix SCADA and Historian to a
FactoryTalk SCADA which will also be designed and programmed using the PlantPAX 4.0 Library
2.1.4 Shop drawings of included hardware and software will be submitted.
2.1.5 A network architecture diagram will be created and submitted for approval.
2.1.6 A Process Control Narrative will be submitted for approval prior to the beginning of the
programming effort.
2.1.7 Existing PLC programs will be modified using the PlantPAX standard.
2.1.8 New ControLogix PLCs will be programmed with the same PlantPAX standard according to the
approved functional description.
2.1.9 The SCADA will be upgraded and redesigned based on the High-Performance HMI Standards and
Excelpro will recreate existing pages using Rockwell PlantPAX library.
2.1.10 New pages will be created for the expansion and will also include the pages visible on the
prepackaged HMI programs provided by the various OEMs.
2.1.11 A new FactoryTalk Historian will be installed and will run in parallel with the existing iFix Historian
until the migration is complete.

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 4
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

2.1.12 A new star, non redundant network architecture with redundant servers, two (2) clients and one (1)
Engineering Workstations using virtualization will also be designed, supplied, configured, installed,
and commissioned.
2.1.13 The other Cisco switches that will be supplied by the control panels suppliers will also be configured
by Excelpro and represented in the network architecture provided.
2.1.14 Startup and commissioning will be performed in 2 phases (Greenfield and Brownfield) and some
work may be required in between. We have included a budgeted bank of hours for the 2 phases.
2.1.15 Workshops including North Grenville’s maintenance and operation personnel will be organized by
Excelpro.

2.2 PlantPAX Library Solution


2.2.1 Proposed Architecture

2.2.2 PlantPAX Library


2.2.2.1 Excelpro proposes to use the PlantPAX library of process objects version 4.0 because of the
short- and long-term advantages for North Grenville.
2.2.2.2 The library is a suite of predefined controller code or add-on instructions (AOI), display elements
and face plates that is provided and supported by Rockwell.

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 5
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

2.2.2.3 Each add-on instruction is developed for a particular use ranging from digital inputs to PID
controllers and variable frequency drives. Inside each AOI is premade logic that has been
developed and tested by Rockwell for a specific application.
2.2.2.4 Each add-on instruction has a matching graphic display (face plate) which communicates directly
with each instance of the add-on instruction.
2.2.2.5 Each face plate is designed to configure, maintain, and operate the AOI which gives the operators
the ability to make changes to the Process Control System without digging into the PLC
logic. Everything from scaling, engineering units, P&ID tag names, delay SP, alarm names, alarm
SP and alarm severity can be configured right from the face plates.
2.2.2.6 Every face plate has the same layout and graphic icons that allow the user to easily navigate
each object. Each face plates are a set of tabs that open different screens pertaining to that
particular instance of the object.
2.2.3 Remote Pumping Stations
2.2.3.1 To use the PlantPAX Library, both PLC and SCADA must be programmed using Rockwell’s PLC
and SCADA programming software (Studio5000 and FactoryTalk). This will require the migration
of the existing iFix SCADA and Historian to a FactoryTalk SCADA and Historian. It will also require
redoing the existing pages and making minor adjustment to include all the remote pumping
stations.
2.2.3.2 A FactoryTalk collector will be installed at each station and the PLCs in place will have to be
mapped in the new SCADA.
2.2.3.3 As mentioned, those are minor adjustments and we have estimated the effort required at one (1)
day per remote station. The fact that most of these remote stations have Rockwell PLCs simplifies
this integration greatly.
2.2.4 Historian
2.2.4.1 The iFix Historian would have to be migrated to a 1,000 tags FactoryTalk Historian which also
requires some additional time included in our estimate of this option. The existing Historian tower
server will run in parallel with the new virtual historian server until the migration is completed for
the whole plant.
2.2.5 Reporting
2.2.5.1 The 500 points Dream Report software will remain, and no addition is required at the time.

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 6
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

2.3 Professional Services


2.3.1 The following table shows the various tasks and services as outlined in section 17002 of the RFQ
package:

Tasks
Project management
Management
Engineering
Site surveys, gathering information
Detailed engineering
I/O List
Functional Description
Network Architecture
PLC Programming
PLC Config. / Prog.
HMI SCADA Programming
HMI/SCADA Dev.
Industrial IT
VM, Server & NAS Configuration
Main Switch Configuration
Other Switches - PLC, RIO and other IT and control panels
Historian
FAT
FAT
Documentation
Operation & Maintenance manual
Training
Training preparation
Training client
Installation
Onsite installation and testing of network IT components
Commissioning and Start-up
Greenfield - I/O check / SAT / Commissioning and start-up
Workshops - (1) Initial, (2) concepts, (3) details.
On site for system verification with the Consultant

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 7
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

2.4 Hardware and Software Scope of Supply


2.4.1 The following table shows the hardware and software included in this proposal for each option.
Qty PlantPAX Library

1 FactoryTalk View SE Small Bundle: Unlimited Display Server with 5 Clients Perpetual
Prorated Annual Cost @ 365 days:
One Time Cost:
Prorated Bundle Total:
Support year 1:
Support year 2:
FactoryTalk View SE Redundant Server Unlimited Display Perpetual with FactoryTalk
1
View SE Redundant Server Unlimited Display Perpetual 8x5 support, ESD
Prorated Annual Cost @365 days:
One Time Cost:
Prorated Bundle Total:
Support year 1
Support year 2
1 Historian SE Standard - 1,000 tags
Prorated Annual Cost @365 days
One Time Cost:
Prorated Bundle Total:
Support year 1
Support year 2
1 FactoryTalk View Studio enterprise Perpetual
Prorated Annual Cost @365 days
One Time Cost
Prorated Bundle Total
Support year 1
Support year 2

1 VMware vSphere Essentials Kit (v. 7) - licence - 3 hosts


VMware vSphere Essentials Kit (v. 7) -
1
subscription (1 year) - 1 licence
Microsoft Windows Server 2019 Standard -
4
licence - 16 core

2 DELL PowerEdge R350 Rack Server


1 EMC NX3240 - PowerVault NX Series Windows NAS
3 DELL Precision 3260 Compact Workstation (2 clients and 1 Dev station)
Cisco C1000-24T-4G-L (Cisco Catalyst 1000 Series) 24x 10/100/1000 RJ45 Data 4
1
SFP
1 HP LaserJet Pro MFP Color Printer

2.4.2 The prices indicated are based on supplier’s prices quoted in March 2023. JLR will include a cash
allowance to cover hardware and software cost increases between now and the time of purchase.

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 8
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

2.5 Installation
2.5.1 This proposal includes installation of all IT components (workstations, switches, servers, printer,
existing VPN) supplied by Excelpro and onsite configuration of all switches supplied by other.
2.5.2 Excelpro will only perform the installation of the hardware included in this proposal.

2.1 Start-Up, Commissioning, Workshops and Verifications with consultant


2.1.1 Start-ups, commissioning and workshops will be performed on an hourly basis in accordance with
Excelpro’s general conditions.
2.1.2 A bank of 248 hours has been estimated to perform the following activities onsite includes the
following:
 Greenfield – 1 resource 120 hours I/O check / SAT / Commissioning and start-up.
 Three (3) workshops, eight of (8) hours each – 2 resources 24 hours each, total 48
hours.
 Verifications with consultant - 1 resource 120 hours.
2.1.3 This proposal includes 40 hours of workshops that will be organized by Excelpro throughout the
project and will include North Grenville’s maintenance and operation personnel.

2.2 Training
2.2.1 A maximum of two (2) 4-hour (8 hours total) sessions of onsite training of personnel are included.
2.2.2 Any additional training time will be charged according to Excelpro’s general conditions.

2.3 Timeline and Project Schedule


2.3.1 A preliminary schedule will be developed and discussed with the contractor after receipt of
purchase order or letter of intent. Any change to the scope of the project could entail an increase
in the duration of work.
2.3.2 Although we take care to select high-quality components, we are not responsible for the
procurement delays generated by our suppliers.

2.4 Clarifications and Assumptions


2.4.1 It is important to understand the PlantPAX Solution presented in this offer proposes to only make
use of the PlantPAX Library of process objects version 4.0 and not of the complete PlantPAX
architecture. Using the complete PlantPAX architecture would require more software and specific
Rockwell networking hardware resulting in higher costs that might not be necessary for North
Grenville at this moment.
2.4.2 The reason for using version 4.0 is that version 5.0 is only available as native instructions on
ControlLogix Process controllers with a part number ending in EP (i.e.: 1756-L84EP). Having the
library as native instructions rather than add on instructions can be useful to maximise the memory
usage of the controller which will not be a problem for this project even with non-process controllers
(i.e.: 1756-L84E). The SCADA’s appearance would remain identical weather we were using version
4.0 or 5.0 and therefore the considerable hardware price difference is not justified in our opinion.
2.4.3 One resource from the electrical contractor must be on site with Excelpro for tests of electrical
inputs and outputs.

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 9
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

2.4.4 Time has been allocated to re-commission PLC and SCADA communications with remote sites.
2.4.5 Time has been allocated re-commission the existing alarm Auto dialer as well as the computer-
based alarm dialing system (Win-911).
2.4.6 Time has been allocated for meetings and coordination with prepackaged suppliers assuming their
full cooperation through out the project.
2.4.7 Windows licencing is based on the number of Cores and the number of Virtual Machines (VM). The
proposed architecture has 16 cores and 7 VMs and the correct number of licences for this count is
4 windows server licences.

2.5 Exclusions
2.5.1 Any certification or approval, by an organization accredited by the Canadian Standards Association
or the Electrical Safety Authority of electrical panels modified during the course of the projects.
2.5.2 Replacement of control auxiliaries (push buttons, selector switches, indicator lights, etc.), field
elements (limit switches, proximity sensors, photoelectric devices, etc.), and motor controls (full-
voltage starters, soft starters, variable-speed drives, etc.) is not part of the present proposal.
2.5.3 Excelpro may suggest or recommend the replacement of components if its representatives suggest
a more suitable option which must be approved by North Grenville. Parts and labour required for
these improvements will be applied on a cost-plus basis with Excelpro standard conditions.
2.5.4 Any request for modification or improvement of equipment that was not part of the original project
scope will be considered outside the project mandate and will be implemented on a cost-plus basis
with Excelpro standard conditions.
2.5.5 Updating of electrical control and power schematics.
2.5.6 Any system optimization once its proper functioning has been demonstrated.
2.5.7 Fabrication and provision of control panels and internal components.
2.5.8 Equipment installation except the equipment mentioned in this quote.
2.5.9 Material and manpower for installation except the equipment mentioned in this quote.
2.5.10 Control panel verification and testing other than I/O checkout.
2.5.11 Supervision and installation work for the new cabinets.
2.5.12 Any other work and material not specified in this document are excluded from this proposal.

2.6 Additional Services


2.6.1 For all services and materials excluded in the present document, we can offer our engineering,
supply, and installation services in the form of an additional proposal that addresses your specific
needs.

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 10
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

Section 3 - Pricing Summary


3.1 Reference number 214991 Rev. 04
3.1.1 This offer contains a unique solution and special rates and conditions. A valid contract or
purchase order, referencing the number of this service offer must be received by Excelpro
before undertaking any work.

3.2 Pricing
3.2.1 To complete the work required to meet the proposed scope we offer our engineering and integration
services on a lumpsum basis (LS) and on an hourly basis (H), during the day in regular time, for a
total amount of $524,833.96.
3.2.2 Our total contract price for the proposed scope can be divided up as follows for the services
performed on a lumpsum basis:
Item Description Price
1 Project management Included
2 Engineering Included
3 PLC Programming Included
4 HMI SCADA Programming Included
5 Industrial IT Included
6 FAT Included
7 Documentation Included
8 Training Included
9 Installation Included
10 Software and Material $110,957.46

Total (LS) $ 477,691.96


3.2.3 The price breakdown is provided to you for reference only. Our price is valid only in its entirety.
3.2.4 To complete the work required to meet the proposed scope we offer our services on an hourly
basis, using a bank of 432 hours. The following table presents a breakdown of the estimate of
hours, travel, and budgeted price:
Item Description Price
Greenfield - I/O check / SAT /
1 Commissioning and start-up Included
120 hours – 15 site visits
Brownfield - I/O check / SAT /
2 Commissioning and start-up Included
80 hours – 10 site visits
Services in between the 2 startups
3 Included
64 hours – 8 site visits
Workshops - (1) Initial, (2) concepts,
4 (3) details. 48 hours – 3 site visits, 2 Included
resources, 24 hours each.

Total (H) $ 47,142.00

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 11
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

3.2.5 Travel (time and mileage) and living expenses (meals and accommodations) of our employees are
included in the present proposal for the work performed on a lump sum basis.
3.2.6 Travel (time and mileage) of our employees is invoiced has been estimated for the work performed
on an hourly basis and any additional site visits will be charged according to Excelpro general
conditions.
3.2.7 Any work in excess of the agreed scope and within the framework of the present proposal shall be
billable on a cost-plus basis and requires written approval from the client before the work is
performed.
3.2.8 Any modifications, additions, or other changes to this project shall be subject to the same conditions
and shall require written authorization from the client before they are implemented.

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 12
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

Section 4 - Specific Conditions


4.1 Schedule of Payments
4.1.1 General sales conditions apply.
4.1.2 Work will be invoiced monthly depending on the progress of the work and on purchases of material.
4.1.3 Our terms of payment are “payable net 30 days”. Interest charges of 2% per month (24% per year)
will be imposed on any account that is past due.
4.1.4 All prices are in Canadian dollars exclusive of taxes.
4.1.5 Prices included in this offer are exclusive of taxes, federal, provincial or other and if the previous
are applicable they shall be paid according to same payment terms, “payable net 30 days”.

4.2 Liquidated Damages


4.2.1 No penalties are applicable to this project.

4.3 End of the Project


4.3.1 The work is deemed to be accepted when one of the following events occurs:
 Payment in full for the work;
 Approval of the work by the North Grenville;

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 13
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

APPENDIX A – SERVICES OFFERED

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 14
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 15
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 16
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 17
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 18
___/___
Municipality of North Grenville
Water Pollution Control Plant Expansion
214991 Rev. 04
December 1, 2023

This proposal is confidential, its content cannot be divulged without the consent of Excelpro Automation Inc. 19
___/___
7

NATURAL GAS(NG)
PID802A 1 75-CS-NG
TO DIGESTER FLARE

CONTRACTOR
GAS UTILITY
SCOPE
SCOPE

VF-910
GLOBAL-1000
VF-911
NATURAL GAS (NG) GLOBAL-1000

M 75-CS-NG
FROM NG SYSTEM
7 7
DIGESTER GAS (DG)
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\5-Mech\MID001 BOILER SYSTEM.dwg

1 PID802A 100-SS-DG
FROM DIGESTER GAS SYSTEM VF-912
75-CS-NG 75-CS-NG
GLOBAL-1000
75-SS-DG
7

MAIN DIGESTER GAS SHUTOFF 75-SS-DG


100-SS-DG
VALVE LOCATED OUTSIDE
BOILER ROOM. PROVIDE
LAMECOID SIGNAGE
INDICATING "DIGESTER GAS
MAIN SHUTOFF VALVE".

1 PARTIAL BOILER SYSTEM MID


7 7 7 SCALE: NTS
SKMID001-1
30-CS-NG

30-CS-NG
75-CS-NG

GLOBAL-1000
VF-907 GLOBAL-1000
VF-904

GLOBAL-1000
VB-903 GLOBAL-1000
VB-902

Tuesday, December 5, 2023 11:23:47 AM


GLOBAL GLOBAL

M M
P-903
1000
A P-902
1000
B PROJECT:
MUNICIPALITY OF NORTH GRENVILLE - WATER POLLUTION CONTROL
DEVICE

TI
DEVICE

TI PLANT EXPANSION
KEMPTVILLE, ONTARIO
2 PARTIAL BOILER SYSTEM MID DRAWING:

SKMID001-1 SCALE: NTS PARTIAL BOILER SYSTEM MID


www.jlrichards.ca DESIGN: JR
This drawing is copyright protected and may ADDENDUM NO. 7

PLOT DATE:
not be reproduced or used for purposes DRAWN: JV
other than execution of the described work DRAWING #:
without the express written consent of CHECKED: JR
J.L. Richards & Associates Limited. JLR #: 29475 SKMID001A-1
2.E 2.F
HEAT TRACE AND INSULATED PIPES
OUTDOORS ABOVE DOWN BELOW GRADE
MANUAL BAR SCREEN. TO 300mm PAST HORIZONTAL SECTION
FINE BUBBLE DIFFUSER INSIDE RAW
REFER TO SPECIFICATIONS. OF PIPE. TYPICAL FOR ALL PIPES
SEWAGE RECEIVING CHAMBER
REFER TO P204 DETAIL NO.3 ENTERING THE RAW SEWAGE RECEIVING
CHAMBER. B.O.P 91.000m REFER TO CIVIL
FOR CONTINUATION.

6
HB 2.5
75-SS-PA 250-SS-RSE 250-PVC-RSE

6
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\4-Process\p201 headworks layout.dwg

250-SS-RSE 250-PVC-RSE
RAW SEWAGE
RECEIVING
6
CHAMBER
50-SS-EW

75-SS-PA

WEIR 250-SS-RSE 250-PVC-RSE


MANUAL BAR EL.: 90.650
6
SCREEN NO. 1
100-SS-SAN 100-PVC-SAN
GLOBAL-1000
HGF-1
HAND GATE
FRAME
2.4 6
DOWN TO CHANNEL
B.O.P. 95.000m 100-SS-CNT 100-PVC-CNT
TYP. AAV
75-SS-SAN

AAV
GLOBAL

HGF-2 M GLOBAL 300-SS-RSE 300-PVC-RSE


GLOBAL-1000
SCV-201 M

75-SS-PA
HAND GATE
1000

3 MS-202
1000

3 6

SG-204 GLOBAL-1000
SG-202 300-SS-RSE 300-PVC-RSE
GLOBAL-1000

6
MECHANICAL BAR
SCREEN NO. 2 200-SS-RSE 200-PVC-RSE
GLOBAL-1000
HG-202
SAMPLE LINE DOWN TO 6
CHANNEL. TEE AND BALL

Tuesday, December 5, 2023 1:01:18 PM


VALVE AND HIGH POINT
TO PURGE AIR
2.3
100 mm SANITARY DOWN TO RAW

PROJECT:
MUNICIPALITY OF NORTH GRENVILLE - WATER POLLUTION CONTROL
PLANT EXPANSION
1 PARTIAL PROCESS PLAN VIEW DRAWING:
KEMPTVILLE, ONTARIO

SKP201A-1 SCALE: 1:50


0 1 2 3 4m PARTIAL PROCESS PLAN VIEW
www.jlrichards.ca DESIGN: JR
This drawing is copyright protected and may ADDENDUM NO. 7

PLOT DATE:
not be reproduced or used for purposes DRAWN: JV
other than execution of the described work DRAWING #:
without the express written consent of CHECKED: JR
J.L. Richards & Associates Limited. JLR #: 29475 SKP201A-1
7
B O P 88 500
1000

M M DIGESTER GAS
BLR-902 BLR-901
150-CS-H R
1000 1000
PIPE AT 2 TO
100-CS-H R
GLOBAL-1000
ET-302 GLOBAL B O P 88 500 DRAI BAC TO
75-CS-H R M DRIP TRAP
VFC-305
x3.1
1000

535
GLOBAL

P-909 M GLOBAL

M 100-SS-DG
UH-334

180
GLOBAL
1000
T UH-332 B O P 89 000
P-908 M 1000
20-CS-H S 20-CS-H R
UH-335
1000
T GLOBAL

50-CS-H R M 50-CS-H R 20-CS-H R


GLOBAL

M T VFC-3031000
20-CS-H S
VFC-306
1000

T
150-CS-H R GLOBAL

B O P 88 500 M GLOBAL
GLOBAL

P-903 S M
SERVICE-BLDG-BASEME T-HVAC

20-CS-H R 1000

VFC-304 UH-333
1000
1000

20-CS-H S T
GLOBAL
GLOBAL

GLOBAL M ECIVED

FSL M
S UH-336
VFC-307
1000
1000 3015
GLOBAL
P-901
1000 x.1
DRIP TRAP M
REFER TO CIVIL DRA I GS P-902 100-CS-H R
FOR CO TI UATIO
x3.C 1000

x3.D
SLOPE 2 MA OMETER VE T TERMI ATE
ITH GOOSE EC AT EL 95 800
DIGESTER GAS PIPE TO BE
E CASED U DERGROU D 100-SS-DG
REFER TO STA DARD B O P 86 750
x3.B DETAILS
50-SS-V T
75-SS- G
TERMI ATE VE T ITH 180
5-M

7 GOOSE EC AT EL 95 800
C BUGSCREE SA D ICHED
BET EE FLA GES
3-P
D
PCP E

1 PARTIAL SERVICE BUILDI G BASEME T PLA

5 2023 11 14 28 AM
S M301A-1 SCALE 1 75
0 1 2 3 4 6
P 29000 29475-000 -

PRO ECT
MU ICIPALIT OF ORTH GRE VILLE - ATER POLLUTIO CO TROL
PLA T E PA SIO
EMPTVILLE O TARIO

D
DRA I G

PARTIAL SERVICE BUILDI G BASEME T PLA

T
DESIG R
T ADDE DUM O 7

PLOT DATE
DRA V
DRA I G
L

CHEC ED R
L R A L LR 29475 S M301A-1
F
4.B
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\4-Process\P401 PRIMARY CLARIFIER LAYOUT.dwg

EQUALIZATION WET WELL PUMPS. 300-SS-EFF1


TYPICAL OF 3

3
P402
7

50-SS-EFF1
4.4 CP
GLOBAL

M
P-407
1000

PIPE TO RUN BELOW SLAB AND ABOVE


SLUICE GATE AND WATER LEVEL.
MECHANICAL CONNECTION AT THIS
LOCATION FOR FUTURE REMOVAL
OF SLUICE GATE

Tuesday, December 5, 2023 11:08:38 AM


PROJECT:
MUNICIPALITY OF NORTH GRENVILLE - WATER POLLUTION CONTROL
PLANT EXPANSION
PARTIAL PRIMARY CLARIFIERS PLAN KEMPTVILLE, ONTARIO
1 DRAWING:
SKP401A-1 SCALE:1:50
0 1 2 3 4m PARTIAL PRIMARY CLARIFIERS PLAN
www.jlrichards.ca DESIGN: JR
This drawing is copyright protected and may ADDENDUM NO. 7

PLOT DATE:
not be reproduced or used for purposes DRAWN: JV
other than execution of the described work DRAWING #:
without the express written consent of CHECKED: JR
J.L. Richards & Associates Limited. JLR #: 29475 SKP401A-1
ODOUR CONTROL ODR

NE DE ATERING AND ELECTRICAL SERVICE


REFER TO PID203 FOR DIGESTER CONTROL ENTRANCE BUILDING
ODOUR CONTROL PID BUILDING 900 SERIES
800 SERIES
NE AERATION NE PRIMARY NE
2 TAN S CLARIFIERS HEAD OR S
500 SERIES 400 SERIES 200 SERIES

NE SECONDARY NE TERTIARY
CLARIFIERS FILTER BUILDING
600 SERIES PHASE B 700 SERIES PHASE B

E UALI ATION
TABLE OF LOCATIONS
E UALI ATION
TABLE OF LOCATIONS
E ISTING SERVICE
BUILDING
TAN 1 TAN 2 300 SERIES

300-SS-OF
B.F. EY PLAN
PRIMARY EFFLUENT EFF1
300-HDPE-EFF1 300-HDPE-EFF1 P2.18 PID202A
LEGEND
OVERFLO OF
300-HDPE-OF 300-HDPE-OF P2.20 PID202A NOT IN CONTRACT N.I.C. -
300-HDPE-EFF1 300-HDPE-EFF1
PHASE B SCOPE NOT IN
B.F. B.F. PRIMARY EFFLUENT EFF1 CONTRACT N.I.C. -
300-HDPE-EFF1 300-HDPE-EFF1 P2.19 PID202A

300-SS-EFF1 300-SS-EFF1 LCP-4014


E UALI ATION ET ELL
GLOBAL-1000

200-SS-EFF1 FC FC DRAIN PUMP


B.F.
4 LOCAL CONTROL PANEL
VF-421 VF-420 VF-422 VF-423
FC
GLOBAL-1000 GLOBAL-1000 GLOBAL-1000 GLOBAL-1000

GLOBAL-1000
P-407

300-SSS-EFF1 M 300-SS-EFF1 FAULT


2
E
VF-418 VF-419 DR DEVICE

GLOBAL-1000
VF-415 GLOBAL-1000
VF-416 GLOBAL-1000
VF-417 GLOBAL-1000
GLOBAL-1000
YA
B.F.
VC-401 VC-402 VC-403 AMBER
GLOBAL-1000 GLOBAL-1000 GLOBAL-1000
200-SS-EFF1
RUNNING
DEVICE

YS

2 B GREEN GEN. FAULT


PLC-200
START
GLOBAL DEVICE

M HS
P-407 1000
B YA
P.B.
STOP DI
PRIMARY EFF1 DEVICE

HS
P4.12 PID402A
FROM PRIMARY CLARIFIERS P.B.
RESET
DEVICE

HS
E UALI ATION TABLE OF LOCATIONS
ET P.B.
ELL HOA

50-SS-EFF1
1 FUTURE E UALI ATION PUMPING STATION PID DEVICE

HS

PID403A SCALE NTS

100-SS-PA PROCESS AIR PA


1 P2.21 PID202A 2 PHASE A - ADDENDUM 7 05/12/23
300-SS-PA
LCP-5000 TO HEAD OR S CHANNELS
GLOBAL-1000

DEVICE PROCESS AIR PA 1 PHASE A - ADDENDUM 3 10/11/23


PI BLO ER CONTROL PANEL
P4.7 PID402A
ENET
GLOBAL GLOBAL

M TI 0 PHASE A ISSUED FOR TENDER 02/10/23


E BL-501
1000 1000
GLOBAL-1000
BL-501 GLOBAL-1000
BL-502 GLOBAL-1000
BL-503
PLC-200 TO AERATION TAN S FINAL TAN S

OUTSIDE AIR OA 250-SS-PA PLC-200


DEVICE

SI
DEVICE

SI
DEVICE

SI
E TYPE 70 FAULT IN-AUTO RUNNING RUN SPEED SPEED REF. DISC OPEN
N . ISSUE / REVISION DD/MM/YY

N/A N/A 250-SS-OA 150-SS-OA PLC-200 PLC-200 PLC-200 PLC-200 PLC-200 PLC-200 PLC-200
VF-504 T
GLOBAL-1000
PI LD-BL-501
NE PROCESS AIR GLOBAL-1000
YA HS YS YC SI SC YA
BLO ER 1 FAULT FAULT FAULT 600 VAC .L. R A L .
AI DEVICE DEVICE DEVICE

C 6
YA YA YA VFD DI DI DI DO AI AO DI VERIFY SHEET SI E AND SCALES. BAR TO THE
DP-201 RIGHT IS 25 IF THIS IS A FULL SI E DRA ING.
DEVICE
AMBER AMBER AMBER 0 25
PI DEVICE

PIT RUNNING RUNNING RUNNING ENET SCALE


GLOBAL GLOBAL
NTS
M TI 5010
F PLC-200
DEVICE DEVICE DEVICE

BL-502 ELEMENT
YS YS YS
1000 1000
PE
5010 GREEN GREEN GREEN
F TYPE 70 FAULT IN-AUTO RUNNING RUN SPEED SPEED REF. DISC OPEN
OUTSIDE AIR OA 250-SS-PA PLC-200 PLC-200 PLC-200 PLC-200 PLC-200 PLC-200 PLC-200
N/A N/A 250-SS-OA 150-SS-OA STOPPED STOPPED STOPPED CLIENT
VF-505
DEVICE DEVICE DEVICE

YS YS YS LD-BL-502
YA HS YS YC SI SC YA
GLOBAL-1000
GLOBAL-1000

NE PROCESS AIR 600 VAC


BLO ER 2 RED RED RED C 6
300-SS-PA

VFD DI DI DI DO AI AO DI
HOA HOA HOA DP-201
DEVICE DEVICE DEVICE

DEVICE
HS HS HS
PI ENET
GLOBAL

M
GLOBAL

TI PLC-200
G BL-503
1000 1000
POT
DEVICE
POT
DEVICE
POT
DEVICE G CONSULTANT . .
HR HR HR TYPE 70 FAULT IN-AUTO RUNNING RUN SPEED SPEED REF. DISC OPEN
OUTSIDE AIR OA 250-SS-PA PLC-200 PLC-200 PLC-200 PLC-200 PLC-200 PLC-200 PLC-200
N/A N/A 250-SS-OA 150-SS-OA
VF-506 LD-BL-503
GLOBAL-1000
GLOBAL-1000
YA HS YS YC SI SC YA
NE PROCESS AIR 600 VAC
C 6
BLO ER 3 VFD DI DI DI DO AI AO DI
DP-201
FAULT IN-AUTO OPENED CLOSED OPEN CLOSE
PLC-800 PLC-800 PLC-800 PLC-800 PLC-800 PLC-800
CONSULTANT
.

HIGH LEVEL LO LEVEL 1 PROCESS AIR PA


PLC-800 PLC-800 PLC-800 YA HS SO SC C C 100-SS-PA P4.3 PID401A
TO PRIMARY CLARIFIERS INLET CHANNEL
LAH LAL LI GLOBAL
DI DI DI DI DO DO
M
DI DI AI VFC-941
1000
2 BLO ER SYSTEM PID
PID403A SCALE NTS
50-PVC-FST
VENT PROFESSIONAL STAMP PRO ECT NORTH
100-PVC-VNT N/A N/A
L TO ATMOSPHERE
15-PVC-FST
ALL FERRIC SULFATE PIPING
1
TO HAVE SECONDARY
15-PVC-FST ALARM CONTAINMENT
4-P

U/S RAD FERRIC SULFATE FST


DEVICE

LS
DEVICE

LIT PLC-800
FERRIC SULFATE FST VF-901
GLOBAL-1000
4029 4026 P6.3 PID601A
N/A N/A 75-PVC-FST DEVICE GLOBAL VPR-901
100-PVC-FST LSH M GLOBAL-1000
LAH TO IN ECTION POINT
FROM BUL TRUC 4023 P-408 1000

VPC-901 DI
3-P

UIC DISCONNECT GLOBAL-1000

RED SECONDARY 15-PVC-FST 25-PVC-FST PRO ECT


ELEMENT
U/S ELEMENT
RAD
LE
MUNICIPALITY OF NORTH
DEVICE

LA LE CONTAINMENT
FLOOD 4029 4026 FERRIC SULFATE
D

LCP-4019 DEVICE

LSH
GLOBAL-1000

FERRIC LOCAL CONTROL


ALARM
PLC-800
ALARM
PLC-800
PUMP 1
SECONDARY DR 4022 GRENVILLE - ATER POLLUTION
PANEL AMBER
DEVICE

LS
TH-901 CONTAINMENT F D/REV FAULT LEA IN-AUTO RUNNING RUN SPEED SPEED REF. CONTROL PLANT E PANSION
PLC-800 PLC-800 PLC-800 PLC-800 PLC-800 PLC-800 PLC-800 PLC-800
GLOBAL-1000

LAH LAH
PCP E

15-PVC-FST
PHASE - A
DI DI YC YA YA HS YS YC SI SC EMPTVILLE ONTARIO
HORN
DEVICE DEVICE FERRIC SULFATE
LI LA TABLE OF LOCATIONS

STORAGE TAN DO DI DI DI DI DO AI AO DRA ING

VPR-902 PROCESS INSTRUMENTATION

5 2023 3 14 05 PM
DEVICE
CAP
LSH M
GLOBAL
GLOBAL-1000

4021 DR P-409 F D/REV FAULT LEA IN-AUTO RUNNING RUN SPEED SPEED REF. PRIMARY CLARIFIERS
P 29000 29475-000 -

VPC-902 PLC-800 PLC-800 PLC-800 PLC-800 PLC-800 PLC-800 PLC-800 PLC-800


1000

HORN LEVEL LEVEL


GLOBAL-1000
E UALI ATION TAN S PROCESS
SILENCE
PLC-800
ALARM
PLC-800
ARNING
PLC-800
15-PVC-FST YC YA YA HS YS YC SI SC AIR COAGULANT DOSING
L FERRIC SULFATE DO DI DI DI DI DO AI AO SYSTEM
YC YC YC PUMP 2
SECONDARY DR
1 DESIGN
DO DO DO
CONTAINMENT C

D
3 FERRIC SULFATE PID DRA N
R DRA ING

PLOT DATE
15-PVC-FST PID403A SCALE NTS CHEC ED
TP
PID403A
L

LR
29475
F
EC5
EngCAD Database Data Exported on: 2023-12-05 2:11:02 PM
MOTOR STARTER AND CONTROL LIST NEW DEWATERING AND ELECTRICAL SERVICE
DIGESTER CONTROL ENTRANCE BUILDING
CONTROL DETAILS & RESPONSIBILITiES BUILDING
800 SERIES
900 SERIES

GENERAL MOTOR NEW AERATION


TANKS
NEW PRIMARY NEW
CLARIFIERS HEADWORKS
STARTER AT MOTOR AUTOMATION COMMENTS 500 SERIES 400 SERIES 200 SERIES

NEW TERTIARY

GENERATOR SEQUENCE
NEW SECONDARY
CLARIFIERS FILTER BUILDING
700 SERIES (PHASE B)

TOTAL LINKS IN DATABASE


600 SERIES (PHASE B)

CONTROL WIRED BY
DETAIL REFERENCE
COMMISSIONED BY

COMMISSIONED BY

COMMISSIONED BY

COMMISSIONED BY
DEVICE LOCATION

STARTER NOTES
PROJECT PHASE

POWER SOURCE

INSTALLED BY

INSTALLED BY

INSTALLED BY

INSTALLED BY
DESCRIPTION

SUPPLIED BY

SUPPLIED BY

SUPPLIED BY

SUPPLIED BY
DEVICE TAG
EXISTING SERVICE
BUILDING

WIRED BY

WIRED BY

WIRED BY
VOLTAGE
300 SERIES

PHASE

LOAD

TYPE
KEY PLAN

0 MD 901 A MOTORIZED DAMPER 0 900 LP 902 120 1 7 W M M E G INTEGRAL N/A M M E G E E E G E E E G


0 MD 902 A MOTORIZED DAMPER 0 900 LP 902 120 1 7 W M M E G INTEGRAL N/A M M E G E E E G E E E G
2 MIX 201 A GRIT TANK 1 VORTEX INDUCER 0 202 MCP 2002 600 3 2 HP M M E G TYPE 14 2/E022 M M E G M M E G M E E G
2 MIX 202 A GRIT TANK 2 VORTEX INDUCER 0 202 MCP 2002 600 3 2 HP M M E G TYPE 14 2/E022 M M E G M M E G M E E G
3 MIX 801 A SLUDGE HOLDING TANK MIXER 0 8XX MCC 800 600 3 3 HP M M E G TYPE 13 1/E023 M M E G E E E G E E E G
0 MIX 802 A POLYMER INLINE MIXER 0 810 CP 8005 120 1 0.75 HP M M E G INTEGRAL N/A
5 MIX 803 A DIGESTER TANK MIXER 0 8XX MCC 800 600 3 7.5 HP M M E G TYPE 14 2/E022 M M E G E E E G E E E G
2 MS 201 A RAW SEWAGE MECHANICAL SCREEN NO. 1 0 202 MCP 2001 600 3 1 HP M M E G TYPE 30 1/E022 M M E G M M E G M E E G
2 MS 202 A RAW SEWAGE MECHANICAL SCREEN NO. 2 0 202 MCP 2001 600 3 1 HP M M E G TYPE 30 1/E022 M M E G M M E G M E E G
3 OCU 201 A HEADWORKS ODOUR CONTROL UNIT #1 0 EXT MCC 200 600 3 50 HP M M E G TYPE 70 1/E020 M M E G E E E G E E E G PROVIDE FIRE DETECTION INTERFACE FOR SHUTDOWN
3 OCU 202 A HEADWORKS ODOUR CONTROL UNIT #2 0 EXT MCC 200 600 3 50 HP M M E G TYPE 70 1/E020 M M E G E E E G E E E G PROVIDE FIRE DETECTION INTERFACE FOR SHUTDOWN
2 OCU 801 A DIGESTER BUILDING ODOUR CONTROL UNIT 0 EXT MCC 800 600 3 50 HP M M E G TYPE 70 1/E020 M M E G E E E G E E E G PROVIDE FIRE DETECTION INTERFACE FOR SHUTDOWN
1 P 201 A GRIT SLURRY PUMP 1 0 202 MCP 2002 600 3 7.5 HP M M E G TYPE 14 2/E022 M M E G M M E G M E E G
1 P 202 A GRIT SLURRY PUMP 2 0 202 MCP 2002 600 3 7.5 HP M M E G TYPE 14 2/E022 M M E G M M E G M E E G
3 P 205 A BIN ROOM SUMP PUMP 0 201 LCP 2030 600 3 1.1 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
3 P 206 A PIPE GALLERY SUMP PUMP 0 200 LCP 2031 600 3 1.1 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
2 P 207 A HEADWORKS GLYCOL HEATING PUMP 0 200 MCC 200 600 3 10 HP M M E G TYPE 14 2/E022 M M E G E E E G E E E G
0 P 208 A EFFLUENT BOOSTER PUMP 0 201 MCC 200 600 0 1 HP M M E E TYPE 14 2/E022 M M E G E E E G E E E G
2 P 401 A PRIMARY SLUDGE PUMP 1 0 200 MCC 200 600 3 5 HP M M E G TYPE 70 1/E020 M M E G E E E G E E E G
2 P 402 A PRIMARY SLUDGE PUMP 2 0 200 MCC 200 600 3 5 HP M M E G TYPE 70 1/E020 M M E G E E E G E E E G
2 P 403 A PRIMARY SCUM PUMP 0 TS-4XX MCC 200 600 3 5 HP M M E G TYPE 14 2/E022 M M E G E E E G E E E G
0 P 407 A EQUALIZATION WET WELL DRAIN PUMP 0 4XX DP 201 600 3 1 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
3 0 P 408 A FERRIC SULFATE METERING PUMP 0 812 LP 803 120 1 10 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 P 409 A FERRIC SULFATE METERING PUMP 0 812 LP 803 120 1 10 W M M E G INTEGRAL N/A M M E G E E E G E E E G
2 P 715 A EFFLUENT PUMP NO. 6 0 1-B06 MCC 300 600 3 40 HP M M E G TYPE 70 1/E020 M M E G E E E G E E E G
3 P 807 A DIGESTER SLUDGE RECIRC PUMP NO. 3 0 803 MCC 800 600 3 20 HP M M E G TYPE 70 1/E020 M M E G E E E G E E E G
3 PHASE A - ADDENDUM #7 05/12/23
3 P 808 A DIGESTER SLUDGE RECIRC PUMP NO. 4 0 803 MCC 800 600 3 20 HP M M E G TYPE 70 1/E020 M M E G E E E G E E E G
3 P 809 A DIGESTER HEX HOT WATER RECIRC PUMP 0 803 MCC 800 600 3 5 HP M M E G TYPE 14 2/E022 M M E G E E E G E E E G 2 PHASE A - ADDENDUM #5 27/11/23

3 P 811 A CENTRATE TRANSFER PUMP NO.1 0 8XX MCC 800 600 3 1.7 HP M M E G TYPE 70 1/E020 M M E G E E E G E E E G
1 PHASE A - ADDENDUM #3 10/11/23
3 P 812 A CENTRATE TRANSFER PUMP NO.2 0 8XX MCC 800 600 3 1.7 HP M M E G TYPE 70 1/E020 M M E G E E E G E E E G
2 P 813 A CENTRIFUGE FEED PUMP NO. 1 0 810 MCP 8001 600 3 5 HP M M E G TYPE 70 1/E020 M M E G M M E G M E E G 0 PHASE A ISSUED FOR TENDER 02/10/23

0 P 814 A POLYMER DOSING PUMP NO.1 0 810 CP 8005 120 1 0.5 HP M M E G INTEGRAL N/A M M E G M M E G M E E G
No. ISSUE / REVISION DD/MM/YY
1 P 815 A DIGESTER GLYCOL HEATING PUMP 0 803 MCC 800 600 3 2 HP M M E G TYPE 14 2/E022 M M E G E E E G E E E G
This drawing is copyright protected and may not be reproduced or
1 P 816 A DIGESTER SANITARY SUMP PUMP NO.1 0 803 LCP 8051 600 3 1.1 HP M M E G INTEGRAL N/A M M E G E E E G E E E G used for purposes other than execution of the described work without
1 P 817 A DIGESTER SANITARY SUMP PUMP NO.2 0 803 LCP 8051 600 3 1.1 HP M M E G INTEGRAL N/A M M E G E E E G E E E G the express written consent of J.L. Richards & Associates Limited.

2 P 818 A DIGESTER HEATING LOOP PUMP 0 803 MCC 800 600 3 1.5 HP M M E G TYPE 14 2/E022 M M E G E E E G E E E G VERIFY SHEET SIZE AND SCALES. BAR TO THE
RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING. 0 25mm
0 P 819 A MUNICIPAL HOT WATER RECIRC PUMP 0 803 LP 802 120 1 28 W M M E G INTEGRAL N/A M M E G E E E G E E E G
SCALE:
2 P 901 A BOILER FEED PUMP NO.1 0 1-B03 MCC 300 600 3 1 HP M M E G TYPE 14 2/E022 M M E G E E E G E E E G N.T.S.

2 P 902 A BOILER FEED PUMP NO.2 0 1-B03 MCC 300 600 3 1 HP M M E G TYPE 14 2/E022 M M E G E E E G E E E G
2 P 903 A BOILER FEED PUMP NO.3 0 1-B03 MCC 300 600 3 15 HP M M E G TYPE 14 2/E022 M M E G E E E G E E E G
CLIENT:
1 P 905 A PRIMARY HEATING DISTRIBUTION PUMP NO.1 0 1-B04 MCC 300 600 3 20 HP M M E G TYPE 14 2/E022 M M E G E E E G E E E G
1 P 906 A PRIMARY HEATING DISTRIBUTION PUMP NO.2 0 1-B04 MCC 300 600 3 20 HP M M E G TYPE 14 2/E022 M M E G E E E G E E E G
2 P 907 A SERVICE BUILDING HEATING PUMP 0 1-B04 MCC 300 600 3 5 HP M M E G TYPE 14 2/E022 M M E G E E E G E E E G
2 P 908 A HEADWORKS HEATING PUMP 0 1-B04 MCC 300 600 3 10 HP M M E G TYPE 14 2/E022 M M E G E E E G E E E G
2 P 909 A EXISTING DIGESTER HEX HOT WATER RECIRC PUMP 0 1-B04 MCC 300 600 3 1 HP M M E G TYPE 14 2/E022 M M E G E E E G E E E G
0 RH 401 A SCUM HEATER 1 0 TS-4XX HCP 4001 600 1 3.6 KW E E E G INTEGRAL N/A E E E G E E E G E E E G REFER TO SECTION 16850 CONSULTANT: www.jlrichards.ca

0 RH 402 A SCUM HEATER 2 0 TS-4XX HCP 4001 600 1 3.6 KW E E E G INTEGRAL N/A E E E G E E E G E E E G REFER TO SECTION 16850
0 RH 403 A SCUM HEATER 3 0 TS-4XX HCP 4001 600 1 3.6 KW E E E G INTEGRAL N/A E E E G E E E G E E E G REFER TO SECTION 16850
0 RH 404 A SCUM HEATER 4 0 TS-4XX HCP 4004 600 1 3.6 KW E E E G INTEGRAL N/A E E E G E E E G E E E G REFER TO SECTION 16850
0 RH 405 A SCUM HEATER 5 0 TS-4XX HCP 4004 600 1 3.6 KW E E E G INTEGRAL N/A E E E G E E E G E E E G REFER TO SECTION 16850
0 RH 406 A SCUM HEATER 6 0 TS-4XX HCP 4004 600 1 3.6 KW E E E G INTEGRAL N/A E E E G E E E G E E E G REFER TO SECTION 16850
CONSULTANT:
0 RH 407 A SCUM HEATER 7 0 TS-4XX HCP 4007 600 1 3.6 KW E E E G INTEGRAL N/A E E E G E E E G E E E G REFER TO SECTION 16850
0 RH 408 A SCUM HEATER 8 0 TS-4XX HCP 4007 600 1 3.6 KW E E E G INTEGRAL N/A E E E G E E E G E E E G REFER TO SECTION 16850
1
0 RH 409 A SCUM HEATER 9 0 TS-4XX HCP 4007 600 1 3.6 KW E E E G INTEGRAL N/A E E E G E E E G E E E G REFER TO SECTION 16850
2 SCV 201 A SCREENINGS CONVEYOR 0 202 MCP 2001 600 3 2 HP M M E G TYPE 30 1/E022 M M E G M M E G M E E G
2 2
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\6-Elect\29475 MSCL.dwg

2 SCV 801 A SCREW CONVEYOR NO. 1 0 811 MCP 8001 600 3 3 HP M M E G TYPE 30 1/E022 M M E G M M E G M E E G
PROFESSIONAL STAMP PROJECT NORTH
2 SCV 802 A SCREW CONVEYOR NO. 2 0 811 MCP 8001 600 3 3 HP M M E G TYPE 30 1/E022 M M E G M M E G M E E G
2 SF 201 A PIPE GALLERY SUPPLY FAN 0 205 MCC 200 600 3 1 HP M M E G TYPE 70 1/E020 M M E G E E E G E E E G PROVIDE FIRE DETECTION INTERFACE FOR SHUTDOWN
0 SF 202 A ELECTRICAL ROOM SUPPLY FAN 0 205 LP 202 120 1 0.5 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
0 SF 301 A SERVICE BUILDING ELECTRICAL ROOM SUPPLY FAN 0 3XX LP 302 120 1 0.25 HP M M E G INTEGRAL N/A M M E G E E E G E E E G

PROJECT:

MUNICIPALITY OF NORTH
GENERAL NOTES: GRENVILLE - WATER POLLUTION
LEGEND:
A. FOR ALL HOUSE SYSTEM EQUIPMENT PROVIDE CONDUIT AND WIRING FROM CONTROL PLANT EXPANSION
THE INDICATED SOURCE PANEL OR MCC TO THE LOAD AS PER THE HOUSE
A => Architectural SYSTEM WIRING SCHEDULE E001A. PHASE - -
M => Mechanical Contractor KEMPTVILLE, ONTARIO
E => Electrical Contractor B. FOR POWER SOURCES THAT ARE LABELLED LP or BP THE PANEL SCHEDULES
G => General Contractor WILL GOVERN WHEN CONFLICTS EXIST DRAWING:
PS1 => Process Equipment Supplier/Contractor
C. FOR POWER SOURCES THAT ARE LABELLED DP or BP, THE PANEL SCHEDULES MECHANICAL / ELECTRICAL

December 5, 2023 3:15:09 PM


WILL GOVERN WHEN CONFLICTS EXIST
SITE-WIDE
D. COORDINATE EXACT LOAD AND WIRE SIZE WITH ACTUAL EQUIPMENT
REQUIREMENTS. MOTOR STARTER & CONTROL LIST
E. WHERE CONFLICTS ARISE REFER TO LAYOUT DRAWINGS FOR SHEET 2 OF 4
EQUIPMENT/DEVICE LOCATIONS.

