You are on page 1of 5

Asmaa Abdulrahman

E: asmaa.abdulrahman.ie@gmail.com T: 010 61 22 42 16

www.linkedin.com/in/asmaa-abdulrahman/

Planning Engineer

‫ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬
CAREER SUMMARY

I graduated from Zagazig University with a bachelor's degree in Industrial Engineer,


an attended workshops for the first model of Basic of Supply Chain (BSCM) for
Management Certified Productions and Inventory Management (CPIM – Part 1), I
study self-study Project Management Professional (PMP) & CPIM (Part 2) courses, I
attended 15 supply chain &logistics events in Cairo, Alexandria, and Zagazig.

‫ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬
Professional skills & Interests:
Leadership | Making Decisions and Solving Problems | Working with Work Group | Face-
to-Face Discussions | Dependable person |Scheduling |Report Preparation |Statistical
analysis.

‫ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬

Education:
 Faculty of Engineering (Industrial Engineer Department). Zagazig University,
(Sep 2012 - July 2017).

 Graduation project: Impact of ERP systems implementation and Production


control on an industry in Electrolux Company, Excellent grade,
(Nov 2016 – June 2017).
 Industrial Technical Institute, Excellent grade, (Sep 2008 –May 2010)
 secondary Technical School, Excellent grade,(Sep 2005 –May 2008)

 Main subjects / occupational skills covered at my University:

Supply Chain Lean&6 Sigma Production Quality Facility layout


Management Manufacturing Planning Management Planning
Logistics Strategy System analysis Operation Modeling
Management Research Systems
Forecasting Safety Simulation Maintenance Project
Models Planning Management
Experience:
Senior Planning Engineer at Multi M Group (Mohm Office Furniture) (Jan 2021 –
Present).

Planning Engineer at Multi M Group (Mohm Office Furniture) (Dec 2018 – Dec 2020).

Demand Planner at Multi M Group (Mohm Office Furniture) (Feb 2022 – Dec 2022).

Material Planner at Multi M Group (Mohm Office Furniture) for the four Plants (Jan
2021 -Present).

Planning Enginner Description

• Responsible for the upholstery plant (One of Multi-M group plants) (Dec 2018 –
Mar 2019).
• Responsible for the Wood plant (One of Multi-M group plants) (Mar 2019 - Dec
2020).

Responsible for the Sheetmetal plant (One of Multi-M group plants) (Jan 2021 –
Dec 2022).

 Preparing a Weekly plan for Plant with their different models and send to all departments
according to seals order priorities with the consideration of the daily factory production
rate.
 Follow up the production lines, secure all required materials and update the plan
according to sales priorities, works requests and different circumstances.
 Follow up prepare purchase requests after checking the following: (stock on hand,
missing shipment, defect reports).
 Follow up shipments delivery date for material availability to reschedule the plan.
 Follow up with Production department to achieve the required plan and analyze the
percentage that has not been achieved from the plan and study the reasons for that, to be
taken into consideration afterwards.
 Run MRP for all plants by Alfa (ERP system).
• Follow up adjustment BOM and the new code.

Demand Planner Description:


• Develop effective forecast models based on industry trends and demand patterns.
• Propose and implement solutions to improve demand forecast accuracy.
• Successfully communicate forecast and inventory estimations to management.
• Monitor and report on important changes in sales forecasts, budgets, and business
strategies.
• Address demand-related issues in a timely and effective manner.
Material Planner Description:
• Determining the required materials and possibly generating purchase orders.
• Ensuring the consistent and adequate supply of materials necessary for production.
• Coordinating with other departments regarding production goals, timelines, etc.
• Tracking production volume and monitoring customer demand patterns.
• Scheduling and overseeing the supply and delivery of materials and products.
• Liaising with operations, manufacturing, and purchasing.
• Managing inventory issues, schedule changes, and cancellations.

• Preparing daily/weekly/monthly meetings and formulating required reports For


Example (Open Orders for Sales, Delayed Orders Analysis per Plant, Productivity
per plant, Finished Good in Warehouse per Plant, On Time Delivery, ABC
classification Report for All Items …).

• SAP user.

Achievements:

- A weekly production plan was created for the factory and the system problems
were avoided manually after no plan was sent to the factory previously due to
system problems.

- Measure the time study for a many products on all work centers by
measuring the time required to do the job for a qualified worker and hence
to establish standard time In addition to Updating the routing on System.

- Participate in the implementation the 5S methodology with Production


Department and Resulting in improved productivity.

‫ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬
Material & Production Planner at Unipro_Egypt Company (FMCG) ( Nov 2017 – Nov
2018)

Description
• Analyzes production specifications, plant capacity data and performs mathematical
calculations to determine manufacturing processes and Determine manpower,
equipment and raw materials needed to cover production demand.
• Plans and schedules workflow for each department and operation according to
previously established manufacturing sequences and lead times.
• Work with management in coordinating and planning production activities to
improve runtime.
• Material requirement planning and following up with material and procurement
teams.
• Plan inventory management processes to avoid shortages and excesses.
• Investigate production problem, analyze root causes and provide solutions.
• Follow up plan completion and interfering to get over any obstacles.

Achievements:
- Perform time study for each production line to determine the rate of production
and labors.
- Establish calculation sheets to determine equipment and labor requirements
for production plan and Material plan monthly & follow up daily for actual
production & Material plan.
- Analyze the present method of doing a job, systematically in order to develop a new
and better method.
- Helping in maintain minimum inventory levels.
- On time availability of the right materials required for production.

‫ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬

RELEVANT Projects:
‫ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬
 Graduation project: Impact of ERP systems implementation and
Production control on an industry in Electrolux Company, Excellent grade,
(11/2016 - 6/2017).
 Achievements:
Increase the utilization of ERP system in Electrolux Company by Make the
production plan which the system launch feasible and sensible.
‫ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬
 S&OP Project at Symbiosis, (1 /2021- 5/2021).

‫ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬
OTHER RELEVANT INFORMATION

Languages: English ((Professional Proficiency), Arabic (Native or


bilingual proficiency).
Computer Skills: Excellent at word, Excellent at Power Point, Excellent
at Excel & Excellent at Power PI.
‫ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬
Courses:
 CPIM – Part 1 (Basics of Supply Chain Management) (30 hour) (Eng. Mohamed
Rady) (7/2016).

 Supply Chain Fundamentals (( 20 Hours)( Career Advancers)( 20 Dec2017)

 CPIM – Part 1 (Basics of Supply Chain Management) (25 hours) (MOHM Office
Furniture).

 CPIM – Part 2 (In Progress).

 Project Management (In Progress).


‫ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ‬
Extracurricular Activities:

 SCS - Supply Chain Society, volunteer, I organized 2events and 2


workshops to know about supply chain field. (9/2016 – 1/2017)

 Resala Organization, volunteer, I taught 50 children Arabic and I


organized more than 10 events for learning English and German. (7/2015
– 4/2017

You might also like