Professional Documents
Culture Documents
E: asmaa.abdulrahman.ie@gmail.com T: 010 61 22 42 16
www.linkedin.com/in/asmaa-abdulrahman/
Planning Engineer
ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ
CAREER SUMMARY
ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ
Professional skills & Interests:
Leadership | Making Decisions and Solving Problems | Working with Work Group | Face-
to-Face Discussions | Dependable person |Scheduling |Report Preparation |Statistical
analysis.
ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ
Education:
Faculty of Engineering (Industrial Engineer Department). Zagazig University,
(Sep 2012 - July 2017).
Planning Engineer at Multi M Group (Mohm Office Furniture) (Dec 2018 – Dec 2020).
Demand Planner at Multi M Group (Mohm Office Furniture) (Feb 2022 – Dec 2022).
Material Planner at Multi M Group (Mohm Office Furniture) for the four Plants (Jan
2021 -Present).
• Responsible for the upholstery plant (One of Multi-M group plants) (Dec 2018 –
Mar 2019).
• Responsible for the Wood plant (One of Multi-M group plants) (Mar 2019 - Dec
2020).
Responsible for the Sheetmetal plant (One of Multi-M group plants) (Jan 2021 –
Dec 2022).
Preparing a Weekly plan for Plant with their different models and send to all departments
according to seals order priorities with the consideration of the daily factory production
rate.
Follow up the production lines, secure all required materials and update the plan
according to sales priorities, works requests and different circumstances.
Follow up prepare purchase requests after checking the following: (stock on hand,
missing shipment, defect reports).
Follow up shipments delivery date for material availability to reschedule the plan.
Follow up with Production department to achieve the required plan and analyze the
percentage that has not been achieved from the plan and study the reasons for that, to be
taken into consideration afterwards.
Run MRP for all plants by Alfa (ERP system).
• Follow up adjustment BOM and the new code.
• SAP user.
Achievements:
- A weekly production plan was created for the factory and the system problems
were avoided manually after no plan was sent to the factory previously due to
system problems.
- Measure the time study for a many products on all work centers by
measuring the time required to do the job for a qualified worker and hence
to establish standard time In addition to Updating the routing on System.
ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ
Material & Production Planner at Unipro_Egypt Company (FMCG) ( Nov 2017 – Nov
2018)
Description
• Analyzes production specifications, plant capacity data and performs mathematical
calculations to determine manufacturing processes and Determine manpower,
equipment and raw materials needed to cover production demand.
• Plans and schedules workflow for each department and operation according to
previously established manufacturing sequences and lead times.
• Work with management in coordinating and planning production activities to
improve runtime.
• Material requirement planning and following up with material and procurement
teams.
• Plan inventory management processes to avoid shortages and excesses.
• Investigate production problem, analyze root causes and provide solutions.
• Follow up plan completion and interfering to get over any obstacles.
Achievements:
- Perform time study for each production line to determine the rate of production
and labors.
- Establish calculation sheets to determine equipment and labor requirements
for production plan and Material plan monthly & follow up daily for actual
production & Material plan.
- Analyze the present method of doing a job, systematically in order to develop a new
and better method.
- Helping in maintain minimum inventory levels.
- On time availability of the right materials required for production.
ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ
RELEVANT Projects:
ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ
Graduation project: Impact of ERP systems implementation and
Production control on an industry in Electrolux Company, Excellent grade,
(11/2016 - 6/2017).
Achievements:
Increase the utilization of ERP system in Electrolux Company by Make the
production plan which the system launch feasible and sensible.
ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ
S&OP Project at Symbiosis, (1 /2021- 5/2021).
ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ
OTHER RELEVANT INFORMATION
CPIM – Part 1 (Basics of Supply Chain Management) (25 hours) (MOHM Office
Furniture).