F. FOR CONFLICTS BETWEEN THIS AND OTHER DRAWINGS REFER TO OTHER DESIGN:
LO
DRAWINGS FOR CLARIFICATION. ADVISE CONSULTANT.
DRAWN: DRAWING #:
IDM

PLOT DATE:
CHECKED:

JLR #:
JO
29475
ME002A
EC5
EngCAD Database Data Exported on: 2023-12-05 2:11:02 PM
MOTOR STARTER AND CONTROL LIST NEW DEWATERING AND ELECTRICAL SERVICE
DIGESTER CONTROL ENTRANCE BUILDING
CONTROL DETAILS & RESPONSIBILITiES BUILDING
800 SERIES
900 SERIES

GENERAL MOTOR NEW AERATION


TANKS
NEW PRIMARY NEW
CLARIFIERS HEADWORKS
STARTER AT MOTOR AUTOMATION COMMENTS 500 SERIES 400 SERIES 200 SERIES

NEW TERTIARY

GENERATOR SEQUENCE
NEW SECONDARY
CLARIFIERS FILTER BUILDING
700 SERIES (PHASE B)

TOTAL LINKS IN DATABASE


600 SERIES (PHASE B)

CONTROL WIRED BY
DETAIL REFERENCE
COMMISSIONED BY

COMMISSIONED BY

COMMISSIONED BY

COMMISSIONED BY
DEVICE LOCATION

STARTER NOTES
PROJECT PHASE

POWER SOURCE

INSTALLED BY

INSTALLED BY

INSTALLED BY

INSTALLED BY
DESCRIPTION

SUPPLIED BY

SUPPLIED BY

SUPPLIED BY

SUPPLIED BY
DEVICE TAG
EXISTING SERVICE
BUILDING

WIRED BY

WIRED BY

WIRED BY
VOLTAGE
300 SERIES

PHASE

LOAD

TYPE
KEY PLAN

0 SF 801 A EXISTING DIGESTER CONTROL BUILDING BASEMENT SUPPLY FAN 0 XXX 120 1 0.33 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
0 SF 802 A FERRIC SULPHATE STORAGE ROOM EXHAUST FAN 0 812 LP 802 120 1 0.25 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
0 SF 804 A ELECTRICAL ROOM SUPPLY FAN 0 815 LP 802 120 1 0.75 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
1 SF 901 A ELECTRICAL SUBSTATION SUPPLY FAN 0 900 LP 902 120 1 0.25 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
3 SMP 201 A RAW SEWAGE SAMPLER 0 202 LP 202 120 1 0 M M E G INTEGRAL N/A M M E G E E E G E E E G
2 SWP 201 A SCREENINGS WASH PRESS 0 201 MCP 2001 600 3 2 HP M M E G TYPE 30 1/E022 M M E G E E E G E E E G
0 UH 201 A PIPE GALLERY HYDRONIC UNIT HEATER 0 200 LP 202 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 202 A PIPE GALLERY HYDRONIC UNIT HEATER 0 200 LP 202 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 203 A HEADWORKS HYDRONIC UNIT HEATER 0 202 LP 202 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 205 A HEADWORKS HYDRONIC UNIT HEATER 0 202 LP 202 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 206 A HEADWORKS HYDRONIC UNIT HEATER 0 202 LP 202 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 207 A HEADWORKS HYDRONIC UNIT HEATER 0 202 LP 202 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 208 A HEADWORKS HYDRONIC UNIT HEATER 0 202 LP 202 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 330 A BOILER ROOM HYDRONIC UNIT HEATER 0 1-B03 LP 302 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 331 A BOILER ROOM HYDRONIC UNIT HEATER 0 1-B03 LP 302 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 332 A BOILER ROOM HYDRONIC UNIT HEATER 0 1-B03 LP 302 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 333 A BOILER ROOM HYDRONIC UNIT HEATER 0 1-B03 LP 302 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 334 A PUMP ROOM HYDRONIC UNIT HEATER 0 LP 302 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 335 A PUMP ROOM HYDRONIC UNIT HEATER 0 LP 302 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 336 A DRIP TRAP ROOM HYDRONIC UNIT HEATER 0 3XX LP 302 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 337 A CLOSET HYDRONIC UNIT HEATER 0 3XX LP 302 120 1 0.15 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 821 A DIGESTER BASEMENT HYDRONIC UNIT HEATER 0 803 LP 802 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 822 A DIGESTER BASEMENT HYDRONIC UNIT HEATER 0 803 LP 802 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 823 A DIGESTER BASEMENT HYDRONIC UNIT HEATER 0 803 LP 802 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 824 A DIGESTER GROUND FLOOR HYDRONIC UNIT HEATER 0 810 LP 802 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 825 A DIGESTER GROUND FLOOR HYDRONIC UNIT HEATER 0 810 LP 802 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 826 A DIGESTER GROUND FLOOR HYDRONIC UNIT HEATER 0 810 LP 802 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 827 A DIGESTER WASTE BIN ROOM HYDRONIC UNIT HEATER 0 811 LP 802 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 UH 828 A DIGESTER WASTE BIN ROOM HYDRONIC UNIT HEATER 0 811 LP 802 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
1 PHASE A - ADDENDUM #7 05/12/23
0 UH 829 A SAMPLE ROOM HYDRONIC UNIT HEATER 0 801 LP 802 120 1 0.04 KW M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VF 721 A WASHWATER PLUG VALVE 0 0 0 0 M M N/A G 0 PHASE A ISSUED FOR TENDER 02/10/23

0 VF 722 A WASHWATER PLUG VALVE 0 0 0 0 M M N/A M


No. ISSUE / REVISION DD/MM/YY
0 VF 910 A NG PLUG VALVE 0 0 0 0 M M N/A G
This drawing is copyright protected and may not be reproduced or
0 VF 911 A NG PLUG VALVE 0 0 0 0 M M N/A G used for purposes other than execution of the described work without
0 VF 912 A DG PLUG VALVE 0 0 0 0 M M N/A G the express written consent of J.L. Richards & Associates Limited.

0 VFC 206 A EFFLUENT WATER WASH SOLENOID VALVE 0 202 CP 2001 120 1 5 W M M E M INTEGRAL N/A M M E G E E E G E E E G VERIFY SHEET SIZE AND SCALES. BAR TO THE
RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING. 0 25mm
0 VFC 208 A EFFLUENT WATER WASH SOLENOID VALVE 0 202 CP 2001 120 1 5 W M M E M INTEGRAL N/A M M E G E E E G E E E G
SCALE:
0 VFC 209 A GRIT TANK 1 SOLENOID VALVE 0 202 CP 2002 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G N.T.S.

0 VFC 211 A GRIT TANK 2 SOLENOID VALVE 0 202 CP 2002 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 213 A GRIT CLASSFIER SOLENOID VALVE 0 202 CP 2002 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
CLIENT:
0 VFC 214 A HYDRONIC CONTROL VALVE 0 200 LP 202 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 215 A HYDRONIC HEATER CONTROL VALVE 0 200 LP 202 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 216 A HYDRONIC HEATER CONTROL VALVE 0 200 LP 202 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 217 A HYDRONIC HEATER CONTROL VALVE 0 202 LP 202 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 218 A HYDRONIC HEATER CONTROL VALVE 0 202 LP 202 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 219 A HYDRONIC HEATER CONTROL VALVE 0 202 LP 202 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G CONSULTANT: www.jlrichards.ca

0 VFC 220 A HYDRONIC HEATER CONTROL VALVE 0 202 LP 202 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 221 A HYDRONIC HEATER CONTROL VALVE 0 202 LP 202 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 222 A HYDRONIC HEATER CONTROL VALVE 0 202 LP 202 120 1 10 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 223 A GLYCOL HEATING CONTROL VALVE 0 200 LP 202 120 1 10 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 224 A MAU GLYCOL HEATING CONTROL VALVE 0 202 LP 202 120 1 10 W M M E G INTEGRAL N/A M M E G E E E G E E E G
CONSULTANT:
0 VFC 241 A HEADWORKS TRAP SEAL PRIMER 0 200 LP 202 120 1 20 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 301 A HYDRONIC HEATING CONTROL VALVE 0 1-B03 LP 302 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 302 A HYDRONIC HEATING CONTROL VALVE 0 1-B03 LP 302 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 303 A HYDRONIC HEATING CONTROL VALVE 0 1-B03 LP 302 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\6-Elect\29475 MSCL.dwg

0 VFC 304 A HYDRONIC HEATING CONTROL VALVE 0 1-B03 LP 302 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
PROFESSIONAL STAMP PROJECT NORTH
0 VFC 305 A HYDRONIC HEATING CONTROL VALVE 0 1-B04 LP 302 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 306 A HYDRONIC HEATING CONTROL VALVE 0 1-B04 LP 302 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 307 A HYDRONIC HEATING CONTROL VALVE 0 1-B04 LP 302 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 308 A HYDRONIC HEATING CONTROL VALVE 0 1-112 LP 302 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G

1
PROJECT:

MUNICIPALITY OF NORTH
GENERAL NOTES: GRENVILLE - WATER POLLUTION
LEGEND:
A. FOR ALL HOUSE SYSTEM EQUIPMENT PROVIDE CONDUIT AND WIRING FROM CONTROL PLANT EXPANSION
THE INDICATED SOURCE PANEL OR MCC TO THE LOAD AS PER THE HOUSE
A => Architectural SYSTEM WIRING SCHEDULE E001A. PHASE - -
M => Mechanical Contractor KEMPTVILLE, ONTARIO
E => Electrical Contractor B. FOR POWER SOURCES THAT ARE LABELLED LP or BP THE PANEL SCHEDULES
G => General Contractor WILL GOVERN WHEN CONFLICTS EXIST DRAWING:
PS1 => Process Equipment Supplier/Contractor
MECHANICAL / ELECTRICAL

December 6, 2023 11:07:28 AM


C. FOR POWER SOURCES THAT ARE LABELLED DP or BP, THE PANEL SCHEDULES
WILL GOVERN WHEN CONFLICTS EXIST
SITE-WIDE
D. COORDINATE EXACT LOAD AND WIRE SIZE WITH ACTUAL EQUIPMENT
REQUIREMENTS. MOTOR STARTER & CONTROL LIST
E. WHERE CONFLICTS ARISE REFER TO LAYOUT DRAWINGS FOR SHEET 3 OF 4
EQUIPMENT/DEVICE LOCATIONS.

F. FOR CONFLICTS BETWEEN THIS AND OTHER DRAWINGS REFER TO OTHER DESIGN:
LO
DRAWINGS FOR CLARIFICATION. ADVISE CONSULTANT.
DRAWN: DRAWING #:
IDM

PLOT DATE:
CHECKED:

JLR #:
JO
29475
ME003A
EC5
EngCAD Database Data Exported on: 2023-12-05 2:11:02 PM
MOTOR STARTER AND CONTROL LIST NEW DEWATERING AND ELECTRICAL SERVICE
DIGESTER CONTROL ENTRANCE BUILDING
CONTROL DETAILS & RESPONSIBILITiES BUILDING
800 SERIES
900 SERIES

GENERAL MOTOR NEW AERATION


TANKS
NEW PRIMARY NEW
CLARIFIERS HEADWORKS
STARTER AT MOTOR AUTOMATION COMMENTS 500 SERIES 400 SERIES 200 SERIES

NEW TERTIARY

GENERATOR SEQUENCE
NEW SECONDARY
CLARIFIERS FILTER BUILDING
700 SERIES (PHASE B)

TOTAL LINKS IN DATABASE


600 SERIES (PHASE B)

CONTROL WIRED BY
DETAIL REFERENCE
COMMISSIONED BY

COMMISSIONED BY

COMMISSIONED BY

COMMISSIONED BY
DEVICE LOCATION

STARTER NOTES
PROJECT PHASE

POWER SOURCE

INSTALLED BY

INSTALLED BY

INSTALLED BY

INSTALLED BY
DESCRIPTION

SUPPLIED BY

SUPPLIED BY

SUPPLIED BY

SUPPLIED BY
DEVICE TAG
EXISTING SERVICE
BUILDING

WIRED BY

WIRED BY

WIRED BY
VOLTAGE
300 SERIES

PHASE

LOAD

TYPE
KEY PLAN

0 VFC 401 A PRIMARY SLUDGE CONTROL VALVE 0 200 LP 203 120 1 0.25 M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 402 A PRIMARY SLUDGE CONTROL VALVE 0 200 LP 203 120 1 0.25 M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 403 A PRIMARY SLUDGE CONTROL VALVE 0 200 LP 203 120 1 0.25 M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 404 A PRIMARY SCUM 3-WAY VALVE 0 TS-4XX LP 203 120 1 0.5 M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 409 A TANK 1 AERATION GRID CONTROL VALVE 1 0 TS-5XX LP 203 120 1 0.25 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 410 A TANK 1 AERATION GRID CONTROL VALVE 2 0 TS-5XX LP 203 120 1 0.25 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 411 A TANK 2 AERATION GRID CONTROL VALVE 1 0 TS-5XX LP 203 120 1 0.25 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 412 A TANK 2 AERATION GRID CONTROL VALVE 2 0 TS-5XX LP 203 120 1 0.25 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 413 A TANK 3 AERATION GRID CONTROL VALVE 1 0 TS-5XX LP 203 120 1 0.25 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 414 A TANK 3 AERATION GRID CONTROL VALVE 2 0 TS-5XX LP 203 120 1 0.25 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 614 A RAS 3-WAY VALVE 0 200 DP 201 600 3 1 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
1 VFC 807 A DIGESTED SLUDGE TO HEX CONTROL VALVE 0 803 LP 803 120 1 0.25 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
1 VFC 808 A RECIRCULATED SLUDGE RETURN CONTROL VALVE 0 803 LP 803 120 1 0.25 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
1 VFC 809 A RECIRCULATED SLUDGE RETURN CONTROL VALVE 0 XXX LP 803 120 1 0.25 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
1 VFC 810 A SLUDGE HEX HOT WATER CONTROL VALVE 0 803 LP 803 120 1 0.25 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 820 A SLUDGE HOLDING TANK INLET CONTROL VALVE 0 803 LP 803 120 1 0.25 HP M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 821 A POLYMER WATER SUPPLY SOLENOID VALVE 0 810 CP 8000 120 1 20 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 822 A SLUDGE CONVEYOR NO.1 WASH WATER SOLENOID VALVE 0 810 CP 8000 120 1 20 W M M E G INTEGRAL N/A M M E G E E E G E E E G
1 VFC 824 A DIGESTER BUILDING HEATING WATER LOOP 3 WAY CONTROL VALVE 0 201 LP 803 120 1 10 W M M E G INTEGRAL N/A M M E G E E E G E E E G
1 VFC 825 A HEATING WATER GLYCOL HEX 3 WAY CONTROL VALVE 0 803 LP 803 120 1 10 W M M E G INTEGRAL N/A M M E G E E E G E E E G
1 VFC 826 A SAMPLE ROOM HEATING COIL CONTROL VALVE 0 801 LP 803 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
1 VFC 827 A FERRIC SULFATE HEATING COIL CONTROL VALVE 0 810 LP 803 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
1 VFC 828 A DIGESTER MAU GLYCOL HEATING CONTROL VALVE 0 810 LP 803 120 1 10 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 829 A BASEMENT UNIT HEATER CONTROL VALVE 0 803 LP 802 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 830 A BASEMENT UNIT HEATER CONTROL VALVE 0 803 LP 802 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 831 A BASEMENT UNIT HEATER CONTROL VALVE 0 803 LP 802 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 832 A STAIRWELL CABINET UNIT HEATER CONTROL VALVE 0 802 LP 803 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 834 A PROCESS AREA UNIT HEATER CONTROL VALVE 0 810 LP 802 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 835 A PROCESS AREA UNIT HEATER CONTROL VALVE 0 810 LP 802 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
1 PHASE A - ADDENDUM #7 05/12/23
0 VFC 836 A PROCESS AREA UNIT HEATER CONTROL VALVE 0 810 LP 802 120 1 10 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 837 A WASTE BIN ROOM UNIT HEATER CONTROL VALVE 0 811 LP 802 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G 0 PHASE A ISSUED FOR TENDER 02/10/23

0 VFC 838 A WASTE BIN ROOM UNIT HEATER CONTROL VALVE 0 811 LP 802 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
No. ISSUE / REVISION DD/MM/YY
0 VFC 839 A SAMPLE ROOM UNIT HEATER CONTROL VALVE 0 801 LP 802 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G
This drawing is copyright protected and may not be reproduced or
1 VFC 840 A CENTRIFUGE EFFLUENT WATER CONTROL VALVE 0 810 LP 803 120 1 20 W M M E G INTEGRAL N/A M M E G E E E G E E E G used for purposes other than execution of the described work without
0 VFC 841 A DIGESTER CONTROL BUILDING TRAP SEAL PRIMER 0 803 LP 803 120 1 20 W M M E G INTEGRAL N/A M M E G E E E G E E E G the express written consent of J.L. Richards & Associates Limited.

0 VFC 845 A EXSTING DIGESTERS 3WAY PLUG VALVE 0 XXX LP 803 120 1 0.25 W M M E G INTEGRAL N/A M M E G E E E G E E E G VERIFY SHEET SIZE AND SCALES. BAR TO THE
RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING. 0 25mm
0 VFC 845 A DIGESTED SLUDGE 3 WAY CONTROL VALVE 0 120 1 0.5 M M E G
SCALE:
0 VFC 846 A POYLMER HX HOT WATER CONTROL VALVE 0 803 LP 803 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G N.T.S.

0 VFC 901 A HOT WATER SUPPLY CONTROL VALVE TO EXISTING DIGESTER 0 1-B04 LP 302 120 1 10 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 902 A HOT WATER SUPPLY CONTROL VALVE TO HEADWORKS BUILDING 0 1-B04 LP 302 120 1 10 W M M E G INTEGRAL N/A M M E G E E E G E E E G
CLIENT:
0 VFC 903 A HOT WATER SUPPLY CONTROL VALVE TO EXISTING PLANT HEATING 0 1-B04 LP 302 120 1 20 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 904 A HOT WATER SUPPLY CONTROL VALVE TO NEW DIGESTER BUILDING 0 1-B04 LP 302 120 1 20 W M M E G INTEGRAL N/A M M E G E E E G E E E G
0 VFC 941 A FERRIC SULFATE TANK ISOLATION 0 812 CP 8000 120 1 5 W M M E G INTEGRAL N/A M M E G E E E G E E E G

CONSULTANT: www.jlrichards.ca

CONSULTANT:
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\6-Elect\29475 MSCL.dwg

PROFESSIONAL STAMP PROJECT NORTH

PROJECT:

MUNICIPALITY OF NORTH
GENERAL NOTES: GRENVILLE - WATER POLLUTION
LEGEND:
A. FOR ALL HOUSE SYSTEM EQUIPMENT PROVIDE CONDUIT AND WIRING FROM CONTROL PLANT EXPANSION
THE INDICATED SOURCE PANEL OR MCC TO THE LOAD AS PER THE HOUSE
A => Architectural SYSTEM WIRING SCHEDULE E001A. PHASE - -
M => Mechanical Contractor KEMPTVILLE, ONTARIO
E => Electrical Contractor B. FOR POWER SOURCES THAT ARE LABELLED LP or BP THE PANEL SCHEDULES
G => General Contractor WILL GOVERN WHEN CONFLICTS EXIST DRAWING:
PS1 => Process Equipment Supplier/Contractor
MECHANICAL / ELECTRICAL

December 6, 2023 11:08:09 AM


C. FOR POWER SOURCES THAT ARE LABELLED DP or BP, THE PANEL SCHEDULES
WILL GOVERN WHEN CONFLICTS EXIST
SITE-WIDE
D. COORDINATE EXACT LOAD AND WIRE SIZE WITH ACTUAL EQUIPMENT
REQUIREMENTS. MOTOR STARTER & CONTROL LIST
E. WHERE CONFLICTS ARISE REFER TO LAYOUT DRAWINGS FOR SHEET 4 OF 4
EQUIPMENT/DEVICE LOCATIONS.

F. FOR CONFLICTS BETWEEN THIS AND OTHER DRAWINGS REFER TO OTHER DESIGN:
LO
DRAWINGS FOR CLARIFICATION. ADVISE CONSULTANT.
DRAWN: DRAWING #:
IDM

PLOT DATE:
CHECKED:

JLR #:
JO
29475
ME004A
X
DRAWING NOTES:

X
1 POWER AND FIBRE DUCT BANKS TO BE INSTALLED 3 CONDUITS TO STOP SHORT OF THE TUNNEL WALL BY 4 ROUTE NEW FIBRE CABLE INSIDE THE TUNNEL. 6 DIRECT BURIED RIGID PVC CONDUITS c/w RWU90 8 PROVIDE A NEMA4 PULL BOX FOR POWER AS WELL 10 REFER TO DETAIL 5/E009A FOR FURTHER POLE

X
OVER THE GALLERY ROOF DEPRESSION SLAB. ENSURE 500mm AND SHOULD NOT ENTER THE TUNNEL. COORDINATE EXACT PATH ON-SITE. PROVIDE PULL WIRING AND CAT6 CABLING (RESPECTIVELY) TO AS A NEMA4 PULL BOX FOR COMMUNICATIONS INSIDE REQUIRMENTS. NEW DEWATERING AND ELECTRICAL SERVICE
A MINIMUM COVER OF 100mm OVER TOP OF CONDUITS. PROVIDE AN OPENING IN THE CONDUIT CAP FOR THE BOXES ALONG ROUTE TO SUIT. PULL BOXES TO BE LIGHT STANDARD(s) AND ASSOCIATED CAMERA(s). THE DIGESTER BUILDING BASEMENT FOR TRANSITION DIGESTER CONTROL ENTRANCE BUILDING
BUILDING 900 SERIES

X
ENSURE DUCT BANKS ARE SECURED TO THE ROOF FIBRE CABLE. PROVIDE A REMOVABLE SEAL AROUND NEMA 4 PAINTED STEEL, HAMMOND ECLIPSE SERIES REFER TO DETAIL 7/E007A. MINIMUM CONDUIT SIZE TO OUTSIDE WIRING. ENSURE PULL BOXES ARE NOT 11 REFER TO DETAIL 2/S016A FOR LIGHT POLE 800 SERIES
NEW AERATION NEW PRIMARY NEW
SLAB TO AVOID SHEERING OF THE CONDUITS AND THE CABLE TO PREVENT WATER AND DIRT INGRESS. OR HOFFMAN EQUIVALENT. REFER TO DRAWING OF 53mm BELOW GRADE. LOCATED INSIDE THE SAMPLE ROOM (HAZARDOUS STRUCTURAL SUPPORT TO TANK WALL. COORDINATE TANKS CLARIFIERS HEADWORKS
500 SERIES 400 SERIES 200 SERIES

X
REFER TO E003A FOR CONTINUATION. CABLES. COORDINATE WITH STRUCTURAL. ENSURE THE OPENING IN THE CAP DOES NOT N001A. AREA). COORDINATE ON-SITE. REFER TO DRAWING WITH STRUCTURAL. REFER TO DETAIL 3/E010A FOR
DAMAGE THE CABLE. PROVIDE AN IRON STAKE AT 7 CONCRETE ENCASED RIGID PVC CONDUITS c/w E003A. ADDITIONAL POLE REQUIREMENTS.
2 EXACT LOCATIONS OF END POINT TERMINATIONS TO THE END OF THE CONDUITS TO ASSIST WITH FINDING 5 PROVIDE WIRING FOR NEW REPLACEMENT FAN AND RWU90 WIRING AND CAT6 CABLING (RESPECTIVELY)

X
BE DETERMINED AND MODIFIED BY THE CONTRACTOR THE CONDUIT ENDS IN THE FUTURE. THE FIBRE ASSOCIATED DAMPER INSIDE THE EXISTING TO LIGHT STANDARD(s) AND ASSOCIATED CAMERA(s). 9 THE FOLLOWING EQUIPMENT IS LOCATED INSIDE THIS 12 DIRECT BURIED RIGID PVC CONDUITS c/w RWU90 NEW SECONDARY NEW TERTIARY
CLARIFIERS FILTER BUILDING
TO SUIT INSTALLATIONS REQUIREMENTS OF THE CABLE TO BE DIRECT BURIED FROM THE CONDUIT DIGESTER BUILDING. REFER TO DETAIL 4/MID802A. REFER TO RETAIL 3/E009A. MINIMUM CONDUIT SIZE BUILDING: WIRING TO LIGHT STANDARD(s). REFER TO DETAIL 700 SERIES (PHASE B)

X
600 SERIES (PHASE B)
GENERATOR MANUFACTURER, AT NO EXTRA COST TO END TO THE TUNNEL. OF 103mm BELOW GRADE. TRANSITION TO SMALLER ATS-001, ATS-002, CP-9000, SB-001, SB-002A, SB-002B, 7/E007A. MINIMUM CONDUIT SIZE OF 53mm BELOW
THE PROJECT. CONDUIT AT POLE. SB-003A, SB-003B GRADE.

X
13 CONTRACTOR TO PROVIDE A MINIMUM SETBACK OF

X
1.5m BETWEEN THE MANHOLE AND THE FACE OF THE EXISTING SERVICE
BUILDING
WALL. COORDINATE WITH CIVIL AND STRUCTURAL. 300 SERIES

X
TO CMH-06 TO TX-001
SLOPE TO CMH-01 SLOPE TO TRANSFORMER BASE
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X
X X X X X X X

1. FIBRE TO SERVICE BLDG FROM HP-04A IN 103mmC


2. COMMUNICATIONS TO SERVICE BLDG FROM HP-04A IN 103mmC KEY PLAN
3. 103mmC SPARE TO HP-04A
4. 103mmC SPARE TO HP-04A
1 2 A
1 2
GENERAL NOTES:
3 4
1 2 3 4 A. ALL BELOW GRADE CONDUIT SYSTEMS ARE CONCRETE
1 2
1 2
ENCASED DUCTS. UNLESS NOTED OTHERWISE, THE
3 4 1. POWER TO MCC-200 IN 103mmC
3 4 TYPICAL CONCRETE ENCASED DUCT BANK SYSTEM TO
3 4 1. POWER IN 103mmC 2. POWER TO MCC-200 IN 103mmC
2. POWER IN 103mmC 3. POWER TO MCC-1 IN 103mmC BE PROVIDED AS A 2 WIDE BY 2 DEEP CONFIGURATION
1. THREE PHASE POWER FROM TX-001 IN 103mmC 3. POWER IN 103mmC 4. 103mmC SPARE WITH 103mmC DUCTS TO OESC REQUIREMENTS.
2. THREE PHASE POWER FROM TX-001 IN 103mmC 1. POWER TO MCC-800 IN 103mmC 4. 103mmC SPARE
3. THREE PHASE POWER FROM TX-001 IN 103mmC 2. POWER TO UP-990 IN 103mmC 1 2
B. REFER TO 3/E009A FOR TYPICAL TRENCHING DETAIL.
4. 103mmC SPARE 3. POWER TO MCP-8001 IN 103mmC
4. 103mmC SPARE 3 4
1 2 C. FOR LARGE MAN HOLES (PMH OR CMH) REFER TO
B 2/E009A. FOR SMALL MAN HOLES (PMH OR CMH) REFER
1. FIBRE TO DIGESTER BLDG IN 103mmC 1 2 3 3 4 1. POWER TO MCC-200 IN 103mmC TO 4/E009A.
2. 103mmC SPARE TO DIGESTER BLDG 2 2. POWER TO MCC-200 IN 103mmC
4 5 6 3. 103mmC SPARE
D. ARRANGEMENT OF WIRING AND CABLES IN THE DUCT
1. POWER TO MCC-300 IN 103mmC 4. 103mmC SPARE
1 2 2. POWER TO MCC-1 IN 103mmC
BANKS SHOWN FOR QUOTATION PURPOSES. FINAL
1. SHORE POWER IN 103mmC 3. 103mmC SPARE ARRANGEMENTS TO BE COORDINATED ON SITE BY THE
LP-802-5 2. DISCRETE ALARMS IN 103mmC 4. 103mmC SPARE CONTRACTOR AND SUBMITTED VIA SHOP DRAWINGS
ROUTE 2X2 3. SPARE FOR APPROVAL PRIOR TO INSTALLATION.
O1
COMM DUCTS 4. GEN/ATS START IN 103mmC
BELOW 2X2 5. FIBRE/COMM IN 103mmC
POWER DUCTS E. ALL BELOW GRADE DUCT BANKS TO SLOPE AWAY FROM
O1 6. SPARE 1 2
LP-802-5 1 2 3 BUILDINGS TOWARDS MAN HOLES/HAND HOLES.
ABOVE. DRAIN POWER AND CONTROLS VIA
2X2 COMMS TO RWU90 WIRING.
4 5 6
PC LP-802-5 CMH-01 1. FIBRE TO HEADWORKS BLDG IN 103mmC F. CONTRACTOR TO COORDINATE FINAL ROUTES OF THE
2. 103mmC SPARE TO HEADWORKS BLDG POWER AND COMMUNICATIONS WIRING TO THE
1. FIBRE TO SERVICE BLDG FROM HP-04A IN 103mmC VARIOUS LIGHT POLES ON-SITE PRIOR TO TRENCHING
2. COMMUNICATIONS TO SERVICE BLDG FROM HP-04A IN 103mmC FM FM FM FM W W
AND INSTALLATION. REFLECT FINAL ROUTES ON THE
GAS

PMH-03:

FM

W
3. 103mmC SPARE TO HP-04A FM FM FM RED LINE DRAWINGS FOR INCLUSION IN THE AS-BUILT
POWER MANHOLE FM
4. 103mmC SPARE TO HP-04A DRAWINGS.

FM
FM
(SMALL) FM FM FM FM
5. FIBRE TO ELECTRICAL SERVICE ENTRANCE BLDG IN 103mmC
O1 LP-802-5

FM
FM
M W W W W W W

FM
6. 103mmC SPARE TO ELECTRICAL SERVICE ENTRANCE BLDG
G. REFER TO TANK LAYOUT DRAWINGS FOR FURTHER

W
FM FM FM FM DETAILS ON THE WIRING REQUIREMENTS FOR LIGHT
POLES AT THE TANKS.
O1
DC

DC

O1 11 11 11 11
GAS

DC
GAS

CP-8000 GENERATOR H. REFER TO E014A FOR SURVEILLANCE SYSTEM SITE


LP-802-5 T1 T1 T1 T1 FM FM
MCC-800 PLAN.
8 GEN-001 LP-202-5 FM FM
LP-202-9.1 LP-202-9.1 LP-202-9.1 LP-202-9.1 FM FM
FM I. COORDINATE BURIED SERVICES WITH CIVIL.
D FM
LP-802-5 FM

FM
FM
SLOPE TO PMH-03
FM

O1 O1 LP-202-5 H3 LP-202-5 FM

FM
FM
GAS

FM
GAS

GAS
LP-202-9.1 TOC=90.35
1
SLOPE TO CMH-07
T1 CP-2000
GAS

CMH-07: MCC-200
GAS

LP-802-5 FM FM FM 2 PHASE A - ADDENDUM #7 05/12/23


O1 COMMUNICATIONS
11

FM
FM FM FM

FM
MANHOLE (SMALL)

FM
CMH-01:

FM
COMMUNICATIONS O1 LP-202-5 PC LP-202-5 1 PHASE A - ADDENDUM #3 10/11/23
MANHOLE (LARGE)

FM
FM
FM

D GAS GAS
C 9 2
GAS

FM
LP-802-5 O1
SLOPE TO CMH-02 MECHANICAL SIT TRENCH 0 PHASE A ISSUED FOR TENDER 02/10/23

FM
E LP-202-9.1 LP-202-9.1 LP-202-9.1
PC LP-901-2 LP-202-9.1
LP-202-9.1
GAS

10 No. ISSUE / REVISION DD/MM/YY


LP-202-5 LP-202-5 LP-202-5 LP-202-5 LP-202-5
T1 T1 T1 T1
LP-802-12
S1 S1

FM
This drawing is copyright protected and may not be reproduced or

FM
FM
11 11 11 11

FM
O1
DC

12 1 LP-202-12 LP-202-12 O1 H3 H3 H3 H3 used for purposes other than execution of the described work without
S1
DC

LP-901-2 50mmØ SERVICE WATER the express written consent of J.L. Richards & Associates Limited.
GAS

PA

12
FM

W W
FM NEW 150mmØ WATERMAIN NEW 150mmØ WATERMAIN EX. 150mmØ WATERMAIN VERIFY SHEET SIZE AND SCALES. BAR TO THE

FM
NEW 150mmØ WATERMAIN
WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW WW W WW WW WW WW WW WW WW W RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING.
GAS

10 A B W 0 25mm
EX. 250mmØ PVC SAN FM (EAST QUAD) S1 W
LP-802-12 EX. 200mmØ PVC SAN FORCEMAIN EX. 200mmØ PVC SAN FORCEMAIN SCALE:
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM AS INDICATED
PA

W
FM SLOPE TO PMH-02
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM W
FM FM FM

W
FM

FM FM FM FM FM FM FM FM 0 5 10 15 20m
FM FM FM FM FM
GAS

FM FM FM FM FM FM FM FM FM FM FM FM
FM FM
REFER TO E014A FOR CONTINUATION. FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
FM FM FM FM FM W W CLIENT:
FM FM

W
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
FM GAS

FM
GAS

EX. 30mmØ NATURAL PIPE EX. 300mmØ EFFLUENT FORCEMAIN EX. 300mmØ EFFLUENT FORCEMAIN
PA

FM FM PMH-02: FM FM FM FM FM
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
FM
FM FM POWER MANHOLE NIN
AAI W
(LARGE) EMM

W
FM 1. FIBRE TO DIGESTER BLDG IN 103mmC E
CC FM FM
RR FM

W
FM
2. 103mmC SPARE TO DIGESTER BLDG FFOO
FM FM
T FM
3. FIBRE TO SERVICE BLDG FROM HP-04A IN 103mmC SLOPE TO CMH-02 O1 O1 FMEENNT FM FM FM
PMH-01: LP-701-17 U W
LP-701-17 U

W
4. COMMUNICATIONS TO SERVICE BLDG FROM HP-04A IN 103mmC L
F L W WW WW WW
PA

POWER MANHOLE 13 F
GAS

GAS GAS GAS F


EEF
GAS GAS
5. 103mmC SPARE TO HP-04A
FM

X X
Ø
X X
(LARGE)
X
6. 103mmC SPARE TO HP-04A T1 T1 T1 mmØ CMH-03: CONSULTANT: www.jlrichards.ca
m

W
00m
X

7. FIBRE TO ELECTRICAL SERVICE ENTRANCE BLDG IN 103mmC LP-701-15 LP-701-15 LP-701-15 .3300 COMMUNICATIONS

X
8. 103mmC SPARE TO ELECTRICAL SERVICE ENTRANCE BLDG X.
LP-701-17 EEX MANHOLE (LARGE)

FM
DIGESTER
CMH-02: LP-701-17 1
X

O1

EX. 200mmØ SAN FM

X
COMMUNICATIONS
O1
GAS

1 2 3 4 MANHOLE (LARGE)
GAS
EX. 300mmØ RAW SEWAGE FM

CP-7000

X
FM
5 6 7 8

FM
FM

FM
PC
3 CMH-04: EXISTING SECONDARY CLARIFIERS

X
CONSULTANT:
COMMUNICATIONS T.O.C = 89.70m
MANHOLE (SMALL)
GAS

X
SLOPE TO CMH-02
EXISTING CONTROL 4
FIBRE TO EXISTING DIGESTER BUILDING FROM IT-3000 O1
GAS

& DIGESTER BLDG O1

X
1 2 F.F = 5
89.90 LP-701-17 LP-701-17
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\6-Elect\29475 SITE PLAN.dwg

CP-3000
FM

EX. 300mmØ RAW


1. FIBRE TO DIGESTER BLDG IN 103mmC MCC-300

SEWAGE FM
GAS

2. 103mmC SPARE TO DIGESTER BLDG GAS


PROFESSIONAL STAMP PROJECT NORTH

FM
EXISTING SERVICE CP-1000
EXISTING SECONDARY CLARIFIERS EXISTING TERITARY BUILDING MCC-1
T.O.C = 89.70m FILTER BUILDING F.F = 89.85 MCC-3
F.F = 89.85 MCC-3B
C 1 2
MECHANICAL SIT TRENCH
GAS

GAS

REFER TO CIVIL DRAWINGS.


FM

FM
1. FIBRE TO ELECTRICAL SERVICES BLDG IN 103mmC EX. 300mmØ RAW SEWAGE FM
2. 103mmC SPARE TO ELECTRICAL SERVICES BLDG

FM
EX. 30mmØ NATURAL GAS HEADER
GAS GAS

O1
GAS GAS GAS GAS GAS GAS GAS GAS GAS

1 2 DIGESTER EX. 100mmØ DIGESTER GAS PIPE


GAS

D GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS LP-302-19
3 4 FM FM FM FM FM FM FM FM FM
FM EX. 300mmØ RAW SEWAGE FM PROJECT:
FM

1. 208V 3-PHASE TO FCP-9000 IN 103mmC MUNICIPALITY OF NORTH


2. UPS POWER TO FCP-9000 IN 103mmC
3. 103mmC SPARE TO FCP-9000 1 2 GRENVILLE - WATER POLLUTION
4. POWER TO POLE MOUNTED LIGHTS IN 103mmC FM
ALL WIRING IN ALL 4 DUCTS TO BE RWU90.
A G
E M
F 3 4 CONTROL PLANT EXPANSION
EW
W
S PHASE - A
RA 1. POWER TO MCC-300 IN 103mmC
FM

1 2 Ø
EXISTING STORAGE KEMPTVILLE, ONTARIO
GARAGE 2. 103mmC SPARE TO SERVICE BLDG
m
E 0 0m 3. POWER TO MCC-1 IN 103mmC DRAWING:
3 4
X .3 M 4. POWER TO MCC-1 IN 103mmC
E F
ELECTRICAL

December 5, 2023 3:17:03 PM


EX. 300mmØ RAW SEWAGE FM
FM FM FM FM FM FM FM
1. FIBRE TO FCP-9000 IN 103mmC
1 2 3 4
SITE-WIDE
2. CONTROLS TO FCP-9000 IN 103mmC
3. 103mmC SPARE TO FCP-9000
5 6 7 8
4. CAT6 TO CAMERAS IN103mmC SITE PLAN
1. FIBRE TO HEADWORKS BLDG IN 103mmC
2. 103mmC SPARE TO HEADWORKS BLDG
3. FIBRE TO SERVICE BLDG FROM HP-04A IN 103mmC DESIGN:
4. COMMUNICATIONS TO SERVICE BLDG FROM HP-04A IN 103mmC JJT/LO
5. 103mmC SPARE TO HP-04A DRAWN: DRAWING #:
IDM

PLOT DATE:
6. 103mmC SPARE TO HP-04A
7. FIBRE TO ELECTRICAL SERVICE ENTRANCE BLDG IN 103mmC CHECKED:
8. 103mmC SPARE TO ELECTRICAL SERVICE ENTRANCE BLDG
JLR #:
JO
29475
E002A
SPLICE CONNECTION INSULATION TEE OR SPLICE INSTALLATION
POINT
SEE DETAIL NEW DEWATERING AND ELECTRICAL SERVICE
DIGESTER CONTROL ENTRANCE BUILDING
9/E004A. BUILDING 900 SERIES
SEE DETAIL SEE DETAIL 4/E004A 800 SERIES
PIPE AND SEE NEW AERATION NEW PRIMARY NEW
8/E004A. FOR HEAT TRACE TANKS CLARIFIERS HEADWORKS
INSULATION BY SEE NOTE 500 SERIES 400 SERIES 200 SERIES
SEE INSTALLATION
DIVISION 15 NOTE No.1
NOTE No.2 DETAILS
No.1
HEATING CABLE NEW SECONDARY NEW TERTIARY
HOT COLD END SEAL CLARIFIERS FILTER BUILDING
700 SERIES (PHASE B)
THERMOSTAT SPLICE KIT
600 SERIES (PHASE B)

SEE PIPE STRAP. HEAT TRACE. SEE PIPE STRAP. LP-XXX


NOTE No.1 SEE DETAIL 3/E004A. DETAIL 10/E004A. SEE DETAIL
RTD 3/E004A.
END SEAL XXA GFCI EXISTING SERVICE
MONITORING BUILDING
300 SERIES

SEE DETAIL
SEE DETAIL PIPE STRAP
8/E004A. PIPE INSULATION
6/E004A. BY DIVISION 15
DETAIL NOTES: INSTALL RTD REFER TO PANELBOARD SCHEDULES KEY PLAN
OPPOSITE TO SEE HEATING CABLE
1. PROVIDE A MIN. OF ONE (1) PIPE DIAMETER OF SLACK SEE HEAT TRACE NOTE GENERAL NOTES:
BEFORE AND AFTER COMPONENT AS SHOWN. NOTE No.1
No.2 A. FINAL QUANTITIES INDICATED UNDER THE
2. PROVIDE RIGID T-CONNECTOR AND CONDUIT DRAIN 'INSTALLATION NOTES' SECTION OF THE HEAT TRACE
PLUG BEFORE TERMINATING TO COMPONENT WITH SCHEDULE ARE TO BE CONFIRMED ON SITE PRIOR TO
FLEXIBLE CONDUIT. (NOT REQUIRED IF FED WITH INSTALLATION.
PIPE STRAP. PIPE STRAP.
TECK90 CABLE).
SEE DETAIL SEE DETAIL B. INSTALL ADDITIONAL HEAT TRACE AT ALL HEAT SINK
3/E004A. 3/E004A. LOCATIONS. ENSURE HEAT TRACE CAN BE
UNWRAPPED FROM IN-LINE EQUIPMENT FOR FUTURE

1 TYPICAL HEAT TRACE INSTALLATION DIAGRAM 2 HEAT TRACE CABLE GENERAL SCHEMATIC 11 RESERVED MAINTENANCE / REPLACEMENT.

E004A SCALE: NTS SCALE: NTS


SCALE: NTS E004A C. PROVIDE SPLICE KITS ON EACH SIDE OF VALVES AND
E004A
OTHER IN-LINE EQUIPMENT FOR EASE OF FUTURE
MAINTENANCE / REPLACEMENT.

X. D. ENSURE SITE ACCEPTANCE TESTING BY THE HEAT


AT A MA PROVIDE END SEAL FOR HEATING CABLE, c/w TRACE MANUFACTURER OCCURS BEFORE
AP
STR F 300mm COLD-APPLIED HEATING CABLE CORE SEAL. INSTALLATION OF INSULATION.
O
E. ELECTRICAL HEAT TRACE SCHEDULE TO BE READ IN
CE CONJUNCTION WITH PROCESS/MECHANICAL AND
T TRA
HEA ELECTRICAL DRAWINGS INDICATED IN SCHEDULE
PROVIDE STAINLESS BELOW.
19mm CONDUIT DRAIN
STEEL PIPE STRAPS TO
PLUG.
ATTACH HEAT TRACE F. PROVIDE ADDITIONAL CIRCUITS AS REQUIRED DUE TO
COMPONENTS. SIZE TO 6 END SEAL CONNECTION DEVICE ADDITIONAL CABLING WHICH MAY BE REQUIRED FOR
SUIT PIPE DIAMETER. LARGER DIAMETER PIPES.
STRAP WITH RAYCHEM E004A SCALE: NTS
GT-66 GLASS TAPE AS
SHOWN. (TYPICAL). G. NUMBER OF POWER CONNECTION ITEMS TO SUIT.

12 HEAT TRACING - PIPE SUPPORT


3 PIPE STRAP 4 STRAPPING 5 CONDUIT DRAIN CONNECTOR E004A SCALE: NTS

E004A SCALE: NTS E004A SCALE: NTS E004A SCALE: NTS

FLUOROPOLYMER OUTER JACKET

TINNED-COPPER BRAIDED GROUND

MODIFIED POLYOLEFIN INNER JACKET


WARNING 2 PHASE A - ADDENDUM #7 05/12/23
SELF REGULATING CONDUCTIVE CORE
PROVIDE POWER CONNECTION DEVICE FOR PROVIDE TEE OR SPICE CONNECTION FOR UP
1 PHASE A - ADDENDUM #3 10/11/23
ELECTRIC HEAT ONE HEATING CABLE, c/w COLD-APPLIED TO THREE HEATING CABLES, c/w SPACER
HEATING CABLE CORE SEAL. COLD-APPLIED HEATING CABLE CORE SEAL.
TRACE NICKEL PLATED COPPER BUS WIRE 0 PHASE A ISSUED FOR TENDER 02/10/23

PROVIDE ELECTRIC HEAT TRACE WARNING No. ISSUE / REVISION DD/MM/YY


LABEL ON EXTERIOR OF INSULATION AT 3m FIBRE WRAPPED HEATING CABLE. INDIVIDUAL POWER OUTPUT RATINGS WILL
INTERVALS. (TYPICAL). This drawing is copyright protected and may not be reproduced or
INDICATED ON LAYOUT DRAWINGS. (TYPICAL).
used for purposes other than execution of the described work without
the express written consent of J.L. Richards & Associates Limited.
SPLICE OR TEE
VERIFY SHEET SIZE AND SCALES. BAR TO THE
7 ELECTRIC HEAT TRACE WARNING 8 POWER CONNECTION DEVICE 9 CONNECTION DEVICE 10 HEAT TRACE CABLE 13 HEAT TRACING - PIPE FLANGE 14 HEAT TRACING - VALVE RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING. 0 25mm
E004A SCALE: NTS E004A SCALE: NTS E004A SCALE: NTS E004A SCALE: NTS E004A SCALE: NTS E004A SCALE: NTS SCALE:
NTS

CLIENT:
HEAT TRACE SCHEDULE

REFERENCE INFORMATION RESPONSIBILITY MECHANICAL SPECIFICATION ENVIRONMENTAL SPECIFICATION ELECTRICAL SPECIFICATION INSTALLATION NOTES

CONSULTANT: www.jlrichards.ca

NUMBER OF POWER CONNECTION SPLICES


NUMBER OF POWER CONNECTIONS, TEES
TEMPERATURE HEAT TRACE OUTER SOURCE APPROVED FOR NUMBER OF
PIPE INFORMATION INSULATION INFORMATION CONTROLS
PARAMETERS JACKET TYPE VOLTAGE INSTALLATION VALVES AND TYPE

NUMBER OF PIPE SHOE SUPPORTS


POWER SOURCE (PANELBOARD)
EXPOSURE TEMPERATURE (°C)

FORM C CONTACT FOR ALARM


CIRCUIT PROTECTIVE DEVICE
MAINTAIN TEMPERATURE (°C)
SUITABLE FOR CLASS 1 DIV 2

PIPE MOUNTED ELECTRONIC

AMBIENT AIR TEMPERATURE


POLYOLEFIN OUTER JACKET

EXTERIOR OF PIPE, UNDER


PIPE MOUNTED / SURFACE
FLUOROPOLYMER OUTER

PIPE TEMPERATURE RTD


MAXIMUM INTERMITTENT
HAZARDOUS LOCATIONS

MOUNTED MECHANICAL
HEAT TRACE STARTING

SIZE (DIAMETER IN mm)

LIGHTED END SEAL KIT


PIPE IDENTIFIER AT

CONSULTANT:

120V, SINGLE-PHASE

208V, SINGLE-PHASE
MINIMUM START-UP
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\6-Elect\29475 HEAT TRACE DETAILS.dwg

TEMPERATURE (°C)

INTERIOR OF PIPE

PIPE LENGTH (m)


THICKNESS (mm)
[MAIN / BRANCH]

DIAMETER (mm)

DIAMETER (mm)
ANNUNCIATION
POINT

CONTROLS BY
INSTALLED BY

THERMOSTAT
CONTROLLER
START-UP BY
SUPPLIED BY

RTD SENSOR

INSULATION
RATING (A)

QUANTITY

QUANTITY
MATERIAL
WIRED BY

SENSOR
JACKET
FINISH
TYPE

DRAWING HEAT TRACE DESCRIPTION GRID LOCATION OTHER


No. REFERENCE THERMOSTAT OF SYSTEM START POINT REFERENCE NOTES
1 100-SS-SAN PID201/P201 TC-2010 ADMIN BUILDING - FORCE MAIN ZONE 2 REFER TO E201A FOR PANEL SCHEDULE. PROFESSIONAL STAMP PROJECT NORTH
E E E E E 100 SS 50 IP-5 FOAM GLASS ALUMINIUM JACKET 10 -40 35 15A LP-202 2 100 -- -- --
2 250-SS-RSE PID201/P201 TC-2012 RAW SEWAGE - FORCE MAIN E E E E E 250 SS 50 IP-5 FOAM GLASS ALUMINIUM JACKET ZONE 2 10 -40 35 15A LP-202 2 250 -- -- -- REFER TO E201A FOR PANEL SCHEDULE.
3 250-SS-RSE PID201/P201 TC-2013 RAW SEWAGE - FORCE MAIN E E E E E 250 SS 50 IP-5 FOAM GLASS ALUMINIUM JACKET ZONE 2 10 -40 35 15A LP-202 2 250 -- -- -- REFER TO E201A FOR PANEL SCHEDULE.
4 250-SS-RSE PID201/P201 TC-2014 RAW SEWAGE - FORCE MAIN E E E E E 250 SS 50 IP-5 FOAM GLASS ALUMINIUM JACKET ZONE 2 10 -40 35 15A LP-202 2 250 -- -- -- REFER TO E201A FOR PANEL SCHEDULE.
5 300-SS-RSE PID201/P201 TC-2015 RAW SEWAGE - FORCE MAIN E E E E E 300 SS 50 IP-5 FOAM GLASS ALUMINIUM JACKET ZONE 2 10 -40 35 15A LP-202 2 300 -- -- -- REFER TO E201A FOR PANEL SCHEDULE.
6 300-SS-RSE PID201/P201 TC-2016 RAW SEWAGE - FORCE MAIN E E E E E 300 SS 50 IP-5 FOAM GLASS ALUMINIUM JACKET ZONE 2 10 -40 35 15A LP-202 2 300 -- -- -- REFER TO E201A FOR PANEL SCHEDULE.
7 250-SS-RSE PID201/P201 TC-2017 RAW SEWAGE - FORCE MAIN E E E E E 250 SS 50 IP-5 FOAM GLASS ALUMINIUM JACKET ZONE 2 10 -40 35 15A LP-202 2 250 -- -- -- REFER TO E201A FOR PANEL SCHEDULE.
8 200-SS-STM MID201/M201 TC-2030 HEADWORKS STORM - GRAVITY DRAINED E E E E E 200 SS 50 IP-5 FOAM GLASS ALUMINIUM JACKET ZONE 2 10 -40 35 15A LP-202 2 200 -- -- -- REFER TO E201A FOR PANEL SCHEDULE. REFER TO 5/PM009A .
9 100-DI-SCM PID401/P402 TC-4030 SCUM COLLECTOR - PUMPED E E E E E 100 SS 50 IP-5 FOAM GLASS ALUMINIUM JACKET ZONE 2 10 -40 35 15A LP-202 21 100 1 -- -- 1 REFER TO E201A FOR PANEL SCHEDULE.
10 100-CI-STM MID701 TC-7011 TERTIARY STORM - GRAVITY DRAINED E E E E E 15A LP-701 REFER TO E302A FOR PANEL SCHEDULE. REFER TO 5/PM009A .
11 100-SS-DG PID802 TC-8020 DIGESTER GAS - TO BURNER E E E E E 100 SS 50 IP-5 FOAM GLASS ALUMINIUM JACKET ZONE 2 10 -40 35 15A LP-803 20 100 2 -- -- 1 REFER TO E802A FOR PANEL SCHEDULE.
PROJECT:
12 150-SS-DG PID802 TC-8030 DIGESTER GAS - ON DIGESTER ROOF E E E E E 100 SS 50 IP-5 FOAM GLASS ALUMINIUM JACKET ZONE 2 10 -40 35 15A LP-803 12 100 -- -- -- REFER TO E802A FOR PANEL SCHEDULE.
13 150-CI-STM MID802 TC-8050 DIGESTER BUILDING STORM - GRAVITY DRAINED E E E E E 150 CI 50 IP-5 FOAM GLASS ALUMINIUM JACKET ZONE 2 10 -40 35 15A LP-803 -- 2 150 -- -- -- REFER TO E802A FOR PANEL SCHEDULE. REFER TO 5/PM009A .
MUNICIPALITY OF NORTH
2
14 100-CI-STM MID901 TC-9010 ELECTRICAL SUBSTATION STORM - GRAVITY DRAINED E E E E E 150 CI 50 IP-5 FOAM GLASS ALUMINIUM JACKET ZONE 2 10 -40 35 15A LP-902 -- 2 150 -- -- -- 1 REFER TO E911A FOR PANEL SCHEDULE. REFER TO 5/PM009A . GRENVILLE - WATER POLLUTION
15 25-CU-CND MID901 TC-9011 ELECTRICAL SUBSTATION AC CONDENSATE - GRAVITY DRAINED E E E E E 25 CU 50 IP-5 FOAM GLASS ALUMINIUM JACKET ZONE 2 10 -40 35 15A LP-902 2 100 -- -- -- REFER TO E911A FOR PANEL SCHEDULE.
16 100-CI-STM MID701 TC-7012 EXISTING TUNNEL STORM - GRAVITY DRAINED E E E E E 15A LP-701 REFER TO E302A FOR PANEL SCHEDULE. REFER TO 5/PM009A .
CONTROL PLANT EXPANSION
17 100-SS-RSE PID802 TC-8032 DIGESTER GAS - GRAVITY DRAINED E E E E E 15A LP-803 1 REFER TO E802A FOR PANEL SCHEDULE. PHASE - A
18 25-SS-DR PID802 TC-8034 FLAME ARRESTOR - ON DIGESTER ROOF E E E E E 25 SS 50 10 -40 35 15A LP-803 REFER TO E802A FOR PANEL SCHEDULE. KEMPTVILLE, ONTARIO
DRAWING:

