Safe Work Execution Plan

Contractor:PACE
Scope of Activity : Stractural
Assessment

Activity
(sequential phases, steps, tasks or Hazards present during the assiociated action
actions to be done)
Please attached a separate sheet if necessary.

List of Workers:

Prepared by: Approved by:


Ritzchel Zaragosa
Contactor Project In-Charge

EHS-014-F1-001
k Execution Plan
Work Duration: 10/26/2023 to 12/31/2023

Location of Working Area: Plantwide

Actions or controls to be taken to protect personnel and address each


hazard identified
List of Tools & Equipment: