Jti - Menthol Room Works 23-004 Rev001
Jti - Menthol Room Works 23-004 Rev001
E-mail: sunra.construction04@gmail.com
BILL OF QUANTITIES
Quotation No. 23-004
ATTENTION: Mr. Alex Aguilar
TO : Clean Air Construction and Supply
PROJECT: MENTHOL ROOM WORKS
LOCATION : JTI, San Fernando , Malvar Batangas
ITEM DESCRIPTION UNIT QTY UNIT COST AMOUNT
SCOPE OF WORKS:
• Mobilization
• Erection fo Scaffolding
• Existing Wall Demolition
• Dismantling of System Grounding
• Dismantling of MPS and Strobe light
• Installation of Support for roll up door
• CHB Laying
• Plastering Works
• Relocation of System Grounding
• Relocation of MPS and Strobe light
• Installation of drywall
• Painting works
• Termination of Power Supply for Roll up door
LABOR COST
Labor lot 1 230,000.00
GENERAL REQUIREMENTS
Mobilization / Demobilization lot 1 10,000.00
Accomodation lot 1 10,000.00
Transportation / Deliveries lot 1 5,000.00
OSH Management lot 1 5,000.00
Miscellaneous lot 1 5,000.00
Subtotal: 265,000.00
VAT 12 % 31,800.00
DISCOUNT:
Grand Total 296,800.00