ELECTRICAL

December 5, 2023 3:14:25 PM


SITE-WIDE
15 HEAT TRACE SCHEDULE
E004A SCALE: NTS HEAT TRACE DETAILS

DESIGN:
LO/MM
DRAWN: DRAWING #:
MM

PLOT DATE:
CHECKED:

JLR #:
JO
29475
E004A
CABLE AND CONDUCTOR LEGEND: SCHEDULE OF SPDs
GENERATOR ENCLOSURE
NEW DEWATERING AND ELECTRICAL SERVICE
LP-001 1 3 x (3C-#600 MCM 1000V RW90 + GND in 103mm EMT) DIGESTER CONTROL ENTRANCE BUILDING
GLOBAL-1000
BUILDING 900 SERIES
TYPE MANUFACTURER PART # 800 SERIES
1 SEE NOTE 'A' NEW AERATION NEW PRIMARY NEW
REFER TO 2 3 x (4C-#600 MCM 1000V RWU90 + GND in 103mm CONCRETE ENCASED DUCT) TANKS CLARIFIERS HEADWORKS
500 SERIES 400 SERIES 200 SERIES
DRAWING SPD-002A TOTAL PROTECTION TK-ST200-600NN-FLB
E003A TO LP-901 11 3 3 x (3C-#600 MCM 1000V RW90 + GND in 103mm OCAL) SOLUTIONS CANADA
GLOBAL-1000

4 3 x (3C-#600 MCM 1000V RWU90 +GND in 103mm DIRECT BURIED RPVC) SPD-002B TOTAL PROTECTION TK-ST200-600NN-FLB NEW SECONDARY NEW TERTIARY
FILTER BUILDING
7 SOLUTIONS CANADA CLARIFIERS
700 SERIES (PHASE B)
TRANSFORMER SUPPLIED AND 600 SERIES (PHASE B)

OWNED BY HONI. CONTRACTOR TO TX-001 5 3C-#600 MCM 1000V RWU90 + GND in 103mm CONCRETE ENCASED DUCT
GLOBAL-1000
SPD-901 & TOTAL PROTECTION TK-ST080-3Y208-FLB
COORDINATE INSTALLATIONS WITH GLOBAL-1000

6 3C-#3/0 AWG 1000V RW90 + GND in 78mm EMT SPD-001 SOLUTIONS CANADA
HONI AND PROVIDE ALL REQUIRED GEN-001 SPD-001 JBP-001
APPURTENANCES AS REQUIRED BY H2 GLOBAL-1000
GLOBAL-1000

5 PORTABLE 7 3 x (1C-#2/0 AWG SHIELDED ALUMINUM 15kV 100% INSULATION TR-XLP/CSA c/w 33% SPD-990 TOTAL PROTECTION TK-ST080-1S240-FLB EXISTING SERVICE
HONI FOR A COMPLETE TURN-KEY L.A. BUILDING
H1 H3 GENERATOR CONCENTRIC NEUTRAL in CONCRETE ENCASED DUCT) SOLUTIONS CANADA 300 SERIES
INSTALLATION. 8320V
DIESEL GENERATOR CONNECTION
Z= 6.5% 9 3C - #6 AWG 1000V RW90 + GND in 35mm EMT
1MVA AFC=14.5
NIC
1250 KVA, 600V
6 7
DRAWING NOTES:
1000KW @ 80%PF
10 4C - #2/0 AWG 1000V RW90 + GND in 53mm EMT
X2 X1 600V SOLIDLY GROUNDED KEY PLAN
1 COORDINATE EXACT BREAKER SIZE WITH SPD MANUFACTURER.
NEUTRAL AT GENERATOR
X0 11 4C - #4 AWG 1000V RWU90 + GND in 103mm CONCRETE ENCASED DUCT
X3
L.A.
MCOV>550V (ɸ - G) PORTABLE 2 TRANSITION TO EMT CONDUIT WITHIN BUILDING. GENERAL NOTES:
LOAD BANK 800A, 3P 1200A, 3P 12 3C - #1/0 AWG 1000V RW90 + GND in 53mmC EMT
100% LSIG 100% LSIG 3 CONTRACTOR TO PROVIDE A NEW MCC WRAPPER UNIT IN A. PROVIDE GROUND AS PER SPD MANUFACTURER'S
3 EXISTING SPACE WITHIN MCC-1 FOR NEW ACTIVE POWER FACTOR REQUIREMENTS. REFER TO SPECIFICATIONS FOR
PROTECTION PANEL. NEW WRAPPER UNIT TO BE COMPLETE WITH ADDITIONAL DETAIL.
CRADLE, DOOR, LAMACOID LABEL, BREAKER AND ALL
ASSOCIATED APPURTENANCES FOR A COMPLETE SYSTEM. FOR B. CONTRACTOR TO COORDINATE THE EXACT
QUOTATION PURPOSES, THE EXISTING MCC IS A WESTINGHOUSE LOCATION OF NEW WRAPPER UNITS IN EXISTING
2 2 SERIES 2100 CONTROL CENTRE S.O./COM. 37B1098. CONTRACTOR MCCS WITH SITE CONDITIONS AND CONSULT THE
TO COORDINATE EXACT DETAILS ONSITE WITH AS-BUILT MCC MANUFACTURER ACCORDINGLY.
2
EQUIPMENT. CONTRACTOR TO RETAIN THE SERVICES OF THE
MCC MANUFACTURER FOR THE COMMISSIONING OF THE NEW
WRAPPER UNIT. REFER TO DRAWING I311A FOR ADDITIONAL
900 SERIES 1 DETAILS.
ELECTRICAL SERVICE BUILDING
SB-001 BOTTOM ENTRY SB-003A BOTTOM ENTRY TOP EXIT SB-003B 4 CONTRACTOR TO COORDINATE SPECIFIC REQUIREMENTS WITH
GLOBAL-1000
GLOBAL-1000 GLOBAL-1000
THE LOCAL UTILITY BEFORE ORDERING EQUIPMENT.
1200A 1200A 1200A
SERVICE
600V M1 600V 600V
ENTRANCE 5 PORTABLE GENERATOR JUNCTION BOX TO MEET THE FOLLOWING
3Ф 4W 1200AF 3Ф 4W 3Ф 4W REQUIREMENTS:
RATED
35kAIC
52 1140AT @ 95 LTPU 35kAIC 35kAIC - 1200A, 600V RATING, AS INDICATED
MCS KIRK KEY 1200AF
100%, LSIG 52 K1 K1 52 - CSA/cUL APPROVED FOR PORTABLE GENERATOR
35kAIC 1200AF 1200AT
100% 1 100%, LSIG APPLICATIONS
- CSA NEMA 4X STAINLESS STEEL WALL MOUNTED
TOP ENCLOSURE
EXIT - DEDICATED COMPARTMENT IN THE BOTTOM FOR BOTTOM
4 M ENTRY OF CABLES FROM PORTABLE GENERATOR.
COMPARTMENT TO BE EQUIPPED WITH QUICK RELEASE
PADLOCKABLE BOTTOM DOOR. DOOR TO BE LINED WITH
SUITABLE NEOPRENE FOAM GASKET TO MAINTAIN NEMA
MCS MCS RATING AND TO PREVENT INGRESS OF FOREIGN MATERIAL
52 52
1200AF 1200AF AND MOISTURE. OPENING TO HAVE SMOOTH ENTRY WITH
100% 100% INTEGRAL BUSHING TO PREVENT CABLE DAMAGE
- CABLE CONNECTORS TO SUIT ALL CONNECTED WIRING,
INCLUDING WIRING TO THE PORTABLE GENERATOR
TOP EXIT TOP EXIT BOTTOM EXIT BOTTOM EXIT - SEQUENCED CONNECTION MECHANISM FOR IMPROVED
SAFETY. CONNECTION AND DISCONNECTION TO THE
JUNCTION BOX TO FOLLOW A SPECIFIC SEQUENCE,
7
GLOBAL-1000
ATS-001 ATS-002 7
0001-LABOLG
ENSURING GROUND CONNECTION
1200A ATS ATS 1200A 1 - FACTORY WIRED TO INTEGRAL PADLOCKABLE NON-FUSED
600V 600V DISCONNECT SWITCH
1 - COLOUR CODED CABLE CONNECTIONS. CONNECTOR
3Ф 3W 3Ф 3W
35kAIC 35kAIC COLOUR CONFIGURATION TO SUIT
1 1 4 4 - FACILITATES THE USE OF SINGLE CONDUCTOR CABLES AT
HIGHER AMPERAGES
- CONNECTOR TYPES TO SUIT PORTABLE GENERATOR 1 PHASE A - ADDENDUM #7 05/12/23
BOTTOM APPLICATIONS, MALE CONNECTORS. CONTRACTOR TO
NORMAL STANDBY ENTRY STANDBY NORMAL
PROCURE AND TURN OVER MATCHING FEMALE
TOP ENTRY BOTTOM CONNECTORS TO THE MUNICIPALITY IN UNOPENED 0 PHASE A ISSUED FOR TENDER 02/10/23
ENTRY PACKAGES
TOP EXIT - ACCEPTABLE PRODUCT: No. ISSUE / REVISION DD/MM/YY
1. EATON CROUSE-HINDS POSI-MAX PM SERIES POWER
DISTRIBUTION PANEL, OR PRE-APPROVED EQUIVALENT This drawing is copyright protected and may not be reproduced or
C/W MATCHING FEMALE CONNECTORS used for purposes other than execution of the described work without
the express written consent of J.L. Richards & Associates Limited.
6 INSTALLATION TO ENSURE NO WATER INGRESS INTO THE
JUNCTION BOX. VERIFY SHEET SIZE AND SCALES. BAR TO THE
RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING. 0 25mm
BYPASS BYPASS
7 EACH ATS IS TO PROVIDE A "DRY CONTACT, GENERATOR START" SCALE:
N.T.S.
SIGNAL TO A CONTROL TERMINAL BOX WITHIN JBP-001.
TOP EXIT TOP ENTRY 1
1 1
CLIENT:
TOP ENTRY TOP ENTRY

SB-002A
GLOBAL-1000
SB-002B 0001-LABOLG

1200A, 600V, 3ɸ, 3W, 35kAIC 1200AF KIRK KEY 1200AF 1200A, 600V, 3ɸ, 3W, 35kAIC
960AT @ 80% LTPU 52 K2 K2 52 960AT @ 80% LTPU
PM-002A 100%, LSIG 100%, LSIG PM-002B
GLOBAL-1000
35kAIC 35kAIC GLOBAL-1000
CONSULTANT: www.jlrichards.ca

OWNER'S OWNER'S
METERING 3 3 METERING

1
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\6-Elect\29475-000 FACILITY SINGLE LINE.dwg

TOP EXIT K2 CONSULTANT:


3 3

52

MCS
1200AF
100%
LSIG LSIG LSIG LSIG LSIG LSIG LSIG LSIG LSIG LSIG
1 400A 400A 400A 400A 400A 800A 400A 200A 200A 800A 1 PROFESSIONAL STAMP PROJECT NORTH
3P 3P 3P 3P 3P 3P 3P 3P 3P 3P

SEE SEE
3 3 3 3 3 3 3 3 3 3
NOTE 'A' NOTE 'A'

SPD-002A
GLOBAL-1000
SPARE
5 5
SPARE SPARE
SPD-002B
GLOBAL-1000

5 5 5 6 5 (x2) PROJECT:

SEE NOTE 'A'


MUNICIPALITY OF NORTH
GRENVILLE - WATER POLLUTION
MCC-300 MCC-1 MCC-800 MCC-200 CONTROL PLANT EXPANSION
LP-901
PHASE - A
GLOBAL-1000 GLOBAL-1000 GLOBAL-1000 GLOBAL-1000

GLOBAL-1000

KEMPTVILLE, ONTARIO
3 DRAWING:
10 9
12
MCP-8001 ELECTRICAL

December 5, 2023 3:16:09 PM


TX-901
SITE-WIDE
GLOBAL-1000

45kVA
600V/120V/208V
APFC 3Ф 4W
GLOBAL-1000

600V 1 SOLIDLY GLOBAL-1000


DP-900 FACILITY SINGLE LINE DIAGRAM
100 kVAR GROUNDED
IN 10 kVAR (TYPE T1)
EXISTING STEPS
ELECTRICAL ROOM GLOBAL-1000 ELECTRICAL ROOM
SPD-901 ELECTRICAL ROOM
DESIGN:
PFP-100
GLOBAL-1000

1 JJT
DRAWN: DRAWING #:
800 SERIES IDM

PLOT DATE:
300 SERIES EXISTING SERVICE BUILDING 200 SERIES
SERVICE BUILDING (PREVIOUSLY PLANT HEADWORKS) SEE NOTE 'B' DIGESTER BUILDING HEADWORKS BUILDING CHECKED:

JLR #:
JO
29475
E011A
TOTAL LINKS

TOTAL LINKS
EC5 EC5
TABLE OF PANEL AND ELECTRICAL EQUIPMENT TABLE OF PANEL AND ELECTRICAL EQUIPMENT

PROJECT
EngCAD Database Data Exported on: 2023-12-05 2:02:14 PM EngCAD Database Data Exported on: 2023-12-05 2:02:14 PM

PROJECT
PHASE

PHASE
DEVICE DEVICE FIELD WORK DEVICE DEVICE FIELD WORK NEW DEWATERING AND ELECTRICAL SERVICE
DIGESTER CONTROL ENTRANCE BUILDING
TAG SERVICE DWG / SPEC SUPPLY INSTALL WIRE COMM. TAG SERVICE DWG / SPEC SUPPLY INSTALL WIRE COMM. BUILDING 900 SERIES
800 SERIES
IDENTIFIER DESCRIPTION LOCATION DETAIL AMPS kAIC VOLTS Ø W BY BY BY BY IDENTIFIER DESCRIPTION LOCATION DETAIL AMPS kAIC VOLTS Ø W BY BY BY BY NEW AERATION NEW PRIMARY NEW
TANKS CLARIFIERS HEADWORKS
500 SERIES 400 SERIES 200 SERIES
4 ATS 001 AUTOMATIC TRANSFER SWITCH #1 ELECTRICAL SERVICE ENTRANCE BUILDING E011A 600 3 3 E E E G A 2 LCP 8001 CENTRIFUGE LOCAL CONTROL PANEL NEW DIGESTER BUILDING PROCESS AREA M E E G A
4 ATS 002 AUTOMATIC TRANSFER SWITCH #2 ELECTRICAL SERVICE ENTRANCE BUILDING E010A 600 3 3 E E E G A 3 LCP 8002 E-STOP CONTROL PANEL NEW DIGESTER BUILDING PROCESS AREA PID803A / I017A [ 1, 7, 22 ] CSS E E G A
3 ATS 390 AUTOMATIC TRANSFER SWITCH ELECTRICAL SERVICE BUILDING (UPS-390) SERVICE BUILDING ELECTRICAL ROOM E301A 208 3 4 E E E G A 3 LCP 8013 DIGESTER MIXER CONTROL PANEL NEW DIGESTER BUILDING DIGESTER ROOF PID801A / I017A [ 1, 2, 22 ] CSS E E G A NEW SECONDARY NEW TERTIARY
CLARIFIERS FILTER BUILDING
700 SERIES (PHASE B)
2 CP 1000 EXISTING SERVICE BLDG CONTROL PANEL SERVICE BUILDING ELECTRICAL ROOM I304A 120 1 2 EX EX E G A 3 LCP 8018 P-807 / 808 DIGESTER RECIRC. PUMP CONTROL PANEL NEW DIGESTER BUILDING BASEMENT PID801A / I017A [ 1, 2, 3, 4, 22 ] CSS E E G A 600 SERIES (PHASE B)

5 CP 2000 HEADWORKS PLC PANEL HEADWORKS ELECTRICAL ROOM I013A, I014A 120 1 2 CSS E E G A 3 LCP 8019 P-809 HOT WATER RECIRC. PUMP CONTROL PANEL NEW DIGESTER BUILDING BASEMENT PID801A / I017A [ 1, 2 ] CSS E E G A
4 CP 2001 SCREENING PLC PANEL HEADWORKS ELECTRICAL ROOM PID201A, SECTION 17052 120 1 2 M E E G A 3 LCP 8020 DIGESTER MAKE-UP AIR UNIT CONTROL PANEL EXTERIOR MID801A / I017A [ 1, 2, 3, 4 ] CSS E E G A
4 CP 2002 DEGRIT PLC PANEL HEADWORKS ELECTRICAL ROOM PID202A, SECTION 17052 120 1 2 M E E G A 3 LCP 8021 DIGESTER ODOUR CONTROL UNIT CONTROL PANEL EXTERIOR MID801A / I017A [ 1, 2, 3, 4 ] CSS E E G A EXISTING SERVICE
BUILDING
300 SERIES
1 CP 2003 UPS POWER CONTROL PANEL HEADWORKS ELECTRICAL ROOM 4/E007A, I017A [1,2,12,13, 22] 208 1 3 CSS E E G A 3 LCP 8022 HEATING LOOP PUMP CONTROL PANEL NEW DIGESTER BUILDING BASEMENT MID801A / I017A [ 1, 2 ] CSS E E G A
12 CP 2004 HEADWORKS LIGHTING & VENTILATION CONTROL PANEL HEADWORKS ELECTRICAL ROOM 9/E006A, 5/E007A, 6/E007A, I017A [1,2,5,8,12,13,19, 23] 120 1 2 CSS E E G A 3 LCP 8023 GLYCOL HEATING PUMP CONTROL PANEL NEW DIGESTER BUILDING BASEMENT MID801A / I017A [ 1, 2 ] CSS E E G A
5 CP 3000 SERVICE BUILDING PLC PANEL SERVICE BUILDING ELECTRICAL ROOM I013A, I014A 120 1 2 CSS E E G A 3 LCP 8031 SLUDGE TANK MIXER CONTROL PANEL EXTERIOR PID803A / I017A [ 1, 2 ] CSS E E G A
KEY PLAN
13 CP 3004 SERVICE BUILDING LIGHTING & VENTILATION CONTROL PANEL SERVICE BUILDING ELECTRICAL ROOM 9/E006A, 5/E007A, 6/E007A, I017A [1,2,5,8,12,13,19, 23] 120 1 2 CSS E E G A 3 LCP 8032 CENTRATE PUMPS CONTROL PANEL NEW DIGESTER BUILDING PROCESS AREA PID803A / I017A [ 1, 2, 3, 4 ] CSS E E G A
5 CP 8000 DIGESTER PLC PANEL NEW DIGESTER BUILDING I&C ROOM I012A 120 1 2 CSS E E G A 2 LCP 8051 DIGESTER BUILDING SUMP PUMP CONTROL PANEL NEW DIGESTER BUILDING BASEMENT MID802A, SECTION 17052 M E E G A
LEGEND:
6 CP 8001 CENTRIFUGE PLC PANEL NEW DIGESTER BUILDING I&C ROOM PID803A, SECTION 17052 120 1 2 M E E G A 3 LCP 9001 BOILER FEED PUMPS LOCAL CONTROL PANEL SERVICE BUILDING BOILER ROOM MID001A / I017A [ 1, 2 ] CSS E E G A G: GENERAL CONTRACTOR
E: ELECTRICAL CONTRACTOR
1 CP 8003 UPS POWER CONTROL PANEL NEW DIGESTER BUILDING I&C ROOM 4/E007A, I017A [1,2,12,13] 208 1 3 CSS E E G A 2 LCP 9002 HOT WATER PUMP LOCAL CONTROL PANEL SERVICE BUILDING BLOWER ROOM MID001A / I017A [ 1, 2 ] CSS E E G A M: MECHANICAL CONTRACTOR
12 CP 8004 DIGESTER LIGHTING & VENTILATION CONTROL PANEL NEW DIGESTER BUILDING I&C ROOM 9/E006A, 5/E007A, 6/E007A, I017A [1,2,5,8,12,13,19, 23] 120 1 2 CSS E E G A 3 LCP 9011 BOILER #1 E-STOP LOCAL CONTROL PANEL SERVICE BUILDING BOILER ROOM MID002A, SECTION 17052 M E E G A EX: EXISTING
CSS: CONTROL SYSTEM SPECIALIST
2 CP 8005 POLYMER SYSTEM CONTROL PANEL NEW DIGESTER BUILDING PROCESS AREA PID803A, SECTION 17052 120 1 2 M E E G A 3 LCP 9021 BOILER #2 E-STOP LOCAL CONTROL PANEL SERVICE BUILDING BOILER ROOM MID002A, SECTION 17052 M E E G A FTE: FLOAT TIPPING ELEVATION
0 CP 8100 EXISTING DIGESTER BUILDING CONTROL PANEL EXISTING DIGESTER BUILDING N001A 120 1 2 EX EX E G A 3 LCP 9031 BOILER #3 E-STOP LOCAL CONTROL PANEL SERVICE BUILDING BOILER ROOM MID002A, SECTION 17052 M E E G A SSS: SECURITY SYSTEM SPECIALIST
FDS: FIRE DETECTION SYSTEM SPECIALIST
5 CP 9000 ELECTRICAL SERVICE ENTRANCE BUILDING PLC PANEL ELECTRICAL SERVICE ENTRANCE BUILDING I015A 120 1 2 CSS E E G A 3 LCP 9040 PRIMARY HEATING PUMPS LOCAL CONTROL PANEL SERVICE BUILDING BLOWER ROOM MID001A / I017A [ 1, 2, 3, 4 ] E E E G A
1 CP 9004 ELECTRICAL SERVICE BUILDING LIGHTING & VENTILATION CONTROL PANEL ELECTRICAL SERVICE ENTRANCE BUILDING 9/E006A, 5/E007A, 6/E007A, I017A [1,2,5,8,12,13,19, 23] 120 1 2 E E E G A 4 LD-BL 501 NEW PROCESS AIR BLOWER #1 DISCONNECT HEADWORKS PIPE GALLERY E201A 600 3 3 E E E G A GENERAL NOTES:
3 DP 201 HEADWORKS DISTRIBUTION PANEL HEADWORKS ELECTRICAL ROOM E202A 600 3 3 E E E G A 4 LD-BL 502 NEW PROCESS AIR BLOWER #2 DISCONNECT HEADWORKS PIPE GALLERY E201A 600 3 3 E E E G A A. REFERENCES ON DRAWING I017A PERTAIN TO
GROUPS OF COMPONENTS TO BE PROVIDED FOR
2 DP 301 SERVICE BUILDING DISTRIBUTION PANEL SERVICE BUILDING ELECTRICAL ROOM E302A 600 3 3 E E E G A 4 LD-BL 503 NEW PROCESS AIR BLOWER #3 DISCONNECT HEADWORKS PIPE GALLERY E201A 600 3 3 E E E G A
THAT PANEL. CONTRACTOR TO DESIGN THE PANEL
3 DP 801 DIGESTER DISTRIBUTION PANEL NEW DIGESTER BUILDING ELECTRICAL ROOM E801A 600 3 3 E E E G A 4 LD-CC 401 PRIMARY CLARIFIER #1 CROSS COLLECTOR DISCONNECT PRIMARY TANK #1 E201A 600 3 3 E E E G A USING THOSE COMPONENTS, AS OUTLINED IN THE
BILL OF MATERIALS ON DRAWING I017A.
3 DP 901 ELECTRICAL SERVICE ENTRANCE BUILDING DISTRIBUTION PANEL ELECTRICAL SERVICE ENTRANCE BUILDING E911A 600 3 3 E E E G A 4 LD-CC 402 PRIMARY CLARIFIER #2 CROSS COLLECTOR DISCONNECT PRIMARY TANK #1 E201A 600 3 3 E E E G A
3 FCP 8050 FLARE PILOT CONTROL PANEL EXTERIOR PID802A, SECTION 17052 M E E G A 4 LD-CC 403 PRIMARY CLARIFIER #3 CROSS COLLECTOR DISCONNECT PRIMARY TANK #1 E201A 600 3 3 E E E G A B. FOR PANELS SUPPLIED BY THE MECHANICAL
CONTRACTOR, REFER TO PERTINENT DIVISION 11 OR
1 FCP 9000 GATE FIELD CONTROL PANEL EXTERIOR I016A 208 3 4 CSS E E G A 4 LD-CNT 801 CENTRIFUGE MAIN DRIVE DISCONNECT NEW DIGESTER BUILDING PROCESS AREA E801A 600 3 3 E E E G A DIVISION 15 SPECIFICATIONS.
0 FCP 9001 GATE CONTROLLER PANEL EXTERIOR 208 3 4 G E E G A 4 LD-CNT 802 CENTRIFUGE BACK DRIVE DISCONNECT NEW DIGESTER BUILDING PROCESS AREA E801A 600 3 3 E E E G A
C. NOTE THAT NOT ALL DISCONNECTS ARE SHOWN IN
3 FCP 9010 BOILER #1 FIELD CONTROL PANEL SERVICE BUILDING BOILER ROOM MID002A, SECTION 17052 600 3 3 M E E G A 4 LD-EF 201 ELECTRICAL ROOM EXHAUST FAN DISCONNECT HEADWORKS ELECTRICAL ROOM E201A 600 3 3 E E E G A THIS TABLE. REFER TO E000A AND OTHER DRAWINGS
FOR FURTHER DETAILS.
3 FCP 9020 BOILER #2 FIELD CONTROL PANEL SERVICE BUILDING BOILER ROOM MID002A, SECTION 17052 600 3 3 M E E G A 4 LD-EF 302 HEATING PUMP ROOM EXHAUST FAN DISCONNECT SERVICE BUILDING MECHANICAL ROOM E301A 600 3 3 E E E G A
3 FCP 9030 BOILER #3 FIELD CONTROL PANEL SERVICE BUILDING BOILER ROOM MID002A, SECTION 17052 600 3 3 M E E G A 4 LD-EF 303 BOILER ROOM EXHAUST FAN DISCONNECT SERVICE BUILDING BOILER ROOM E301A 600 3 3 E E E G A D. NOTE THAT ADDITIONAL PULL BOXES MAY BE
REQUIRED BASED ON SITE CONDITIONS.
2 FDP 2001 HEADWORKS FIRE DETECTION PANEL HEADWORKS ELECTRICAL ROOM SECTION 16899 FDS E E G A 4 LD-GC 201 GRIT CLASSIFIER DISCONNECT HEADWORKS SCREEN AND DEGRIT ROOM E202A 600 3 3 E E E G A CONTRACTOR TO PROVIDE SUCH ADDITIONAL PULL
2 FDP 8001 DIGESTER FIRE DETECTION PANEL NEW DIGESTER BUILDING ELECTRICAL ROOM SECTION 16899 FDS E E G A 4 LD-LC 401 PRIMARY CLARIFIER #1 LONGITUDINAL COLLECTOR DISCONNECT PRIMARY TANK #1 E201A 600 3 3 E E E G A BOXES, AS REQUIRED.

3 GEN 001 STANDBY GENERATOR EXTERIOR E011A, SECTION 16622 600 3 4 E E E G A 4 LD-LC 402 PRIMARY CLARIFIER #2 LONGITUDINAL COLLECTOR DISCONNECT PRIMARY TANK #1 E201A 600 3 3 E E E G A
2 GEN ANUN GENERATOR ANNUNCIATOR PANEL ELECTRICAL SERVICE ENTRANCE BUILDING SECTION 16622 E E E G A 4 LD-LC 403 PRIMARY CLARIFIER #3 LONGITUDINAL COLLECTOR DISCONNECT PRIMARY TANK #1 E201A 600 3 3 E E E G A
2 GEN REPO GENERATOR REPO PANEL ELECTRICAL SERVICE ENTRANCE BUILDING SECTION 16622 E E E G A 4 LD-MAU 201 MAKEUP AIR UNIT DISCONNECT EXTERIOR E201A 600 3 3 E E E G A
2 HCP 4001 PRIMARY CLARIFIER TANK NO. 1 SCUM HEATERS HEATER CONTROL PANEL HEADWORKS ELECTRICAL ROOM I017A [ 1, 2, 5, 12, 13, 20, 21, 22 ] 600 3 3 E E E G A 4 LD-MAU 801 DIGESTER MAKE-UP AIR UNIT DISCONNECT NEW DIGESTER BUILDING DIGESTER ROOF E801A 600 3 3 E E E G A
2 HCP 4004 PRIMARY CLARIFIER TANK NO. 2 SCUM HEATERS HEATER CONTROL PANEL HEADWORKS ELECTRICAL ROOM I017A [ 1, 2, 5, 12, 13, 20, 21, 22 ] 600 3 3 E E E G A 4 LD-MIX 201 GRIT TANK MIXER #1 DISCONNECT HEADWORKS SCREEN AND DEGRIT ROOM E202A 600 3 3 E E E G A
2 HCP 4007 PRIMARY CLARIFIER TANK NO. 3 SCUM HEATERS HEATER CONTROL PANEL HEADWORKS ELECTRICAL ROOM I017A [ 1, 2, 5, 12, 13, 20, 21, 22 ] 600 3 3 E E E G A 4 LD-MIX 202 GRIT TANK MIXER #2 DISCONNECT HEADWORKS SCREEN AND DEGRIT ROOM E202A 600 3 3 E E E G A
2 IB 201 HEAT TRACE TEMPERATURE CONTROL BOARD HEADWORKS SCREEN AND DEGRIT ROOM E007A CSS E E G A 4 LD-MIX 801 SLUDGE HOLDING TANK MIXER DISCONNECT EXTERIOR E801A 600 3 3 E E E G A 3 PHASE A - ADDENDUM #7 05/12/23

2 IB 202 PROCESS FLOW INSTRUMENTATION CONTROL BOARD HEADWORKS PIPE GALLERY E007A CSS E E G A 4 LD-MIX 803 DIGESTER TANK MIXER DISCONNECT NEW DIGESTER BUILDING DIGESTER ROOF E801A 600 3 3 E E E G A
2 PHASE A - ADDENDUM #5 27/11/23
2 IB 203 PROCESS FLOW INSTRUMENTATION CONTROL BOARD HEADWORKS PIPE GALLERY E007A CSS E E G A 4 LD-MS 201 MECHANICAL SCREEN #1 DISCONNECT HEADWORKS SCREEN AND DEGRIT ROOM E202A 600 3 3 E E E G A
32 ISJBD 800 INTRINSICALLY SAFE DISCRETE JUNCTION BOX NEW DIGESTER BUILDING I&C ROOM I017A [ 10, 11 ] CSS E E G A 4 LD-MS 202 MECHANICAL SCREEN #2 DISCONNECT HEADWORKS SCREEN AND DEGRIT ROOM E202A 600 3 3 E E E G A 1 PHASE A - ADDENDUM #3 10/11/23

2 IT 2000 HEADWORKS BUILDING IT CABINET HEADWORKS ELECTRICAL ROOM N002A 120 1 2 CSS E E G A 4 LD-OC 201 ODOUR CONTROL UNIT #1 DISCONNECT EXTERIOR E201A 600 3 3 E E E G A
0 PHASE A ISSUED FOR TENDER 02/10/23
3 IT 3000 SERVICE BUILDING SERVICE BUILDING ELECTRICAL ROOM N002A 208 1 3 CSS E E G A 4 LD-OC 202 ODOUR CONTROL UNIT #2 DISCONNECT EXTERIOR E201A 600 3 3 E E E G A
2 IT 8000 DIGESTER BUILDING IT CABINET NEW DIGESTER BUILDING I&C ROOM N002A 120 1 2 CSS E E G A 4 LD-OC 801 DIGESTER ODOUR CONTROL UNIT DISCONNECT EXTERIOR E801A 600 3 3 E E E G A No. ISSUE / REVISION DD/MM/YY

2 JBA 500 ANALOG JUNCTION BOX EQUALIZATION WET WELL I017A [ 10 ] CSS E E G A 4 LD-P 201 GRIT TANK PUMP #1 DISCONNECT HEADWORKS SCREEN AND DEGRIT ROOM E202A 600 3 3 E E E G A This drawing is copyright protected and may not be reproduced or
2 JBD 201 HEAT TRACE DISCRETE JUNCTION BOX EXTERIOR I017A [ 10 ] CSS E E G A 4 LD-P 202 GRIT TANK PUMP #2 DISCONNECT HEADWORKS SCREEN AND DEGRIT ROOM E202A 600 3 3 E E E G A used for purposes other than execution of the described work without
the express written consent of J.L. Richards & Associates Limited.
2 JBD 500 DISCRETE JUNCTION BOX EQUALIZATION WET WELL I017A [ 10 ] CSS E E G A 2 LD-P 205 BIN ROOM SUMP PUMP DISCONNECT HEADWORKS SCREENINGS BIN AREA E202A 600 3 3 E E E G A
VERIFY SHEET SIZE AND SCALES. BAR TO THE
2 JBD 800 DISCRETE JUNCTION BOX NEW DIGESTER BUILDING DIGESTER ROOF I017A [ 10 ] CSS E E G A 2 LD-P 206 PIPE GALLERY SUMP PUMP DISCONNECT HEADWORKS PIPE GALLERY E202A 600 3 3 E E E G A RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING. 0 25mm
2 JBN 1000 NETWORK JUNCTION BOX SERVICE BUILDING ELECTRICAL ROOM N001A CSS E E G A 4 LD-P 207 HEADWORKS GLYCOL HEATING PUMP DISCONNECT HEADWORKS PIPE GALLERY E201A 600 3 3 E E E G A SCALE:
N.T.S.
1 JBN 8000 NETWORK JUNCTION BOX EXISTING DIGESTER BUILDING N001A CSS E E G A 4 LD-P 401 PRIMARY SLUDGE PUMP DISCONNECT HEADWORKS PIPE GALLERY E201A 600 3 3 E E E G A
3 JBP 001 PORTABLE GENERATOR CONNECTION ELECTRICAL SERVICE ENTRANCE BUILDING E011A 600 3 3 E E E G A 4 LD-P 402 PRIMARY SLUDGE PUMP 2 DISCONNECT PRIMARY TANK #1 E201A 600 3 3 E E E G A
6 51 JBP 201 HEAT TRACE POWER JUNCTION BOX EXTERIOR I211A / I017A [ 10 ] 120 1 2 CSS E E G A 4 LD-P 403 PRIMARY SCUM PUMP DISCONNECT EQUALIZATION WET WELL E201A 600 3 3 E E E G A CLIENT:

51 JBP 401 SCUM HEATER JUNCTION BOX PRIMARY TANK #1 I017A [ 10, 20 ] / I023A CSS E E G A 4 LD-P 715 EFFLUENT PUMP #6 DISCONNECT SERVICE BUILDING BASEMENT E301A 600 3 3 E E E G A
2
51 JBP 404 SCUM HEATER JUNCTION BOX PRIMARY TANK #2 I017A [ 10, 20 ] / I023A CSS E E G A 4 LD-P 807 DIGESTER SLUDGE RECIRC. PUMP #4 DISCONNECT NEW DIGESTER BUILDING BASEMENT E801A 600 3 3 E E E G A
51 JBP 407 SCUM HEATER JUNCTION BOX PRIMARY TANK #3 I017A [ 10, 20 ] / I023A CSS E E G A 4 LD-P 808 DIGESTER SLUDGE RECIRC. PUMP #4 DISCONNECT NEW DIGESTER BUILDING BASEMENT E801A 600 3 3 E E E G A
2
6 51 JBP 500 POWER JUNCTION BOX EQUALIZATION WET WELL I017A [ 10 ] CSS E E G A 4 LD-P 809 DIGESTER HEX HOT WATER RECIRC. PUMP DISCONNECT NEW DIGESTER BUILDING BASEMENT E801A 600 3 3 E E E G A

2 3 LCP 2011 MECHANICAL SCREEN #1 CONTROL PANEL HEADWORKS SCREEN AND DEGRIT ROOM PID201A, SECTION 17052 M E E G A 4 LD-P 811 CENTRATE TRANSFER PUMP #1 DISCONNECT NEW DIGESTER BUILDING PROCESS AREA E801A 600 3 3 E E E G A
CONSULTANT: www.jlrichards.ca
3 LCP 2012 MECHANICAL SCREEN #2 CONTROL PANEL HEADWORKS SCREEN AND DEGRIT ROOM PID201A, SECTION 17052 M E E G A 4 LD-P 812 CENTRATE TRANSFER PUMP #2 DISCONNECT NEW DIGESTER BUILDING PROCESS AREA E801A 600 3 3 E E E G A
3 LCP 2013 CONVEYOR CONTROL PANEL HEADWORKS SCREEN AND DEGRIT ROOM PID201A, SECTION 17052 M E E G A 4 LD-P 813 CENTRIFUGE SLUDGE FEED PUMP DISCONNECT NEW DIGESTER BUILDING PROCESS AREA E801A 600 3 3 E E E G A
3 LCP 2014 SCREENINGS WASH PRESS LOCAL CONTROL PANEL HEADWORKS SCREENINGS BIN AREA PID201A, SECTION 17052 M E E G A 4 LD-P 815 DIGESTER GLYCOL HEATING PUMP DISCONNECT NEW DIGESTER BUILDING PROCESS AREA E801A 600 3 3 E E E G A
3 LCP 2015 GRIT TANK PUMP #1 CONTROL PANEL HEADWORKS SCREEN AND DEGRIT ROOM PID202A, SECTION 17052 M E E G A 1 LD-P 816 DIGESTER SANITARY SUMP PUMP #1 DISCONNECT NEW DIGESTER BUILDING PROCESS AREA E801A 600 3 3 E E E G A
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\6-Elect\29475 TABLE OF PANELS & DEVICES.dwg

3 LCP 2016 VORTEX INDUCER #1 LOCAL CONTROL PANEL HEADWORKS SCREEN AND DEGRIT ROOM PID202A, SECTION 17052 M E E G A 1 LD-P 817 DIGESTER SANITARY SUMP PUMP #2 DISCONNECT NEW DIGESTER BUILDING PROCESS AREA E801A 600 3 3 E E E G A
3 LCP 2017 GRIT CLASSIFIER CONTROL PANEL HEADWORKS SCREEN AND DEGRIT ROOM PID202A, SECTION 17052 M E E G A 4 LD-P 818 DIGESTER HEATING LOOP PUMP DISCONNECT NEW DIGESTER BUILDING PROCESS AREA E801A 600 3 3 E E E G A CONSULTANT:

3 LCP 2018 HEADWORKS GLYCOL HEATING PUMP CONTROL PANEL HEADWORKS PIPE GALLERY MID201A / I017A [ 1, 2, 22 ] CSS E E G A 4 LD-P 901 BOILER FEED PUMP #1 LOCAL DISCONNECT SERVICE BUILDING BOILER ROOM E301A 600 3 3 E E E G A
3 LCP 2019 HEADWORKS ELECTRICAL ROOM VENTIALTION CONTROL PANEL (EF/SF-201) HEADWORKS ELECTRICAL ROOM MID201A / I017A [ 1, 2, 3, 4, 22 ] CSS E E G A 4 LD-P 902 BOILER FEED PUMP #2 LOCAL DISCONNECT SERVICE BUILDING BOILER ROOM E301A 600 3 3 E E E G A
3 LCP 2020 HEADWORKS MUA UNIT CONTROL PANEL EXTERIOR MID201A / I017A [ 1, 2, 3, 4, 22 ] CSS E E G A 4 LD-P 903 BOILER FEED PUMP #3 LOCAL DISCONNECT SERVICE BUILDING BOILER ROOM E301A 600 3 3 E E E G A
3 LCP 2021 GRIT TANK PUMP #2 CONTROL PANEL HEADWORKS SCREEN AND DEGRIT ROOM PID202A, SECTION 17052 M E E G A 4 LD-P 905 PRIMMARY HEATING DISTRIBUTION PUMP #1 LOCAL DISCONNECT SERVICE BUILDING BLOWER ROOM E301A 600 3 3 E E E G A
3 LCP 2022 GRIT TANK MIXER #2 CONTROL PANEL HEADWORKS SCREEN AND DEGRIT ROOM PID202A, SECTION 17052 M E E G A 4 LD-P 906 PRIMMARY HEATING DISTRIBUTION PUMP #2 LOCAL DISCONNECT SERVICE BUILDING BLOWER ROOM E301A 600 3 3 E E E G A PROFESSIONAL STAMP PROJECT NORTH
1 LCP 2030 SCREEN BIN AREA SANITARY PUMP CONTROL PANEL HEADWORKS SCREENINGS BIN AREA MID201A, SECTION 17052 M E E G A 4 LD-P 907 HOT WATER PUMP LOCAL DISCONNECT SERVICE BUILDING BLOWER ROOM E301A 600 3 3 E E E G A
3 LCP 2031 GALLERY LEVEL SANITARY PUMP CONTROL PANEL HEADWORKS PIPE GALLERY MID201A, SECTION 17052 M E E G A 4 LD-P 908 HOT WATER PUMP LOCAL DISCONNECT SERVICE BUILDING BLOWER ROOM E301A 600 3 3 E E E G A
3 LCP 2901 ODOUR CONTROL UNIT #1 LOCAL CONTROL PANEL EXTERIOR PID203A / I017A [ 1, 2, 3, 4, 22 ] CSS E E G A 4 LD-P 909 HOT WATER PUMP LOCAL DISCONNECT SERVICE BUILDING BLOWER ROOM E301A 600 3 3 E E E G A
3 LCP 2902 ODOUR CONTROL UNIT #2 LOCAL CONTROL PANEL EXTERIOR PID203A / I017A [ 1, 2, 3, 4, 22 ] CSS E E G A 2 LD-RH 401 PRIMARY CLARIFIER TANK NO. 1 SCUM HEATERS LOCAL DISCONNECT PRIMARY TANK #1 I410A 600 3 3 E E E G A
3 LCP 3900 SERVICE BLDG HEATING PUMP ROOM CONTROL PANEL (EF-302) SERVICE BUILDING MECHANICAL ROOM MID301A / I017A [ 1, 2, 3, 4, 22 ] CSS E E G A 2 LD-RH 404 PRIMARY CLARIFIER TANK NO. 2 SCUM HEATERS LOCAL DISCONNECT PRIMARY TANK #2 I410A 600 3 3 E E E G A
3 LCP 3901 SERVICE BLDG BOILER ROOM CONTROL PANEL (EF-303) SERVICE BUILDING BOILER ROOM MID301A / I017A [ 1, 2, 3, 4, 22 ] CSS E E G A 2 LD-RH 407 PRIMARY CLARIFIER TANK NO. 3 SCUM HEATERS LOCAL DISCONNECT PRIMARY TANK #3 I410A 600 3 3 E E E G A
2 LCP 4001 PRIMARY CLARIFIER TANK NO. 1 SCUM HEATERS LOCAL CONTROL PANEL PRIMARY TANK #1 PID401A / I017A [ 1, 2, 13 ] / I023A CSS E E G A 4 LD-SCV 201 CONVEYOR DISCONNECT HEADWORKS SCREEN AND DEGRIT ROOM E202A 600 3 3 E E E G A
2 LCP 4004 PRIMARY CLARIFIER TANK NO. 2 SCUM HEATERS LOCAL CONTROL PANEL PRIMARY TANK #2 PID401A / I017A [ 1, 2, 13 ] / I023A CSS E E G A 4 LD-SCV 801 SLUDGE CONVEYOR #1 DISCONNECT NEW DIGESTER BUILDING WASTE BIN ROOM E801A 600 3 3 E E E G A
PROJECT:
2 LCP 4007 PRIMARY CLARIFIER TANK NO. 3 SCUM HEATERS LOCAL CONTROL PANEL PRIMARY TANK #3 PID401A / I017A [ 1, 2, 13 ] / I023A CSS E E G A 4 LD-SCV 802 SLUDGE CONVEYOR #2 DISCONNECT NEW DIGESTER BUILDING WASTE BIN ROOM E801A 600 3 3 E E E G A
3 LCP 4010 PRIMARY CLARIFIER #1 & #2 CONTROL PANEL PRIMARY TANK #1 PID401A / I017A [ 1, 2 , 22 ] CSS E E G A 4 LD-SF 201 ELECTRICAL ROOM SUPPLY FAN DISCONNECT HEADWORKS ELECTRICAL ROOM E201A 600 3 3 E E E G A
MUNICIPALITY OF NORTH
43 LCP 4011 PRIMARY SLUDGE PUMP #1 & #2 CONTROL PANEL HEADWORKS PIPE GALLERY PID401A / I017A [ 1, 2, 3, 4, 22 ] CSS E E G A 4 LD-SWP 201 SCREENINGS WASH PRESS DISCONNECT HEADWORKS SCREENINGS BIN AREA E202A 600 3 3 E E E G A GRENVILLE - WATER POLLUTION
3 LCP 4013 PRIMARY CLARIFIER SCUM PIT LOCAL CONTROL PANEL PRIMARY TANK #1 PID401 / I017A [ 1, 2, 3, 4, 14 ] CSS E E G A 3 LP 001 GENERATOR POWER PANEL ELECTRICAL SERVICE ENTRANCE BUILDING E011A, E911A 208 3 4 E E E G A CONTROL PLANT EXPANSION
4 LCP 4014 EQUALIZATION WET WELL DRAIN PUMP LOCAL CONTROL PANEL EQUALIZATION WET WELL SECTION 15412 600 3 3 M/E M/E E G A 3 LP 202 HEADWORKS POWER PANEL HEADWORKS ELECTRICAL ROOM E201A 208 3 4 E E E G A PHASE - A
2 LCP 4019 FERRIC SULPHATE TANK LOCAL CONTROL PANEL EXTERIOR PID403A / I017A [ 1, 4, 6, 9, 13, 22 ] CSS E E G A 3 LP 203 HEADWORKS POWER PANEL HEADWORKS ELECTRICAL ROOM E202A 208 3 4 E E E G A KEMPTVILLE, ONTARIO
3
3 LCP 4020 PRIMARY CLARIFIER #2 & #3 CONTROL PANEL PRIMARY TANK #1 PID401A / I017A [ 1, 2, 22 ] CSS E E G A 2 LP 302 SERVICE BUILDING POWER PANEL SERVICE BUILDING ELECTRICAL ROOM E302A 208 3 4 E E E G A DRAWING:

3 LCP 5000 BLOWER CONTROL PANEL HEADWORKS PIPE GALLERY PID403A / I017A [ 1, 2, 3, 4, 22 ] CSS E E G A 2 LP 305 SERVICE BUILDING POWER PANEL SERVICE BUILDING ELECTRICAL ROOM E302A 208 3 4 E E E G A ELECTRICAL

December 5, 2023 3:14:43 PM


3 LCP 7012 EFFLUENT PUMP #6 CONTROL PANEL SERVICE BUILDING BASEMENT PID701B / I017B [ 1, 2, 3, 4 ] CSS E E G A 3 LP 802 DIGESTER POWER PANEL NEW DIGESTER BUILDING ELECTRICAL ROOM E801A 208 3 4 E E E G A SITE-WIDE

1 DRAWING NOTES: TABLE OF PANELS SHEET 1 OF 2


1 REFER ALSO TO DETAILS 9/E006A, 5/E007A AND 6/E007A. 4 REFER TO DETAIL 2/I022A.
DESIGN:
MM/LO
2 MODIFIED BY CSS. 5 JUNCTION BOX COMPLETE WITH EPA SERIES S/S PADLOCK ADAPTER OR APPROVED EQUIVALENT COMPATIBLE WITH
DRAWN: DRAWING #:
SELECTED PANEL. JUNCTION BOX TO INCLUDE LAMACOID LABEL PER ITEM 54 ON BILL OF MATERIALS (I010A). LABEL TO MM

PLOT DATE:
3 CSS TO COORDINATE WITH THE P. ENG. HIRED BY THE CONTRACTOR TO DESIGN THE INTRINSICALLY SAFE SYSTEM. READ "DISCONNECT POWER BEFORE OPENING". CHECKED:
SHOP DRAWINGS FOR THIS PANEL TO BE SEALED BY THAT P. ENG. REFER TO DRAWING I800A FOR FURTHER DETAILS.
6 CONTRACTOR TO USE PHOENIX CONTACT UK 6N TERMINAL BLOCKS IN LIEU OF UK 5N. 2 1 JLR #:
JO
29475
I001A
TOTAL LINKS
EC5
TABLE OF PANEL AND ELECTRICAL EQUIPMENT

PROJECT
EngCAD Database Data Exported on: 2023-12-05 2:02:14 PM

PHASE
NEW DEWATERING AND ELECTRICAL SERVICE
DIGESTER CONTROL ENTRANCE BUILDING
DEVICE DEVICE FIELD WORK BUILDING 900 SERIES
800 SERIES
TAG SERVICE DWG / SPEC SUPPLY INSTALL WIRE COMM. NEW AERATION NEW PRIMARY NEW
CLARIFIERS HEADWORKS
TANKS
IDENTIFIER DESCRIPTION LOCATION DETAIL AMPS kAIC VOLTS Ø W BY BY BY BY 500 SERIES 400 SERIES 200 SERIES

3 LP 803 DIGESTER POWER PANEL NEW DIGESTER BUILDING ELECTRICAL ROOM E801A 208 3 4 E E E G A
1 LP 900 FCP-9000 POWER PANEL EXTERIOR I016A 208 3 4 CSS E E G A NEW TERTIARY
NEW SECONDARY
CLARIFIERS FILTER BUILDING
5 LP 902 ELECTRICAL SERVICE ENTRANCE BUILDING POWER PANEL ELECTRICAL SERVICE ENTRANCE BUILDING E010A 208 3 4 E E E G A 600 SERIES (PHASE B) 700 SERIES (PHASE B)

0 MCC 1 EXISTING MOTOR CONTROL CENTRE SERVICE BUILDING EXISTING ELECTRICAL ROOM E311A 600 3 3 EX E E G A
6 MCC 200 HEADWORKS BUILDING MOTOR CONTROL CENTRE HEADWORKS ELECTRICAL ROOM E201A 600 3 3 E E E G A
0 MCC 3 EXISTING MOTOR CONTROL CENTRE SERVICE BUILDING EXISTING ELECTRICAL ROOM E311A 600 3 3 EX E E G A EXISTING SERVICE
BUILDING
6 MCC 300 SERVICE BUILDING MOTOR CONTROL CENTRE SERVICE BUILDING ELECTRICAL ROOM E301A 600 3 3 E E E G A 300 SERIES

0 MCC 3B EXISTING MOTOR CONTROL CENTRE SERVICE BUILDING EXISTING ELECTRICAL ROOM E311A 600 3 3 EX E E G A
5 MCC 800 NEW DIGESTER BUILDING MOTOR CONTROL CENTRE NEW DIGESTER BUILDING ELECTRICAL ROOM E801A 600 3 3 E E E G A
KEY PLAN
4 MCP 2001 SCREENING MOTOR CONTROL PANEL HEADWORKS ELECTRICAL ROOM E202A, SECTION 17052 600 3 3 M E E G A
4 MCP 2002 GRIT REMOVAL MOTOR CONTROL PANEL HEADWORKS ELECTRICAL ROOM E202A, SECTION 17052 600 3 3 M E E G A LEGEND:
4 MCP 8001 CENTRIFUGE MOTOR CONTROL PANEL NEW DIGESTER BUILDING ELECTRICAL ROOM E801A, SECTION 17052 600 3 3 M E E G A G: GENERAL CONTRACTOR
2 PB 201 PULL BOX HEADWORKS PIPE GALLERY I210A CSS E E G A E: ELECTRICAL CONTRACTOR
M: MECHANICAL CONTRACTOR
2 PB 202 PULL BOX HEADWORKS PIPE GALLERY I210A CSS E E G A EX: EXISTING
CSS: CONTROL SYSTEM SPECIALIST
1 PB 203 PULL BOX HEADWORKS PIPE GALLERY I210A CSS E E G A
FTE: FLOAT TIPPING ELEVATION
1 PB 204 PULL BOX HEADWORKS PIPE GALLERY I210A CSS E E G A SSS: SECURITY SYSTEM SPECIALIST
FDS: FIRE DETECTION SYSTEM SPECIALIST
1 PB 301 PULL BOX SERVICE BUILDING BASEMENT I310A CSS E E G A
1 PB 302 PULL BOX SERVICE BUILDING BASEMENT I310A CSS E E G A GENERAL NOTES:
1 PB 303 PULL BOX SERVICE BUILDING BOILER ROOM I310A CSS E E G A A. REFERENCES ON DRAWING I017A PERTAIN TO GROUPS
1 PB 304 PULL BOX SERVICE BUILDING BOILER ROOM I310A CSS E E G A OF COMPONENTS TO BE PROVIDED FOR THAT PANEL.
CONTRACTOR TO DESIGN THE PANEL USING THOSE
1 PB 305 PULL BOX SERVICE BUILDING BOILER ROOM I310A CSS E E G A COMPONENTS, AS OUTLINED IN THE BILL OF MATERIALS
1 PB 306 PULL BOX SERVICE BUILDING BOILER ROOM I310A CSS E E G A ON DRAWING I017A.

1 PB 307 PULL BOX SERVICE BUILDING BOILER ROOM I310A CSS E E G A B. FOR PANELS SUPPLIED BY THE MECHANICAL
CONTRACTOR, REFER TO PERTINENT DIVISION 11 OR
0 PB 308 PULL BOX SERVICE BUILDING BASEMENT I310A CSS E E G A
DIVISION 15 SPECIFICATIONS.
1 PB 801 PULL BOX NEW DIGESTER BUILDING BASEMENT I810A CSS E E G A
C. NOTE THAT NOT ALL DISCONNECTS ARE SHOWN IN
1 PB 802 PULL BOX NEW DIGESTER BUILDING BASEMENT I810A CSS E E G A
THIS TABLE. REFER TO E000A AND OTHER DRAWINGS
1 PB 803 PULL BOX NEW DIGESTER BUILDING BASEMENT I810A CSS E E G A FOR FURTHER DETAILS.

1 PB 804 PULL BOX NEW DIGESTER BUILDING BASEMENT I810A CSS E E G A D. NOTE THAT ADDITIONAL PULL BOXES MAY BE
4 PFP 100 ACTIVE POWER FACTOR PANEL SERVICE BUILDING ELECTRICAL ROOM E011A 600 3 3 E E E G A REQUIRED BASED ON SITE CONDITIONS. CONTRACTOR
IS TO PROVIDE ADDITIONAL PULL BOXES, AS REQUIRED.
4 PFP 200 ACTIVE POWER FACTOR PANEL HEADWORKS ELECTRICAL ROOM E201A 600 3 3 E E E G A
4 PFP 300 ACTIVE POWER FACTOR PANEL SERVICE BUILDING ELECTRICAL ROOM E301A 600 3 3 E E E G A
4 PFP 800 ACTIVE POWER FACTOR PANEL NEW DIGESTER BUILDING ELECTRICAL ROOM E801A 600 3 3 E E E G A
0 RH 401 SCUM HEATER 1 PRIMARY TANK #1 I023A 600 1 3 E E E G A
0 RH 402 SCUM HEATER 2 PRIMARY TANK #1 I023A 600 1 3 E E E G A
0 RH 403 SCUM HEATER 3 PRIMARY TANK #1 I023A 600 1 3 E E E G A
0 RH 404 SCUM HEATER 4 PRIMARY TANK #2 I023A 600 1 3 E E E G A
0 RH 405 SCUM HEATER 5 PRIMARY TANK #2 I023A 600 1 3 E E E G A
0 RH 406 SCUM HEATER 6 PRIMARY TANK #2 I023A 600 1 3 E E E G A
2 PHASE A - ADDENDUM #7 05/12/23
0 RH 407 SCUM HEATER 7 PRIMARY TANK #3 I023A 600 1 3 E E E G A
0 RH 408 SCUM HEATER 8 PRIMARY TANK #3 I023A 600 1 3 E E E G A 1 PHASE A - ADDENDUM #3 10/11/23
0 RH 409 SCUM HEATER 9 PRIMARY TANK #3 I023A 600 1 3 E E E G A
0 PHASE A ISSUED FOR TENDER 02/10/23
3 SB 001 UTILITY INCOMMING SWITCHGEAR ELECTRICAL SERVICE ENTRANCE BUILDING E011A 600 3 4 E E E G A
4 SB 002A LOAD SWITCHGEAR ELECTRICAL SERVICE ENTRANCE BUILDING E011A 600 3 3 E E E G A No. ISSUE / REVISION DD/MM/YY

4 SB 002B LOAD SWITCHGEAR ELECTRICAL SERVICE ENTRANCE BUILDING E011A 600 3 3 E E E G A


This drawing is copyright protected and may not be reproduced or
3 SB 003A STANDBY POWER INCOMING SWITCHBOARDS ELECTRICAL SERVICE ENTRANCE BUILDING E011A 600 3 4 E E E G A used for purposes other than execution of the described work without
the express written consent of J.L. Richards & Associates Limited.
4 SB 003B STANDBY POWER INCOMING SWITCHBOARDS ELECTRICAL SERVICE ENTRANCE BUILDING E011A 600 3 4 E E E G A
VERIFY SHEET SIZE AND SCALES. BAR TO THE
2 SPD 001 SURGE PROTECTION DEVICE GENERATOR ENCLOSURE E011A 208 3 4 E E E G A RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING. 0 25mm
1 SPD 002A SURGE PROTECTION DEVICE ELECTRICAL SERVICE ENTRANCE BUILDING E011A 600 3 3 E E E G A SCALE:
N.T.S.
1 SPD 002B SURGE PROTECTION DEVICE ELECTRICAL SERVICE ENTRANCE BUILDING E011A 600 3 3 E E E G A
2 SPD 200 SURGE PROTECTION DEVICE HEADWORKS ELECTRICAL ROOM E202A 600 3 3 E E E G A
3 SPD 202 SURGE PROTECTION DEVICE HEADWORKS ELECTRICAL ROOM E202A 208 3 4 E E E G A CLIENT:
3 SPD 203 SURGE PROTECTION DEVICE HEADWORKS ELECTRICAL ROOM E202A 208 3 4 E E E G A
2 SPD 290 SURGE PROTECTION DEVICE HEADWORKS ELECTRICAL ROOM E202A 208 1 3 E E E G A
2 SPD 300 SURGE PROTECTION DEVICE SERVICE BUILDING ELECTRICAL ROOM E301A 600 3 3 E E E G A
2 SPD 302 SURGE PROTECTION DEVICE SERVICE BUILDING ELECTRICAL ROOM E301A 208 3 4 E E E G A
1 SPD 390 SURGE PROTECTION DEVICE SERVICE BUILDING ELECTRICAL ROOM E301A 208 3 4 E E E G A
CONSULTANT: www.jlrichards.ca
2 SPD 800 SURGE PROTECTION DEVICE NEW DIGESTER BUILDING ELECTRICAL ROOM E801A 600 3 3 E E E G A
3 SPD 802 SURGE PROTECTION DEVICE NEW DIGESTER BUILDING ELECTRICAL ROOM E801A 208 3 4 E E E G A
3 SPD 803 SURGE PROTECTION DEVICE NEW DIGESTER BUILDING ELECTRICAL ROOM E801A 208 3 4 E E E G A
2 SPD 890 SURGE PROTECTION DEVICE NEW DIGESTER BUILDING ELECTRICAL ROOM E801A 208 1 3 E E E G A
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\6-Elect\29475 TABLE OF PANELS & DEVICES.dwg

1 SPD 900 SURGE PROTECTION DEVICE EXTERIOR I016A 208 3 4 CSS E E G A


3 SPD 901 SURGE PROTECTION DEVICE ELECTRICAL SERVICE ENTRANCE BUILDING E011A 208 3 4 E E E G A CONSULTANT:

1 SPD 990 SURGE PROTECTION DEVICE ELECTRICAL SERVICE ENTRANCE BUILDING E011A 208 1 3 E E E G A
22 TCP 100 EXISTING TELECOMMUNICATIONS PANEL SERVICE BUILDING EXISTING ELECTRICAL ROOM N001A EX EX E G A
32 TX 001 UTILITY TRANSFORMER EXTERIOR E011A E E E G A
2 TX 202 HEADWORKS POWER PANEL TRANSFORMER HEADWORKS ELECTRICAL ROOM E202A 600 3 3 E E E G A
1 TX 203 HEADWORKS POWER PANEL TRANSFORMER HEADWORKS ELECTRICAL ROOM E202A 600 3 3 E E E G A
PROFESSIONAL STAMP PROJECT NORTH
1 TX 302 SERVICE BUILDING TRANSFORMER SERVICE BUILDING ELECTRICAL ROOM E301A 600 3 3 E E E G A
2 TX 305 SERVICE BUILDING TRANSFORMER SERVICE BUILDING ELECTRICAL ROOM E301A 600 3 3 E E E G A
1 TX 802 DIGESTER POWER TRANSFORMER NEW DIGESTER BUILDING ELECTRICAL ROOM E801A 600 3 3 E E E G A
2 TX 803 DIGESTER POWER TRANSFORMER NEW DIGESTER BUILDING ELECTRICAL ROOM E801A 600 3 3 E E E G A
3 TX 901 ELECTRICAL SERVICE ENTRANCE BUILDING TRANSFORMER ELECTRICAL SERVICE ENTRANCE BUILDING E011A 600 3 3 E E E G A
3 UP 290 HEADWORKS UPS POWER PANEL HEADWORKS ELECTRICAL ROOM E202A 208 1 3 E E E G A
2 UP 390 SERVICE BUILDING UPS POWER PANEL SERVICE BUILDING ELECTRICAL ROOM E302A 208 3 4 E E E G A
2 UP 890 DIGESTER UPS POWER PANEL NEW DIGESTER BUILDING I&C ROOM E801A 208 1 3 E E E G A
1 UP 990 ELECTRICAL SERVICE ENTANCE BUILDING UPS POWER PANEL ELECTRICAL SERVICE ENTRANCE BUILDING E901A 208 1 3 E E E G A PROJECT:

3 UPS 290 HEADWORKS UPS HEADWORKS ELECTRICAL ROOM E007A 208 1 3 CSS E E G A MUNICIPALITY OF NORTH
0 UPS 300 IT-3000 CABINET UPS SERVICE BUILDING ELECTRICAL ROOM N002A 208 1 3 CSS E E G A GRENVILLE - WATER POLLUTION
1
3 UPS 390 SERVICE BUILDING UPS SERVICE BUILDING ELECTRICAL ROOM E301A 208 3 4 CSS E E G A
2 CONTROL PLANT EXPANSION
4 UPS 890 DIGESTER UPS NEW DIGESTER BUILDING I&C ROOM E007A 208 1 3 CSS E E G A
PHASE - A
1 KEMPTVILLE, ONTARIO
DRAWING NOTES: DRAWING:

ELECTRICAL

December 6, 2023 11:20:46 AM


1 REFER TO TABLE OF DEVICES.
SITE-WIDE
2 MODIFIED BY CSS
TABLES OF PANELS SHEET 2 OF 2
3 HONI SUPPLIED SERVICE TRANSFORMER. COORDINATE WITH HONI.

DESIGN:
MM/LO
DRAWN: DRAWING #:
MM

PLOT DATE:
CHECKED:

JLR #:
JO
29475
I002A
TOTAL LINKS

TOTAL LINKS
EC5 EC5
EngCAD Database Data Exported on: 2023-12-05 3:09:09 PM TABLE OF DEVICES EngCAD Database Data Exported on: 2023-12-05 3:09:09 PM TABLE OF DEVICES
DEVICE FIELD WORK DEVICE FIELD WORK NEW DEWATERING AND ELECTRICAL SERVICE
DIGESTER CONTROL ENTRANCE BUILDING
TAG PROJECT COMPONENT DEVICE INS. SUPPLY INSTALL WIRE COMM. TAG PROJECT COMPONENT DEVICE INS. SUPPLY INSTALL WIRE COMM. BUILDING 900 SERIES
800 SERIES
IDENTIFIER PHASE CODE DESCRIPTION TYPE LOCATION OPERATION NOTES BY BY BY BY IDENTIFIER PHASE CODE DESCRIPTION TYPE LOCATION OPERATION NOTES BY BY BY BY NEW AERATION NEW PRIMARY NEW
TANKS CLARIFIERS HEADWORKS
500 SERIES 400 SERIES 200 SERIES
6 AIT 2011 A A01 HEADWORKS H2S GAS MONITOR H2S HEADWORKS SCREEN AND DEGRIT ROOM H2S CSS E E G 3 PSH 8010 A P01 NEW PRIMARY DIGESTER OVERFLOW PRESSURE LEVEL ALARM NEW DIGESTER BUILDING BASEMENT RANGE: 0 TO 1 BAR CSS M/E E G
6 AIT 2012 A A01 HEADWORKS CH4 GAS MONITOR CH4 HEADWORKS SCREEN AND DEGRIT ROOM CH4 CSS E E G 3 PSH 8018 A P01 HEAT EXCHANGER WATER PRESSURE ALARM HIGH NEW DIGESTER BUILDING BASEMENT CSS M/E E G
6 AIT 2013 A A01 HEADWORKS H2S GAS MONITOR H2S HEADWORKS SCREEN AND DEGRIT ROOM H2S CSS E E G 3 PSH 8031 A P01 SLUDGE HOLDING TANK HIGH LEVEL NEW DIGESTER BUILDING BASEMENT RANGE: 0 TO 1 BAR CSS M/E E G NEW SECONDARY NEW TERTIARY
CLARIFIERS FILTER BUILDING
700 SERIES (PHASE B)
6 AIT 2014 A A01 HEADWORKS CH4 GAS MONITOR CH4 HEADWORKS SCREEN AND DEGRIT ROOM CH4 CSS E E G 3 PSH 8033 A P01 CENTRATE TANK HIGH LEVEL NEW DIGESTER BUILDING BASEMENT RANGE: 0 TO 1 BAR CSS M/E E G 600 SERIES (PHASE B)

6 AIT 2015 A A01 HEADWORKS PIPE GALLERY H2S GAS MONITOR H2S HEADWORKS PIPE GALLERY H2S CSS E E G 3 PSL 2011 A P01 HEADWORKS HOT WATER PRESSURE SWITCH NEW DIGESTER BUILDING BASEMENT CSS M/E E G
6 AIT 2016 A A01 HEADWORKS PIPE GALLERY CH4 GAS MONITOR CH4 HEADWORKS PIPE GALLERY CH4 CSS E E G 3 PSL 8032 A P01 SLUDGE HOLDING TANK LOW LEVEL NEW DIGESTER BUILDING BASEMENT RANGE: 0 TO 1 BAR CSS M/E E G
6 AIT 3300 A A01 DRIP TRAP ROOM H2S GAS MONITOR H2S SERVICE BUILDING DRIP TRAP ROOM H2S CSS E E G 3 PSL 8034 A P01 CENTRATE TANK LOW LEVEL NEW DIGESTER BUILDING BASEMENT RANGE: 0 TO 1 BAR CSS M/E E G EXISTING SERVICE
BUILDING

6 AIT 3301 A A01 DRIP TRAP ROOM CH4 GAS MONITOR CH4 SERVICE BUILDING DRIP TRAP ROOM CH4 CSS E E G 3 SD 0001 A T50 GENERATOR ENCLOSURE SMOKE DETECTOR GENERATOR ENCLOSURE 1 CSS E E G
300 SERIES

6 AIT 4011 A A02 AERATION TANK #1 DIFFUSER GRID DO ANALYZER DO AERATION TANK #1 DO CSS M/E E G 2 SD 2001 A 16899 HEADWORKS PIPE GALLERY SMOKE DETECTOR HEADWORKS PIPE GALLERY FDS E E G
6 AIT 4012 A A02 AERATION TANK #2 DIFFUSER GRID DO ANALYZER DO AERATION TANK #2 DO CSS M/E E G 2 SD 2002 A 16899 HEADWORKS PIPE GALLERY SMOKE DETECTOR HEADWORKS PIPE GALLERY FDS E E G
KEY PLAN
6 AIT 4013 A A02 AERATION TANK #3 DIFFUSER GRID DO ANALYZER DO AERATION TANK #3 DO CSS M/E E G 2 SD 2003 A 16899 HEADWORKS PIPE GALLERY SMOKE DETECTOR HEADWORKS PIPE GALLERY FDS E E G
6 AIT 8300 A A01 SAMPLE ROOM H2S GAS MONITOR H2S NEW DIGESTER BUILDING SAMPLE ROOM H2S CSS E E G 2 SD 2004 A 16899 HEADWORKS ELECTRICAL ROOM SMOKE DETECTOR HEADWORKS ELECTRICAL ROOM FDS E E G
LEGEND:
6 AIT 8301 A A01 SAMPLE ROOM CH4 GAS MONITOR CH4 NEW DIGESTER BUILDING SAMPLE ROOM CH4 CSS E E G 2 SD 2005 A 16899 HEADWORKS ELECTRICAL ROOM SMOKE DETECTOR HEADWORKS ELECTRICAL ROOM FDS E E G G: GENERAL CONTRACTOR
E: ELECTRICAL CONTRACTOR
1 FDH 2001 A 16899 HEADWORKS EXTERIOR FIRE DETECTION HORN/STROBE EXTERIOR FDS E E G 2 SD 2006 A 16899 HEADWORKS ELECTRICAL ROOM SMOKE DETECTOR HEADWORKS ELECTRICAL ROOM FDS E E G M: MECHANICAL CONTRACTOR
1 FDH 2002 A 16899 HEADWORKS PIPE GALLERY FIRE DETECTION HORN/STROBE HEADWORKS PIPE GALLERY FDS E E G 2 SD 2007 A 16899 HEADWORKS ELECTRICAL ROOM SMOKE DETECTOR HEADWORKS ELECTRICAL ROOM FDS E E G EX: EXISTING
CSS: CONTROL SYSTEM SPECIALIST
1 FDH 2003 A 16899 HEADWORKSSCREEN & DEGRI TAREA FIRE DETECTION HORN/STROBE HEADWORKS SCREENINGS BIN AREA FDS E E G 2 SD 2008 A 16899 HEADWORKS SCREEN AND DEGRIT ROOM SMOKE DETECTOR HEADWORKS SCREEN AND DEGRIT ROOM FDS E E G FTE: FLOAT TIPPING ELEVATION
1 FDH 2004 A 16899 HEADWORKS SCREEN & DEGRIT AREA FIRE DETECTION HORN/STROBE HEADWORKS SCREENINGS BIN AREA FDS E E G 2 SD 2009 A 16899 HEADWORKS SCREEN AND DEGRIT ROOM SMOKE DETECTOR HEADWORKS SCREEN AND DEGRIT ROOM FDS E E G SSS: SECURITY SYSTEM SPECIALIST
FDS: FIRE DETECTION SYSTEM SPECIALIST
1 FDH 2005 A 16899 HEADWORKS SCREEN & DEGRIT AREA FIRE DETECTION HORN/STROBE HEADWORKS SCREEN AND DEGRIT ROOM FDS E E G 2 SD 2010 A 16899 HEADWORKS SCREEN AND DEGRIT ROOM SMOKE DETECTOR HEADWORKS SCREEN AND DEGRIT ROOM FDS E E G
1 FDH 2006 A 16899 HEADWORKS ELECTRICAL ROOM FIRE DETECTION HORN/STROBE HEADWORKS ELECTRICAL ROOM FDS E E G 2 SD 2011 A 16899 HEADWORKS SCREENINGS BIN AREA SMOKE DETECTOR HEADWORKS SCREENINGS BIN AREA FDS E E G
GENERAL NOTES:
1 FDH 2007 A 16899 HEADWORKS ELECTRICAL ROOM FIRE DETECTION HORN/STROBE HEADWORKS ELECTRICAL ROOM FDS E E G 2 SD 2012 A 16899 HEADWORKS SCREENINGS SHAFT SMOKE DETECTOR HEADWORKS ELECTRICAL ROOM FDS E E G A. COMPONENT CODES REFER TO SPECIFICATION
SECTIONS, CLAUSES AND SUPPLIERS. THE TABLE OF
1 FDH 8001 A 16899 DIGESTER EXTERIOR FIRE DETECTION HORN/STROBE EXTERIOR FDS E E G 3 SD 3011 A T50 SERVICE BUILDING ELECTRICAL ROOM SMOKE DETECTOR SERVICE BUILDING ELECTRICAL ROOM CSS E E G
DEVICES TO BE READ IN CONJUNCTION WITH THE
1 FDH 8002 A 16899 DIGESTER BASEMENT FIRE DETECTION HORN/STROBE NEW DIGESTER BUILDING BASEMENT FDS E E G 3 SD 3012 A T50 SERVICE BUILDING ELECTRICAL ROOM SMOKE DETECTOR SERVICE BUILDING ELECTRICAL ROOM CSS E E G DIVISION 16 AND 17 SPECIFICATIONS.

1 FDH 8003 A 16899 DIGESTER PROCESS AREA FIRE DETECTION HORN/STROBE NEW DIGESTER BUILDING PROCESS AREA FDS E E G 2 SD 8001 A 16899 DIGESTER WASTE BIN ROOM SMOKE DETECTOR NEW DIGESTER BUILDING WASTE BIN ROOM FDS E E G B. REFER TO MECHANICAL AND PROCESS DRAWINGS.
1 FDH 8004 A 16899 DIGESTER PROCESS AREA FIRE DETECTION HORN/STROBE NEW DIGESTER BUILDING PROCESS AREA FDS E E G 2 SD 8002 A 16899 DIGESTER ELECTRICAL ROOM SMOKE DETECTOR NEW DIGESTER BUILDING ELECTRICAL ROOM FDS E E G
C. REFER TO PID AND MID DRAWINGS.
1 FDH 8005 A 16899 DIGESTER WASTE BIN ROOM FIRE DETECTION HORN/STROBE NEW DIGESTER BUILDING WASTE BIN ROOM FDS E E G 2 SD 8003 A 16899 DIGESTER I&C ROOM SMOKE DETECTOR NEW DIGESTER BUILDING I&C ROOM FDS E E G
1 FDH 8006 A 16899 DIGESTER BASEMENT FERRIC SULPHATE STORAGE ROOM DETECTION HORN/STROBE FERRIC SULPHATE STORAGE ROOM FDS E E G 2 SD 8004 A 16899 DIGESTER FERRIC SULPHATE ROOM SMOKE DETECTOR FERRIC SULPHATE STORAGE ROOM FDS E E G
1 FDH 8007 A 16899 DIGESTER I&C ROOM FIRE DETECTION HORN/STROBE NEW DIGESTER BUILDING I&C ROOM FDS E E G 2 SD 8005 A 16899 DIGESTER SAMPLE ROOM SMOKE DETECTOR NEW DIGESTER BUILDING SAMPLE ROOM FDS E E G
1 FDH 8008 A 16899 DIGESTER ELECTRICAL ROOM FIRE DETECTION HORN/STROBE NEW DIGESTER BUILDING ELECTRICAL ROOM FDS E E G 2 SD 8006 A 16899 DIGESTER BASEMENT SMOKE DETECTOR NEW DIGESTER BUILDING BASEMENT FDS E E G
6 FIT 2017 A F01 PRIMARY CLARIFIER #1 INLET FLOW METER MAG HEADWORKS PIPE GALLERY RANGE: 92 L/S 162 L/S CSS M/E E G 2 SD 8007 A 16899 DIGESTER PROCESS AREA SMOKE DETECTOR NEW DIGESTER BUILDING PROCESS AREA FDS E E G
6 FIT 2018 A F01 PRIMARY CLARIFIER #2 INLET FLOW METER MAG HEADWORKS PIPE GALLERY RANGE: 92 L/S 162 L/S CSS M/E E G 2 SD 8008 A 16899 DIGESTER PROCESS AREA SMOKE DETECTOR NEW DIGESTER BUILDING PROCESS AREA FDS E E G
6 FIT 2019 A F01 PRIMARY CLARIFIER #3 INLET FLOW METER MAG HEADWORKS PIPE GALLERY RANGE: 8 L/S 14 L/S CSS M/E E G 2 SD 8009 A 16899 DIGESTER PROCESS AREA SMOKE DETECTOR NEW DIGESTER BUILDING PROCESS AREA FDS E E G
6 FIT 4010 A F01 PRIMARY SLUDGE FLOW METER MAG HEADWORKS PIPE GALLERY RANGE: 0 L/S TO 12 L/S CSS M/E E G 2 SD 8010 A 16899 DIGESTER BASEMENT SMOKE DETECTOR NEW DIGESTER BUILDING BASEMENT FDS E E G
6 FIT 7002 A F01 WASHWATER PUMP FLOW METER MAG SERVICE BUILDING BASEMENT RANGE: 5 L/S TO 25 L/S CSS M/E E G 3 SD 9011 A T50 ELECTRICAL SERVICE ENTRANCE BUILDING SMOKE DETECTOR ELECTRICAL SERVICE ENTRANCE BUILDING CSS E E G
6 FIT 7017 A F01 EFFLUENT PUMPS (TO OUTFALL) FLOW METER MAG SERVICE BUILDING BASEMENT RANGE: 61 L/S TO 71 L/S CSS M/E E G 3 TC 2010 A 16857 HEAT TRACE PIPING - ADMIN BUILDING - FORCE MAIN HEADWORKS SCREEN AND DEGRIT ROOM T RANGE: 0 C TO 100 C E E E G
6 FIT 8036 A F01 CENTRATE FLOW METER MAG NEW DIGESTER BUILDING PROCESS AREA RANGE: 0 L/S TO 5 L/S CSS M/E E G 3 TC 2012 A 16857 HEAT TRACE PIPING - RAW SEWAGE - FORCE MAIN HEADWORKS SCREEN AND DEGRIT ROOM T RANGE: 0 C TO 100 C E E E G
6 FIT 8101 A DIGESTER CENTRIFUGE SLUDGE FLOW METER MAG NEW DIGESTER BUILDING PROCESS AREA SET BY EQUIPMENT SUPPLIER M M/E E G 3 TC 2013 A 16857 HEAT TRACE PIPING - RAW SEWAGE - FORCE MAIN HEADWORKS SCREEN AND DEGRIT ROOM T RANGE: 0 C TO 100 C E E E G
6 FIT 8102 A F02 DIGESTER GAS THERMAL MASS FLOW METER NEW DIGESTER BUILDING DIGESTER ROOF SET BY EQUIPMENT SUPPLIER CSS M/E E G 3 TC 2014 A 16857 HEAT TRACE PIPING - RAW SEWAGE - FORCE MAIN HEADWORKS SCREEN AND DEGRIT ROOM T RANGE: 0 C TO 100 C E E E G
2 FS 8052 A CHEMICAL FILL STATION EYE WASH STATION FLOW ALARM NEW DIGESTER BUILDING PROCESS AREA M M/E E G 3 TC 2015 A 16857 HEAT TRACE PIPING - RAW SEWAGE - FORCE MAIN HEADWORKS SCREEN AND DEGRIT ROOM T RANGE: 0 C TO 100 C E E E G
2 FS 8053 A FERRIC SULPHATE ROOM EYE WASH STATION FLOW ALARM FERRIC SULPHATE STORAGE ROOM M M/E E G 3 TC 2016 A 16857 HEAT TRACE PIPING - RAW SEWAGE - FORCE MAIN HEADWORKS SCREEN AND DEGRIT ROOM T RANGE: 0 C TO 100 C E E E G
2 FS 8054 A POLYMER AREA EYE WASH STATION FLOW ALARM NEW DIGESTER BUILDING PROCESS AREA M M/E E G 3 TC 2017 A 16857 HEAT TRACE PIPING - RAW SEWAGE - FORCE MAIN HEADWORKS SCREEN AND DEGRIT ROOM T RANGE: 0 C TO 100 C E E E G
3 FSL 2011 A F04 HEADWORKS ELECTRICAL ROOM EXHAUST FLOW SWITCH HEADWORKS ELECTRICAL ROOM CSS M/E E G 3 TC 2030 A 16857 HEAT TRACE PIPING - HEADWORKS STORM - GRAVITY DRAINED HEADWORKS SCREEN AND DEGRIT ROOM T RANGE: 0 C TO 100 C E E E G 1 PHASE A - ADDENDUM #7 05/12/23

3 FSL 2013 A F05 HEADWORKS MUA FLOW SWITCH HEADWORKS SCREEN AND DEGRIT ROOM CSS M/E E G 3 TC 4030 A 16857 HEAT TRACE PIPING - SCUM COLLECTOR - PUMPED EQUALIZATION WET WELL T RANGE: 0 C TO 100 C E E E G
0 PHASE A ISSUED FOR TENDER 02/10/23
3 FSL 2031 A F05 HEADWORKS ODOUR CONTROL UNIT #1 FLOW SWITCH EXTERIOR CSS M/E E G 3 TC 8020 A 16857 FLARE GAS HEAT TRACE PIPING NEW DIGESTER BUILDING DIGESTER ROOF T RANGE: 0 C TO 100 C E E E G
3 FSL 2032 A F05 HEADWORKS ODOUR CONTROL UNIT #2 FLOW SWITCH EXTERIOR CSS M/E E G 3 TC 8030 A 16857 DIGESTER GAS HEAT TRACE PIPING NEW DIGESTER BUILDING DIGESTER ROOF T RANGE: 0 C TO 100 C E E E G No. ISSUE / REVISION DD/MM/YY

3 FSL 3015 A F04 DRIP TRAP ROOM EXHAUST FLOW SWITCH SERVICE BUILDING BOILER ROOM CSS M/E E G 4 TC 8032 A 16857 FLARE DRAIN HEAT TRACE PIPING NEW DIGESTER BUILDING DIGESTER ROOF T RANGE: 0 C TO 100 C E E E G This drawing is copyright protected and may not be reproduced or
3 FSL 8038 A F04 DIGESTER BUILDING GLYCOL LOOP FLOW SWITCH NEW DIGESTER BUILDING BASEMENT CSS M/E E G 3 TC 8034 A 16857 FLAME ARRESTOR HEAT TRACE PIPING NEW DIGESTER BUILDING DIGESTER ROOF T RANGE: 0 C TO 100 C E E E G used for purposes other than execution of the described work without
the express written consent of J.L. Richards & Associates Limited.
3 FSL 8040 A F05 SAMPLE ROOM EXHAUST FLOW SWITCH NEW DIGESTER BUILDING SAMPLE ROOM CSS M/E E G 3 TC 8050 A 16857 STORM DRAIN HEAT TRACE PIPING NEW DIGESTER BUILDING PROCESS AREA T RANGE: 0 C TO 100 C E E E G
VERIFY SHEET SIZE AND SCALES. BAR TO THE
3 FSL 8045 A F04 DIGESTER MAKE-UP AIR UNIT FLOW SWITCH NEW DIGESTER BUILDING PROCESS AREA CSS M/E E G 3 TC 9010 A 16857 STORM DRAIN HEAT TRACE PIPING ELECTRICAL SERVICE ENTRANCE BUILDING T RANGE: 0 C TO 100 C E E E G RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING. 0 25mm
3 FSL 8046 A F04 DIGESTER ODOUR CONTROL UNIT FLOW SWITCH EXTERIOR CSS M/E E G 3 TC 9011 A 16857 AC CONDENSATE HEAT TRACE PIPING ELECTRICAL SERVICE ENTRANCE BUILDING T RANGE: 0 C TO 100 C E E E G SCALE:
N.T.S.
3 FSL 2012 A F04 HEADWORKS ELECTRICAL ROOM SUPPLY FLOW SWITCH HEADWORKS ELECTRICAL ROOM CSS M/E E G 3 TE 8013 A CENTRIFUGE PUMP TEMPERATURE SAFETY CONTROL NEW DIGESTER BUILDING PROCESS AREA SET BY EQUIPMENT SUPPLIER M M E G
3 HS 2015 A GRIT CLASSIFIER EMERGENCY STOP ROPE SWITCH HEADWORKS SCREENINGS BIN AREA M E E G 3 TE 8021 A FLARE BURNER TEMPERATURE SAFETY CONTROL NEW DIGESTER BUILDING DIGESTER ROOF SET BY EQUIPMENT SUPPLIER M M/E E G
3 IT 2011 A SCREENINGS WASH PRESS CURRENT TRANSMITTER HEADWORKS SCREENINGS BIN AREA M E E G 3 TIT 2011 A T03 HEADWORKS HOT WATER TEMPERATURE TRANSMITTER RTD HEADWORKS PIPE GALLERY T RANGE: 0 C TO 50 C CSS M/E E G CLIENT:

3 IT 2012 A GRIT SLURRY PUMP #1 CURRENT TRANSMITTER HEADWORKS SCREEN AND DEGRIT ROOM M E E G 3 TIT 2014 A T02 HEADWORKS ELECTRICAL ROOM TEMPERATURE TRANSMITTER RTD HEADWORKS ELECTRICAL ROOM T RANGE: 0 C TO 50 C CSS E E G
3 IT 2013 A VORTEX INDUCER #1 CURRENT TRANSMITTER HEADWORKS SCREEN AND DEGRIT ROOM M E E G 3 TIT 3010 A T02 SERVICE BUILDING ELECTRICAL ROOM TEMPERATURE TRANSMITTER RTD SERVICE BUILDING ELECTRICAL ROOM T RANGE: 0 C TO 50 C CSS E E G
3 IT 2014 A GRIT CLASSIFIER CURRENT TRANSMITTER HEADWORKS SCREENINGS BIN AREA M E E G 3 TIT 3013 A T02 SERVICE BUILDING MECHANICAL ROOM TEMPERATURE TRANSMITTER RTD SERVICE BUILDING MECHANICAL ROOM T RANGE: 0 C TO 50 C CSS E E G
3 IT 2021 A GRIT SLURRY PUMP #2 CURRENT TRANSMITTER HEADWORKS SCREEN AND DEGRIT ROOM M E E G 3 TIT 3014 A T02 SERVICE BUILDING BOILER ROOM TEMPERATURE TRANSMITTER RTD SERVICE BUILDING BOILER ROOM T RANGE: 0 C TO 50 C CSS E E G
3 IT 2022 A VORTEX INDUCER #2 CURRENT TRANSMITTER HEADWORKS SCREEN AND DEGRIT ROOM M E E G 6 TIT 8012 A T03 HEAT EXCHANGER SLUDGE TEMPERATURE TRANSMITTER RTD NEW DIGESTER BUILDING BASEMENT T RANGE: 0 C TO 100 C CSS M/E E G
CONSULTANT: www.jlrichards.ca
3 JIT 2011 A MECHANICAL SCREEN #1 POWER TRANSMITTER HEADWORKS SCREEN AND DEGRIT ROOM M E E G 6 TIT 8013 A T03 HEAT EXCHANGER WATER TEMPERATURE TRANSMITTER RTD NEW DIGESTER BUILDING BASEMENT T RANGE: 0 C TO 100 C CSS M/E E G
3 JIT 2021 A MECHANICAL SCREEN #2 POWER TRANSMITTER HEADWORKS SCREEN AND DEGRIT ROOM M E E G 3 TIT 8015 A T02 DIGESTER ELECTRICAL ROOM TEMPERATURE TRANSMITTER RTD NEW DIGESTER BUILDING ELECTRICAL ROOM T RANGE: 0 C TO 50 C CSS E E G
6 LIT 2010 A L03 SEWAGE RECEIVING CHANNEL LEVEL TRANSMITTER U/S HEADWORKS SCREEN AND DEGRIT ROOM RANGE: 0 TO 1.9 M CSS E E G 3 TIT 8016 A T02 DIGESTER I&C ROOM TEMPERATURE TRANSMITTER RTD NEW DIGESTER BUILDING I&C ROOM T RANGE: 0 C TO 50 C CSS E E G
3 LIT 2011 A MECHANICAL SCREEN #1 LEVEL TRANSMITTER U/S HEADWORKS SCREEN AND DEGRIT ROOM RANGE: 0 TO 1.9 M M E E G 3 TIT 8037 A T03 DIGESTER BUILDING GLYCOL LOOP TEMPERATURE TRANSMITTER RTD NEW DIGESTER BUILDING BASEMENT T RANGE: 0 C TO 50 C CSS M/E E G
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\6-Elect\29475 TABLE OF PANELS & DEVICES.dwg

3 LIT 2012 A MECHANICAL SCREEN #2 LEVEL TRANSMITTER U/S HEADWORKS SCREEN AND DEGRIT ROOM RANGE: 0 TO 1.9 M M E E G 3 TIT 8043 A T02 SAMPLE ROOM TEMPERATURE TRANSMITTER RTD NEW DIGESTER BUILDING BASEMENT T RANGE: 0 C TO 50 C CSS E E G
7 LIT 4015 A L05 PRIMARY SCUM PUMP LEVEL TRANSMITTER RAD SCUM PIT RANGE: 0 TO 4.1 M CSS E E G 2 TIT 8045 A T03 POLYMER SERVICE WATER TEMPERATURE TRANSMITTER RTD NEW DIGESTER BUILDING PROCESS AREA T RANGE: 0 C TO 50 C CSS M/E E G CONSULTANT:

6 LIT 4026 A L05 FERRIC SULPHATE TANK LEVEL TRANSMITTER RAD FERRIC SULPHATE STORAGE ROOM RANGE: 0 TO 4.5 M CSS M/E E G 3 TIT 9010 A T02 ELECTRICAL SERVICE ENTRANCE BUILDING TEMPERATURE TRANSMITTER RTD ELECTRICAL SERVICE ENTRANCE BUILDING T RANGE: 0 C TO 50 C CSS E E G
6 LIT 8011 A P04 NEW PRIMARY DIGESTER LEVEL TRANSMITTER NEW DIGESTER BUILDING BASEMENT RANGE: 0 TO 10 M CSS M/E E G 3 TIT 9020 A T03 BOILER HOT WATER SUPPLY TEMPERATURE TRANSMITTER RTD SERVICE BUILDING BLOWER ROOM T RANGE: 0 C TO 50 C CSS M/E E G
6 LIT 8030 A P04 SLUDGE HOLDING TANK LEVEL TRANSMITTER NEW DIGESTER BUILDING BASEMENT RANGE: 0 TO 4.05 M CSS M/E E G 3 TIT 9021 A T03 BOILER HOT WATER RETURN TEMPERATURE TRANSMITTER RTD SERVICE BUILDING BLOWER ROOM T RANGE: 0 C TO 50 C CSS M/E E G
6 LIT 8035 A P04 CENTRATE TANK LEVEL TRANSMITTER NEW DIGESTER BUILDING BASEMENT RANGE: 0 TO 4.05 M CSS M/E E G 3 TIT 9022 A T03 HOT WATER SUPPLY TEMPERATURE TRANSMITTER FOR EXISTING PLANT HEATING RTD SERVICE BUILDING BLOWER ROOM T RANGE: 0 C TO 50 C CSS M/E E G
3 LS 2013 A L02 MECHANICAL SCREEN #2 LEVEL SWITCH U/S HEADWORKS SCREEN AND DEGRIT ROOM RANGE: 0 TO 1.9 M CSS E E G 3 TIT 9023 A T03 HOT WATER SUPPLY TEMPERATURE TO EXISTING DIGESTER RTD SERVICE BUILDING BLOWER ROOM T RANGE: 0 C TO 50 C CSS M/E E G PROFESSIONAL STAMP PROJECT NORTH
6 LS 4029 A L02 FERRIC SULPHATE TANK LEVEL INDICATOR U/S FERRIC SULPHATE STORAGE ROOM RANGE: 0 TO 4.5 M CSS M/E E G 2 TIT 9030 A T02 OUTDOOR AIR TEMPERATURE TRANSMITTER RTD EXTERIOR T RANGE: -40 TO 50C CSS E E G
3 LSH 4021 A L07 FERRIC SULPHATE TANK LEAK LEVEL DETECTOR FERRIC SULPHATE STORAGE ROOM AS CLOSE AS POSSIBLE TO FLOOR CSS E E G 3 TSHH 8014 A T01 HEAT EXCHANGER WATER TEMPERATURE ALARM HIGH NEW DIGESTER BUILDING BASEMENT RANGE BY MANUFACTURER CSS M/E E G
3 LSH 4022 A FERRIC SULPHATE PIPE SECONDARY CONTAINMENT LEAK LEVEL DETECTOR FERRIC SULPHATE STORAGE ROOM SET BY EQUIPMENT SUPPLIER M M/E E G 3 TT 2012 A T90 PIPE GALLERY SUPPLY AIR TEMPERATURE TRANSMITTER RTD HEADWORKS PIPE GALLERY T RANGE: 0 C TO 50 C CSS M/E E G
3 LSH 4023 A FERRIC SULPHATE PIPE SECONDARY CONTAINMENT LEAK LEVEL DETECTOR EXISTING DIGESTER BUILDING SET BY EQUIPMENT SUPPLIER M M/E E G 3 TT 2013 A T90 HEADWORKS MUA TEMPERATURE TRANSMITTER RTD HEADWORKS SCREEN AND DEGRIT ROOM T RANGE: 0 C TO 50 C CSS M/E E G
3 LSH 8016 A DIGESTER SANITARY PUMP #1 HIGH LEVEL FLOAT NEW DIGESTER BUILDING BASEMENT M M/E E G 3 TT 8042 A T90 FERRIC SULPHATE ROOM SUPPLY AIR TEMPERATURE TRANSMITTER RTD NEW DIGESTER BUILDING PROCESS AREA T RANGE: 0 C TO 50 C CSS M/E E G
3 LSH 8017 A DIGESTER SANITARY PUMP #2 HIGH LEVEL FLOAT NEW DIGESTER BUILDING BASEMENT M M/E E G 3 TT 8044 A T90 DIGESTER MAKE-UP AIR UNIT SUPPLY AIR TEMPERATURE TRANSMITTER RTD NEW DIGESTER BUILDING PROCESS AREA T RANGE: 0 C TO 50 C CSS M/E E G
3 LSH 8019 A L01 DIGESTER TANK HIGH LEVEL FLOAT FLOAT NEW DIGESTER BUILDING PROCESS AREA CSS E E G 6 TT 8102 A DIGESTER CENTRIFUGE TEMPERATURE TRANSMITTER NEW DIGESTER BUILDING PROCESS AREA T RANGE: 0 C TO 100 C M M/E E G
3 LSHH 8051 A DIGESTER SUMP PIT HIGH LEVEL FLOAT FLOAT NEW DIGESTER BUILDING BASEMENT 0.4M AFF M M/E E G 6 TT 8103 A DIGESTER CENTRIFUGE TEMPERATURE TRANSMITTER NEW DIGESTER BUILDING PROCESS AREA T RANGE: 0 C TO 100 C M M/E E G
PROJECT:
3 LSL 4030 A LOW OIL ALARM SCUM PUMP P-403 PRIMARY TANK #1 OIL SET BY EQUIPMENT SUPPLIER M M/E E G 2 UAL 2201 A O02 HEADWORKS BUILDING GAS WARNING STACK LIGHT RED EXTERIOR CSS E E G
3 LSL 8016 A DIGESTER SANITARY PUMP #1 LOW LEVEL FLOAT NEW DIGESTER BUILDING BASEMENT M M/E E G 2 UAL 2202 A O02 HEADWORKS BUILDING GAS WARNING STACK LIGHT AMBER EXTERIOR CSS E E G
MUNICIPALITY OF NORTH
3 LSL 8017 A DIGESTER SANITARY PUMP #2 LOW LEVEL FLOAT NEW DIGESTER BUILDING BASEMENT M M/E E G 2 UAL 2203 A O02 HEADWORKS BUILDING GAS WARNING STACK LIGHT CLEAR EXTERIOR CSS E E G GRENVILLE - WATER POLLUTION
3 MS 4023 A PRIMARY TANK #1 LONGITUDINAL COLLECTOR TORQUE SWITCH PRIMARY TANK #1 M M/E E G 2 UAL 2204 A O02 HEADWORKS BUILDING GAS WARNING STACK LIGHT BLUE EXTERIOR CSS E E G CONTROL PLANT EXPANSION
3 MS 4024 A PRIMARY TANK #2 LONGITUDINAL COLLECTOR TORQUE SWITCH PRIMARY TANK #2 M M/E E G 2 UAL 2206 A O02 HEADWORKS BUILDING GAS WARNING STACK LIGHT RED EXTERIOR CSS E E G PHASE - A
3 MS 4025 A PRIMARY TANK #3 LONGITUDINAL COLLECTOR TORQUE SWITCH PRIMARY TANK #3 M M/E E G 2 UAL 2207 A O02 HEADWORKS BUILDING GAS WARNING STACK LIGHT AMBER EXTERIOR CSS E E G KEMPTVILLE, ONTARIO
6 PIT 5010 A P04 NEW PROCESS AIR BLOWERS (#1, #2 & #3) PRESSURE TRANSMITTER HEADWORKS PIPE GALLERY SET BY EQUIPMENT SUPPLIER CSS M/E E G 2 UAL 2208 A O02 HEADWORKS BUILDING GAS WARNING STACK LIGHT CLEAR EXTERIOR CSS E E G DRAWING:

6 PIT 8013 A CENTRIFUGE FEED PUMP PRESSURE TRANSMITTER NEW DIGESTER BUILDING PROCESS AREA SET BY EQUIPMENT SUPPLIER M M/E E G 2 UAL 2209 A O02 HEADWORKS BUILDING GAS WARNING STACK LIGHT BLUE EXTERIOR CSS E E G ELECTRICAL

December 5, 2023 3:15:17 PM


6 PIT 8020 A P04 PRIMARY DIGESTER PRESSURE TRANSMITTER NEW DIGESTER BUILDING DIGESTER ROOF RANGE: 0 TO 1 BAR CSS M/E E G 2 UAL 2211 A O02 HEADWORKS BUILDING GAS WARNING STACK LIGHT RED HEADWORKS SCREENINGS BIN AREA CSS E E G SITE-WIDE
1
TABLE OF DEVICES SHEET 1 OF 2

DESIGN:
IDM
DRAWN: DRAWING #:
IDM

PLOT DATE:
CHECKED:

JLR #:
JO
29475
I003A
GLOBAL-1000
DP-201 3c #12 AWG RW90 + GND IN EMT
600 VOLT, 3Ø-3W NEW DEWATERING AND ELECTRICAL SERVICE
SURFACE MOUNTED DIGESTER CONTROL ENTRANCE BUILDING
900 SERIES
BUILDING
35kAIC 800 SERIES
NEW AERATION NEW PRIMARY NEW
400 AMP MAIN BREAKER TANKS CLARIFIERS HEADWORKS
FED FROM MCC-200 500 SERIES 400 SERIES 200 SERIES
SEE DWG E201A FOR
DETAILS 15A
MCP-2001 GLOBAL-1000
2
LOAD DESCRIPTION BRKR CCT CCT BRKR DESCRIPTION LOAD
3P
100A, 600V, 3ɸ, 3W, 35kAIC 2
NEW SECONDARY NEW TERTIARY
CLARIFIERS FILTER BUILDING
1 2 700 SERIES (PHASE B)
P-407 EQUALIZATION WET 600 SERIES (PHASE B)
15A, 3P 3 4 15A, 3P SPARE
WELL DRAIN PUMP 5 6
7 8
SPARE 15A, 3P 9 10 15A, 3P SPARE
2
11 12
EXISTING SERVICE
13 14 BUILDING
200A, 15A 15A 15A 15A
SPARE 15 16 15A, 3P SPARE 300 SERIES
3P 3P 3P 3P 3P
17 18
19 20

FVR

FVR

FVR

FVR
SPARE 15A, 3P 21 22 15A, 3P P-205 BIN ROOM SUMP
23 24
25 26 KEY PLAN
P-206 PIPE GALLERY SUMP 15A, 3P 27 28 15A, 3P VFC-614
29 30
31 32 DRAWING NOTES:
TX-202 (LP-202) 60A, 3P 33 34 60A, 3P TX-203 (LP-203)
35 36 1 COORDINATE EXACT BREAKER SIZE WITH SPD
37 38 MANUFACTURER.
MCP-2001 15A, 3P 39 40 50A, 3P MCP-2002
41 42
2 BREAKER, BUS SIZES AND OTHER DETAILS SHOWN

AL ARMOUR ANIXTER
43 44
HCP-4001 HCP-4004 DP-201

3C #12 AWG TECK90


20A, 3P 45 46 20A, 3P FOR QUOTATION PURPOSES. FINAL DETAILS TO BE

3c #6 AWG RW90 +
(RH-401, RH-402, RH-403) (RH-404, RH-405, RH-406)

3c #6 AWG RW90 +
GLOBAL-1000

47 48 COORDINATED WITH THE MOTOR CONTROL PANEL


49 50 SUPPLIER.
HCP-4007
20A, 3P 51 52 20A, 3P SPARE TO CP-2001

GND IN EMT

7TK SERIES
GND IN EMT
(RH-407, RH-408, RH-409)
53 54 3c #12 AWG TECK90 3 LOCAL CONTROL PANEL TO HAVE INTEGRAL
55 56 AL ARMOUR ANIXTER DISCONNECT.
SPARE 15A, 3P 57 58 20A, 3P SPARE

Cat 6

Cat 6

Cat 6

Cat 6
1 7TK SERIES GLOBAL-1000

59 60
2

TOTAL CONNECTED LOAD: LCP-4014


GLOBAL-1000
LCP-2030
GLOBAL-1000
LCP-2031
GLOBAL-1000

PHASE LOAD TO BE FILLED IN BY CONTRACTOR:


LOAD PHASE A: LOAD PHASE B: LOAD PHASE C:
H2 TX-202 H2 TX-203 STARTER STARTER STARTER
Cat 6 Cat 6 Cat 6 Cat 6 Cat 6
0001-LABOLG 0001-LABOLG
PANEL PANEL PANEL
REMARKS
H3 H1 600V H3 H1 600V
1. ALL LOADS ARE IN WATTS, UNLESS OTHERWISE NOTED. NOTE: PROVIDE PADLOCKABLE CLASPS 3
2. DEDICATED NEUTRAL FOR ALL BREAKERS PROVIDED.
3.
*
GFI 45kVA 45kVA LD-MS-201
GLOBAL-1000
LD-MS-202
GLOBAL-1000
LD-SCV-201
GLOBAL-1000
LD-SWP-201
GLOBAL-1000

4. LOCKED
5. ARC FAULT CIRCUIT INTERRUPTER X2 X1 120/208V X2 X1 120/208V
X0 X0
LD-P-205 LD-P-206
1 DP-201 PANEL SCHEDULE X3 X3 GLOBAL-1000 GLOBAL-1000

E202A SCALE: N.T.S.

LP-203

4c #2/0 AWG RW90 +

4c #2/0 AWG RW90 +


GLOBAL-1000

120/208 VOLT, 3Ø-4W

3c #12 AWG TECK90 AL ARMOUR

3c #12 AWG TECK90 AL ARMOUR

3c #12 AWG TECK90 AL ARMOUR

3c #12 AWG TECK90 AL ARMOUR


SURFACE MOUNTED 1 1 2 2
ELECTRICAL ROOM

GND IN EMT

GND IN EMT

3c #12 AWG ARMOURED BELDEN

3c #12 AWG ARMOURED BELDEN


INTEGRALCABLE
225 AMP MAINS
NOTE 'A' NOTE 'A' 1 1.1 1.1

SCV-201

SCREENINGS WASH PRESS


SWP-201
SCREENINGS CONVEYOR
RAW SEWAGE MECHANICAL SCREEN No. 1
MS-201

RAW SEWAGE MECHANICAL SCREEN No. 2


MS-202
10 kAIC

ANIXTER 7TK SERIES

ANIXTER 7TK SERIES

ANIXTER 7TK SERIES

ANIXTER 7TK SERIES


BIN ROOM SUMP PUMP

PIPE GALLERY SUMP PUMP


P-407

P-205

P-206
EQUALIZATION WET WELL DRAIN PUMP
LOAD DESCRIPTION BRKR CCT CCT BRKR DESCRIPTION LOAD
CC-401 HEATER 15A,1P 1 2 15A,1P CC-402 HEATER
LC-401 / LC-402 HEATER 15A,1P 3 4 25A,1P ELEC. RM. SUPPLY FAN SF-202 2 PHASE A - ADDENDUM #7 05/12/23
VFC-401 SLUDGE CONTROL VALVE 15A,1P
15A,1P
5 6 15A,1P
15A,1P
VFC-402 SLUDGE CONTROL VALVE 1 LP-202 1 LP-203
VFC-403 SLUDGE CONTROL VALVE 7 8 VFC-404 PRIMARY SCUM 3-WAY VALVE 0001-LABOLG 0001-LABOLG
1 PHASE A - ADDENDUM #3 10/11/23

VFD CABLE

VFD CABLE
VFC-409 TANK 1 AERATION VALVE 1 15A,1P 9 10 15A,1P VFC-411 TANK 2 AERATION VALVE 1
VFC-410 TANK 1 AERATION VALVE 2 15A,1P 11 12 15A,1P VFC-412 TANK 2 AERATION VALVE 2
VFC-413 TANK 3 AERATION VALVE 1 15A,1P 13 14 15A,1P SPARE 0 PHASE A ISSUED FOR TENDER 02/10/23
VFC-414 TANK 3 AERATION VALVE 2 15A,1P 15 16 15A,1P SPARE
17 18
COOL. CDN-201 (AC-201) 40A,2P
19 20
40A,2P COOL. CDN-202 (AC-202)
GLOBAL-1000
SPD-202 GLOBAL-1000
SPD-203 No. ISSUE / REVISION DD/MM/YY
21 22 20A,1P SERV. RECP. - MUA UNIT *
COOL. CDN-203 (AC-203) 40A,2P This drawing is copyright protected and may not be reproduced or
23 24 20A,1P SERV. RECP. - OC UNIT * 3c #8 AWG RW90 + GND IN EMT
RECP. PRIMARY CLAR. TANK #1 20A,1P 25 26 20A,1P SERV. RECP. - EQUALIZATION PUMPS * used for purposes other than execution of the described work without
RECP. PRIMARY CLAR. TANK #2 20A,1P 27 28 20A,1P SERV. RECP. - LONG. COLLECTORS * the express written consent of J.L. Richards & Associates Limited.
RECP. PRIMARY CLAR. TANK #3 20A,1P 29 30 15A,1P SPARE
HEAT. UH-201, VFC-215 15A,1P 31 32 15A,1P HEAT. UH-202, VFC-216 VERIFY SHEET SIZE AND SCALES. BAR TO THE
RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING.
HEAT. UH-203, VFC-218
HEAT. UH-205, VFC-219
15A,1P
15A,1P
33
35
34
36
15A,1P
15A,1P
VFC-217
HEAT. UH-206, VFC-220
4 SINGLE LINE DIAGRAM (CONTINUED) 2 0 25mm
SCALE:
HEAT. UH-207, VFC-221 15A,1P 37 38 15A,1P HEAT. UH-208, VFC-222 E202A SCALE: N.T.S.
50A
MCP-2002 N.T.S.
SPARE 15A,1P 39 40 15A,1P SPARE 2
GLOBAL-1000

SPARE 15A,1P 41 42 15A,1P SPARE 3P


100A, 600V, 3ɸ, 3W, 35kAIC 2
SPARE 20A,1P 43 44 20A,1P SPARE
SPARE 20A,1P 45 46 20A,1P SPARE
SPARE 20A,1P 47 48 20A,1P SPARE CLIENT:
49 50
EUH-201 ELECTRICAL RM. UNIT HEATER 20A,3P 51 52 20A,3P EUH-202 ELECTRICAL RM. UNIT HEATER
53 54
55 56
SPARE 60A,3P 57 58 XXA,3P SPD-203 1 15A 15A 20A 20A 15A
59 60
3P 3P 3P 3P 3P

FVNR

FVNR

FVNR

FVNR

FVR
CONSULTANT: www.jlrichards.ca
TOTAL CONNECTED LOAD: _________ GENERAL NOTES:
PHASE LOAD TO BE FILLED IN BY CONTRACTOR:
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\6-Elect\29475-000 HEADWORKS BLDG SINGLE LINE.dwg

LOAD PHASE A: _________ LOAD PHASE B: _________ LOAD PHASE C: _________ A. PROVIDE GROUND AS PER SPD MANUFACTURER'S
REQUIREMENTS. REFER TO SPECIFICATIONS FOR
REMARKS ADDITIONAL DETAIL. SCHEDULE OF SPDs
1. ALL LOADS ARE IN WATTS, UNLESS OTHERWISE NOTED.
2. DEDICATED NEUTRAL B. ALL INDICATED CABLES SHOWN AS "ARMOURED BELDEN
3. * GFI TYPE MANUFACTURER PART #
VFD CABLE" TO BE ALUMINUM ARMOURED BELDEN VFD CONSULTANT:
4. LOCKED CABLE SERIES 12295XX SERIES.
5. ARC FAULT CIRCUIT INTERRUPTER SPD-200 TOTAL PROTECTION TK-ST160-600NN-FLB
SOLUTIONS CANADA
C. REFER TO MOTOR STARTER AND CONTROL LIST IN THE ME
2 LP-203 PANEL SCHEDULE SERIES DRAWINGS FOR ADDITIONAL DETAILS.
SPD-202 TOTAL PROTECTION TK-ST080-3Y208-FLB
SOLUTIONS CANADA TO CP-2002
E202A SCALE: N.T.S. D. MCP BREAKER SIZES SHOWN FOR QUOTATION PURPOSES
ONLY. FINAL BREAKER SIZES TO BE DETERMINED BY
SPD-203 TOTAL PROTECTION TK-ST080-3Y208-FLB
MANUFACTURER, SUBJECT TO THE APPROVAL OF THE

Cat 6

Cat 6

Cat 6

Cat 6

Cat 6
GLOBAL-1000

SOLUTIONS CANADA PROFESSIONAL STAMP PROJECT NORTH


ENGINEER.

E. REFER TO DRAWING N001A FOR CAT6 NETWORK DETAILS. SPD-290 TOTAL PROTECTION TK-ST080-1S240-FLB

GLOBAL-1000
UP-290 SOLUTIONS CANADA
F. WHERE CONDUIT IS NOTED WITHOUT TRADE SIZE,
120/208 VOLT, 1PH, 3W, 60A BUS, 10KA CONTRACTOR TO PROVIDE SIZE IN COMPLIANCE WITH
40 AMP MAIN BREAKER ONTARIO ELECTRICAL SAFETY CODE REQUIREMENTS.
Cat 6 Cat 6 Cat 6 Cat 6 Cat 6
SURFACE MOUNTED
ELECTRICAL ROOM
LD-MIX-201
GLOBAL-1000
LD-MIX-202
GLOBAL-1000 GLOBAL-1000
LD-P-201 GLOBAL-1000
LD-P-202 LD-GC-201
GLOBAL-1000

LOAD DESCRIPTION BKR CCT CCT BKR DESCRIPTION LOAD


MCC-200 15A,1P 1 2 20A,1P FDP-2001 PROJECT:
CP-2000 15A,1P 3 4 15A,1P SPARE
CP-2001 15A,1P 5 6 15A,1P SPARE
MUNICIPALITY OF NORTH
CP-2002
SPARE
15A,1P
20A,1P
7
9
8
10
15A,1P
XXA,2P
SPARE
SPD-290
GRENVILLE - WATER POLLUTION
1
SPARE 20A,1P 11 12 CONTROL PLANT EXPANSION
TOTAL CONNECTED LOAD:
PHASE - A
KEMPTVILLE, ONTARIO

3c #12 AWG TECK90 AL ARMOUR

3c #12 AWG TECK90 AL ARMOUR

3c #12 AWG TECK90 AL ARMOUR

3c #12 AWG TECK90 AL ARMOUR

3c #12 AWG TECK90 AL ARMOUR


PHASE LOAD TO BE FILLED IN BY CONTRACTOR: 2 2 7.5 7.5 1
LOAD PHASE A: __________ LOAD PHASE B: __________ DRAWING:

GRIT PUMP 1

GRIT PUMP 2
GRIT TANK 1 VORTEX INDUCER

GRIT TANK 2 VORTEX INDUCER

P-201

P-202

GRIT CLASSIFIER
MIX-201

MIX-202

GC-201
REMARKS ELECTRICAL

December 5, 2023 3:14:34 PM


1. ALL LOADS ARE IN WATTS, UNLESS OTHERWISE NOTED.
HEADWORKS BUILDING

ANIXTER 7TK SERIES

ANIXTER 7TK SERIES

ANIXTER 7TK SERIES

ANIXTER 7TK SERIES

ANIXTER 7TK SERIES


2. DEDICATED NEUTRAL
3. GFI
4. LOCKED SINGLE LINE DIAGRAM AND PANEL
5. ARC FAULT CIRCUIT INTERRUPTER
SCHEDULES SHEET 2 OF 2

3 UP-290 PANEL SCHEDULE DESIGN:


MM/LO
SCALE: N.T.S. DRAWN: DRAWING #:
E202A MM

PLOT DATE:
CHECKED:

JLR #:
JO
29475
E202A
HEADWOR S HVAC PLUMBING MID201A MA E-UP AIR UNIT 201
DRAWING NOTES
LOCAL CONTROL PANEL
1 DAISY CHAIN TO NEXT STAC LIGHT USING SAME
NEW DEWATERING AND ELECTRICAL SERVICE
CABLE AS FIRST ONE IN THE CHAIN DIGESTER CONTROL ENTRANCE BUILDING
900 SERIES
LCP-2020
GLOBAL-1000
BUILDING
800 SERIES
4 14 AWG RW90 20 14 AWG TEC 90 NEW AERATION NEW PRIMARY NEW
2 PROVIDE AN EMPTY EMT RACEWAY SYSTEM TO TAN S CLARIFIERS HEADWOR S
SCREEN BIN AREA SANITARY LD-MAU-201 GLOBAL-1000
GND IN OCAL COND CABLE
EXTEND FIELD WIRING FROM THE PLC PANEL TO THE
500 SERIES 400 SERIES 200 SERIES

PUMP CONTROL PANEL RECIRC PUMP


4 14 AWG MOTOR CONTROL PANEL AS RE UIRED BASED ON
LOCAL CONTROL PANEL THE RE UIREMENTS OF THE SELECTED E UIPMENT
TEC 90 CABLE NEW TERTIARY
NEW SECONDARY
MINIMUM SI E OF EACH RACEWAY TO BE 53 CLARIFIERS FILTER BUILDING
LCP-2030
GLOBAL-1000 4P 16AWG 7 24 600 SERIES PHASE B 700 SERIES PHASE B
ECIVED HORN ECIVED HORN ECIVED HORN ECIVED HORN LCP-2018 STRAND AL ARMOURED
YA YA YA YA
LABOLG

REFER TO DRAWING E030A


GLOBAL-1000

4 14 AWG RW90 10 14 AWG TEC 90 M 3


2230 2210 2215 2220 LD-P-207 VFC-223
GND IN RGS COND CABLE
4P 16AWG 7 24
0001

ECIVED RED ECIVED


RED ECIVED
RED ECIVED
RED GLOBAL-1000

UAL UAL UAL UAL STRAND AL ARMOURED LABOLG 4 CONTRACTOR TO PROVIDE A MINIMUM OF 225 - 14
2231 2211 2216 2221 GALLERY LEVEL SANITARY PUMP HEADWOR S ELECTRICAL ROOM M EXISTING SERVICE
VFC-224 AWG WIRING VIA TEC 90 CABLING TO THE
ECIVED
AMBER ECIVED AMBER ECIVED AMBER ECIVED AMBER CONTROL PANEL LD-SF-201 LOCAL CONTROL PANEL 0001
BUILDING
PLC PANEL VIA THE MCC EXACT CONDUCTOR COUNT 300 SERIES
UAL UAL UAL UAL 4 14 AWG GLOBAL-1000

2P 16 AWG 7X24 STRAND


2232 2212 2217 2222 TEC 90 CABLE RTD PER CABLE AND ASSOCIATED NUMBER OF CABLES
AL ARMOURED TIT
DEVICE

ECIVED CLEAR ECIVED CLEAR ECIVED CLEAR ECIVED CLEAR


UAL UAL UAL UAL 4 14 AWG RW90 2011 TO BE COORDINATED WITH THE PROPOSED MCC
LCP-2031 LCP-2019
2233 2213 2218 2223 GLOBAL-1000

GND IN EMT 2P 16 AWG 7X24 STRAND LAYOUT AND SITE CONDITIONS REFER TO DRAWING
GLOBAL-1000

40 14 TEC 90 CABLE RTD


BLUE BLUE BLUE BLUE AL ARMOURED DEVICE
EY PLAN
ECIVED

UAL
ECIVED

UAL
ECIVED

UAL
ECIVED

UAL 4 14 AWG TT E000A FOR CABLE DETAILS


2234 2214 2219 2224 4 14 AWG RW90 2012
TEC 90 CABLE DEVICE

LD-EF-201 2P 16 AWG 7X24 STRAND


FSL GND IN EMT
1 1 1 1
4 14 AWG
2011
GLOBAL-1000

AL ARMOURED TT
RTD DEVICE 5 CONTRACTOR TO PROVIDE A MINIMUM OF 24 PAIRS GENERAL NOTES
ODOR CONTROL UNIT 1 OF 16 AWG 7X24 STRAND WIRING VIA TEC 90
4P 16 AWG 7X24 2013
TEC 90 CABLE DEVICE

LOCAL CONTROL PANEL 2P 16 AWG 7X24 STRAND CABLING TO THE PLC PANEL VIA THE MCC EXACT
FSL RTD A REFER TO PID AS WELL AS MID DRAWINGS
HORN HORN HORN 2012 STRAND AL ARMOURED
UNARMOURED IN EMT
ECIVED ECIVED ECIVED DEVICE

YA YA YA 4 14 AWG TIT PAIR COUNT PER CABLE AND ASSOCIATED NUMBER


2225 2200 2205 2014 OF CABLES TO BE COORDINATED WITH THE
RED TEC 90 CABLE DEVICE

LCP-2901 2 TRIADS 16 AWG 7X24 B REFER TO N001A FOR NETWOR DETAILS


RED RED FSL
PROPOSED MCC LAYOUT AND SITE CONDITIONS
ECIVED ECIVED ECIVED
GLOBAL-1000

UAL UAL UAL 2013 4 14 AWG RW90 STRAND AL ARMOURED 2 TRIADS 16 AWG 7X24
2226 2201 2206 4 14 AWG LD-OC-201 GND IN OCAL COND STRAND AL ARMOURED REFER TO DRAWING E000A FOR CABLE DETAILS
AMBER GLOBAL-1000

15 14 AWG INTEGRAL CABLE C REFER TO THE ASSOCIATED MID S AND PID S


AMBER ECIVED
AMBER TEC 90 CABLE 6 14 AWG TEC 90 CABLE
ECIVED ECIVED DEVICE

UAL UAL UAL FSL ODOR CONTROL UNIT 2 TEC 90 CABLE IN RGS COND FOR COMMUNICATION REFERENCE BETWEEN
2227 2202 2207 H2S H2S 6 OPEN-ENDED CONDUIT AT UPS
2031 LOCAL CONTROL PANEL 4P 16 AWG 7X24
DEVICE ELEMENT

VARIOUS E UIPMENT AND THE PLC PANEL


CLEAR 4 14 AWG AIT AE
ECIVED
CLEAR ECIVED ECIVED CLEAR STRAND AL ARMOURED 2011 2011
UAL UAL UAL TEC 90 CABLE DEVICE

2 TRIADS 16 AWG 7X24


2228 2203 2208 FSL
2032 STRAND AL ARMOURED INTEGRAL CABLE D REFER TO DRAWING E000A FOR ADDITIONAL
ECIVED BLUE ECIVED
BLUE ECIVED
BLUE LCP-2902 2 TRIADS 16 AWG 7X24
UAL UAL UAL GLOBAL-1000
6 14 AWG TEC 90 CABLE CH4 IN RGS COND CABLE RE UIREMENTS
4 14 AWG RW90 STRAND AL ARMOURED CH4
2229 2204 2209 DEVICE

AIT
ELEMENT

AE
10 14 AWG LD-OC-202 GND IN OCAL COND
1
GLOBAL-1000

15 14 AWG 2012 2012


TEC 90 CABLE 2 TRIADS 16 AWG 7X24
TEC 90 CABLE STRAND AL ARMOURED INTEGRAL CABLE
6 14 AWG TEC 90 CABLE H2S IN RGS COND
DEVICE ELEMENT
H2S
AIT AE
10 14 AWG 2 TRIADS 16 AWG 7X24 2013 2013
TEC 90 CABLE STRAND AL ARMOURED INTEGRAL CABLE
6 14 AWG TEC 90 CABLE CH4 IN RGS COND
DEVICE ELEMENT
CH4
AIT AE
2014 2014
ELECTRICAL ROOM 2 TRIADS 16 AWG 7X24
STRAND AL ARMOURED INTEGRAL CABLE
8 18AWG PORTABLE
6 CONTROL CABLE IN EMT 6 14 AWG TEC 90 CABLE H2S IN RGS COND
C 6 C 6 C 6 C 6 C 6 C 6 C 6 C 6 DEVICE ELEMENT
H2S
UPS-290 AIT AE
0001-LABOLG
2 RUNS CATEGORY 6 IN EMT 2015 2015
2 TRIADS 16 AWG 7X24
4 16AWG PORTABLE STRAND AL ARMOURED
MCC-200 INTEGRAL CABLE
CONTROL CABLE IN EMT
6 14 AWG TEC 90 CABLE CH4 IN RGS COND
SPD-200 DEVICE ELEMENT
CH4
AIT AE
0001-LABOLG

4 16AWG PORTABLE 2016 2016


CP-2000 PFP-200
CONTROL CABLE IN EMT GLOBAL-1000 GLOBAL-1000

4P 16 AWG 7X24
SPD-202 4C 14 AWG TEC 90
0001-LABOLG
STRAND AL ARMOURED M
LABOLG

CABLE VFC-214
4 16AWG PORTABLE 0001

CONTROL CABLE IN EMT PLC ACTIVE POWER


SPD-203 CONTROL PANEL FACTOR PANEL 8 14 AWG
0001-LABOLG
C 6 C 6 C 6 TEC 90 CABLE LABOLG

M
4 16AWG PORTABLE 2 RUNS CATEGORY 6 IN EMT MD-201
CONTROL CABLE IN EMT 8 14 AWG 0001

3
SPD-290 TEC 90 CABLE M
LABOLG

0001-LABOLG

MD-202 0001

3 1 PHASE A - ADDENDUM 7 05/12/23


1 4 5
4 14 AWG
TEC 90 CABLE M
GLOBAL

0 PHASE A ISSUED FOR TENDER 02/10/23


3 FDP-2001
GLOBAL-1000 GFS-201
15 14 AWG RW90 GND IN EMT 4 14 AWG 1000

6
N ISSUE / REVISION DD/MM/YY
TEC 90 CABLE DEVICE

C
PSL

C
2011
T

6
4 14 AWG
TEC 90 CABLE DEVICE
JL R A L
TC
6 2030
VERIFY SHEET SI E AND SCALES BAR TO THE
RIGHT IS 25 IF THIS IS A FULL SI E DRAWING
C

C 6 C 6 C 6 C 6 C 6 C 6 C 6 C 6 0 25
SCALE
NTS

C
6

6
C

CLIENT
2 RUNS OF CATEGORY 6 IN EMT

C
SCREENING PID201A GRIT REMOVAL AND E UALI ATION TAN PID202A
6

2 40 14 AWG

6
TEC 90 CABLE
C

INTEGRAL CABLE 2 40 14 AWG


4P 16 AWG 7X24 IB-202
MCP-2001 IN RGS COND TEC 90 CABLE
29475 HEADWOR S BUILDING CONTROL BLOC DIAGRAM

GLOBAL-1000
CP-2001 STRAND AL ARMOURED GLOBAL-1000

MAG MCP-2002
GLOBAL-1000 ECIVED
TNEMELE MAG
8P 16 AWG 7X24 FIT FE CP-2002 GLOBAL-1000

CONSULTANT

C
GLOBAL-1000

C 6 2017 2017
STRAND AL ARMOURED

6
6 14 AWG 8P 16 AWG 7X24
MOTOR 2 RUNS OF 2 RUNS OF
U/S TEC 90 CABLE INTEGRAL CABLE PLC STRAND AL ARMOURED
DEVICE

CONTROL PANEL CATEGORY 6 IN EMT PLC CATEGORY 6 IN EMT 4P 16 AWG 7X24 MOTOR
LS IN RGS COND CONTROL PANEL 2 RUNS OF
2013 C 6 C 6 CONTROL PANEL STRAND AL ARMOURED CONTROL PANEL
ECIVED MAG TNEMELE
MAG CATEGORY 6 IN EMT
2 FIT FE
2018 2018 C 6 C 6
INTEGRAL CABLE 2
IN RGS COND INTEGRAL CABLE
4P 16 AWG 7X24 IB-203 CONSULTANT
GLOBAL-1000 IN RGS COND
U/S TNEMELE
ECIVED
U/S STRAND AL ARMOURED MAG
LE LIT ECIVED
TNEMELE
MAG
2010 2010 FIT FE
4 14 AWG 2019 2019
25 16 AWG TEC 90 GLOBAL TEC 90 CABLE 4P 16 AWG 7X24
CABLE S STRAND AL ARMOURED GRIT SLURRY PUMP 1
VFC-206 2P 16 AWG 7X24
SEWAGE SAMPLER LOCAL CONTROL PANEL
1000

DEVICE
STRAND AL ARMOURED 4 14 AWG
2P 16 AWG 7X24 IT
JBD-201 2011 TEC 90 CABLE
STRAND AL ARMOURED 2P 16 AWG 7X24
GLOBAL-1000

4 14 AWG
DEVICE

IT SMP-201 LCP-2015 PROFESSIONAL STAMP PROJECT NORTH


STRAND AL ARMOURED
GLOBAL-1000

2011
GLOBAL-1000

TEC 90 CABLE IT
DEVICE

LD-P-201 15 14 AWG
S
GLOBAL

2P 16 AWG 7X24 6 14 AWG GLOBAL-1000

TEC 90 CABLE
2012
VFC-208 STRAND AL ARMOURED DEVICE
TEC 90 CABLE 2P 16 AWG 7X24
JIT VORTEX INDUCER 1
1000

2011 STRAND AL ARMOURED


LOCAL CONTROL PANEL
DEVICE

2P 16 AWG 7X24 IT 4 14 AWG


2013 TEC 90 CABLE
STRAND AL ARMOURED 2P 16 AWG 7X24
MECHANICAL SCREEN 1
6-E

DEVICE

JIT
CONTROL PANEL 2021 DEVICE
STRAND AL ARMOURED LCP-2016
IT
GLOBAL-1000

20 14 AWG 4P 16 AWG 7X24 LD-MIX-201 15 14 AWG


2014 TEC 90 CABLE
STRAND AL ARMOURED
GLOBAL-1000

TEC 90 CABLE INTEGRAL CABLE 2P 16 AWG 7X24


IB-201 LCP-2011
GLOBAL-1000
IN RGS COND DEVICE
STRAND AL ARMOURED
GLOBAL-1000
U/S IT
3-P

4 14 AWG LD-MS-201
DEVICE DEVICE
GRIT CLASSIFIER
LIT LE 2021
TEC 90 CABLE
GLOBAL-1000

2011 2011A 2P 16 AWG 7X24 LOCAL CONTROL PANEL PROJECT


DEVICE
4 14 AWG 4 14 AWG
TC
2017 4 14 AWG
TEC 90 CABLE MECHANICAL SCREEN 2 DEVICE

IT
STRAND AL ARMOURED TEC 90 CABLE MUNICIPALITY OF NORTH
D

CONTROL PANEL
DEVICE

20 14 AWG LE 2022 LCP-2017


DEVICE

TC
TEC 90 CABLE
TEC 90 CABLE 2011B 4 14 AWG
LD-GC-201
GLOBAL-1000

20 14 AWG
GRENVILLE - WATER POLLUTION
2016 TEC 90 CABLE
4 14 AWG CONTROL PLANT EXPANSION
DEVICE GLOBAL-1000

INTEGRAL CABLE HS TEC 90 CABLE


TEC 90 CABLE LCP-2012 2015
GLOBAL-1000

IN RGS COND
WPCP E

DEVICE

TC
2015 4 14 AWG
LD-MS-202
GLOBAL-1000

4P 16 AWG 7X24 4 14 AWG


GRIT SLURRY PUMP 2
LOCAL CONTROL PANEL
PHASE - A
4 14 AWG STRAND AL ARMOURED GLOBAL
TEC 90 CABLE 4 14 AWG EMPTVILLE ONTARIO
TEC 90 CABLE INTEGRAL CABLE S
DEVICE

TC TEC 90 CABLE TEC 90 CABLE


CONVEYOR CONTROL IN RGS COND VFC-209
2014 U/S
1000

LCP-2021 DRAWING
4 14 AWG PANEL DEVICE DEVICE

LIT LE 4 14 AWG GLOBAL-1000

TEC 90 CABLE 20 14 AWG LD-P-202 15 14 AWG ELECTRICAL

5 2023 3 15 58 PM
DEVICE
2012 2012A GLOBAL
TEC 90 CABLE
TC TEC 90 CABLE S GLOBAL-1000

TEC 90 CABLE
INTEGRAL CABLE
2013 4 14 AWG LCP-2013 VFC-210 HEADWOR S BUILDING
P 29000 29475-000 -

DEVICE IN RGS COND 1000

VORTEX INDUCER 2
TEC 90 CABLE
GLOBAL-1000

DEVICE

LD-SCV-201 LE 4 14 AWG
TC GLOBAL-1000
2012B LOCAL CONTROL PANEL
2012
GLOBAL
TEC 90 CABLE 4 14 AWG
4 14 AWG 4 14 AWG S
VFC-211 TEC 90 CABLE CONTROL BLOC DIAGRAM 1 OF 2
TEC 90 CABLE TEC 90 CABLE SCREENINGS WASH PRESS 1000

LCP-2022
DEVICE

TC LOCAL CONTROL PANEL 4 14 AWG GLOBAL-1000

2010 20 14 AWG LD-MIX-202 15 14 AWG


GLOBAL
TEC 90 CABLE
TEC 90 CABLE S GLOBAL-1000

TEC 90 CABLE
VFC-212 DESIGN
MM/LO
LCP-2014

D
GLOBAL-1000
TO MCC-200 1000

LD-SWP-201 LD-P-208 4 14 AWG 4 14 AWG DRAWN


MM DRAWING

PLOT DATE
GLOBAL-1000 GLOBAL-1000 GLOBAL
TEC 90 CABLE TEC 90 CABLE
S CHEC ED

I200A
4 14 AWG 4 14 AWG E-STOP JO
VFC-213
L

TEC 90 CABLE TEC 90 CABLE 1000

JLR
29475
F
PRIMAR CLARIFIERS PID401A ELECTRICAL ROOM E ALI ATION TAN S PROCESS AIR PRIMAR CLARIFIERS PID401A
NE DE ATERING AND ELECTRICAL SERVICE
COAG LANT DOSING S STEM PID403A DIGESTER CONTROL
B ILDING
ENTRANCE B ILDING
900 SERIES
2P 16 A G 7 24 00 SERIES
NE PRIMAR NE
LD-LC-401 0001-LABOLG 4 14 A G STRAND AL ARMO RED
NE AERATION
TAN S CLARIFIERS HEAD OR S
RAD 500 SERIES 400 SERIES 200 SERIES
TEC 90 CABLE DEVICE

LIT
4015
ELEMENT
RAD
PRIMAR CLARIFIER 1 2 LE
NE TERTIAR
CONTROL PANEL 10 14 A G 4015 NE SECONDAR
FILTER B ILDING
LD-LC-402 4 14 A G 50 14 A G
CLARIFIERS
700 SERIES PHASE B
0001-LABOLG
TEC 90 CABLE GLOBAL
600 SERIES PHASE B
TEC 90 CABLE TEC 90 CABLE M
LCP-4010 VFC-404
1000

0001-LABOLG

LD-P-403
GLOBAL-1000

LD-CC-401 4 14 A G E ISTING SERVICE


0001-LABOLG 4 14 A G B ILDING
TEC 90 CABLE 300 SERIES
TEC 90 CABLE
4 14 A G
MCC-200 TEC 90 CABLE DEVICE

CP-2000 LSL
4 14 A G GLOBAL-1000

4030
DEVICE
TEC 90 CABLE 50 14 A G TEC 90 CABLE E PLAN
MS
4023 4 14 A G
4 14 A G
DEVICE

MS
TEC 90 CABLE PLC
LCP-4013
GLOBAL-1000
TEC 90 CABLE GENERAL NOTES
4024 CONTROL PANEL
P 16 A G 7 24 STRAND AL ARMO RED 1
A REFER TO PID AS ELL AS MID DRA INGS
PRIMAR CLARIFIERS
SC M PIT LOCAL
LD-LC-403 CONTROL PANEL B REFER TO N001A FOR NET OR DETAILS
0001-LABOLG

4 14 A G 1
TEC 90 CABLE
C REFER TO THE ASSOCIATED MID S AND PID S
PRIMAR CLARIFIER 2 3 FOR COMM NICATION REFERENCE BET EEN
CONTROL PANEL VARIO S E IPMENT AND THE PLC PANEL
LD-CC-402 2 LCP-4014
0001-LABOLG

4 14 A G 50 14 A G GLOBAL-1000

TEC 90 CABLE TEC 90 CABLE D REFER TO DRA ING E000A FOR ADDITIONAL
LCP-4020 0001-LABOLG
CABLE RE IREMENTS
E ALI ATION ET ELL
DRAIN P MP
LD-CC-403 LOCAL CONTROL PANEL
0001-LABOLG

4 14 A G
TEC 90 CABLE 4 14 A G LD-BL-501
GLOBAL-1000

TEC 90 CABLE

4 14 A G
DEVICE
TEC 90 CABLE
MS 6 TRIADS 16 A G 7 24
4025
STRAND AL ARMO RED 4 14 TEC 90 LD-BL-502
GLOBAL-1000

CABLE
LCP-5000
2 40 14 50 14 TEC 90 CABLE GLOBAL-1000

TEC 90 CABLE AERATION TAN S PID402A P 16 A G 7 24


STRAND AL ARMO RED BLO ER CONTROL PANEL 4 14 A G LD-BL-503
6 TRIADS 16 A G 7 24 GLOBAL-1000

STRAND AL ARMO RED TEC 90 CABLE


16 P 16 A G 7 24
STRAND AL ARMO RED
4 TRIADS 16 A G 7 24
STRAND AL ARMO RED 2P 16 A G 7 24
STRAND AL ARMO RED DEVICE

2 TRIADS 16 A G 7 24 PIT
STRAND AL ARMO RED INTEGRAL CABLE IN OCAL 5010
LD-P-401 DO COND IT ELEMENT

0001-LABOLG 4 14 A G 4P 16 A G 7 24 DEVICE DO
ELEMENT
PE
AIT AE 5010
TEC 90 CABLE STRAND AL ARMO RED 4011
4011
6 14 A G TEC 90 INTEGRAL CABLE IN OCAL
LCP-4011 0001-LABOLG

CABLE DO COND IT
DEVICE DO
ELEMENT

AIT AE
40 14 A G TEC 90 4012
LD-P-402 4012 2 PHASE A - ADDEND M 7 05 12 23
4 14 A G PRIMAR SL DGE P MP CABLE INTEGRAL CABLE IN OCAL
0001-LABOLG

TEC 90 CABLE 1 2 LOCAL CONTROL 6 14 A G TEC 90


CABLE DO COND IT
PANEL DEVICE DO
ELEMENT
1 PHASE A - ADDEND M 3 10 11 23
GLOBAL-1000 GLOBAL-1000
AIT AE
JBD-500 JBA-500 4013 4013
10 14 A G 0 PHASE A ISS ED FOR TENDER 02 10 23
6 14 A G TEC 90
TEC 90 CABLE
LABOLG CABLE
M 4P 16 A G 7 24 10 14 A G N ISS E REVISION DD MM
VFC-614
0001
STRAND AL ARMO RED TEC 90 CABLE LABOLG

M T
10 14 A G VFC-409 0001

LABOLG
TEC 90 CABLE 4P 16 A G 7 24 10 14 A G JL R A L
M STRAND AL ARMO RED TEC 90 CABLE
VFC-401 LABOLG
VERIF SHEET SI E AND SCALES BAR TO THE
0001
M RIGHT IS 25 IF THIS IS A F LL SI E DRA ING
10 14 A G VFC-410 0 25
0001

LABOLG
TEC 90 CABLE 4P 16 A G 7 24 10 14 A G SCALE
NTS
M STRAND AL ARMO RED TEC 90 CABLE
VFC-402 LABOLG

0001
M
10 14 A G VFC-411
0001

TEC 90 CABLE 4P 16 A G 7 24 10 14 A G
LABOLG
CLIENT
M STRAND AL ARMO RED TEC 90 CABLE
VFC-403 GLOBAL

0001
M
10 14 A G VFC-412
1000

LABOLG
TEC 90 CABLE 4P 16 A G 7 24 10 14 A G
M STRAND AL ARMO RED TEC 90 CABLE
VFC-404 4P 16 A G 7 24
LABOLG

0001
M
STRAND AL ARMO RED VFC-413
29475 HEAD OR S B ILDING CONTROL BLOC DIAGRAM

0001

MAG
ELEMENT
MAG DEVICE
4P 16 A G 7 24 10 14 A G CONS LTANT
FE FIT
4010 4010 STRAND AL ARMO RED TEC 90 CABLE
GLOBAL

M
GLOBAL-1000
IB-202 VFC-414
1000

3 40 14
INTEGRAL CABLE 4 14 A G
TEC 90 CABLE
IN OCAL COND TEC 90 CABLE DEVICE

TC
4030

CONS LTANT
ELECTRICAL ROOM
LD-RH-401 0001-LABOLG 4 14 A G R 90
GND IN OCAL COND
40 14 A G
TEC 90 CABLE
DRA ING NOTES
LCP-4001 HCP-4001
0001-LABOLG 0001-LABOLG
1 CONTRACTOR TO PROVIDE FOR RO TING OF SIGNAL
CABLE FROM LCP-4014 VIA LCP-4013 TO CP-2000
PROFESSIONAL STAMP PROJECT NORTH

2
6-E

LD-RH-404 0001-LABOLG 4 14 A G R 90 40 14 A G
GND IN OCAL COND TEC 90 CABLE
3-P

LCP-4004 0001-LABOLG
HCP-4004
0001-LABOLG

PROJECT

M NICIPALIT OF NORTH
D

GRENVILLE - ATER POLL TION


CONTROL PLANT E PANSION
PCP E

PHASE - A
EMPTVILLE ONTARIO
DRA ING

LD-RH-407 ELECTRICAL

5 2023 3 16 1 PM
0001-LABOLG 4 14 A G R 90 40 14 A G
GND IN OCAL COND TEC 90 CABLE
HEAD OR S B ILDING
P 29000 29475-000 -

LCP-4007 0001-LABOLG
HCP-4007
0001-LABOLG

CONTROL BLOC DIAGRAM 2 OF 2

1
DESIGN
MM LO

D
DRA N DRA ING
MM

PLOT DATE
CHEC ED
JO
I201A
L

JLR
29475
F
XLS XLS
PLC-200 PLC-200
Table Sheet
Excel Data Exported
Data Exported
on: 05-23-14
on: 2023-12-05
13:24:46 1:14:26 PM Table Sheet
Excel Data Exported
Data Exported
on: 05-23-14
on: 2023-12-05
13:24:46 1:14:26 PM
COMPONENT I/O LIST COMPONENT I/O LIST
CONTROLLER ISA CONTROLLER ISA NEW DEWATERING AND ELECTRICAL SERVICE
DIGESTER CONTROL ENTRANCE BUILDING
IO TAG FUNCTION EQUIPMENT DESCRIPTION LOCATION OPERATION RACK SLOT POINT COMMENTS IO TAG FUNCTION EQUIPMENT DESCRIPTION LOCATION OPERATION RACK SLOT POINT COMMENTS BUILDING 900 SERIES
800 SERIES
DI - 120 YA P-401 Prim. Sludge Pump #1 - Disconnect Open Pipe Gallery 0 = ALARM 0 11 8 NEW AERATION NEW PRIMARY NEW
DI - 215 YA VFC-409 Tank 1 Aeration Grid Control Valve #1 - Fault Aeration Tank #1 0 = FAULT 1 2 7 TANKS CLARIFIERS HEADWORKS
500 SERIES 400 SERIES 200 SERIES
DI - 121 0 11 9 DI - 216 ZSO VFC-410 Tank 1 Aeration Grid Control Valve #2 - Open Aeration Tank #1 1 = OPEN 1 2 8
DI - 122 0 11 10 DI - 217 ZSC VFC-410 Tank 1 Aeration Grid Control Valve #2 - Closed Aeration Tank #1 1 = CLOSED 1 2 9
DI - 123 0 11 11 DI - 218 HS VFC-410 Tank 1 Aeration Grid Control Valve #2- In Auto Aeration Tank #1 1 = AUTO 1 2 10 NEW SECONDARY NEW TERTIARY
CLARIFIERS FILTER BUILDING
600 SERIES (PHASE B) 700 SERIES (PHASE B)
DI - 124 0 11 12 DI - 219 YA VFC-410 Tank 1 Aeration Grid Control Valve #2 - Fault Aeration Tank #1 0 = FAULT 1 2 11
DI - 125 0 11 13 DI - 220 ZSO VFC-401 Primary Sludge Control Valve #1 - Open Pipe Gallery 1 = OPEN 1 2 12
DI - 126 0 11 14 DI - 221 ZSC VFC-401 Primary Sludge Control Valve #1 - Closed Pipe Gallery 1 = CLOSED 1 2 13
DI - 127 0 11 15 DI - 222 HS VFC-401 Primary Sludge Control Valve #1- In Auto Pipe Gallery 1 = AUTO 1 2 14 EXISTING SERVICE
BUILDING
DI - 128 YA CP-2000 Rack 0 DI Card 12 24 VDC Failure Headworks PLC Panel 0 = FAILURE 0 12 0 300 SERIES
DI - 223 YA VFC-401 Primary Sludge Control Valve #1 - Fault Pipe Gallery 0 = FAULT 1 2 15
DI - 129 YA OCU-202 Headworks Odor Control Unit #2 - Fault Headworks Building 0 = FAULT 0 12 1 DI - 224 YA CP-2000 Rack 1 DI Card 3 24 VDC Failure Headworks PLC Panel 0 = FAILURE 1 3 0
DI - 130 HS OCU-202 Headworks Odor Control Unit #2 - In-Auto Headworks Building 1 = IN-AUTO 0 12 2 DI - 225 ZSO VFC-402 Primary Sludge Control Valve #2 - Open Pipe Gallery 1 = OPEN 1 3 1
DI - 131 YS OCU-202 Headworks Odor Control Unit #2 - Running Headworks Building 1 = RUNNING 0 12 3 DI - 226 ZSC VFC-402 Primary Sludge Control Valve #2 - Closed Pipe Gallery 1 = CLOSED 1 3 2 KEY PLAN

DI - 132 YA OCU-202 Headworks Odor Control Unit #2 - Disconnect Open Headworks Building 0 = ALARM 0 12 4 DI - 227 HS VFC-402 Primary Sludge Control Valve #2 - In Auto Pipe Gallery 1 = AUTO 1 3 3
DI - 133 YA P-402 Prim. Sludge Pump #2 - Fault Pipe Gallery 0 = FAULT 0 12 5 DI - 228 YA VFC-402 Primary Sludge Control Valve #2- Fault Pipe Gallery 0 = FAULT 1 3 4 GENERAL NOTES:
DI - 134 HS P-402 Prim. Sludge Pump #2 - In-Auto Pipe Gallery 1 = IN-AUTO 0 12 6 DI - 229 ZSO VFC-411 Tank 2 Aeration Grid Control Valve #1 - Open Aeration Tank #2 1 = OPEN 1 3 5
A. AMOUNT AND LOCATION OF INTERPOSING RELAYS,
DI - 135 YS P-402 Prim. Sludge Pump #2 - Running Pipe Gallery 1 = RUNNING 0 12 7 DI - 230 ZSC VFC-411 Tank 2 Aeration Grid Control Valve #1 - Closed Aeration Tank #2 1 = CLOSED 1 3 6 INTRINSICALLY SAFE BARRIERS, SIGNAL SPLITTERS,
DI - 136 YA P-402 Prim. Sludge Pump #2 - Disconnect Open Pipe Gallery 0 = ALARM 0 12 8 DI - 231 HS VFC-411 Tank 2 Aeration Grid Control Valve #1 - In Auto Aeration Tank #2 1 = AUTO 1 3 7
AND ISOLATION MODULES TBD.

DI - 137 0 12 9 DI - 232 YA VFC-411 Tank 2 Aeration Grid Control Valve #1 - Fault Aeration Tank #2 0 = FAULT 1 3 8
DI - 138 0 12 10 DI - 233 ZSO VFC-412 Tank 2 Aeration Grid Control Valve #2 - Open Aeration Tank #2 1 = OPEN 1 3 9
DI - 139 0 12 11 DI - 234 ZSC VFC-412 Tank 2 Aeration Grid Control Valve #2 - Closed Aeration Tank #2 1 = CLOSED 1 3 10
DI - 140 0 12 12 DI - 235 HS VFC-412 Tank 2 Aeration Grid Control Valve #2 - In Auto Aeration Tank #2 1 = AUTO 1 3 11
DI - 141 0 12 13 DI - 236 YA VFC-412 Tank 2 Aeration Grid Control Valve #2 - Fault Aeration Tank #2 0 = FAULT 1 3 12
DI - 142 0 12 14 DI - 237 1 3 13
DI - 143 0 12 15 DI - 238 1 3 14
DI - 144 YA CP-2000 Rack 0 DI Card 13 24 VDC Failure Headworks PLC Panel 0 = FAILURE 0 13 0 DI - 239 1 3 15
DI - 145 HS EF-201 Pipe Gallery Exhaust Fan - In Auto Pipe Gallery 1 = AUTO 0 13 1 DI - 240 YA CP-2000 Rack 1 DI Card 4 24 VDC Failure Headworks PLC Panel 0 = FAILURE 1 4 0
DI - 146 YA EF-201 Pipe Gallery Exhaust Fan - Fault Pipe Gallery 0 = ALARM 0 13 2 DI - 241 ZSO VFC-403 Primary Sludge Control Valve #3 - Open Pipe Gallery 1 = OPEN 1 4 1
DI - 147 YS EF-201 Pipe Gallery Exhaust Fan - Running Pipe Gallery 1 = RUNNING 0 13 3 DI - 242 ZSC VFC-403 Primary Sludge Control Valve #3 - Closed Pipe Gallery 1 = CLOSED 1 4 2
DI - 148 YA EF-201 Pipe Gallery Exhaust Fan - Disconnect Open Pipe Gallery 0 = ALARM 0 13 4 DI - 243 HS VFC-403 Primary Sludge Control Valve #3 - In Auto Pipe Gallery 1 = AUTO 1 4 3
DI - 149 YA P-403 Primary Scum Pump - Fault Primary Clarifiers 0 = FAULT 0 13 5 DI - 244 YA VFC-403 Primary Sludge Control Valve #3- Fault Pipe Gallery 0 = FAULT 1 4 4
DI - 150 HS P-403 Primary Scum Pump - In-Auto Primary Clarifiers 1 = IN-AUTO 0 13 6 DI - 245 ZSO VFC-413 Tank 3 Aeration Grid Control Valve #1 - Open Aeration Tank #3 1 = OPEN 1 4 5
DI - 151 YS P-403 Primary Scum Pump - Running Primary Clarifiers 1 = RUNNING 0 13 7 DI - 246 ZSC VFC-413 Tank 3 Aeration Grid Control Valve #1 - Closed Aeration Tank #3 1 = CLOSED 1 4 6
DI - 152 YA P-403 Primary Scum Pump - Disconnect Open Primary Clarifiers 0 = ALARM 0 13 8 DI - 247 HS VFC-413 Tank 3 Aeration Grid Control Valve #1- In Auto Aeration Tank #3 1 = AUTO 1 4 7
DI - 153 YA P-403 Primary Scum Pump - Low Oil (LSL 4030) Primary Clarifiers 0 = ALARM 0 13 9 DI - 248 YA VFC-413 Tank 3 Aeration Grid Control Valve #1 - Fault Aeration Tank #3 0 = FAULT 1 4 8
DI - 154 AAY AIT-2013 Headworks H2S Analysis - Fault Headworks Screen And Degrit Room 1 = ALARM 0 13 10 Provide interposing relay to suit DI - 249 ZSO VFC-414 Tank 3 Aeration Grid Control Valve #2 - Open Aeration Tank #3 1 = OPEN 1 4 9
DI - 155 AAY AIT-2013 Headworks H2S Analysis - Alarm Headworks Screen And Degrit Room 1 = ALARM 0 13 11 Provide interposing relay to suit DI - 250 ZSC VFC-414 Tank 3 Aeration Grid Control Valve #2 - Closed Aeration Tank #3 1 = CLOSED 1 4 10
DI - 156 AAY AIT-2013 Headworks H2S Analysis - Warning Headworks Screen And Degrit Room 1 = ALARM 0 13 12 Provide interposing relay to suit DI - 251 HS VFC-414 Tank 3 Aeration Grid Control Valve #2- In Auto Aeration Tank #3 1 = AUTO 1 4 11
DI - 157 YA GFS-201 Glycol Fill Station Alarm Pipe Gallery 0 = ALARM 0 13 13 DI - 252 YA VFC-414 Tank 3 Aeration Grid Control Valve #2 - Fault Aeration Tank #3 0 = FAULT 1 4 12
DI - 158 0 13 14 DI - 253 1 4 13
DI - 159 0 13 15 DI - 254 1 4 14
DI - 160 YA CP-2000 Rack 0 DI Card 14 24 VDC Failure Headworks PLC Panel 0 = FAILURE 0 14 0 DI - 255 1 4 15
DI - 161 HS SF-201 Pipe Gallery Supply Fan - In Auto Pipe Gallery 1 = AUTO 0 14 1 DI - 256 YA CP-2000 Rack 1 DI Card 5 24 VDC Failure Headworks PLC Panel 0 = FAILURE 1 5 0 2 PHASE A - ADDENDUM #7 05/12/23
DI - 162 YA SF-201 Pipe Gallery Supply Fan - Fault Pipe Gallery 0 = ALARM 0 14 2 DI - 257 YS LCP-4001 Primary Clarifier Tank #1 Scum Heaters - Running Primary Clarifiers 1 = RUNNING 1 5 1
DI - 163 YS SF-201 Pipe Gallery Supply Fan - Running Pipe Gallery 1 = RUNNING 0 14 3 DI - 258 HS LCP-4001 Primary Clarifier Tank #1 Scum Heaters - In-Auto Primary Clarifiers 1 = IN-AUTO 1 5 2 1 PHASE A - ADDENDUM #3 10/11/23

DI - 164 YA SF-201 Pipe Gallery Supply Fan - Disconnect Open Pipe Gallery 0 = ALARM 0 14 4 DI - 259 YA LCP-4001 Primary Clarifier Tank #1 Scum Heaters - Disc. Open Primary Clarifiers 0 = FAULT 1 5 3
0 PHASE A ISSUED FOR TENDER 02/10/23
DI - 165 AAY AIT-2014 Headworks CH4 Analysis - Fault Headworks Screen And Degrit Room 0 14 5 Provide interposing relay to suit DI - 260 YA LCP-4014 Equalization Wet Well Drain Pump - General Alarm Equalization Wet Well 0 = ALARM 1 5 4
DI - 166 AAY AIT-2014 Headworks CH4 Analysis - Alarm Headworks Screen And Degrit Room 0 14 6 Provide interposing relay to suit DI - 261 1 5 5 No. ISSUE / REVISION DD/MM/YY
2
DI - 167 AAY AIT-2014 Headworks CH4 Analysis - Warning Headworks Screen And Degrit Room 0 14 7 Provide interposing relay to suit DI - 262 1 5 6 This drawing is copyright protected and may not be reproduced or
DI - 168 ZSO VFC-614 Ras 3-Way Valve - Open Pipe Gallery 1 = OPEN 0 14 8 DI - 263 1 5 7 used for purposes other than execution of the described work without
the express written consent of J.L. Richards & Associates Limited.
DI - 169 ZSC VFC-614 Ras 3-Way Valve - Closed Pipe Gallery 1 = CLOSED 0 14 9 DI - 264 1 5 8
DI - 170 HS VFC-614 Ras 3-Way Valve - In Auto Pipe Gallery 1 = AUTO 0 14 10 VERIFY SHEET SIZE AND SCALES. BAR TO THE
DI - 265 1 5 9
RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING. 0 25mm
DI - 171 YA VFC-614 Ras 3-Way Valve - Fault Pipe Gallery 0 = ALARM 0 14 11 DI - 266 1 5 10
SCALE:
N.T.S.
DI - 172 0 14 12 DI - 267 1 5 11
DI - 173 0 14 13 DI - 268 1 5 12
DI - 174 0 14 14 DI - 269 1 5 13
CLIENT:
DI - 175 0 14 15 DI - 270 1 5 14
DI - 176 YA CP-2000 Rack 0 DI Card 15 24 VDC Failure Headworks PLC Panel 0 = FAILURE 0 15 0 DI - 271 1 5 15
DI - 177 HS MAU-201 Headworks Make-up Air Unit - In Auto Headworks Screen And Degrit Room 1 = AUTO 0 15 1 DI - 272 YA CP-2000 Rack 1 DI Card 6 24 VDC Failure Headworks PLC Panel 0 = FAILURE 1 6 0
DI - 178 YA MAU-201 Headworks Make-up Air Unit - Fault Headworks Screen And Degrit Room 0 = ALARM 0 15 2 DI - 273 ZSO VFC-404 Primary Scum 3-Way Valve - Open Primary Clarifiers 1 = OPEN 1 6 1
DI - 179 YS MAU-201 Headworks Make-up Air Unit - Running Headworks Screen And Degrit Room 1 = RUNNING 0 15 3 DI - 274 ZSC VFC-404 Primary Scum 3-Way Valve - Closed Primary Clarifiers 1 = CLOSED 1 6 2
DI - 180 YA MAU-201 Headworks Make-up Air Unit - Disconnect Open Headworks Screen And Degrit Room 0 = ALARM 0 15 4 DI - 275 HS VFC-404 Primary Scum 3-Way Valve - In Auto Pipe Gallery 1 = AUTO 1 6 3 CONSULTANT: www.jlrichards.ca
DI - 181 HS P-207 Headworks Glycol Heating Pump - In Auto Pipe Gallery 1 = AUTO 0 15 5 DI - 276 YA VFC-404 Primary Scum 3-Way Valve- Fault Pipe Gallery 0 = FAULT 1 6 4
DI - 182 YA P-207 Headworks Glycol Heating Pump - Fault Pipe Gallery 0 = ALARM 0 15 6 DI - 277 YS LCP-4004 Primary Clarifier Tank #2 Scum Heaters - Running Primary Clarifiers 1 = RUNNING 1 6 5
DI - 183 YS P-207 Headworks Glycol Heating Pump - Running Pipe Gallery 1 = RUNNING 0 15 7 DI - 278 HS LCP-4004 Primary Clarifier Tank #2 Scum Heaters - In-Auto Primary Clarifiers 1 = IN-AUTO 1 6 6
DI - 184 YA P-207 Headworks Glycol Heating Pump - Disconnect Open Pipe Gallery 0 = ALARM 0 15 8 DI - 279 YA LCP-4004 Primary Clarifier Tank #2 Scum Heaters - Disc. Open Primary Clarifiers 0 = FAULT 1 6 7
DI - 185 YA P-207 Headworks Glycol Heating Pump - E-Stop Pipe Gallery 0 = ALARM 0 15 9 DI - 280 SA MS-4025 Primary Tank #3 Longitudinal Collector Alarm Primary Clarifiers 0 = ALARM 1 6 8
DI - 186 0 15 10 DI - 281 1 6 9 CONSULTANT:

DI - 187 0 15 11 DI - 282 1 6 10
DI - 188 0 15 12 DI - 283 1 6 11
DI - 189 0 15 13 DI - 284 1 6 12
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\6-Elect\29475-000 IO List.dwg

DI - 190 0 15 14 DI - 285 1 6 13
DI - 191 0 15 15 DI - 286 1 6 14
PROFESSIONAL STAMP PROJECT NORTH
DI - 192 YA CP-2000 Rack 0 DI Card 16 24 VDC Failure Headworks PLC Panel 0 = FAILURE 0 16 0 DI - 287 1 6 15
DI - 193 FAL FSL-2011 Headworks Electrical Room Exhaust Low Flow Headworks Electrical Room 0 = ALARM 0 16 1 DI - 288 YA CP-2000 Rack 1 DI Card 7 24 VDC Failure Headworks PLC Panel 0 = FAILURE 1 7 0
DI - 194 FAL FSL-2012 Headworks Electrical Room Supply Low Flow Headworks Electrical Room 0 = ALARM 0 16 2 DI - 289 YS LCP-4007 Primary Clarifier Tank #3 Scum Heaters - Running Primary Clarifiers 1 = RUNNING 1 7 1
DI - 195 FAL FSL-2013 Headworks MUA Low Flow Rate Alarm Headworks Screen And Degrit Room 0 = ALARM 0 16 3 DI - 290 HS LCP-4007 Primary Clarifier Tank #3 Scum Heaters - In-Auto Primary Clarifiers 1 = IN-AUTO 1 7 2
DI - 196 FAL FSL-2031 Odour Control Unit #1 Low Flow Alarm Septage Receiving 0 = ALARM 0 16 4 DI - 291 YA LCP-4007 Primary Clarifier Tank #3 Scum Heaters - Disc. Open Primary Clarifiers 0 = FAULT 1 7 3
DI - 197 FAL FSL-2032 Odour Control Unit #2 Low Flow Alarm Septage Receiving 0 = ALARM 0 16 5 DI - 292 YA P-208 Effluent Booster Pump - Fault Headworks Screen And Degrit Room 0 = FAULT 1 7 4
DI - 198 PAL PSL-2011 Headworks Hot Water Low Pressure Alarm Pipe Gallery 0 = ALARM 0 16 6 DI - 293 HS P-208 Effluent Booster Pump - In-Auto Headworks Screen And Degrit Room 1 = IN-AUTO 1 7 5
DI - 199 SA MS-4023 Primary Tank #1 Longitudinal Collector Alarm Primary Clarifiers 0 = ALARM 0 16 7 DI - 294 YS P-208 Effluent Booster Pump - Running Headworks Screen And Degrit Room 1 = RUNNING 1 7 6
DI - 200 LAH LS-2013 Mechanical Screen #2 Level Alarm High Headworks Screen And Degrit Room 0 = ALARM 0 16 8 DI - 295 YA P-208 Effluent Booster Pump - Disconnect Open Headworks Screen And Degrit Room 0 = ALARM 1 7 7
PROJECT:
DI - 201 LAHH LS-2013 Mechanical Screen #2 Level Alarm High High Headworks Screen And Degrit Room 0 = ALARM 0 16 9 DI - 296 1 7 8
MUNICIPALITY OF NORTH
DI - 202 0 16 10 DI - 297 1 7 9
DI - 203 0 16 11 DI - 298 1 7 10
GRENVILLE - WATER POLLUTION
DI - 204 0 16 12 DI - 299 1 7 11 CONTROL PLANT EXPANSION
DI - 205 0 16 13 DI - 300 1 7 12 PHASE - A
DI - 206 0 16 14 DI - 301 1 7 13 KEMPTVILLE, ONTARIO
DI - 207 0 16 15 DI - 302 1 7 14 DRAWING:
DI - 208 YA CP-2000 Rack 1 DI Card 2 24 VDC Failure Headworks PLC Panel 0 = FAILURE 1 2 0 DI - 303 1 7 15
ELECTRICAL

December 5, 2023 3:16:31 PM


DI - 209 YS LCP-4012 Prim. Clar. Scum Pit/Pep Pumps LCP - Start Primary Clarifiers 1 = STATUS 1 2 1 DO - 0 ZC LCP-4012 Prim. Clar. Scum Pit/Pep Pumps LCP - Recirculate Primary Clarifiers 1 = RECIRC 1 8 0 Provide interposing relay to suit
HEADWORKS BUILDING
DI - 210 LAHH LSHH-2033 Screen Bin Area Sanitary Drain High High Headworks Screen And Degrit Room 0 = ALARM 1 2 2 DO - 1 ZC LCP-4012 Prim. Clar. Scum Pit/Pep Pumps LCP - Discharge Primary Clarifiers 1 = DISCHRG 1 8 1 Provide interposing relay to suit
DI - 211 LAHH LSHH-2034 Gallery Level Sanitary Drain High High Pipe Gallery 0 = ALARM 1 2 3 DO - 2 YA YA-2200 Headworks Stack Light - Horn Headworks Building 1 = ON 1 8 2 Provide interposing relay to suit
DI - 212 ZSO VFC-409 Tank 1 Aeration Grid Control Valve #1 - Open Aeration Tank #1 1 = OPEN 1 2 4 DO - 3 UAL UAL-2201 Headworks Stack Light - Red Headworks Building 1 = ON 1 8 3 Provide interposing relay to suit
IO TABLES - PLC-200 (CONT'D)
DI - 213 ZSC VFC-409 Tank 1 Aeration Grid Control Valve #1 - Closed Aeration Tank #1 1 = CLOSED 1 2 5 DO - 4 UAL UAL-2202 Headworks Stack Light - Amber Headworks Building 1 = ON 1 8 4 Provide interposing relay to suit
DI - 214 HS VFC-409 Tank 1 Aeration Grid Control Valve #1- In Auto Aeration Tank #1 1 = AUTO 1 2 6 DO - 5 UAL UAL-2203 Headworks Stack Light - Clear Headworks Building 1 = ON 1 8 5 Provide interposing relay to suit
DESIGN:
1 LO
1
DRAWN: DRAWING #:
NB

PLOT DATE:
1 I/O LIST (CONT'D) - PLC - 200 2 I/O LIST (CONT'D) - PLC - 200 CHECKED:
I203A SCALE: NTS I203A SCALE: NTS
JLR #:
JO
29475
I203A
XLS XLS
PLC-200 PLC-200
Table Sheet
Excel Data Exported
Data Exported
on: 05-23-14
on: 2023-12-05
13:24:46 1:14:26 PM Table Sheet
Excel Data Exported
Data Exported
on: 05-23-14
on: 2023-12-05
13:24:46 1:14:26 PM
COMPONENT I/O LIST COMPONENT I/O LIST
CONTROLLER ISA CONTROLLER ISA NEW DEWATERING AND ELECTRICAL SERVICE
DIGESTER CONTROL ENTRANCE BUILDING
IO TAG FUNCTION EQUIPMENT DESCRIPTION LOCATION OPERATION RACK SLOT POINT COMMENTS IO TAG FUNCTION EQUIPMENT DESCRIPTION LOCATION OPERATION RACK SLOT POINT COMMENTS BUILDING 900 SERIES
800 SERIES
NEW AERATION NEW PRIMARY NEW
DO - 6 UAL UAL-2204 Headworks Stack Light - Blue Headworks Building 1 = ON 1 8 6 Provide interposing relay to suit AI - 35 AI AIT-4011 Aeration Tank #1 Diffuser Grid Analyzer Indicator Aeration Tank #1 2 6 3 TANKS CLARIFIERS HEADWORKS
500 SERIES 400 SERIES 200 SERIES
DO - 7 ZC VFC-614 RAS 3-Way Valve - Drive Open Pipe Gallery 1 = OPEN 1 8 7 Provide interposing relay to suit AI - 36 AI AIT-4012 Aeration Tank #2 Diffuser Grid Analyzer Indicator Aeration Tank #2 2 6 4
DO - 8 ZC VFC-614 RAS 3-Way Valve - Drive Closed Pipe Gallery 1 = CLOSED 1 8 8 Provide interposing relay to suit AI - 37 AI AIT-4013 Aeration Tank #3 Diffuser Grid Analyzer Indicator Aeration Tank #3 2 6 5
DO - 9 YC P-207 Headworks Glycol Heating Pump - Run Pipe Gallery 1 = RUN 1 8 9 Provide interposing relay to suit AI - 38 2 6 6 NEW SECONDARY NEW TERTIARY
CLARIFIERS FILTER BUILDING
600 SERIES (PHASE B) 700 SERIES (PHASE B)
DO - 10 YC LCP-4001 Primary Clarifier Tank #1 Scum Heaters - Run Primary Clarifiers 1 = RUN 1 8 10 Provide interposing relay to suit AI - 39 2 6 7
DO - 11 YC PFP-200 Active Power Factor Panel - Inhibit Headworks Building 1 = INHIBIT 1 8 11 Provide interposing relay to suit AI - 40 AI AIT-2011 Headworks H2S Analyzer Indicator Headworks Screen And Degrit Room 2 7 0
DO - 12 1 8 12 Provide interposing relay to suit AI - 41 AI AIT-2012 Headworks CH4 Analyzer Indicator Headworks Screen And Degrit Room 2 7 1
2
DO - 13 1 8 13 Provide interposing relay to suit AI 42 AI AIT-2013 Headworks H2S Analyzer Indicator Headworks Screen And Degrit Room 2 7 2 EXISTING SERVICE
BUILDING
300 SERIES
DO - 14 1 8 14 Provide interposing relay to suit AI - 43 AI AIT-2014 Headworks CH4 Analyzer Indicator Headworks Screen And Degrit Room 2 7 3
DO - 15 1 8 15 Provide interposing relay to suit AI - 44 AI AIT-2015 Headworks Pipe Gallery H2S Gas Monitor Pipe Gallery 2 7 4
DO - 16 YC LC-401 Prim. Clarifier #1 Long. Collector - Run Primary Clarifier #1 1 = RUN 1 9 0 Provide interposing relay to suit AI - 45 AI AIT-2016 Headworks Pipe Gallery CH4 Gas Monitor Pipe Gallery 2 7 5
DO - 17 YC CC-401 Prim. Clarifier #1 Cross Collector - Run Primary Clarifier #1 1 = RUN 1 9 1 Provide interposing relay to suit AI - 46 2 7 6 KEY PLAN

DO - 18 YC BL-501 Aeration Blower #1 - Run Pipe Gallery 1 = RUN 1 9 2 Provide interposing relay to suit AI - 47 2 7 7 GENERAL NOTES:
DO - 19 YC EF-201 Pipe Gallery Exhaust Fan - Run Pipe Gallery 1 = RUN 1 9 3 Provide interposing relay to suit AI - 48 FI FIT-2017 Primary Clarifier #1 Inlet Flow Indicator Pipe Gallery 2 8 0
A. AMOUNT AND LOCATION OF INTERPOSING RELAYS,
DO - 20 YC OCU-201 Odor Control Unit #1 - Run Septage Receiving 1 = RUN 1 9 4 Provide interposing relay to suit AI - 49 FI FIT-2018 Primary Clarifier #2 Inlet Flow Indicator Pipe Gallery 2 8 1
INTRINSICALLY SAFE BARRIERS, SIGNAL SPLITTERS,
DO - 21 YC P-401 Primary Sludge Pump #1 - Run Pipe Gallery 1 = RUN 1 9 5 Provide interposing relay to suit AI 50 FI FIT-2019 Primary Clarifier #3 Inlet Flow Indicator Pipe Gallery 2 8 2 AND ISOLATION MODULES TBD.
DO - 22 ZC VFC-401 Primary Sludge Control Valve #1 - Drive Open Pipe Gallery 1 = OPEN 1 9 6 Provide interposing relay to suit AI - 51 FI FIT-4010 Primary Sludge Flow Indicator Pipe Gallery 2 8 3
B. REFER TO DETAIL 1/I022A FOR THE REQUIRED
DO - 23 ZC VFC-401 Primary Sludge Control Valve #1 - Drive Closed Pipe Gallery 1 = CLOSED 1 9 7 Provide interposing relay to suit AI - 52 2 8 4 HARDWIRED LOGIC FOR CONTROLLING THE
ASSOCIATED STACK LIGHTS AND HORNS.
DO - 24 ZC VFC-404 Primary Scum 3-Way Valve - Drive Open Primary Clarifiers 1 = OPEN 1 9 8 Provide interposing relay to suit AI - 53 2 8 5
DO - 25 ZC VFC-404 Primary Scum 3-Way Valve - Drive Closed Primary Clarifiers 1 = CLOSED 1 9 9 Provide interposing relay to suit AI - 54 2 8 6
DRAWING NOTES:
DO - 26 YC LCP-4004 Primary Clarifier Tank #2 Scum Heaters - Run Primary Clarifiers 1 = RUN 1 9 10 Provide interposing relay to suit AI - 55 2 8 7
DO - 27 1 9 11 Provide interposing relay to suit AI - 56 LI LIT-4015 Primary Scum Pump Level Indicator Primary Clarifiers 2 9 0 Provide analog signal duplicator 1 PROGRAM THE PLC TO PROVIDE A WATCHDOG
PULSE. THIS PULSE IS TO BE MONITORED BY THE
DO - 28 1 9 12 Provide interposing relay to suit AI - 57 2 9 1
WATCHDOG TIMING RELAY INSIDE THE PANEL.
DO - 29 1 9 13 Provide interposing relay to suit AI 58 2 9 2 COORDINATE PULSE WIDTH AND RELAY SELECTION
TO SUIT. THE INTENT OF THIS FEATURE IS TO
DO - 30 1 9 14 Provide interposing relay to suit AI - 59 2 9 3
DETECT PLC FAILURE. PROVIDE HARD-WIRED LOGIC
DO - 31 1 9 15 Provide interposing relay to suit AI - 60 2 9 4 INSIDE THE PLC PANEL TO ENERGIZE ALL STACK
LIGHTS AND ASSOCIATED HORNS CONNECTED TO
DO - 32 YC LC-402 Prim. Clarifier #2 Long. Collector - Run Primary Clarifier #2 1 = RUN 1 10 0 Provide interposing relay to suit AI - 61 2 9 5
THIS PLC IN EVENT OF A PLC FAILURE. PROVIDE
DO - 33 YC CC-402 Prim. Clarifier #2 Cross Collector - Run Primary Clarifier #2 1 = RUN 1 10 1 Provide interposing relay to suit AI - 62 2 9 6 LOGIC TO SILENCE THE HORNS VIA A FLUSH HEAD
PUSHBUTTON ON THE PLC PANEL DOOR. LABEL THE
DO - 34 YC BL-502 Aeration Blower #2 - Run Pipe Gallery 1 = RUN 1 10 2 Provide interposing relay to suit AI - 63 2 9 7
PUSHBUTTON "SILENCE HORNS". PUSHBUTTON
DO - 35 YC SF-201 Pipe Gallery Supply Fan - Run Pipe Gallery 1 = RUN 1 10 3 Provide interposing relay to suit AI - 64 2 10 0 COLOUR TO BE BLUE. HORNS TO BE RE-TRIGGERED
EACH TIME THE PLC FAILS.
DO - 36 YC OCU-202 Odor Control Unit #2 - Run Septage Receiving 1 = RUN 1 10 4 Provide interposing relay to suit AI - 65 2 10 1
DO - 37 ZC VFC-402 Primary Sludge Control Valve #2 - Drive Open Pipe Gallery 1 = OPEN 1 10 5 Provide interposing relay to suit AI - 66 2 10 2
DO - 38 ZC VFC-402 Primary Sludge Control Valve #2 - Drive Closed Pipe Gallery 1 = CLOSED 1 10 6 Provide interposing relay to suit AI - 67 2 10 3
DO - 39 YC LCP-4007 Primary Clarifier Tank #3 Scum Heaters - Run Primary Clarifiers 1 = RUN 1 10 7 Provide interposing relay to suit AI - 68 2 10 4
DO - 40 1 10 8 Provide interposing relay to suit AI - 69 2 10 5
DO - 41 1 10 9 Provide interposing relay to suit AI - 70 2 10 6
DO - 42 1 10 10 Provide interposing relay to suit AI - 71 2 10 7
DO - 43 1 10 11 Provide interposing relay to suit AO - 0 SC BL-501 Aeration Blower #1 Speed Control Pipe Gallery 2 11 0
DO - 44 1 10 12 Provide interposing relay to suit AO - 1 SC P-401 Primary Sludge Pump #1 Speed Control Pipe Gallery 2 11 1
DO - 45 1 10 13 Provide interposing relay to suit AO - 2 SC OCU-201 Odor Control Unit #1 Speed Control Septage Receiving 2 11 2
DO - 46 1 10 14 Provide interposing relay to suit AO - 3 ZC VFC-409 Tank #1 Aeration Grid Control Valve #1 Position Control Aeration Tank #1 2 11 3
DO - 47 1 10 15 Provide interposing relay to suit AO - 4 ZC VFC-411 Tank #2 Aeration Grid Control Valve #1 Position Control Aeration Tank #2 2 11 4 2 PHASE A - ADDENDUM #7 05/12/23
DO - 48 YC LC-403 Prim. Clarifier #3 Long. Collector - Run Primary Clarifier #3 1 = RUN 1 11 0 Provide interposing relay to suit AO - 5 2 11 5
DO - 49 YC CC-403 Prim. Clarifier #3 Cross Collector - Run Primary Clarifier #3 1 = RUN 1 11 1 Provide interposing relay to suit AO - 6 2 11 6 1 PHASE A - ADDENDUM #3 10/11/23

DO - 50 YC BL-503 Aeration Blower #3 - Run Pipe Gallery 1 = RUN 1 11 2 Provide interposing relay to suit AO - 7 ZC VFC-413 Tank #3 Aeration Grid Control Valve #1 Position Control Aeration Tank #3 2 12 7
0 PHASE A ISSUED FOR TENDER 02/10/23
DO - 51 YC MAU-201 Headworks Make-Up Air Unit - Run Headworks Screen And Degrit Room 1 = RUN 1 11 3 Provide interposing relay to suit AO - 8 SC BL-502 Aeration Blower #2 Speed Control Pipe Gallery 2 12 0
DO - 52 YC P-403 Primary Scum Pump - Run Primary Clarifiers 1 = RUN 1 11 4 Provide interposing relay to suit AO - 9 SC P-402 Primary Sludge Pump #2 Speed Control Pipe Gallery 2 12 1 No. ISSUE / REVISION DD/MM/YY

DO - 53 ZC VFC-403 Primary Sludge Control Valve #3 - Drive Open Pipe Gallery 1 = OPEN 1 11 5 Provide interposing relay to suit AO - 10 SC OCU-202 Odor Control Unit #2 Speed Control Septage Receiving 2 12 2 This drawing is copyright protected and may not be reproduced or
DO - 54 ZC VFC-403 Primary Sludge Control Valve #3 - Drive Closed Pipe Gallery 1 = CLOSED 1 11 6 Provide interposing relay to suit AO - 11 ZC VFC-410 Tank #1 Aeration Grid Control Valve #2 Position Control Aeration Tank #1 2 12 3 used for purposes other than execution of the described work without
the express written consent of J.L. Richards & Associates Limited.
DO - 55 YC P-208 Effluent Booster Pump - Run Headworks Screen And Degrit Room 1 = RUN 1 11 7 Provide interposing relay to suit AO - 12 ZC VFC-412 Tank #2 Aeration Grid Control Valve #2 Position Control Aeration Tank #2 2 12 4
VERIFY SHEET SIZE AND SCALES. BAR TO THE
DO - 56 1 11 8 Provide interposing relay to suit AO - 13 ZC VFC-414 Tank #3 Aeration Grid Control Valve #2 Position Control Aeration Tank #3 2 12 5
RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING. 0 25mm
DO - 57 1 11 9 Provide interposing relay to suit AO - 14 2 12 6
SCALE:
NTS
DO - 58 1 11 10 Provide interposing relay to suit AO - 15 2 12 7
DO - 59 1 11 11 Provide interposing relay to suit AO - 16 SC BL-503 Aeration Blower #3 Speed Control Pipe Gallery 2 13 0
DO - 60 1 11 12 Provide interposing relay to suit AO - 17 SC SF-201 Pipe Gallery Supply Fan Speed Selection Pipe Gallery 2 13 1
CLIENT:
DO - 61 1 11 13 Provide interposing relay to suit AO - 18 2 13 2
DO - 62 1 11 14 Provide interposing relay to suit AO - 19 2 13 3
1 DO - 63 YS CP-2000 PLC Watchdog Pulse 1 13 15 Provide interposing relay to suit AO - 20 2 13 4
AO - 21 2 13 5
AO - 22 2 13 6
AI - 0 SI BL-501 Aeration Blower #1 Speed Indicator Pipe Gallery 2 2 0 Provide analog signal duplicator AO - 23 2 13 7 CONSULTANT: www.jlrichards.ca
AI - 1 SI OCU-201 Odor Control Unit #1 Speed Indicator Septage Receiving 2 2 1 Provide analog signal duplicator AO - 24 SC MAU-201 Headworks Make-Up Air Unit Speed Control Headworks Screen And Degrit Room 2 14 0
AI - 2 SI P-401 Primary Sludge Pump #1 Speed Indicator Pipe Gallery 2 2 2 Provide analog signal duplicator AO - 25 ZC VFC-214 Hydronic Control Valve Position Control Pipe Gallery 2 14 1
AI - 3 SI EF-201 Pipe Gallery Exhaust Fan Speed Indicator Pipe Gallery 2 2 3 Provide analog signal duplicator AO - 26 2 14 2
AI - 4 ZI VFC-214 Hydronic Control Valve Position Status Pipe Gallery 2 2 4 AO - 27 2 14 3
AI - 5 2 2 5 AO - 28 2 14 4
AI - 6 2 2 6 AO - 29 2 14 5 CONSULTANT:

AI - 7 2 2 7 AO - 30 2 14 6
AI - 8 SI BL-502 Aeration Blower #2 Speed Indicator Pipe Gallery 2 3 0 Provide analog signal duplicator AO - 31 2 14 7
AI - 9 SI OCU-202 Odor Control Unit #2 Speed Indicator Septage Receiving 2 3 1 Provide analog signal duplicator AO - 32 SC EF-201 Pipe Gallery Exhaust Fan Speed Selection Pipe Gallery 2 15 0
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\6-Elect\29475-000 IO List.dwg

AI 10 SI P-402 Primary Sludge Pump #2 Speed Indicator Pipe Gallery 2 3 2 Provide analog signal duplicator AO - 33 ZC VFC-223 Glycol Heating Control Valve Position Control Pipe Gallery 2 15 1
AI - 11 SI SF-201 Pipe Gallery Supply Speed Indicator Pipe Gallery 2 3 3 Provide analog signal duplicator AO - 34 ZC VFC-224 MAU Glycol Heating Control Valve Position Control Headworks Screen And Degrit Room 2 15 2
PROFESSIONAL STAMP PROJECT NORTH
AI - 12 ZI VFC-223 Glycol Heating Control Valve Position Status Pipe Gallery 2 3 4 AO - 35 2 15 3
AI - 13 ZI VFC-224 MAU Glycol Heating Control Valve Position Status Headworks Screen And Degrit Room 2 3 5 AO - 36 2 15 4
AI - 14 2 3 6 AO - 37 2 15 5
AI - 15 2 3 7 AO - 38 2 15 6
AI - 16 SI BL-503 Aeration Blower #3 Speed Indicator Pipe Gallery 2 4 0 Provide analog signal duplicator AO - 39 2 15 7
AI - 17 SI MAU-201 Headworks Make-Up Air Unit Speed Indicator Headworks Screen And Degrit Room 2 4 1 Provide analog signal duplicator
AI - 18 TI TIT-2011 Headworks Hot Water Temperature Indicator Pipe Gallery 2 4 2
AI - 19 TI TT-2012 Pipe Gallery Supply Air Temperature Indicator Pipe Gallery 2 4 3
AI - 20 TI TT-2013 Headworks MUA Temperature Indicator Headworks Screen And Degrit Room 2 4 4
PROJECT:
AI - 21 TI TIT-2014 Headworks Electrical Room Temperature Indicator Headworks Electrical Room 2 4 5
1 MUNICIPALITY OF NORTH
AI 22 PI PIT-5010 New Process Air Blowers Pressure Indicator Pipe Gallery 2 4 6
AI - 23 2 4 7
GRENVILLE - WATER POLLUTION
AI - 24 ZI VFC-409 Tank #1 Aeration Grid Control Valve #1 Position Status Aeration Tank #1 2 5 0 CONTROL PLANT EXPANSION
AI - 25 ZI VFC-411 Tank #2 Aeration Grid Control Valve #1 Position Status Aeration Tank #2 2 5 1 PHASE - A
AI - 26 ZI VFC-413 Tank #3 Aeration Grid Control Valve #1 Position Status Aeration Tank #3 2 5 2 KEMPTVILLE, ONTARIO
AI - 27 LI LIT-2010 Sewage Receiving Channel Level Indicator Headworks Screen And Degrit Room 2 5 3 Provide analog signal duplicator DRAWING:
AI - 28 2 5 4
ELECTRICAL

December 5, 2023 3:16:41 PM


AI - 29 2 5 5
HEADWORKS BUILDING
AI - 30 2 5 6
AI - 31 2 5 7
AI - 32 ZI VFC-410 Tank #1 Aeration Grid Control Valve #2 Position Status Aeration Tank #1 2 6 0
IO TABLES - PLC-200 (CONT'D)
AI - 33 ZI VFC-412 Tank #2 Aeration Grid Control Valve #2 Position Status Aeration Tank #2 2 6 1
AI - 34 ZI VFC-414 Tank #3 Aeration Grid Control Valve #2 Position Status Aeration Tank #3 2 6 2
DESIGN:
LO
1 DRAWN: DRAWING #:
NB

PLOT DATE:
1 I/O LIST (CONT'D) - PLC - 200 2 I/O LIST (CONT'D) - PLC - 200 CHECKED:
I204A SCALE: NTS I204A SCALE: NTS
JLR #:
JO
29475
I204A
NEW DEWATERING AND ELECTRICAL SERVICE
DIGESTER CONTROL ENTRANCE BUILDING
BUILDING 900 SERIES
DRAWING NOTES: 800 SERIES
NEW AERATION NEW PRIMARY NEW
TANKS CLARIFIERS HEADWORKS
500 SERIES 400 SERIES 200 SERIES

1 FRONT OF IT CABINET HERE.

2 COORDINATE FINAL LIGHT SWITCH LOCATION WITH THE ACTIVE DOOR LEAF. SWITCH TO NEW SECONDARY NEW TERTIARY
CLARIFIERS FILTER BUILDING
BE LOCATED AT ACTIVE DOOR LEAF. 600 SERIES (PHASE B) 700 SERIES (PHASE B)

x3.5 3 REFER TO DRAWING N002A FOR RECEPTACLE REQUIREMENTS FOR IT-3000.

4 ALLOW FOR A 10m ADJUSTMENT IN THE LOCATION OF THIS RECEPTACLE. COORDINATE


EXISTING SERVICE
FINAL LOCATION ON-SITE WITH THE MUNICIPALITY. ROUTE WIRING VIA EMT CONDUIT IN BUILDING
300 SERIES
THE CEILING SPACE. PAINT EXPOSED CONDUIT TO MATCH WALL COLOUR.

5 REFER TO DETAIL 9/E006A AND MID301A FOR REQUIRED CONTROLS. SF-301, MD-301 AND
MD-302 TO BE ENERGIZED ONCE THE ELECTRICAL ROOM IS OCCUPIED, I.E. THE LIGHTS KEY PLAN
4 8 ARE ON INSIDE THE ELECTRICAL ROOM.
UP-390-14
IT-3000 6 OPENING IN FLOOR SLAB FOR WIRING TO BASEMENT. COORDINATE WITH STRUCTURAL.
GENERAL NOTES:
4 8 REFER TO I311A. A. REFER TO DRAWING E001A FOR LIGHTING FIXTURE TYPES.
UP-390-8
IT-3000 11 7 INDOOR EVAPORATOR UNIT IS TO BE FED FROM THE OUTDOOR UNIT. ELECTRICAL B. REFER TO DRAWING E000A FOR LIGHT FIXTURE MOUNTING HEIGHTS
4 8 14 CONTRACTOR IS TO PROVIDE POWER AND CONTROL WIRING BETWEEN THE OUTDOOR AND OTHER REQUIREMENTS.
UP-390-10 CONDENSING UNIT AND THE INDOOR EVAPORATOR UNIT. WIRING TO BE RUN IN EMT
IT-3000 C. REFER TO MOTOR STARTER CONTROL LIST AND HAZARDOUS AREA
INDOORS; OCAL AND METALLIC LIQUID-TIGHT FLEXIBLE CONDUITS OUTDOORS. LENGTH
CLASSIFICATIONS ON ME SERIES DRAWINGS.
OF LIQUID-TIGHT CONDUITS NOT TO EXCEED 450mm. COORDINATE THE EXACT WIRING
GATE INTERCOM
EXISTING REQUIREMENTS WITH THE MANUFACTURER. SIZE POWER WIRING TO SUIT. PROVIDE A D. REFER TO DRAWING E000A FOR FURTHER HOUSE SERVICES
12 SCADA RM. AUTO-DIALER DISCONNECT FOR EACH UNIT. PROVIDE SEPARATE CONDUITS FOR POWER AND CONTROL REQUIREMENTS, INCLUDING DISCONNECTS AND RECEPTACLES.
9 WIRING. REFER TO DRAWING MID301A.
1-107
E. REFER TO E001A FOR FURTHER HOUSE SERVICES WIRING
10 x.4 8 PROVIDE A 4-PORT NETWORK OUTLET c/w TWO (2) TERMINATED PORTS, PER DETAILS 4/N002A
AND 5/N002A. REFER TO SECTION 17060 AND DRAWING N001A. COORDINATE FINAL LOCATIONS
REQUIREMENTS.

UP-390-13
LP-302-17

LP-302-17

F. REFER TO M SERIES DRAWINGS FOR FURTHER HVAC WIRING


IT-3000 ON-SITE WITH THE MUNICIPALITY. CAT6 CABLING TO BE RUN IN EMT. ROUTE CONDUIT IN REQUIREMENTS, INCLUDING SEQUENCE OF OPERATIONS.
10 15
CEILING SPACE. PAINT EXPOSED CONDUITS TO MATCH WALL COLOUR. ALLOW FOR A 10m
UP-390-15
IT-3000 ADJUSTMENT IN THE FINAL LOCATION OF THE OUTLET. G. ELECTRICAL CONTRACTOR TO PROVIDE A DETAILED DIMENSION
13 14 13 SHOP DRAWING OF THE PROPOSED LAYOUT OF THE NEW
9 EXISTING AUTO-DIALER. CONTRACTOR TO RE-FEED THE EXISTING AUTO-DIALER WITH UPS ELECTRICAL ROOM PRIOR TO THE CONSTRUCTION OF ANY NEW
POWER. REFER TO DRAWING E302A. IN ADDITION, CONTRACTOR TO PROVIDE A NEW CATEGORY PARTITION WALLS. SHOP DRAWINGS TO USE ACTUAL DIMENSIONS
OF EQUIPMENT FROM REVIEWED SHOP DRAWINGS. REFER TO
6 CONNECTION TO CP-1000. REFER TO DRAWING N001A. ROUTE CATEGORY 6 CABLING IN EMT.
SECTION 16010. CONTRACTOR TO ALLOW FOR ADJUSTMENTS TO THE
EMT TO BE ROUTED IN CEILING SPACE. PAINT EXPOSED EMT CONDUIT TO MATCH WALL COLOUR. FINAL LOCATIONS AND DIMENSION OF THE NEW PARTITION WALLS
CONTRACTOR TO RE-COMMISSION AUTO-DIALER. DEMOLISH EXISTING POWER AND PER THE REQUIREMENTS OF THE ELECTRICAL EQUIPMENT.
VESTIBULE COMMUNICATIONS WIRING AND ASSOCIATED CONDUITS AND APPURTENANCES. PATCH, PAINT AND
MAKE GOOD WALL SURFACES.
1-107

R-EBU-4 x.3 10 REPLACE THE EXISTING SECURITY STATIONS WITH NEW REPLACEMENT STATION. REFER TO
SECTION 16010. INSTALL NEW GATE CONTROL INTERCOM SYSTEM NEXT TO THE SECURITY VIDEO
E E LP-302-13.2 SURVEILLANCE STATIONS. COORDINATE WITH THE MUNICIPALITY.

LP-302-13.2 LP-302-13.2
x3.3 11 REPLACE EXISTING SCADA STATIONS WITH NEW STATIONS IN-SITU. COORDINATE WITH MUNICIPALITY.

A1 A1 LP-302-18
M
LABOLG

12 GATE INTERCOM MASTER STATION (TYPE IX-MV7-HB OR APPROVED EQUIVALENT). COORDINATE EXACT
GLOBAL
EXISTING MCC-3
MD-303 GLOBAL
M EXISTING MCC-1 LOCATION WITH MUNICIPALITY. SECURITY CONTRACTOR TO INCLUDE IP ADDRESSABLE RELAYS AND ALL
STAIR no. 1
0001

STORAGE S UH-337
M 1000
REQUIRED APPURTENANCES FOR COMPLETE WORKING SYSTEM.
ROOM VFC-308 T

TX-EX
1000

1-101 LP-302-18
1-112 13 THIS RECEPTACLE IS INTENDED FOR A WALLMOUNT LARGE SCREEN SCADA TELEVISION. WALLMOUNT
MD BD
RECEPTACLE AT 1500MM A.F.F. PROVIDE A SHALLOW-DEPTH OUTLET BOX TO SUIT. WIRING VIA EMT.
ROUTE CONDUIT IN THE CEILING SPACE. PAINT EXPOSED CONDUIT TO MATCH WALL COLOUR.
COORDINATE EXACT RECEPTACLE LOCATION WITH THE MUNICIPALITY. 1 PHASE A - ADDENDUM #7 05/12/23

14 PROVIDE TWO (2) EMPTY 41MM EMT RACEWAYS C/W FISH CORDS. THE RACEWAYS TO EXTEND FROM THE 0 PHASE A ISSUED FOR TENDER 02/10/23
UPS-390
GLOBAL-1000
TWO 120V RECEPTACLES FOR THE SCADA COMPUTERS TO THE SCADA TV RECEPTACLES. TERMINATE
A1 A1 ELECTRICAL
x3.2 EACH RACEWAY END AT THE TV RECEPTACLES AT 1500MM A.F.F.; THE OTHER END TO BE TERMINATED AT No. ISSUE / REVISION DD/MM/YY

MCC-300
ROOM THE SAME HEIGHT AS THE SCADA COMPUTER RECEPTACLES. COORDINATE EXACT TERMINATION
SPD-390 LOCATIONS ONSITE. PROVIDE A PULL BOX FOR EACH RACEWAY IN THE CEILING SPACE. PAINT EXPOSED This drawing is copyright protected and may not be reproduced or
1-115 RACEWAY TO MATCH WALL COLOUR. used for purposes other than execution of the described work without

GLOBAL-1000

UP-390
LOCKER PART the express written consent of J.L. Richards & Associates Limited.
ROOM STORAGE 15 TEMPORARY LOCATION OF IT-3000 DURING CONSTRUCTION. COORDINATE EXACT LOCATION WITH
VERIFY SHEET SIZE AND SCALES. BAR TO THE

GLOBAL-1000
1-110 1-113 LP-302-13.1 LP-302-13.1 MUNICIPALITY. RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING. 0 25mm

LP-305
TX-305
ATS-390
MCC-310
16 SCALE:
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\6-Elect\300 Series - Existing Serive Building\29475 - GROUND FLOOR HOUSE SERVICES PLAN.dwg

16 MCC-310 IS FUTURE AND NOT INCLUDED IN THIS CONTRACT. CONTRACTOR TO COORDINATE THE AS INDICATED
x.2 INSTALLATION OF MCC-300 TO FACILITATE THE FUTURE INSTALLATION OF MCC-310. PROVIDE

GLOBAL-1000
GLOBAL-1000
GLOBAL-1000
GLOBAL-1000

HOUSEKEEPING PAD AS SHOWN FOR FUTURE MCC-310. COORDINATE THE BRANCH BREAKER IN MCC-300
SPD-302 EXISTING MCC-3B TO FACILITATE FEEDING MCC-310 AT A LATER DATE. THE BRANCH BREAKER FOR MCC-310 INSIDE MCC-300
0 1 2 3 4m
LP-302-13 LP-302-13 IS TO BE PROVIDED AS PART OF THIS CONTRACT; REFER TO E301A..

TX-302
CLIENT:
1

LP-302
A1 A1

ELECTRICAL 17 CONTRACTOR TO ENSURE A MINIMUM CLEARANCE OF 1.2m BETWEEN THE IT CABINET AND THE PLC PANEL.

GLOBAL-1000
HCP-6001

GLOBAL-1000
ROOM

DP-301
GLOBAL-1000

HCP-6004
GLOBAL-1000

1-114

CP-3004
x3.1
GLOBAL-1000
PFP-300

GLOBAL-1000
EXISTING BELL LP-302-1 6 6 CONSULTANT: www.jlrichards.ca

CP-3000
TERMINATION EQUIPMENT GLOBAL
5
GLOBAL-1000

JBN-1000
TCP-100
SF-301

GLOBAL-1000
1000

BD BD

GLOBAL-1000

GLOBAL-1000
6
PFP-100

EXISTING CP
LUNCH 1 17
LP-302-32/34/36 6

CP-1000
ROOM FD 3
GLOBAL-1000

MD GLOBAL
IT-3000
1-111 BD LABOLG
M GLOBAL-1000
CONSULTANT:
M A1 LP-302-13.1

GLOBAL-1000
EUH-301
MD-PS-2 1000

0001 GLOBAL

M
GLOBAL
7
T M
MD MD-302
1000 CND-301
M 1000

LABOLG LP-302-13.1 T
M E E LP-302-33/35
MD-301
0001
2 M MD
EBU-4 GLOBAL
LP-302-15
LP-302-13 M
AC-301
1000

7
x.1 PROFESSIONAL STAMP PROJECT NORTH

LP-302-19

x3.C x3.D
B.O. LOUVRE: 92.600m B.O. LOUVRE: 92.600m

x3.B PROJECT:

MUNICIPALITY OF NORTH
GRENVILLE - WATER POLLUTION
CONTROL PLANT EXPANSION
1 SERVICE BUILDING GROUND FLOOR PLAN PHASE - A
E311A SCALE: AS INDICATED KEMPTVILLE, ONTARIO
DRAWING:

ELECTRICAL

December 5, 2023 3:15:28 PM


SERVICE BUILDING
GROUND FLOOR HOUSE
SERVICES PLAN

DESIGN:
NB
DRAWN: DRAWING #:
NB

PLOT DATE:
CHECKED:

JLR #:
JO
29475
E311A
600 - SECONDARY CLARIFIERS 300 - SERVICE BUILDING ELECTRICAL AND I C ROOM C 6 C 6 C 6 C 6 C 6 C 6 C 6 C 6 C 6 C 6 C 6 C 6 C 6 C 6

2 RUNS CATEGORY 6 IN EMT


LD-RH-601 4 14 A G R 90 6
0001-LABOLG
40 14 A G NE DE ATERING AND ELECTRICAL SERVICE
GND IN OCAL COND TEC 90 CABLE UPS-390 DIGESTER CONTROL ENTRANCE BUILDING

6
PFP-100 PFP-300 900 SERIES

C
0001-LABOLG
BUILDING
8 18A G PORTABLE GLOBAL-1000 GLOBAL-1000

LCP-6001 HCP-6001 800 SERIES

C
NE AERATION NE PRIMARY NE
CONTROL CABLE IN EMT

6
0001-LABOLG 0001-LABOLG

TAN S CLARIFIERS HEAD OR S


500 SERIES 400 SERIES 200 SERIES
15 14A G TEC 90 CABLE 2
ATS-390
0001-LABOLG
ACTIVE PO ER ACTIVE PO ER
FACTOR PANEL FACTOR PANEL

6
NE TERTIARY

C
NE SECONDARY
4 16A G PORTABLE FILTER BUILDING

C
CLARIFIERS
700 SERIES PHASE B

6
600 SERIES PHASE B
CONTROL CABLE IN EMT
SPD-300
0001-LABOLG

MCC-300
4 16A G PORTABLE
CONTROL CABLE IN EMT GLOBAL-1000
CP-3000 GLOBAL-1000
IT-3000 E ISTING SERVICE
BUILDING
LD-RH-604 SPD-302 4C 14 A G TEC 90 CABLE 300 SERIES
0001-LABOLG 4 14 A G R 90 40 14 A G
0001-LABOLG

GND IN OCAL COND TEC 90 CABLE 4C 14 A G TEC 90 CABLE


LCP-6004 HCP-6004 4 16A G PORTABLE 2 RUNS CATEGORY 6 IN EMT
PLC
0001-LABOLG 0001-LABOLG
CONTROL CABLE IN EMT C 6 C 6 C 6 C 6 C 6 C 6 IT CABINET
CONTROL PANEL EY PLAN
SPD-390
0001-LABOLG REFER TO DRA ING N001A 2 RUNS CATEGORY 6 IN EMT
N I C PHASE B FOR CABLE DETAILS
FBR FBR FBR FBR FBR
2 40 14 4 14 A G R 90 UPS-300 0001-LABOLG
GENERAL NOTES
ECIVED TEC 90 CABLE GND IN EMT
1 SD
3011 8 18A G PORTABLE A REFER TO PID AS ELL AS MID DRA INGS
4 14 A G R 90 CONTROL CABLE IN EMT 4 5
ECIVED

SD GND IN EMT B REFER TO N001A FOR NET OR DETAILS


FBR FBR FBR FBR FBR FBR
3012
2P 16 A G 7 24 STRAND C REFER TO THE ASSOCIATED MID S AND PID S
RTD
ECIVED
UNARMOURED IN EMT FOR COMMUNICATION REFERENCE BET EEN
TIT
3010

FBR
VARIOUS E UIPMENT AND THE PLC PANEL

FBR
D REFER TO DRA ING E000A FOR ADDITIONAL
CABLE RE UIREMENTS

1
300 - SERVICE BUILDING BOILER ROOM 900 - ELECTRICAL SERVICE ENTRANCE BUILDING

FBR
REFER TO

FBR
DRA ING
BOILER 1 FIELD N001A FOR GLOBAL-1000
CP-9000 GEN-ANUN
GLOBAL-1000
GEN-REPO
GLOBAL-1000

BOILER 1 E-STOP PANEL CONTROL PANEL 50 14 A G


CABLE
TEC 90 CABLE
8 14 A G DETAILS GENERATOR GENERATOR
TEC 90 CABLE PLC
FBR ANNUNCIATOR REPO
8P 16 A G 7 24 2P 16 A G 7 24 CONTROL PANEL
LCP-9011 FCP-9010 STRAND AL ARMOURED STRAND AL ARMOURED RTD ECIVED
PANEL PANEL
GLOBAL-1000 GLOBAL-1000
TIT
3014

FBR
4 14 A G TEC 90 CABLE ECIVED

BOILER 2 FIELD FSL


BOILER 2 E-STOP PANEL 50 14 A G 3015
CONTROL PANEL
TEC 90 CABLE
8 14 A G
TEC 90 CABLE REFER TO

6
8P 16 A G 7 24 DRA ING 3 4 14 A G R U90 GND
LCP-9021 FCP-9020

C
ECIVED

GLOBAL-1000 GLOBAL-1000 STRAND AL ARMOURED HEATING PUMP ROOM E HAUST N001A FOR SD
FAN CONTROL PANEL 0001

FBR
CABLE
20 14 A G TEC 90 CABLE 4 14 A G R 90
DETAILS
GND IN EMT ECIVED

BOILER 3 FIELD 4P 16 A G 7 24 SD
BOILER 3 E-STOP PANEL 50 14 A G 9011

6
CONTROL PANEL STRAND AL ARMOURED LCP-3900
TEC 90 CABLE GLOBAL-1000

4 14 A G TEC 90 LD-EF-302 2

C
8 14 A G 4 14 A G R 90 GND DEVICE

CABLE
GLOBAL-1000
TC
TEC 90 CABLE 2 TRIADS 16 A G 7 24 9010
8P 16 A G 7 24 2 PHASE A - ADDENDUM 7 05 12 23
LCP-9031 FCP-9030 STRAND AL ARMOURED STRAND AL ARMOURED 2
GLOBAL-1000 GLOBAL-1000
4 14 A G R 90 GND

FBR
DEVICE

TC

6
9011 1 PHASE A - ADDENDUM 3 10 11 23
BOILER ROOM E HAUST FAN

C
4 14 A G 2P 16 A G 7 24 STRAND
CONTROL PANEL RTD
TEC 90 CABLE 20 14 TEC 90 A G CABLE UNARMOURED IN EMT ECIVED

0 PHASE A ISSUED FOR TENDER 02 10 23


TIT
9010
BOILER FEED PUMP 4P 16 A G 7 24 2P 16 A G 7 24
2 N ISSUE REVISION DD MM YY
LD-P-901 CONTROL PANEL STRAND AL ARMOURED LCP-3901 STRAND UNARMOURED RTD

6
ECIVED
GLOBAL-1000 GLOBAL-1000

4 14 A G TEC 90 LD-EF-303 TIT


4 14 A G 50 14 A G 9030 T

C
CABLE
GLOBAL-1000

FBR
TEC 90 CABLE TEC 90 CABLE
2 TRIADS 16 A G 7 24
LCP-9001 STRAND AL ARMOURED L R A L
GLOBAL-1000

LD-P-902
GLOBAL-1000
VERIFY SHEET SI E AND SCALES BAR TO THE

6
RIGHT IS 25 IF THIS IS A FULL SI E DRA ING 0 25
4 14 A G ATS-002

C
TEC 90 CABLE 20 14 A G R 90 GND IN EMT
0001-LABOLG

SCALE
NTS

LD-P-903 PRIMARY HEATING PUMP

FBR
GLOBAL-1000

CONTROL PANEL 40 14 A G ATS-001

GND
TEC 90 CABLE 20 14 A G R 90 GND IN EMT
0001-LABOLG

4 14 A G CLIENT

C
TEC 90 CABLE
4P 16 A G 7 24

14 A G R U90
LCP-9040 STRAND AL ARMOURED

GND
SPD-002A
GLOBAL-1000

GND
LD-P-905
GLOBAL-1000
4 16 A G PORTABLE CONTROL
0001-LABOLG

6
4 14 A G 4 TRIADS 16 A G 7 24 CABLE IN EMT

14 A G R U90
C
STRAND AL ARMOURED

14 A G R U90
TEC 90 CABLE

FBR
SPD-002B
4 16 A G PORTABLE CONTROL 0001-LABOLG

CONSULTANT
LD-P-906 CABLE IN EMT

20
GLOBAL-1000

4 16 A G PORTABLE CONTROL

6
CABLE IN EMT

C
SPD-901 0001-LABOLG

300 - SERVICE BUILDING BASEMENT

25

20
4 16 A G PORTABLE CONTROL

FBR
2P 16 A G 7 24
EFFLUENT PUMP 6 RTD CABLE IN EMT
20 14 A G STRAND AL ARMOURED ECIVED

TIT

6
CONTROL PANEL SPD-990
TEC 90 CABLE 3013 0001-LABOLG
CONSULTANT

C
4 14 A G N I C PHASE B
TEC 90 CABLE 3
4P 16 A G 7 24
LCP-7012 STRAND AL ARMOURED
GLOBAL-1000
4P 16 A G 7 24 INTEGRAL CABLE IN
MAG

GND
LD-P-715 STRAND AL ARMOURED DEVICE
MAG OCAL COND
ELEMENT

GLOBAL-1000
FIT FE
2 TRIADS 16 A G 7 24 7002 7002

FBR
D

GND
DRA ING NOTES STRAND AL ARMOURED 4P 16 A G 7 24 GEN-001

14 A G R U90
INTEGRAL CABLE IN GLOBAL-1000

MAG MAG 3
STRAND AL ARMOURED ECIVED ELEMENT

OCAL COND
FIT FE PROFESSIONAL STAMP PRO ECT NORTH
29475 300 C

14 A G R U90
1 DAISY CHAIN TO NE T STAC LIGHT USING SAME CABLE AS RETURN ACTIVATED 6011 6011
SLUDGE PUMP 4 5 4P 16 A G 7 24 INTEGRAL CABLE IN
FIRST ONE IN THE CHAIN 40 14 A G MAG MAG
LOCAL CONTROL PANEL STRAND AL ARMOURED ECIVED ELEMENT

OCAL COND
TEC 90 CABLE FIT FE
4 14 A G 6010 6010 3
2 PROVIDE OCAL OUTDOORS AND EMT INDOORS
TEC 90 CABLE 4P 16 A G 7 24 INTEGRAL CABLE IN
4P 16 A G 7 24 MAG

FBR
MAG OCAL COND GENERATOR

20
LCP-6014 STRAND AL ARMOURED DEVICE ELEMENT

3 VIA DUCTBAN PROVIDE EMT INDOORS STRAND AL ARMOURED FIT FE


ENCLOSURE
6-E

GLOBAL-1000

LD-P-612 7017 7017

20
GLOBAL-1000
7
4 CONTRACTOR TO PROVIDE A MINIMUM OF 212 - 14 A G 4 14 A G 4 TRIADS 16 A G 7 24
2P 16 A G 7 24
IRING VIA TEC 90 CABLING TO THE TEC 90 CABLE STRAND AL ARMOURED RTD 7
STRAND AL ARMOURED ECIVED

PLC PANEL VIA THE MCC E ACT CONDUCTOR COUNT PER TIT
3-P

9020
CABLE AND ASSOCIATED NUMBER OF CABLES TO BE LD-P-613 2P 16 A G 7 24
GLOBAL-1000

RTD PRO ECT


COORDINATED ITH THE PROPOSED MCC LAYOUT AND SITE STRAND AL ARMOURED

FBR
ECIVED

CONDITIONS REFER TO DRA ING E000A FOR CABLE N I C PHASE B TIT


9021 MUNICIPALITY OF NORTH
D

DETAILS 4 14 A G
TEC 90 CABLE
2P 16 A G 7 24
STRAND AL ARMOURED ECIVED
RTD GRENVILLE - ATER POLLUTION
TIT
5 CONTRACTOR TO PROVIDE A MINIMUM OF 8 PAIRS OF 16 9022 700 - TERTIARY FILTER 3 4 BUILDING CONTROL PLANT E PANSION
A G 7 24 STRAND IRING VIA TEC 90 CABLING TO THE PLC HOT ATER PUMP LOCAL 2P 16 A G 7 24
PCP E

PANEL VIA THE MCC E ACT PAIR COUNT PER CABLE AND
LD-P-907 0001-LABOLG
CONTROL PANEL STRAND AL ARMOURED
TIT
ECIVED
RTD ECIVED HORN ECIVED HORN N I C PHASE B PHASE - A
4 14 A G YA YA EMPTVILLE ONTARIO
ASSOCIATED NUMBER OF CABLES TO BE COORDINATED 40 14 A G 9023 3200 3205

FBR
TEC 90 CABLE TEC 90 CABLE
ITH THE PROPOSED MCC LAYOUT AND SITE CONDITIONS ECIVED
RED ECIVED
RED
10 14 A G TEC 90 CABLE UAL UAL DRA ING
LCP-9002
GLOBAL

REFER TO DRA ING E000A FOR CABLE DETAILS 0001-LABOLG


M 3201 3206
LD-P-908 VFC-901 CP-7000 ELECTRICAL

5 2023 3 14 13 PM
0001-LABOLG
1000
ECIVED AMBER ECIVED AMBER GLOBAL-1000

UAL UAL
6 OPEN ENDED CONDUIT AT UPS
1 4 14 A G GLOBAL

M
10 14 A G TEC 90 CABLE 3202 3207 SERVICE BUILDING
P 29000 29475-000 -

TEC 90 CABLE VFC-902 CLEAR CLEAR REMOTE I O PLC


ECIVED ECIVED

FOR PRICING PURPOSES CONTRACTOR TO ALLO FOR THE


1000
UAL UAL FBR
7 2 TRIADS 16 A G 7 24 3203 3208 CONTROL PANEL
10 14 A G TEC 90 CABLE
IRING INDICATED CONTRACTOR TO COORDINATE E ACT ELEMENT
H2S DEVICE
H2S STRAND AL ARMOURED
GLOBAL

M ECIVED BLUE ECIVED BLUE CONTROL BLOC DIAGRAM


IRING RE UIREMENTS ITH THE GENERATOR AE AIT VFC-903 UAL UAL
LD-P-909 3300 3300
1000

3204 3209
MANUFACTURER REFER TO E911A FOR ROUTING PROVIDE 0001-LABOLG

6 14 A G TEC 90 CABLE GLOBAL 10 14 A G TEC 90 CABLE


M 1
RGS CONDUIT PLUS NEMA 4 PAINTED STEEL PULL BO ES
2 TRIADS 16 A G 7 24 VFC-904 DESIGN
LO IDM
SI ED TO SUIT INSIDE GENERATOR ENCLOSURE AND 1000

D
CH4 CH4 STRAND AL ARMOURED 10 14 A G TEC 90 CABLE
ELECTRICAL SERVICE BUILDING TO COMPLETE ROUTING ELEMENT

AE
DEVICE

AIT REFER TO DRA ING I700B DRA N


IDM DRA ING

PLOT DATE
PROVIDE DIRECT BURIED 103 PVC CONDUIT OUTDOORS 3301 3301
6 14 A G TEC 90 CABLE CHEC ED
O
I300A
L

LR
29475
F
XLS XLS
PLC-300 PLC-300
Table Sheet
Excel Data Exported
Data Exported
on: 05-23-14
on: 2023-12-05
13:24:46 10:39:53 AM Table Sheet
Excel Data Exported
Data Exported
on: 05-23-14
on: 2023-12-05
13:24:46 10:39:53 AM
COMPONENT I/O LIST COMPONENT I/O LIST
CONTROLLER ISA CONTROLLER ISA NEW DEWATERING AND ELECTRICAL SERVICE
DIGESTER CONTROL ENTRANCE BUILDING
IO TAG FUNCTION EQUIPMENT DESCRIPTION LOCATION OPERATION RACK SLOT POINT COMMENTS IO TAG FUNCTION EQUIPMENT DESCRIPTION LOCATION OPERATION RACK SLOT POINT COMMENTS BUILDING 900 SERIES
800 SERIES
DI - 0190 YA CP-3000 Rack 0 DI Card 4 24 VDC Failure Service Building PLC Panel 0 = FAILURE 0 4 0 DI - 0285 YA CP-3000 Rack 0 DI Card 4 24 VDC Failure Service Building PLC Panel 0 = FAILURE NEW PRIMARY NEW
15 14 10 46 0
13 NEW AERATION
TANKS CLARIFIERS HEADWORKS
500 SERIES 400 SERIES 200 SERIES
DI - 191 0 15 15 DI - 286 1 6 14
DI - 192 YA CP-3000 Rack 0 DI Card 16 24 VDC Failure Service Building PLC Panel 0 = FAILURE 0 16 0 DI - 287 1 6 15
DI - 193 HS FCP-9010 Boiler #1 Field Control Panel - In Auto Service Building Boiler Room 0 16 1 DO - 0 YS FCP-9010 Boiler #1 Field Control Panel - Service Building Boiler Room 1 7 0 Provide interposing relay to suit NEW SECONDARY NEW TERTIARY
CLARIFIERS FILTER BUILDING
600 SERIES (PHASE B) 700 SERIES (PHASE B)
DI - 194 YA FCP-9010 Boiler #1 Field Control Panel - Alarm Service Building Boiler Room 0 16 2 DO - 1 YC FCP-9010 Boiler #1 Field Control Panel - Service Building Boiler Room 1 7 1 Provide interposing relay to suit
DI - 195 LAL FCP-9010 Boiler #1 Field Control Panel - Alarm Service Building Boiler Room 0 16 3 DO - 2 YC FCP-9010 Boiler #1 Field Control Panel - Service Building Boiler Room 1 7 2 Provide interposing relay to suit
DI - 196 TAH FCP-9010 Boiler #1 Field Control Panel - Alarm Service Building Boiler Room 0 16 4 DO - 3 YC P-612 Ras Pump #4 - Run Service Building Basement 1 = RUN 1 7 3 Provide interposing relay to suit 2
DI - 197 NG FCP-9010 Boiler #1 Field Control Panel - Mode Service Building Boiler Room 0 16 5 DO - 4 YC EF-302 Heating Pump Room Exhaust Fan - Run Service Building Mechanical Room 1 = RUN 1 7 4 Provide interposing relay to suit EXISTING SERVICE
BUILDING
300 SERIES
DI - 198 DG FCP-9010 Boiler #1 Field Control Panel - Mode Service Building Boiler Room 0 16 6 DO - 5 ZC VFC-901 Hot Water Supply to Ex. Digester Control Valve - Drive Open Service Building Mechanical Room 1 = OPEN 1 7 5 Provide interposing relay to suit
DI - 199 PAH FCP-9010 Boiler #1 Field Control Panel - Alarm Service Building Boiler Room 0 16 7 DO - 6 ZC VFC-901 Hot Water Supply to Ex. Digester Control Valve - Drive Closed Service Building Mechanical Room 1 = CLOSE 1 7 6 Provide interposing relay to suit
DI - 200 PAL FCP-9010 Boiler #1 Field Control Panel - Alarm Service Building Boiler Room 0 16 8 DO - 7 YC P-901 Boiler Feed Pump #1 - Run Service Building Boiler Room 1 = RUN 1 7 7 Provide interposing relay to suit
DI - 201 PAH FCP-9010 Boiler #1 Field Control Panel - Alarm Service Building Boiler Room 0 16 9 DO - 8 YC P-905 Prim. Heating Distribution Pump #1 - Run Service Building Mechanical Room 1 = RUN 1 7 8 Provide interposing relay to suit KEY PLAN

DI - 202 PAL FCP-9010 Boiler #1 Field Control Panel - Alarm Service Building Boiler Room 0 16 10 DO - 9 YC MIX-704 Flash Tank #2 Mixer - Run Tertiary Filter 1 = RUN 1 7 9 Provide interposing relay to suit
GENERAL NOTES:
DI - 203 YS FCP-9010 Boiler #1 Field Control Panel - Service Building Boiler Room 0 16 11 DO - 10 YC LC-608 Sec. Clarifier #3 Long. Collector - Run Final Clarifiers 1 = RUN 1 7 10 Provide interposing relay to suit
DI - 204 JI FCP-9010 Boiler #1 Field Control Panel - Service Building Boiler Room 0 16 12 DO - 11 YC CC-609 Sec. Clarifier #3 Cross Collector - Run Final Clarifiers 1 = RUN 1 7 11 Provide interposing relay to suit 2 A. AMOUNT AND LOCATION OF INTERPOSING RELAYS,
INTRINSICALLY SAFE BARRIERS, SIGNAL SPLITTERS,
DI - 205 JI FCP-9010 Boiler #1 Field Control Panel - Service Building Boiler Room 0 16 13 DO - 12 YC P-728 Washwater Sump Pump #3 - Run Tertiary Filter 1 = RUN 1 7 12 Provide interposing relay to suit AND ISOLATION MODULES TBD.
DI - 206 FAL FCP-9010 Boiler #1 Field Control Panel - Alarm Service Building Boiler Room 0 16 14 DO - 13 YC LCP-6001 Secondary Clarifier Tank #3 Scum Heaters - Run Final Clarifiers 1 = RUN 1 7 13 Provide interposing relay to suit
B. REFER TO DETAIL 1/I022A FOR THE REQUIRED
DI - 207 PAL FCP-9010 Boiler #1 Field Control Panel - Alarm Service Building Boiler Room 0 16 15 DO 14 1 7 14 Provide interposing relay to suit HARDWIRED LOGIC FOR CONTROLLING THE
DI - 208 YA CP-3000 Rack 1 DI Card 2 24 VDC Failure Service Building PLC Panel 0 = FAILURE 1 2 0 DO - 15 1 7 15 Provide interposing relay to suit ASSOCIATED STACK LIGHTS AND HORNS.

DI - 209 YS FCP-9010 Boiler #1 Field Control Panel - Service Building Boiler Room 1 2 1 DO - 16 YS FCP-9020 Boiler #2 Field Control Panel - Service Building Boiler Room 1 8 0 Provide interposing relay to suit
DRAWING NOTES:
DI - 210 YS FCP-9010 Boiler #1 Field Control Panel - Service Building Boiler Room 1 2 2 DO - 17 YC FCP-9020 Boiler #2 Field Control Panel - Service Building Boiler Room 1 8 1 Provide interposing relay to suit
DI - 211 YA FCP-9010 Boiler #1 Field Control Panel - E-Stop Service Building Boiler Room 1 2 3 DO - 18 YC FCP-9020 Boiler #2 Field Control Panel - Service Building Boiler Room 1 8 2 Provide interposing relay to suit 1 PROGRAM THE PLC TO PROVIDE A WATCHDOG
PULSE. THIS PULSE IS TO BE MONITORED BY THE
DI - 212 1 2 4 DO - 19 YC P-613 Ras Pump #5 - Run Service Building Basement 1 = RUN 1 8 3 Provide interposing relay to suit 2 WATCHDOG TIMING RELAY INSIDE THE PANEL.
DI - 213 1 2 5 DO - 20 YC EF-303 Boiler Room Exhaust Fan - Run Service Building Boiler Room 1 = RUN 1 8 4 Provide interposing relay to suit COORDINATE PULSE WIDTH AND RELAY SELECTION
TO SUIT. THE INTENT OF THIS FEATURE IS TO
DI - 214 1 2 6 DO - 21 ZC VFC-902 Hot Water Supply to Headworks Control Valve - Drive Open Service Building Mechanical Room 1 = OPEN 1 8 5 Provide interposing relay to suit DETECT PLC FAILURE. PROVIDE HARD-WIRED LOGIC
DI - 215 1 2 7 DO - 22 ZC VFC-902 Hot Water Supply to Headworks Control Valve - Drive Closed Service Building Mechanical Room 1 = CLOSE 1 8 6 Provide interposing relay to suit INSIDE THE PLC PANEL TO ENERGIZE ALL STACK
LIGHTS AND ASSOCIATED HORNS CONNECTED TO
DI - 216 1 2 8 DO - 23 YC P-902 Boiler Feed Pump #2 - Run Service Building Boiler Room 1 = RUN 1 8 7 Provide interposing relay to suit
THIS PLC IN EVENT OF A PLC FAILURE. PROVIDE
DI - 217 1 2 9 DO - 24 YC P-906 Prim. Heating Distribution Pump #2 - Run Service Building Mechanical Room 1 = RUN 1 8 8 Provide interposing relay to suit LOGIC TO SILENCE THE HORNS VIA A FLUSH HEAD
PUSHBUTTON ON THE PLC PANEL DOOR. LABEL THE
DI - 218 1 2 10 DO - 25 YC MIX-705 Floc Tank #3 Mixer - Run Tertiary Filter 1 = RUN 1 8 9 Provide interposing relay to suit
PUSHBUTTON "SILENCE HORNS". PUSHBUTTON
DI - 219 1 2 11 DO - 26 YC LC-610 Sec. Clarifier #4 Long. Collector - Run Final Clarifiers 1 = RUN 1 8 10 Provide interposing relay to suit COLOUR TO BE BLUE. HORNS TO BE RE-TRIGGERED
EACH TIME THE PLC FAILS.
DI - 220 1 2 12 DO - 27 YC CC-611 Sec. Clarifier #4 Cross Collector - Run Final Clarifiers 1 = RUN 1 8 11 Provide interposing relay to suit 2
DI - 221 1 2 13 DO - 28 YC P-729 Washwater Sump Pump #4 - Run Tertiary Filter 1 = RUN 1 8 12 Provide interposing relay to suit 2 N.I.C. - PHASE B. PROVIDE RELAY FOR FUTURE I/O,
DI - 222 1 2 14 DO - 29 YC LCP-6004 Secondary Clarifier Tank #4 Scum Heaters - Run Final Clarifiers 1 = RUN 1 8 13 Provide interposing relay to suit WHERE INDICATED.

DI - 223 1 3 15 DO - 30 1 8 14 Provide interposing relay to suit


1
DI - 224 YA CP-3000 Rack 1 DI Card 3 24 VDC Failure Service Building PLC Panel 0 = FAILURE 1 3 0 DO - 31 1 8 15 Provide interposing relay to suit
DI - 225 HS FCP-9020 Boiler #2 Field Control Panel - In Auto Service Building Boiler Room 1 3 1 DO - 32 YS FCP-9030 Boiler #3 Field Control Panel - Service Building Boiler Room 1 9 0 Provide interposing relay to suit
DI - 226 YA FCP-9020 Boiler #2 Field Control Panel - Alarm Service Building Boiler Room 1 3 2 DO - 33 YC FCP-9030 Boiler #3 Field Control Panel - Service Building Boiler Room 1 9 1 Provide interposing relay to suit
DI - 227 LAL FCP-9020 Boiler #2 Field Control Panel - Alarm Service Building Boiler Room 1 3 3 DO - 34 YC FCP-9030 Boiler #3 Field Control Panel - Service Building Boiler Room 1 9 2 Provide interposing relay to suit
DI - 228 TAH FCP-9020 Boiler #2 Field Control Panel - Alarm Service Building Boiler Room 1 3 4 DO - 35 YC P-715 Effluent Pump #6 - Run Service Building Basement 1 = RUN 1 9 3 Provide interposing relay to suit
DI - 229 NG FCP-9020 Boiler #2 Field Control Panel - Mode Service Building Boiler Room 1 3 5 DO - 36 ZC VFC-903 Hot Water Supply to Plant Heat Control Valve - Drive Open Service Building Mechanical Room 1 = OPEN 1 9 4 Provide interposing relay to suit
DI - 230 DG FCP-9020 Boiler #2 Field Control Panel - Mode Service Building Boiler Room 1 3 6 DO - 37 ZC VFC-903 Hot Water Supply to Plant Heat Control Valve - Drive Closed Service Building Mechanical Room 1 = CLOSE 1 9 5 Provide interposing relay to suit
DI - 231 PAH FCP-9020 Boiler #2 Field Control Panel - Alarm Service Building Boiler Room 1 3 7 DO - 38 YC P-903 Boiler Feed Pump #3 - Run Service Building Boiler Room 1 = RUN 1 9 6 Provide interposing relay to suit 2 PHASE A - ADDENDUM #7 05/12/23
DI - 232 PAL FCP-9020 Boiler #2 Field Control Panel - Alarm Service Building Boiler Room 1 3 8 DO - 39 YC P-907 Service Building Heating Pump - Run Service Building Mechanical Room 1 = RUN 1 9 7 Provide interposing relay to suit
DI - 233 PAH FCP-9020 Boiler #2 Field Control Panel - Alarm Service Building Boiler Room 1 3 9 DO - 40 YC PFP-100 Active Power Factor Panel - Inhibit Service Building Electrical Room 1 = INHIBIT 1 9 8 Provide interposing relay to suit 1 PHASE A - ADDENDUM #3 10/11/23

DI - 234 PAL FCP-9020 Boiler #2 Field Control Panel - Alarm Service Building Boiler Room 1 3 10 DO - 41 YC PFP-300 Active Power Factor Panel - Inhibit Service Building Electrical Room 1 = INHIBIT 1 9 9 Provide interposing relay to suit
0 PHASE A ISSUED FOR TENDER 02/10/23
DI - 235 YS FCP-9020 Boiler #2 Field Control Panel - Service Building Boiler Room 1 3 11 DO - 42 1 9 10 Provide interposing relay to suit
2 No. ISSUE / REVISION DD/MM/YY
DI - 236 JI FCP-9020 Boiler #2 Field Control Panel - Service Building Boiler Room 1 3 12 DO - 43 1 9 11 Provide interposing relay to suit
DI - 237 JI FCP-9020 Boiler #2 Field Control Panel - Service Building Boiler Room 1 3 13 DO - 44 1 9 12 Provide interposing relay to suit This drawing is copyright protected and may not be reproduced or
DI - 238 FAL FCP-9020 Boiler #2 Field Control Panel - Alarm Service Building Boiler Room 1 3 14 DO - 45 1 9 13 Provide interposing relay to suit used for purposes other than execution of the described work without
the express written consent of J.L. Richards & Associates Limited.
DI - 239 PAL FCP-9020 Boiler #2 Field Control Panel - Alarm Service Building Boiler Room 1 3 15 DO - 46 1 9 14 Provide interposing relay to suit
VERIFY SHEET SIZE AND SCALES. BAR TO THE
DI - 240 YA CP-3000 Rack 1 DI Card 4 24 VDC Failure Service Building PLC Panel 0 = FAILURE 1 4 0 DO - 47 1 9 15 Provide interposing relay to suit
RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING. 0 25mm
DI - 241 YS FCP-9020 Boiler #2 Field Control Panel - Service Building Boiler Room 1 4 1 DO - 48 ZC VFC-904 Hot Water Supply to New Digester - Drive Open Service Building Mechanical Room 1 = OPEN 1 10 0 Provide interposing relay to suit
SCALE:
N.T.S.
DI - 242 YS FCP-9020 Boiler #2 Field Control Panel - Service Building Boiler Room 1 4 2 DO - 49 ZC VFC-904 Hot Water Supply to New Digester - Drive Closed Service Building Mechanical Room 1 = CLOSE 1 10 1 Provide interposing relay to suit
DI - 243 YA FCP-9020 Boiler #2 Field Control Panel - E-stop Service Building Boiler Room 1 4 3 DO - 50 YC P-908 Headworks Heating Pump - Run Service Building Mechanical Room 1 = RUN 1 10 2 Provide interposing relay to suit
DI - 244 1 4 4 DO - 51 1 10 3 Provide interposing relay to suit
CLIENT:
DI - 245 1 4 5 DO - 52 1 10 4 Provide interposing relay to suit
DI - 246 1 4 6 DO - 53 1 10 5 Provide interposing relay to suit
DI - 247 1 4 7 DO - 54 1 10 6 Provide interposing relay to suit
DI - 248 1 4 8 DO - 55 1 10 7 Provide interposing relay to suit
DI - 249 1 4 9 DO - 56 1 10 8 Provide interposing relay to suit
DI - 250 1 4 10 DO - 57 1 10 9 Provide interposing relay to suit CONSULTANT: www.jlrichards.ca
DI - 251 1 4 11 DO - 58 1 10 10 Provide interposing relay to suit
DI - 252 1 4 12 DO - 59 1 10 11 Provide interposing relay to suit
DI - 253 1 4 13 DO - 60 1 10 12 Provide interposing relay to suit
DI - 254 1 4 14 DO - 61 1 10 13 Provide interposing relay to suit
DI - 255 1 4 15 DO - 62 1 10 14 Provide interposing relay to suit
DI - 256 YA CP-3000 Rack 1 DI Card 5 24 VDC Failure Service Building PLC Panel 0 = FAILURE 1 5 0 DO - 63 1 10 15 Provide interposing relay to suit CONSULTANT:

DI - 257 HS FCP-9030 Boiler #3 Field Control Panel - In Auto Service Building Boiler Room 1 5 1 DO - 64 YC P-909 Exist. Digester Hot Water Recirc. Pump - Run Service Building Mechanical Room 1 = RUN 1 11 0 Provide interposing relay to suit
DI - 258 YA FCP-9030 Boiler #3 Field Control Panel - Alarm Service Building Boiler Room 1 5 2 DO - 65 YA YA-3200 Service Building Stack Light - Horn Service Building 1 = ON 1 11 1 Provide interposing relay to suit
DI - 259 LAL FCP-9030 Boiler #3 Field Control Panel - Alarm Service Building Boiler Room 1 5 3 DO - 66 UAL UAL-3201 Service Building Stack Light - Red Service Building 1 = ON 1 11 2 Provide interposing relay to suit
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\6-Elect\29475-000 IO List.dwg

DI - 260 TAH FCP-9030 Boiler #3 Field Control Panel - Alarm Service Building Boiler Room 1 5 4 DO - 67 UAL UAL-3202 Service Building Stack Light - Amber Service Building 1 = ON 1 11 3 Provide interposing relay to suit
DI - 261 NG FCP-9030 Boiler #3 Field Control Panel - Mode Service Building Boiler Room 1 5 5 DO - 68 UAL UAL-3203 Service Building Stack Light - Clear Service Building 1 = ON 1 11 4 Provide interposing relay to suit
PROFESSIONAL STAMP PROJECT NORTH
DI - 262 DG FCP-9030 Boiler #3 Field Control Panel - Mode Service Building Boiler Room 1 5 6 DO - 69 UAL UAL-3204 Service Building Stack Light - Blue Service Building 1 = ON 1 11 5 Provide interposing relay to suit
DI - 263 PAH FCP-9030 Boiler #3 Field Control Panel - Alarm Service Building Boiler Room 1 5 7 DO - 70 1 11 6 Provide interposing relay to suit
DI - 264 PAL FCP-9030 Boiler #3 Field Control Panel - Alarm Service Building Boiler Room 1 5 8 DO - 71 1 11 7 Provide interposing relay to suit
DI - 265 PAH FCP-9030 Boiler #3 Field Control Panel - Alarm Service Building Boiler Room 1 5 9 DO - 72 1 11 8 Provide interposing relay to suit
DI - 266 PAL FCP-9030 Boiler #3 Field Control Panel - Alarm Service Building Boiler Room 1 5 10 DO - 73 1 11 9 Provide interposing relay to suit
DI - 267 YS FCP-9030 Boiler #3 Field Control Panel - Service Building Boiler Room 1 5 11 DO - 74 1 11 10 Provide interposing relay to suit
DI - 268 JI FCP-9030 Boiler #3 Field Control Panel - Service Building Boiler Room 1 5 12 DO - 75 1 11 11 Provide interposing relay to suit
DI - 269 JI FCP-9030 Boiler #3 Field Control Panel - Service Building Boiler Room 1 5 13 DO - 76 1 11 12 Provide interposing relay to suit
DI - 270 FAL FCP-9030 Boiler #3 Field Control Panel - Alarm Service Building Boiler Room 1 5 14 DO - 77 1 11 13 Provide interposing relay to suit
PROJECT:
DI - 271 PAL FCP-9030 Boiler #3 Field Control Panel - Alarm Service Building Boiler Room 1 5 15 DO - 78 YC ATS-390 ATS-390 Transfer to Normal Power Command Service Building Electrical Room 1 = TRANSFER 1 11 14 Provide interposing relay to suit
MUNICIPALITY OF NORTH
DI - 272 YA CP-3000 Rack 1 DI Card 6 24 VDC Failure Service Building PLC Panel 0 = FAILURE 1 6 0 DO - 79 YS CP-3000 PLC Watchdog Pulse 1 11 15 Provide interposing relay to suit 1
DI - 273 YS FCP-9030 Boiler #3 Field Control Panel - Service Building Boiler Room 1 6 1
GRENVILLE - WATER POLLUTION
DI - 274 YS FCP-9030 Boiler #3 Field Control Panel - Service Building Boiler Room 1 6 2 CONTROL PLANT EXPANSION
DI - 275 YA FCP-9030 Boiler #3 Field Control Panel - E-stop Service Building Boiler Room 1 6 3 AI - 0 BI FCP-9010 Boiler #1 Field Control Panel - Service Building Boiler Room 2 2 0 PHASE - A
DI - 276 1 6 4 AI - 1 FF FCP-9010 Boiler #1 Field Control Panel - Service Building Boiler Room 2 2 1 KEMPTVILLE, ONTARIO
DI - 277 1 6 5 AI - 2 FF FCP-9010 Boiler #1 Field Control Panel - Service Building Boiler Room 2 2 2 DRAWING:
DI - 278 1 6 6 AI - 3 SI EF-302 Heating Pump Room Exhaust Fan Speed Indicator Service Building Mechanical Room 2 2 3 Provide analog signal duplicator
ELECTRICAL

December 5, 2023 3:17:30 PM


DI - 279 1 6 7 AI - 4 SI P-905 Prim. Heating Distribution Pump #1 Speed Indicator Service Building Mechanical Room 2 2 4 Provide analog signal duplicator
SERVICE BUILDING
DI - 280 1 6 8 AI - 5 2 2 5
DI - 281 1 6 9 AI - 6 SI P-612 Ras Pump #4 Speed Indicator Service Building Basement 2 2 6 2
DI - 282 1 6 10 AI - 7 AI AIT-3300 Drip Trap Room H2S Analyzer Indicator Service Building Boiler Room 2 2 7
IO TABLES CONT'D - PLC-300
DI - 283 1 6 11 AI - 8 BI FCP-9020 Boiler #2 Field Control Panel - Service Building Boiler Room 2 3 0
DI - 284 1 6 12 AI - 9 FF FCP-9020 Boiler #2 Field Control Panel - Service Building Boiler Room 2 3 1 DESIGN:
1 LO
1
DRAWN: DRAWING #:
NB

PLOT DATE:
1 I/O LIST (CONT'D) - PLC - 300 2 I/O LIST (CONT'D) - PLC - 300 CHECKED:
I302A SCALE: NTS I302A SCALE: NTS
JLR #:
JO
29475
I302A
DRA ING NOTES
300 CABLE TRA MO NTED 1 PROVIDE PVC SLEEVES MO NTED BELO SLAB FOR CABLE NE DE ATERING AND ELECTRICAL SERVICE
ALONG HAND RAIL REFER TO TRANSITIONS BET EEN TAN S ANTIT AND SI ES TO S IT DIGESTER CONTROL ENTRANCE B ILDING
LD-P-404 LD-P-406 B ILDING 900 SERIES
DETAIL 6 E006A GLOBAL-1000 GLOBAL-1000
800 SERIES
NE AERATION NE PRIMAR NE
2 CONTRACTOR TO PROVIDE PVC SLEEVES THRO GH E TERIOR TAN S CLARIFIERS HEAD OR S

4.B LD-P-405
GLOBAL-1000
ALLS
ENVELOPE
ANTIT AND SI E TO S IT MAINTAIN ATER TIGHT 500 SERIES 400 SERIES 200 SERIES

3 PROVIDE OPENING IN CONCRETE SLAB S S STILLING ELL FOR NE SECONDAR NE TERTIAR


CABLE TRA DROPS BELO RADAR SENSOR RADAR SENSOR TO BE MO NTED ON TOP OF THE CLARIFIERS FILTER B ILDING
600 SERIES PHASE B 700 SERIES PHASE B
STAIRS CONCRETE SLAB NE T TO THE P MP DISCHARGE PIPING ENS RE
THE SENSOR IS F LL ACCESSIBLE AND DOES NOT IMPEDE ACCESS
TO AN MECHANICAL E IPMENT COORDINATE OPENING ITH
STR CT RAL PROVIDE A REMOVABLE S S SHRO D FOR THE RADAR
10 SENSOR FOR MECHANICAL PROTECTION OF THE DEVICE ALLO FOR
LCP-4012 E ISTING SERVICE
CABLE TRA MO NTED BELO 12
GLOBAL-1000
P GFCI A 100 S S STILLING ELL TAPERED END INSIDE THE ET ELL B ILDING
12 LCP-4014 300 SERIES
STAIR MAINTAIN A MINIM M OF LP-203-26 GLOBAL-1000
COORDINATE DETAILS OF THE STILLING ELL ITH THE SENSOR
300 BELO PLATFORM FOR 2 2 MAN FACT RER
CABLE ACCESS
13 4 RESERVED
E PLAN
5 PROVIDE 10 A G TEC 90 CABLE FOR IRING TO LIGHT STANDARD
300-SS-EFF1 FINAL TERMINATION AT LIGHT STANDARD TO BE 12 A G R 90 GENERAL NOTES
CABLE TRA DROPS BELO RO TE THE CABLE INSIDE THE CABLE TRA S S STEM O TLINED
STAIRS
LCP-4013
2.A PROVIDE A PVC SLEEVE NEMA4 J NCTION BO AND OCAL E S
FITTING AT THE POLE TO E TEND IRING INTO THE POLE SI E
A ALL CABLES NOT SHO N REFER TO BLOC DIAGRAM
AND SINGLE LINE DIAGRAM FOR COMPLETE LIST OF
2 GLOBAL GLOBAL-1000
SLEEVE P LL BO AND FITTINGS TO S IT MINIM M SLEEVE SI E OF CABLES
12 12 12 M
VFC-404 GLOBAL 53 ENS RE SLEEVE DOES NOT PROVIDE A PATH FOR GAS
1000
M LD-P-403 MIGRATION INTO THE POLE REFER TO ME005A FOR HA ARDO S
300 CABLE TRA MO NTED DEVICE
B CONTRACTOR TO COORDINATE CABLE TRA RO TE
P-403
GLOBAL-1000
DEVICE

LSL TC CLASSIFICATION PROVIDE ALL ASSOCIATED APP RTENANCES FOR


ALONG HAND RAIL REFER TO 2 2 2
1000

4030 450 CABLE TRA MO NTED ITH MECHANICAL AND ELECTRICAL S STEMS
DETAIL 6 E006A
DEVICE DEVICE DEVICE
4030 RAD RATED AREAS REFER TO DETAIL 2 E010A COORDINATE ITH
M M M DEVICE
ALONG HAND RAIL REFER TO
P-404 P-405 P-406 LIT STR CT RAL C CABLE TRA BRAC ETS NOT TO E TEND MORE THAN
4015 DETAIL 6 E006A
ELEMENT
RAD 50 BE OND CABLE TRA S
LE 6 PROVIDE 6 A G TEC 90 CABLE FOR IRING TO RECEPTACLE
13 4015 3 RO TE CABLE INSIDE THE CABLE TRA S STEMS O TLINED PROVIDE D COORDINATE FINAL DIMENSIONS OF HO SE EEPING
A PVC SLEEVE TO RO TE CABLE THRO GH CONCRETE SEC RE PADS ITH ACT AL E IPMENT DIMENSIONS PROVIDE
4.4 2
GLOBAL

M
P-407
1000 5
CABLE TO ALLS BENEATH THE GRATING ENS RE CABLE DOES NOT
IMPEDE ACCESS TO MECHANICAL E IPMENT AND REMOVAL OF
A MINIM M OF 100 CLEARANCE ON FRONT AND SIDES
EACH HO SE EEPING PAD TO BE 100 HIGH
GRATING ENS RE CABLE IS SEC RED AT AN ELEVATION ABOVE THE
TOP ATER LEVEL FINAL TERMINATION AT RECEPTACLE TO BE 12 E REFER TO SITE PLANS ON DRA INGS E002A AND E003A
A G R 90 RECEPTACLE TO BE MO NTED AT 1200 AFF FOR F RTHER DETAILS ON THE POLE-MO NTED
LIGHTING
7 PROVIDE 4 A G TEC 90 CABLE FOR IRING TO RECEPTACLE
RH-409 T O TIER 450 CABLE RO TE CABLE INSIDE THE CABLE TRA S STEMS O TLINED PROVIDE
DP-201-49 51 53
GLOBAL-1000

TRA ON S PPORTS A PVC SLEEVE TO RO TE CABLE THRO GH CONCRETE SEC RE


REFER TO STR CT RAL CABLE TO ALLS BENEATH THE GRATING ENS RE CABLE DOES NOT
300 CABLE TRA MO NTED FOR S PPORT DETAILS IMPEDE ACCESS TO MECHANICAL E IPMENT AND REMOVAL OF
ALONG HAND RAIL REFER TO LP-203-29 COORDINATE FINAL CABLE GRATING ENS RE CABLE IS SEC RED AT AN ELEVATION ABOVE THE
DETAIL 6 E006A TRA ELEVATION ITH TOP ATER LEVEL FINAL TERMINATION AT RECEPTACLE TO BE 12
11
6
P GFCI
PRIMAR HEAD OR S TRA A G R 90 RECEPTACLE TO BE MO NTED AT 1200 AFF
ELEVATION
JBP-500 LCP-4007
CLARIFIER CABLE TRA DO N 8 PROVIDE 4 A G TEC 90 CABLE FOR IRING TO RECEPTACLE
RH-408
TO PLATFORM
2.4 RO TE CABLE INSIDE THE CABLE TRA S STEMS O TLINED PROVIDE
GLOBAL-1000
GLOBAL-1000

DP-201-49 51 53
GLOBAL-1000

JBD-500 TAN NO 3 FLOOR TRANSITION A PVC SLEEVE TO RO TE CABLE THRO GH CONCRETE SEC RE
GLOBAL-1000
LD-RH-407 CABLES TO CABLE TO ALLS BENEATH THE GRATING ENS RE CABLE DOES NOT
GLOBAL-1000
2
JBA-500
GLOBAL-1000
G ARDRAIL IMPEDE ACCESS TO MECHANICAL E IPMENT AND REMOVAL OF
GLOBAL-1000
JBP-407 MO NTED TRA AS GRATING ENS RE CABLE IS SEC RED AT AN ELEVATION ABOVE THE
RE IRED LCP-4010 TOP ATER LEVEL FINAL TERMINATION AT RECEPTACLE TO BE 12
GLOBAL-1000 A G R 90 RECEPTACLE TO BE MO NTED AT 1200 AFF
1
450 CABLE
LD-LC-401 9 PROVIDE 12 A G TEC 90 CABLE FOR IRING TO RECEPTACLE
RH-407 TRA MO NTED GLOBAL-1000 GLOBAL

RO TE CABLE INSIDE THE CABLE TRA S STEMS O TLINED FINAL


GLOBAL-1000

DP-201-49 51 53 M
ALONG HAND RAIL DEVICE

MS
LC-403
GLOBAL

LD-CC-401 M TERMINATION AT RECEPTACLE TO BE 12 A G R 90 MO NT


REFER TO DETAIL 1000

4023 RECEPTACLE AT 1200 AFF


GLOBAL-1000

CC-403
6 E006A 1000

LD-LC-402
10 PROVIDE 8 A G TEC 90 CABLE FOR IRING TO RECEPTACLE
GLOBAL-1000

1 2 PHASE A - ADDEND M 7 05 12 23
4.3 P GFCI
LP-203-28
RO TE CABLE INSIDE THE CABLE TRA S STEMS O TLINED FINAL
TERMINATION AT RECEPTACLE TO BE 12 A G R 90 MO NT
1 PHASE A - ADDEND M 3 10 11 23
RECEPTACLE AT 1200 AFF
9 GLOBAL

M
DEVICE

MS
1 LC-402 4024 11 450 CABLE TRA MO NTED VERTICALL BENEATH GRATING 0 PHASE A ISS ED FOR TENDER 02 10 23
1000

PROVIDE PVC SLEEVES MO NTED BELO SLAB FOR CABLE


RH-406 TRANSITIONS ANTIT AND SI ES TO S IT ENS RE CABLE TRA N ISS E REVISION DD MM
DP-201-44 46 48
GLOBAL-1000

AND SLEEVES DO NOT IMPEDE REMOVAL OF GRATE OR MECHANICAL


CABLE TRA DO N E IPMENT T
300 CABLE TRA MO NTED TO PLATFORM
ALONG HAND RAIL REFER TO LP-203-27 FLOOR TRANSITION 12 PROVIDE A DEDICATED 103 PVC SLEEVE FOR THE INTEGRAL JL R A L
CABLES TO CABLE FOR EACH F T RE P MP SEC RE SLEEVES TO THE
DETAIL 6 E006A
11 7
P GFCI PRIMAR G ARDRAIL NDERSIDE OF THE CONCRETE SLAB SING S S HARD ARE AND S S VERIF SHEET SI E AND SCALES BAR TO THE
MO NTED TRA AS FASTENERS EACH SLEEVE TO ST B P THRO GH THE CONCRETE RIGHT IS 25 IF THIS IS A F LL SI E DRA ING 0 25
CLARIFIER RE IRED SLAB BENEATH THE RESPECTIVE F T RE P MP DISCONNECT SCALE
LCP-4004 RH-405 AS INDICATED
GLOBAL-1000 COORDINATE ITH STR CT RAL STOP AND CAP EACH SLEEVE AT
DP-201-44 46 48
TAN NO 2 T O TIER 450 TRA
GLOBAL-1000

300 ABOVE THE CONCRETE SLAB IN ADDITION PROVIDE ONE 1


ON S PPORTS REFER
LD-RH-404 SPARE 103 PVC SLEEVE SPARE SLEEVE TO R N FROM THE 0 1 2 3 4
TO STR CT RAL FOR
GLOBAL-1000
LOCATION OF P-405 BENEATH THE CONCRETE SLAB SPARE SLEEVE
S PPORT DETAILS CLIENT
TO ST B P BENEATH THE F T RE LCP-4012 AND BE CAPPED AT
JBP-404 COORDINATE FINAL
GLOBAL-1000
300 ABOVE THE CONCRETE SLAB
LCP-4020
CABLE TRA ELEVATION
ITH HEAD OR S TRA
ELEVATION
GLOBAL-1000

2.2a 1 13 PROVIDE T O 2 DEDICATED 103MM PVC SLEEVES FOR THE


LD-CC-402 INTEGRAL CABLES FOR DRAIN P MP SEC RE SLEEVES TO THE
RH-404 GLOBAL-1000

M
GLOBAL

NDERSIDE OF THE CONCRETE SLAB SING S S HARD ARE AND S S


DP-201-44 46 48
GLOBAL-1000

LD-LC-403 CC-402
1000
FASTENERS SLEEVES TO ST B P THRO GH THE CONCRETE SLAB
GLOBAL-1000

GLOBAL
2 BENEATH THE LOCAL CONTROL PANEL COORDINATE ITH
M STR CT RAL
LD-CC-403
GLOBAL-1000 LC-401 CONS LTANT
1 1000

4.2 P GFCI
LP-203-28 2
9

GLOBAL

450 CABLE 1 DEVICE


M
MS
TRA MO NTED 4025 CC-401
RH-403 ALONG HAND RAIL
1000
29475 PRIMAR CLARIFIER LA O T

DP-201-43 45 47
GLOBAL-1000

REFER TO DETAIL CONS LTANT


1
6 E006A

LP-203-25

11
8
P GFCI
PRIMAR
LCP-4001
CLARIFIER
300 CABLE TRA MO NTED GLOBAL-1000
RH-402
GLOBAL-1000

DP-201-43 45 47 PROFESSIONAL STAMP PROJECT NORTH


VERTICALL ALONG HAND RAIL
REFER TO DETAIL 6 E006A
TAN NO 1
LD-RH-401
GLOBAL-1000

GLOBAL-1000
JBP-401
150 CABLE TRA MO NTED
ALONG HAND RAIL REFER TO
6-E

DETAIL 6 E006A
RH-401
DP-301-43 45 47
GLOBAL-1000

1
3-P

PROJECT
5
M NICIPALIT OF NORTH
4.1
D

GRENVILLE - ATER POLL TION


CONTROL PLANT E PANSION
PCP E

PHASE - A
EMPTVILLE ONTARIO
DRA ING
1 PRIMAR CLARIFIER TAN PLAN VIE
ELECTRICAL

6 2023 11 36 45 AM
I410A SCALE AS INDICATED
PRIMAR TAN S
P 29000 29475-000 -

PO ER AND INSTR MENTATION


PLAN

DESIGN
LO

D
DRA N DRA ING
IDM

PLOT DATE
CHEC ED
JO
I410A
L

JLR
29475
F
2 Pair #16AWG 7x24 2 Pair #16AWG 7x24
HVAC DIAGRAMS DEVICE
RTD STRAND AL ARMOURED STRAND AL ARMOURED DEVICE
RTD NEW DIGESTER EXISTING DIGESTER BUILDING
TT TIT NEW DEWATERING AND ELECTRICAL SERVICE
MID801A & MID802A 8044 8045 ELECTRICAL AND I&C ROOMS DIGESTER CONTROL
BUILDING
ENTRANCE BUILDING
900 SERIES
2 Pair #16AWG 7x24 800 SERIES
NEW AERATION NEW PRIMARY NEW
DEVICE
RTD STRAND AL ARMOURED FLOAT 4c #14AWG TECK90 CABLE TANKS CLARIFIERS HEADWORKS
TIT 4 PAIR #16 AWG 7X24 STRAND AL
DEVICE

HORN LSH 500 SERIES 400 SERIES 200 SERIES


ECIVED ECIVED HORN 8043 8016 \ \ \ \ \ ARMOURED GLOBAL

YA YA 2 Pair #16AWG 7x24 M


8200 8205 RTD VFC-845
RED DEVICE
STRAND AL ARMOURED FLOAT 4c #14AWG TECK90 CABLE CP-8100 1000

RED TT
DEVICE

LSH 10c #14AWG TECK90 CABLE

\
ECIVED ECIVED GLOBAL-1000

UAL UAL 8042 \ \ \ \ \ GLOBAL


NEW SECONDARY NEW TERTIARY
8201 8206 8017 \ \ \ M \ \ EQUIPMENT CONTAINED IN THIS BOUNDARY CLARIFIERS FILTER BUILDING
700 SERIES (PHASE B)
AMBER AMBER 2 Pair #16AWG 7x24 4c #16 AWG PORTABLE VFC-809 SUPPLIED BY PRE-PACKAGED EQUIPMENT
600 SERIES (PHASE B)
ECIVED ECIVED

RTD FLOAT 4c #14AWG TECK90 CABLE 1000

UAL UAL STRAND AL ARMOURED


DEVICE

CONTROL CABLE IN EMT SUPPLIER. WIRING TO BE PROVIDED BY THE

\
DEVICE

TIT LSL SPD-800


8202 8207 8016 \ \ \ \ \ \ \ \ \ PLC ELECTRICAL CONTRACTOR.
8037
0001-LABOLG

ECIVED
CLEAR ECIVED CLEAR CONTROL PANEL
UAL UAL FLOAT 4c #14AWG TECK90 CABLE
8203 8208

\
DEVICE

LSL 4c #16 AWG PORTABLE EXISTING SERVICE


ECIVED
BLUE ECIVED
BLUE 8017 \ \ \ \ \ BUILDING
UAL UAL CONTROL CABLE IN EMT 300 SERIES
SPD-802

\
\ \ \ \
8204 8209 4c #14AWG TECK90 CABLE 0001-LABOLG

\
DEVICE

10c #14 TECK90 FS CP-8005


1 \ \ \ \ \ GLOBAL-1000

CABLE 8052
4c #16 AWG PORTABLE

\
\ \ \ \ \ \ \ \
4c #14AWG TECK90 CABLE

\
DEVICE CONTROL CABLE IN EMT KEY PLAN
FS \ \ \ \ SPD-803
2 TRIADS #16 AWG 7X24 8053 \ \ \ \ \ 0001-LABOLG
POLYMER
INTEGRAL CABLE IN

\
SYSTEM
STRAND AL ARMOURED GENERAL NOTES:

\
OCAL COND. H2S 4c #14AWG TECK90 CABLE CONTROL PANEL

\
ELEMENT
H2S DEVICE

AE AIT
DEVICE

FS 4c #16 AWG PORTABLE


8300 8300
\ \ \ \ \ \ \ \ \
6c #14 TECK90 CABLE 8054 CONTROL CABLE IN EMT

\
\ \ \ \ SPD-890 A. REFER TO PID AS WELL AS MID DRAWINGS.

\
0001-LABOLG

2 TRIADS #16 AWG 7X24

\
INTEGRAL CABLE IN DEVICE
FLOAT 4c #14AWG TECK90 CABLE
OCAL COND. CH4 STRAND AL ARMOURED LSHH
ELEMENT
CH4 DEVICE

8051 \ \ \ \ \ B. REFER TO N001A FOR NETWORK DETAILS.

\
AE AIT \ \ \ \ 8c #18 AWG PORTABLE 9

\
8301 8301

\
6c #14 TECK90 CABLE 4c #14AWG TECK90 CABLE CONTROL CABLE IN EMT
DEVICE
\ \ \ \ UPS-890 C. REFER TO THE ASSOCIATED MID'S AND PID'S
TC 0001-LABOLG

\ \ \ \ \

\
8050

\
FOR COMMUNICATION REFERENCE BETWEEN

\
15c #14 AWG RWU90 + GND

\
MAKEUP AIR UNIT LOCAL 4c #14AWG TECK90 CABLE VARIOUS EQUIPMENT AND THE PLC PANEL.
CONTROL PANEL 20c #14 TECK90 LABOLG

WIRING VIA COMMS DUCTBANK.


M 4 Pair #16 AWG 7X24 STRAND AL ARMOURED
\ \ \ \ \

\
CABLE

\
4c #14 TECK90 \ \ \ \ \ \ GFS-801 \ \ \ \ FCP-9000 PROVIDE RGS INDOORS. REFER TO D. REFER TO DRAWING E000A FOR ADDITIONAL

\
0001-LABOLG
15c #14 AWG TECK90 CABLE

\
0001

CABLE DRAWING E002A. (LOCATED AT THE


\ \ \ \ LCP-8020 2 TRIADS #16 AWG 7X24 4c #14AWG TECK90 CABLE CABLE REQUIREMENTS.
STRAND AL ARMOURED
DEVICE

FSL GATE)

\
LD-MAU-801 \ \ \ \ \

\
GLOBAL-1000

8045

\
\
0001-LABOLG

\
2 Pair #16AWG 7x24 STRAND 4c #14AWG TECK90 CABLE
DEVICE

FSL \ \ \ \ \

\
AL ARMOURED \ \ \ \ \ 2 RUNS CATEGORY 6 IN EMT
8046

\
\
\ Cat 6 Cat 6 Cat 6 Cat 6 Cat 6 Cat 6 Cat 6 Cat 6 Cat 6 Cat 6 Cat 6 Cat 6
40c #14AWG RW90 + GND IN EMT
ODOUR CONTROL UNIT
20c #14 TECK90 10 PAIRS #16AWG 7X24 STRAND

\
LOCAL CONTROL PANEL 4c #14AWG TECK90 CABLE Cat 6 Cat 6 Cat 6 Cat 6 Cat 6 Cat 6 Cat 6 Cat 6 Cat 6

\
CABLE

\
DEVICE

4c #14 TECK90 UNARMOURED IN EMT

\
\ \ \ \ \ \ FSL

\
\ \ \ \ \ REFER TO DRAWING E030A 2 RUNS CATEGORY 6 IN EMT
\
\

CABLE 8040
\ \ \ \ LCP-8021 2 TRIADS #16 AWG 7X24
STRAND AL ARMOURED 4c #14AWG TECK90 CABLE
LD-OC-801 GLOBAL-1000
DEVICE
MCC-800

\
FDP-8001 \ \ \
\
FSL
\

0001-LABOLG

8038
\ \ \ \ \ GLOBAL-1000

CP-8000 PFP-800 CP-8001 MCP-8001


2 Pair #16AWG 7x24 STRAND GLOBAL-1000 GLOBAL-1000 GLOBAL-1000 GLOBAL-1000

AL ARMOURED 4C #14 AWG TECK90

\
4 Pair #16AWG 7x24 15c #14 AWG RW90 + GND
\
\

HEATING LOOP PUMP GLOBAL


STRAND AL ARMOURED IN EMT CABLE
M \ \ \ \ \ \ CENTRIFUGE CENTRIFUGE
LOCAL CONTROL PANEL VFC-846 PLC ACTIVE POWER

\
4 Pair #16AWG 7x24 PLC MOTOR
\

4c #14 TECK90 1000


\

15c #14 TECK90 CONTROL PANEL FACTOR PANEL


CABLE GLOBAL
STRAND AL ARMOURED Cat 6 Cat 6 Cat 6 CONTROL PANEL CONTROL PANEL
CABLE M
\ \ \ \ LCP-8022 \ \ \ \ \ \
VFC-828 2 RUNS CATEGORY 6 IN EMT

\
LD-P-815 4 Pair #16AWG 7x24
\

GLOBAL-1000 1000
\

0001-LABOLG
GLOBAL
STRAND AL ARMOURED
M
VFC-827
GLYCOL HEATING PUMP

\
4 Pair #16AWG 7x24
\

1000
\

LOCAL CONTROL PANEL GLOBAL


STRAND AL ARMOURED 2
4c #14 TECK90 M 6 7
15c #14 TECK90 VFC-826

\
CABLE

\
4 Pair #16AWG 7x24
\

1000

CABLE

\
\

\
\ \ \ \ LCP-8023

\
\ \ \ \ \ \

\
GLOBAL
STRAND AL ARMOURED
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
M

Cat 6

\
LD-P-818 GLOBAL-1000
Cat 6 Cat 6
VFC-825

\
0001-LABOLG

\
4 Pair #16AWG 7x24
\

1000

\
\

2 RUNS CATEGORY 6 IN EMT

\
\
GLOBAL
STRAND AL ARMOURED 2 PHASE A - ADDENDUM #7 05/12/23
M

\
2 Pair #16AWG 7X24 STRAND
DIGESTER SUMP PUMP VFC-824 RTD

\
UNARMOURED IN EMT DEVICE

\
TIT
\

1000

\
\

CONTROL PANEL 4c #14 TECK90

\
1 PHASE A - ADDENDUM #2 03/11/23

\
8016

\
Cat 6
CABLE

\
2 Pair #16AWG 7X24 STRAND
\ \ \ \ RTD

\
UNARMOURED IN EMT DEVICE
\
0 PHASE A ISSUED FOR TENDER 02/10/23
\

TIT

\
\

LCP-8051

\
\ \ \ \ \ \ \ \ \ \
8015

\
GLOBAL-1000

No. ISSUE / REVISION DD/MM/YY

\
\
\

\
\

\
\

\
Cat 6
This drawing is copyright protected and may not be reproduced or
used for purposes other than execution of the described work without

\
\

\
\

\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ the express written consent of J.L. Richards & Associates Limited.

\
\

\
2 RUNS OF CATEGORY IN RGS COND. VERIFY SHEET SIZE AND SCALES. BAR TO THE

\
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING.
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ Cat 6 Cat 6 Cat 6 0 25mm

\
\
\ \ \ \ \ \
\

SCALE:
N.T.S.
DRAWING NOTES:

\
\

\
DIGESTER GAS PID802A

Cat 6
\

DAISY CHAIN TO NEXT STACK LIGHT USING SAME 4c #14AWG TECK90 CABLE

\
\
1
\

DEVICE

CABLE AS FIRST ONE IN THE CHAIN. TC


\ \ \ \ \

\
CLIENT:
DIGESTION PID801A POLYMER & DEWATERING PID803A

\
8034

\
10c #14 AWG TECK90 CABLE 4c #14 AWG TECK90 CABLE
\

\
GLOBAL

2 PROVIDE AN INTRINSIC BARRIER INSIDE A 4c #14AWG TECK90 CABLE

\
M \ \ \ \ \ \ \
\

DEVICE

TC \ \ \ \ \
VFC-807 DEDICATED JUNCTION BOX. RETAIN THE

\
\ \ \ \ \

\
\

Cat 6
1000

10c #14 AWG TECK90 CABLE SERVICES OF A PROFESSIONAL ENGINEER, 8020 LD-CNT-801
\

10c #14 TECK90 CABLE GLOBAL-1000

\
GLOBAL

M \ \ \ \ \ \ \ LICENSED IN THE PROVINCE OF ONTARIO, TO 4c #14AWG TECK90 CABLE

\
GLOBAL
\

DEVICE
M
VFC-808 DESIGN THE INTRINSIC BARRIER PROTECTION TC
\ \ \ \ \ \ \ \ \ \ \ \

\
VFC-820

\
\

\
1000

4 Pair #16 AWG 7X24 TECK90 CABLE 8030 4c #14 AWG TECK90 CABLE
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\6-Elect\29475 DIGESTER BUILDING CONTROL BLOCK DIAGRAM.dwg

1000

SYSTEM IN ACCORDANCE WITH THE


\

4c #14AWG TECK90 CABLE \ \ \ \ \

\
GLOBAL

M \ \ \ \ \ \ \ 4c #14AWG TECK90 CABLE

\
DEVICE
\

REQUIREMENTS OF THE OESC. SUBMIT SEALED DEVICE


PSH
VFC-810 TC 8031 \ \ \ \ \ \ \ LD-CNT-802 CONSULTANT: www.jlrichards.ca

\
SHOP DRAWINGS FOR REVIEW.

Cat 6
\ \ \ \ \

\
\

\
1000

4c #14AWG TECK90 CABLE 8032 GLOBAL-1000


\

4c #14AWG TECK90 CABLE

\
DEVICE

PSH \ \ \ \ \ \ \ FLARE PILOT CONTROL

\
DEVICE
\

3 COORDINATE EXACT CABLE REQUIREMENTS WITH PSL 4c #14 AWG TECK90 CABLE
8010 PANEL 8032 \ \ \ \ \ \ \

\
THE EQUIPMENT MANUFACTURER PRIOR TO 10c #14AWG TECK90 CABLE

\
4c #14AWG TECK90 CABLE \ \ \ \ \
\

PROCUREMENT. 3 4c #14AWG TECK90 CABLE


\ \ \ \ \ 2 Pair #16AWG 7x24 STRAND AL
DEVICE DEVICE

\
TSHH \ \ \ \ \ \ \ TE

\
LD-P-813
DEVICE
\

\ FCP-8050 PSH
8014 8021 \ \ \ \ \ \ \ GLOBAL-1000
ARMOURED

Cat 6
8033

\
GLOBAL-1000

4c #14AWG TECK90 CABLE 4 PROVIDE NEMA 4X PVC JUNCTION BOX. PE PIT


ELEMENT DEVICE

4 Pair #16AWG 7x24 STRAND AL 4c #14 AWG TECK90 CABLE


\

DEVICE
4c #14AWG TECK90 CABLE 8013

\
PSH \ \ \ \ \ \ \ 8013

\
DEVICE

ARMOURED
\

PSL \ \ \ \ \ \ CONSULTANT:
8018 5 PROVIDE EMPTY OCAL RACEWAY TO ROUTE THE 2 Pair #16 AWG 7X24 STRAND 8034 \ \ \ \ \ \ \
INTEGRAL 2 Pair #16AWG 7x24 STRAND AL

\
4c #14AWG TECK90 CABLE
\

FLOAT CONTROL CONDUCTORS INSIDE THE INTEGRAL


\

UNARMOURED IN OCAL COND.

\
DEVICE
\ \ \ \ CABLE IN LD-SCV-801 ARMOURED

\
LSH \ PUMP CABLE THROUGH THE DISCONNECT BACK

\
OCAL COND. 4 Pair #16AWG 7x24 STRAND AL GLOBAL 4c #14 TECK90 CABLE GLOBAL-1000
DEVICE

8019 JBD-800 ISJBD-800 S TE

Cat 6
TO THE LCP FOR TERMINATION INSIDE LCP. \ \ \ \ \ \ \ 4c #14 AWG TECK90 CABLE 8013

\
GLOBAL-1000

1 GLOBAL-1000
ARMOURED VFC-821
\

ELEMENT DEVICE

ENSURE THE INSTALLATION FACILITATES THE FE FIT


\

2 1000 \ \ \ \ \ \
8102 8102

\
EASY REMOVAL AND RE-INSTALLATION OF EACH 2 Pair #16AWG 7x24 STRAND AL

\
GLOBAL 4c #14 TECK90 CABLE
INTEGRAL CABLE IN RGS PUMP AND ASSOCIATED INTEGRAL CABLING. ARMOURED S
4c #14AWG TECK90 CABLE
ELEMENT DEVICE

\ \ \ \ \ \ \ EQUIPMENT CONTAINED IN THIS

\
PE PIT VFC-822 LD-SCV-802
COND. (OPEN ENDED) BOUNDARY SUPPLIED BY PRE-PACKAGED
\

ARRANGE THE DISCONNECTS AND LCP TO SUIT. 8020 8020


1000
GLOBAL-1000

\
2 Pair #16AWG 7x24 4c #14 TECK90 CABLE PROFESSIONAL STAMP PROJECT NORTH

\
SIZE CONDUITS TO SUIT. MINIMUM CONDUIT SIZE GLOBAL
EQUIPMENT SUPPLIER. WIRING TO BE

Cat 6
M
\

PE
ELEMENT ECIVED

LIT STRAND AL ARMOURED OF 25mm. \ \ \ \ \ \ \ PROVIDED BY THE ELECTRICAL


VFC-840
\

8011 8011 1000

CONTRACTOR.
COAGULANT DOSING PID403A

\
2 Pair #16AWG 7x24

\
6 CONTRACTOR TO PROVIDE A MINIMUM OF 212c - 4c #12 AWG TECK90 CABLE
\

TE
ELEMENT ECIVED

TIT STRAND AL ARMOURED 2 Pair #16AWG 7x24 STRAND AL


#14 AWG WIRING VIA TECK90 CABLING TO THE 15c #14AWG TECK90 CABLE \ \ \ \ \ \
ARMOURED
\

8012 8012 PLC PANEL VIA THE MCC. EXACT CONDUCTOR \ \ \ \ \ \ \


ELEMENT

PE
DEVICE

LIT LCP-8001 Cat 6 Cat 6

\
2 Pair #16AWG 7x24

\
COUNT PER CABLE AND ASSOCIATED NUMBER OF LCP-4019 8030 8030
GLOBAL-1000
\

TE
ELEMENT ECIVED

TIT STRAND AL ARMOURED GLOBAL-1000

2 Pair #16AWG 7x24 STRAND AL


CABLES TO BE COORDINATED WITH THE 4 Pair #16 AWG 7X24 STRAND AL ARMOURED
8013 8013 ARMOURED
\

ELEMENT DEVICE

PROPOSED MCC LAYOUT AND SITE CONDITIONS. 10c #14AWG TECK90 CABLE PE LIT 4c #12 AWG TECK90 CABLE

\
\
GLOBAL

M 8035 8035
REFER TO DRAWING E000A FOR CABLE DETAILS. \ \ \ \ \ \
\

DIGESTER MIXER
VFC-941 \ \ \ \ \ 4 Pair #16AWG 7x24 STRAND AL
CONTROL PANEL 1000 MAG MAG ARMOURED LCP-8002
\

ELEMENT DEVICE
GLOBAL-1000

4c #14AWG TECK90 CABLE FE FIT

\
7 CONTRACTOR TO PROVIDE A MINIMUM OF 28

\
15c #14 TECK90 DEVICE

LSH 8036 8036


CABLE PAIRS OF #16 AWG 7X24 STRAND WIRING VIA 4 4021 \ \ \ \ \
4c #14 AWG TECK90 CABLE PROJECT:
\

4c #14 TECK90 LCP-8013 TECK90 CABLING TO THE PLC PANEL VIA THE MCC.
DEVICE
\

\ \ \ \ \ ZSS
CABLE GLOBAL-1000

EXACT PAIR COUNT PER CABLE AND ASSOCIATED 4c #14AWG TECK90 CABLE 8106 \ \ \ \ \ MUNICIPALITY OF NORTH

\
CENTRATE TRANSFER
DEVICE

\ \ \ \ LSH
NUMBER OF CABLES TO BE COORDINATED WITH \ \ \ \ \
4022 PUMPS LOCAL CONTROL GRENVILLE - WATER POLLUTION
\

LD-MIX-803 INTEGRAL 50c #14 TECK90


\

0001-LABOLG
THE PROPOSED MCC LAYOUT AND SITE P-811 PANEL
4c #14AWG TECK90 CABLE CABLE CABLE

\
CONDITIONS. REFER TO DRAWING E000A FOR CONTROL PLANT EXPANSION
GLOBAL-1000
DEVICE
8 4c #14 TECK90
CABLE DETAILS.
LSH
\ \ \ \ \ \ \ \ \ \ \
DIGESTER SLUDGE 4023 CABLE 4 TRIADS #16 AWG 7X24
PHASE - A
\

RECIRCULATION PUMPS 40c #14 TECK90 \ \ \ \ LCP-8032


STRAND AL ARMOURED

\
8 PROVIDE EMPTY RGS RACEWAY TO ROUTE THE 2 Pair #16AWG 7x24 STRAND AL GLOBAL-1000

LOCAL CONTROL PANEL CABLE KEMPTVILLE, ONTARIO


\

RAD RAD ARMOURED LD-P-811 8 INTEGRAL CABLE


4c #14 TECK90 \ \ \ \ \ CONTROL CONDUCTORS INSIDE THE INTEGRAL LE
ELEMENT DEVICE

LIT P-812
\

GLOBAL-1000
\

CABLE PUMP CABLE THROUGH THE DISCONNECT BACK 4026 4026


GLOBAL-1000

8 4 Pair #16AWG 7x24 STRAND IN RGS COND. 4 Pair #16AWG 7x24 STRAND AL DRAWING:

\
\ \ \ \ LCP-8018 4 TRIADS #16 AWG 7X24 TO THE LCP FOR TERMINATION INSIDE LCP. 6c #14AWG TECK90 CABLE AL ARMOURED ELEMENT
MAG DEVICE
MAG ARMOURED
\

FE FIT
GLOBAL-1000

LD-P-807 STRAND AL ARMOURED U/S U/S \ \ \


ELECTRICAL

December 5, 2023 3:14:57 PM


ENSURE THE INSTALLATION FACILITATES THE LE
ELEMENT DEVICE

LS SLUDGE HOLDING 8101 8101


\

GLOBAL-1000

EASY REMOVAL AND RE-INSTALLATION OF EACH 2 Pair #16AWG 7x24 STRAND AL


4029 4029
DIGESTER UPGRADES
\

4c #14 TECK90 TANK MIXER LOCAL

\
4c #14 TECK90 4 Pair #16AWG 7x24 STRAND PUMP AND ASSOCIATED INTEGRAL CABLING. LD-P-812 ELEMENT DEVICE
ARMOURED
\

GLOBAL-1000

CABLE CONTROL PANEL TE TT


CABLE AL ARMOURED ARRANGE THE DISCONNECTS AND LCP TO SUIT. P-408 MIX-801 8102 8102
20c #14 TECK90
\

0001-LABOLG

15c #14AWG TECK90 CABLE 5 2 Pair #16AWG 7x24 STRAND AL


\ \ \ HOT WATER SIZE CONDUITS TO SUIT. MINIMUM CONDUIT SIZE \ \ \ \ \
GLOBAL-1000

CABLE
LD-P-808 RECIRCULATION PUMP 10W
5 \ \ \ \ \ \
INTEGRAL CABLE
ELEMENT DEVICE
ARMOURED CONTROL BLOCK DIAGRAM
\

GLOBAL-1000
OF 25mm. LCP-8031 TE TT
LOCAL CONTROL PANEL 4 Pair #16 AWG 7X24 STRAND AL GLOBAL-1000

IN RGS COND. 8103 8103


\

P-409 ARMOURED \ \ \ \ 4 Pair #16AWG 7x24 STRAND AL


15c #14 TECK90 9 OPEN ENDED CONDUIT AT UPS. 0001-LABOLG

\ 15c #14AWG TECK90 CABLE


\ \ \ \ ELEMENT DEVICE
ARMOURED
4c #14 TECK90 CABLE LD-MIX-801 VE VT
LCP-8019 \ \ \ \ \
10W GLOBAL-1000

4c #14 TECK90 8104 8104 DESIGN:


MM/LO
CABLE GLOBAL-1000

\ 4 Pair #16 AWG 7X24 STRAND AL CABLE


\ \ \ ARMOURED DRAWN: DRAWING #:
MM

PLOT DATE:
LD-P-809
GLOBAL-1000

CHECKED:

JLR #:
JO
29475
I800A
XLS XLS
PLC-800 PLC-800
Table Sheet
Excel Data Exported
Data Exported
on: 05-23-14
on: 2023-12-05
13:24:46 10:00:19 AM Table Sheet
Excel Data Exported
Data Exported
on: 05-23-14
on: 2023-12-05
13:24:46 10:00:19 AM
COMPONENT I/O LIST COMPONENT I/O LIST
CONTROLLER ISA CONTROLLER ISA NEW DEWATERING AND ELECTRICAL SERVICE
DIGESTER CONTROL ENTRANCE BUILDING
IO TAG FUNCTION EQUIPMENT DESCRIPTION LOCATION OPERATION RACK SLOT POINT COMMENTS IO TAG FUNCTION EQUIPMENT DESCRIPTION LOCATION OPERATION RACK SLOT POINT COMMENTS BUILDING 900 SERIES
800 SERIES
DI - 190 0 15 14 AI - 29 LI LIT-8035 Centrate Tank Level Indicator Centrate Storage Tank 1 9 5 NEW AERATION NEW PRIMARY NEW
TANKS CLARIFIERS HEADWORKS
500 SERIES 400 SERIES 200 SERIES
DI - 191 0 15 15 AI - 30 1 9 6
DO - 0 YC P-807 Digester Sludge Recirc Pump #3 - Run Digester Building Basement 1 = RUN 0 2 0 Provide interposing relay to suit AI - 31 1 9 7
DO - 1 YC P-811 Centrate Transfer Pump #1 - Run Centrate Storage Tank 1 = RUN 0 2 1 Provide interposing relay to suit AI - 32 ZI VFC-810 Sludge Hex Hot Water Position Status Centrate Storage Tank 1 10 0 NEW SECONDARY NEW TERTIARY
CLARIFIERS FILTER BUILDING
700 SERIES (PHASE B)
DO - 2 ZC VFC-807 Digested Sludge to Hex Valve - Drive Open Digester Building Basement 1 = OPEN 0 2 2 Provide interposing relay to suit AI - 33 ZI VFC-824 Digester Bldg. Heating Water Loop 3-Way Pos. Status Pipe Gallery 1 10 1 600 SERIES (PHASE B)

DO - 3 ZC VFC-807 Digested Sludge to Hex Valve - Drive Closed Digester Building Basement 1 = CLOSED 0 2 3 Provide interposing relay to suit AI - 34 ZI VFC-825 Heating Water Glycol Hex 3-Way Position Status Centrate Storage Tank 1 10 2
DO - 4 YC MIX-801 Sludge Holding Tank Mixer - Run Sludge Mixing Tank 1 = RUN 0 2 4 Provide interposing relay to suit AI - 35 ZI VFC-826 Sample Room Heating Coil Position Status Sample Room 1 10 3
DO - 5 YC MAU-801 Digester Bldg. Make-Up Air Unit - Run Digester Building Roof 1 = RUN 0 2 5 Provide interposing relay to suit AI - 36 ZI VFC-827 Ferric Sulfate Heating Coil Position Status Digester Building Process Area 1 10 4 EXISTING SERVICE
BUILDING
DO - 6 YC P-815 Digester Glycol Heating Pump - Run Digester Building Basement 1 = RUN 0 2 6 Provide interposing relay to suit AI - 37 ZI VFC-828 Digester MAU Glycol Heating Position Status Digester Building Process Area 1 10 5 300 SERIES

DO - 7 ZC P-408 Ferric Sulfate Metering Pump - Run Ferric Sulphate Storage Room 1 = RUN 0 2 7 Provide interposing relay to suit AI - 38 ZI VFC-845 3-Way Valve Existing Digester Building Pos. Status Existing Digester Building 1 10 6
DO - 8 ZC P-408 Ferric Sulfate Metering Pump - Fwd./Rev Ferric Sulphate Storage Room 1 = FWD 0 2 8 Provide interposing relay to suit AI - 39 ZI VFC-846 Polymer Heat Exchange Valve Pos. Status Digester Building 1 10 7
DO - 9 ZC VFC-820 Sludge Holding Tank Inlet Control Valve - Drive Open Digester Building Basement 1 = OPEN 0 2 9 Provide interposing relay to suit AI - 40 1 11 0 KEY PLAN

DO - 10 ZC VFC-820 Sludge Holding Tank Inlet Control Valve - Drive Closed Digester Building Basement 1 = CLOSED 0 2 10 Provide interposing relay to suit AI - 41 1 11 1
GENERAL NOTES:
DO - 11 YA LCP-4019 Ferric Sulphate Tank Stack Light - Horn Silence Digester Building 0 = SILENCE 0 2 11 Provide interposing relay to suit AI - 42 1 11 2
DO - 12 UAL LCP-4019 Ferric Sulphate Tank Stack Light - Red Light and Horn (Alarm) Digester Building 1 = ON 0 2 12 Provide interposing relay to suit AI - 43 1 11 3 A. AMOUNT AND LOCATION OF INTERPOSING RELAYS,
INTRINSICALLY SAFE BARRIERS, SIGNAL SPLITTERS,
DO - 13 UAL LCP-4019 Ferric Sulphate Tank Stack Light - Amber Light (Warning) Digester Building 1 = ON 0 2 13 Provide interposing relay to suit AI - 44 1 11 4 AND ISOLATION MODULES TBD.
DO 14 0 2 14 Provide interposing relay to suit AI - 45 1 11 5
B. REFER TO DETAIL 1/I022A FOR THE REQUIRED
DO - 15 0 2 15 Provide interposing relay to suit AI - 46 1 11 6 HARDWIRED LOGIC FOR CONTROLLING THE
DO - 16 YC P-808 Digester Sludge Recirc Pump #4 - Run Digester Building Basement 1 = RUN 0 3 0 Provide interposing relay to suit AI - 47 1 11 7 ASSOCIATED STACK LIGHTS AND HORNS.

DO - 17 YC P-812 Centrate Transfer Pump #2 - Run Centrate Storage Tank 1 = RUN 0 3 1 Provide interposing relay to suit AO - 0 SC P-408 Ferric Sulfate Pump Speed Control Ferric Sulphate Storage Room 1 12 0
DRAWING NOTES:
DO - 18 ZC VFC-808 Recirc. Sludge Return Valve - Drive Open Digester Building Basement 1 = OPEN 0 3 2 Provide interposing relay to suit AO - 1 SC P-807 Digester Sludge Recirc Pump #3 Speed Control Digester Building Basement 1 12 1
DO - 19 ZC VFC-808 Recirc. Sludge Return Valve - Drive Closed Digester Building Basement 1 = CLOSED 0 3 3 Provide interposing relay to suit AO - 2 SC P-811 Centrate Transfer Pump #1 Speed Control Centrate Storage Tank 1 12 2 1 PROGRAM THE PLC TO PROVIDE A WATCHDOG
PULSE. THIS PULSE IS TO BE MONITORED BY THE
DO - 20 YC MIX-803 Digester Tank Mixer - Run Digester Tank 1 = RUN 0 3 4 Provide interposing relay to suit AO - 3 SC MAU-801 Digester Make-Up Air Unit Speed Control Digester Building Roof 1 12 3 WATCHDOG TIMING RELAY INSIDE THE PANEL.
DO - 21 YC OCU-801 Digester Bldg. Odour Control Uni - Run Outside Digester Building 1 = RUN 0 3 5 Provide interposing relay to suit AO - 4 1 12 4 COORDINATE PULSE WIDTH AND RELAY SELECTION
TO SUIT. THE INTENT OF THIS FEATURE IS TO
DO - 22 YC P-818 Digester Heating Loop Pump - Run Digester Building Basement 1 = RUN 0 3 6 Provide interposing relay to suit AO - 5 1 12 5 DETECT PLC FAILURE. PROVIDE HARD-WIRED LOGIC
DO - 23 ZC P-409 Ferric Sulfate Metering Pump - Run Ferric Sulphate Storage Room 1 = RUN 0 3 7 Provide interposing relay to suit AO - 6 1 12 6 INSIDE THE PLC PANEL TO ENERGIZE ALL STACK
LIGHTS AND ASSOCIATED HORNS CONNECTED TO
DO - 24 ZC P-409 Ferric Sulfate Metering Pump - Fwd./Rev Ferric Sulphate Storage Room 1 = FWD 0 3 8 Provide interposing relay to suit AO - 7 1 12 7
THIS PLC IN EVENT OF A PLC FAILURE. PROVIDE
DO - 25 ZC VFC-821 Polymer Water Supply Solenoid - Drive Open Digester Building Process Area 1 = OPEN 0 3 9 Provide interposing HOA relay to suit AO - 8 SC P-409 Ferric Sulfate Pump Speed Control Ferric Sulphate Storage Room 1 13 0 LOGIC TO SILENCE THE HORNS VIA A FLUSH HEAD
PUSHBUTTON ON THE PLC PANEL DOOR. LABEL THE
DO - 26 ZC VFC-822 Sludge Conveyor #1 Wash Water - Drive Open Digester Building Waste Room 1 = OPEN 0 3 10 Provide interposing HOA relay to suit AO - 9 SC P-808 Digester Sludge Recirc Pump #4 Speed Control Digester Building Basement 1 13 1
PUSHBUTTON "SILENCE HORNS". PUSHBUTTON
DO - 27 YC LCP-4019 Ferric Sulphate Tank - High Level Alarm Ferric Sulphate Storage Room 1 = ALARM 0 3 11 Provide interposing relay to suit AO - 10 SC P-812 Centrate Transfer Pump #2 Speed Control Centrate Storage Tank 1 13 2 COLOUR TO BE BLUE. HORNS TO BE RE-TRIGGERED
EACH TIME THE PLC FAILS.
DO - 28 YC LCP-4019 Ferric Sulphate Tank - High Level Warning Ferric Sulphate Storage Room 1 = ALARM 0 3 12 Provide interposing relay to suit AO - 11 SC OCU-801 Digester Odour Control Unit Speed Control Outside Digester Building 1 13 3
DO - 29 YC LCP-4019 Ferric Sulphate Tank - Horn Silence Ferric Sulphate Storage Room 1 = SILENCE 0 3 13 Provide interposing relay to suit AO - 12 1 13 4
DO - 30 0 3 14 Provide interposing relay to suit AO - 13 1 13 5
DO - 31 0 3 15 Provide interposing relay to suit AO - 14 1 13 6
DO - 32 YC P-809 Digester Hot Water Recirc Pump - Run Digester Building Basement 1 = RUN 1 4 0 Provide interposing relay to suit AO - 15 1 13 7
DO - 33 ZC VFC-809 Recirc. Sludge Return Valve - Drive Open Digester Building Basement 1 = OPEN 1 4 1 Provide interposing relay to suit AO - 16 ZC VFC-810 Sludge Hex Hot Water Position Control Centrate Storage Tank 1 14 0
DO - 34 ZC VFC-809 Recirc. Sludge Return Valve - Drive Closed Digester Building Basement 1 = CLOSED 1 4 2 Provide interposing relay to suit AO - 17 ZC VFC-824 Digester Bldg. Heating Water Loop 3-Way Pos. Control Pipe Gallery 1 14 1
DO - 35 ZC VFC-941 Ferric Sulfate Tank Isolation Valve - Drive Open Ferric Sulphate Storage Room 1 = OPEN 1 4 3 Provide interposing relay to suit AO - 18 ZC VFC-825 Heating Water Glycol Hex 3-Way Position Control Centrate Storage Tank 1 14 2
DO - 36 ZC VFC-941 Ferric Sulfate Tank Isolation Valve - Drive Closed Ferric Sulphate Storage Room 1 = CLOSED 1 4 4 Provide interposing relay to suit AO - 19 ZC VFC-826 Sample Room Heating Coil Position Control Sample Room 1 14 3
DO - 37 ZC VFC-840 Centrifuge Effluent Water Control - Drive Open Digester Building Process Area 1 = OPEN 1 4 5 Provide interposing relay to suit AO - 20 ZC VFC-827 Ferric Sulfate Heating Coil Position Control Digester Building Process Area 1 14 4
DO - 38 YA YA-8200 Digester Stack Light - Horn Digester Building 1 = ON 1 4 6 Provide interposing relay to suit AO - 21 ZC VFC-828 Digester MAU Glycol Heating Position Control Digester Building Process Area 1 14 5
DO - 39 UAL UAL-8201 Digester Stack Light - Red Digester Building 1 = ON 1 4 7 Provide interposing relay to suit AO - 22 ZC VFC-845 3-Way Valve Existing Digester Building Pos. Control Existing Digester Building 1 14 6 2 PHASE A - ADDENDUM #7 05/12/23
DO - 40 UAL UAL-8202 Digester Stack Light - Amber Digester Building 1 = ON 1 4 8 Provide interposing relay to suit AO - 23 ZC VFC-846 Polymer Heat Exchange Valve Pos. Control Digester Building 1 14 7
DO - 41 UAL UAL-8203 Digester Stack Light - Clear Digester Building 1 = ON 1 4 9 Provide interposing relay to suit 1 PHASE A - ADDENDUM #3 10/11/23

DO - 42 UAL UAL-8204 Digester Stack Light - Blue Digester Building 1 = ON 1 4 10 Provide interposing relay to suit
0 PHASE A ISSUED FOR TENDER 02/10/23
DO - 43 YC PFP-800 Active Power Factor Panel - Inhibit Digester Electrical Room 1 = INHIBIT 1 4 11 Provide interposing relay to suit 1
DO - 44 1 4 12 Provide interposing relay to suit 1 IO TABLE CONT'D - PLC - 800 No. ISSUE / REVISION DD/MM/YY
2
DO - 45 1 4 13 Provide interposing relay to suit SCALE: NTS
I802A This drawing is copyright protected and may not be reproduced or
DO - 46 1 4 14 Provide interposing relay to suit used for purposes other than execution of the described work without
the express written consent of J.L. Richards & Associates Limited.
1 DO - 47 YS CP-8000 PLC Watchdog Pulse 1 4 15 Provide interposing relay to suit XLS

DO - 48 1 5 0 Provide interposing relay to suit VERIFY SHEET SIZE AND SCALES. BAR TO THE
Excel Sheet Data Exported on: 2017-07-11 11:25:22 AM
COMPONENT SUMMARY RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING. 0 25mm
DO - 49 1 5 1 Provide interposing relay to suit
SLOT CATALOG IO IO SCALE:
N.T.S.
DO - 50 1 5 2 Provide interposing relay to suit NUMB. NUMBER MANUFACTURER DESCRIPTION IO TYPE RACK COUNT COMMENTS
DO - 51 1 5 3 Provide interposing relay to suit 0 1756-A17 AB/RA 17 Slot ControlLogix Chassis Miscellaneous 0 0
DO - 52 1 5 4 Provide interposing relay to suit
0 1756-PB75 AB/RA 24VDC Power Supply (13A @ 5V) Miscellaneous 0 0 CLIENT:
DO - 53 1 5 5 Provide interposing relay to suit
0 1756-L84E AB/RA ControlLogix Processor with 20MB NV Memory Processor 0 0
DO - 54 1 5 6 Provide interposing relay to suit
0 1784-SD2 AB/RA 2Gb Secure Digital Memory Card Miscellaneous 0 0
DO - 55 1 5 7 Provide interposing relay to suit
1 1756-EN2T AB/RA EtherNet/IP 10/100 Mbps Bridge Module (128 TCP) Network Card 0 0
DO - 56 1 5 8 Provide interposing relay to suit
2 1756-EN2T AB/RA EtherNet/IP 10/100 Mbps Bridge Module (128 TCP) Network Card 0 0 Used for direction connection to Rack 1.
DO - 57 1 5 9 Provide interposing relay to suit
3 1756-N2 AB/RA Slot Filler Miscellaneous 0 0
DO - 58 1 5 10 Provide interposing relay to suit CONSULTANT: www.jlrichards.ca
4 1756-IB16I AB/RA 16 Point 24 VDC Input Module Isolated Digital Input 0 16 Provide 1756-TBCH Screw Clamp Block
DO - 59 1 5 11 Provide interposing relay to suit
5 1756-IB16I AB/RA 16 Point 24 VDC Input Module Isolated Digital Input 0 16 Provide 1756-TBCH Screw Clamp Block
DO - 60 1 5 12 Provide interposing relay to suit
6 1756-IB16I AB/RA 16 Point 24 VDC Input Module Isolated Digital Input 0 16 Provide 1756-TBCH Screw Clamp Block
DO - 61 1 5 13 Provide interposing relay to suit
DO - 62 1 5 14 Provide interposing relay to suit 7 1756-IB16I AB/RA 16 Point 24 VDC Input Module Isolated Digital Input 0 16 Provide 1756-TBCH Screw Clamp Block

DO - 63 1 5 15 Provide interposing relay to suit 8 1756-IB16I AB/RA 16 Point 24 VDC Input Module Isolated Digital Input 0 16 Provide 1756-TBCH Screw Clamp Block

AI - 0 AI AIT-8300 Sample Room H2S Analyzer Indicator Sample Room 1 6 0 9 1756-IB16I AB/RA 16 Point 24 VDC Input Module Isolated Digital Input 0 16 Provide 1756-TBCH Screw Clamp Block CONSULTANT:

AI - 1 SI P-807 Digester Sludge Recirc Pump #3 Speed Indicator Digester Building Basement 1 6 1 Provide analog signal duplicator 10 1756-IB16I AB/RA 16 Point 24 VDC Input Module Isolated Digital Input 0 16 Provide 1756-TBCH Screw Clamp Block
AI - 2 SI P-811 Centrate Transfer Pump #1 Speed Indicator Centrate Storage Tank 1 6 2 Provide analog signal duplicator 11 1756-IB16I AB/RA 16 Point 24 VDC Input Module Isolated Digital Input 0 16 Provide 1756-TBCH Screw Clamp Block
AI - 3 SI MAU-801 Digester Make-Up Air Unit Speed Indicator Digester Building Roof 1 6 3 12 1756-IB16I AB/RA 16 Point 24 VDC Input Module Isolated Digital Input 0 16 Provide 1756-TBCH Screw Clamp Block
File Location: P:\29000\29475-000 - Kemptville WPCP Expansion Design\3-Production\6-Elect\29475-000 IO List.dwg

AI - 4 SI P-408 Ferric Sulfate Pump Speed Indicator Ferric Sulphate Storage Room 1 6 4 13 1756-IB16I AB/RA 16 Point 24 VDC Input Module Isolated Digital Input 0 16 Provide 1756-TBCH Screw Clamp Block
AI - 5 FI FIT-8036 Centrate Flow Indicator Digester Building Process Area 1 6 5 14 1756-IB16I AB/RA 16 Point 24 VDC Input Module Isolated Digital Input 0 16 Provide 1756-TBCH Screw Clamp Block
PROFESSIONAL STAMP PROJECT NORTH
AI - 6 FI FIT-8102 Digester Gas Flow Indicator Digester Building 1 6 6 15 1756-OB16I AB/RA 16 Point 24 VDC Output Module Isolated Digital Output 0 16 Provide 1756-TBCH Screw Clamp Block
AI - 7 PI PIT-8020 Primary Digester Pressure Indicator Existing Digester Building Roof 1 6 7 16 1756-OB16I AB/RA 16 Point 24 VDC Output Module Isolated Digital Output 0 16 Provide 1756-TBCH Screw Clamp Block
AI - 8 AI AIT-8301 Sample Room CH4 Analyzer Indicator Sample Room 1 7 0 0 1756-A17 AB/RA 17 Slot ControlLogix Chassis Miscellaneous 1 0
AI - 9 SI P-808 Digester Sludge Recirc Pump #4 Speed Indicator Digester Building Basement 1 7 1 Provide analog signal duplicator
0 1756-PB75 AB/RA 24VDC Power Supply (13A @ 5V) Miscellaneous 1 0
AI 10 SI P-812 Centrate Transfer Pump #2 Speed Indicator Centrate Storage Tank 1 7 2 Provide analog signal duplicator
1 1756-EN2T AB/RA EtherNet/IP 10/100 Mbps Bridge Module (128 TCP) Network Card 1 0 Used for direct connection to Rack 0.
AI - 11 SI OCU-801 Digester Odour Control Unit Speed Indicator Outside Digester Building 1 7 3
2 1756-OB16I AB/RA 16 Point 24 VDC Output Module Isolated Digital Output 1 16 Provide 1756-TBCH Screw Clamp Block
AI - 12 SI P-409 Ferric Sulfate Pump Speed Indicator Ferric Sulphate Storage Room 1 7 4
3 1756-IF8I AB/RA Isolated Analog Input Module Analog Input 1 8 Provide 1756-TBCH Screw Clamp Block
AI - 13 1 7 5
4 1756-IF8I AB/RA Isolated Analog Input Module Analog Input 1 8 Provide 1756-TBCH Screw Clamp Block
AI - 14 1 7 6
5 1756-IF8I AB/RA Isolated Analog Input Module Analog Input 1 8 Provide 1756-TBCH Screw Clamp Block PROJECT:
AI - 15 1 7 7
AI - 16 TI TIT-8012 Heat Exch. Sludge Temperature Indicator Digester Building Basement 1 8 0
6 1756-IF8I AB/RA Isolated Analog Input Module Analog Input 1 8 Provide 1756-TBCH Screw Clamp Block MUNICIPALITY OF NORTH
AI - 17 TI TIT-8013 Heat Exch. Water Temperature Indicator Digester Building Basement 1 8 1
7 1756-IF8I AB/RA Isolated Analog Input Module Analog Input 1 8 Provide 1756-TBCH Screw Clamp Block GRENVILLE - WATER POLLUTION
AI - 18 TI TIT-8015 Digester Electrical Room Temperature Indicator Digester Building Electrical Room 1 8 2
8 1756-IF8I AB/RA Isolated Analog Input Module Analog Input 1 8 Provide 1756-TBCH Screw Clamp Block CONTROL PLANT EXPANSION
9 1756-OF8I AB/RA Isolated Analog Output Module Analog Output 1 8 Provide 1756-TBCH Screw Clamp Block
AI - 19 TI TIT-8016 Digester Electrical Room Temperature Indicator Digester Building Electrical Room 1 8 3 PHASE - A
AI - 20 TI TIT-8037 Digester Bldg. Hot Water Supply Temperature Indicator Digester Building Basement 1 8 4 10 1756-OF8I AB/RA Isolated Analog Output Module Analog Output 1 8 Provide 1756-TBCH Screw Clamp Block KEMPTVILLE, ONTARIO
AI - 21 TI TT-8042 Ferric Sulfate Room Supply Air Temperature Indicator Digester HVAC 1 8 5 11 1756-OF8I AB/RA Isolated Analog Output Module Analog Output 1 8 Provide 1756-TBCH Screw Clamp Block
DRAWING:
AI 22 TI TIT-8043 Sample Room Exhaust Air Temperature Indicator Sample Room 1 8 6 12 1756-N2 AB/RA Slot Filler Miscellaneous 1 0
ELECTRICAL

December 5, 2023 3:17:17 PM


AI - 23 TI TT-8044 Digester MAU Supply Air Temperature Indicator Digester Building Process Area 1 8 7 13 1756-N2 AB/RA Slot Filler Miscellaneous 1 0
AI - 24 TI TIT-8045 Polymer Service Water Digester Building Process Area 1 9 0 14 1756-N2 AB/RA Slot Filler Miscellaneous 1 0
DIGESTER UPGRADES
AI - 25 TI FCP-8050 Flare Pilot CP - Flare Pilot Temperature Digester Building Process Area 1 9 1 15 1756-N2 AB/RA Slot Filler Miscellaneous 1 0 COMPONENT LIST & IO TABLES
AI - 26 LI LIT-4026 Ferric Sulfate Tank Level Indicator Ferric Sulphate Storage Room 1 9 2 Provide analog signal duplicator 16 1756-N2 AB/RA Slot Filler Miscellaneous 1 0 CONT'D - PLC-800
AI - 27 LI LIT-8011 New Primary Digester Level Indicator Digester Building Basement 1 9 3
AI - 28 LI LIT-8030 Sludge Holding Tank Level Indicator Sludge Holding Tank 1 9 4
DESIGN:
1 LO
1 DRAWN: DRAWING #:
NB

PLOT DATE:
1 IO TABLE CONT'D - PLC - 800 2 COMPONENT LIST - PLC - 800 CHECKED:
I802A SCALE: NTS I802A SCALE: NTS
JLR #:
JO
29475
I802A
Bridge St SPS nearest MH
Colonnade SPS nearest MH
Equinelle SPS nearest MH
Tempo SPS nearest MH