S.No Page No. Section Name Section No. Statement as per RFP Query by Bidder AIC Response
For DR, in case the bidder has quoted a value, the bill
amount payable is limited to the number quoted and
ii. In case service is not listed in BoM or a variation of
cannot be higher than the quoted value irrespective of
26 66 Payment Schedule 6.2 service is not listed in BoM, the payments shall be made Refer Pre-Bid Query response to S. No 8
DR required. Also, how are you ensuring that DR
based on actual invoice.
capacity provisioned is exactly 25% or more for every
minute of the project as this cost is taken as lumpsum.
Any deviation in such measurement will give undue
advantage to bidder undertaking financial engineering in
bid price. Also, we request that BoM be proposed by
bidder for DR to ensure trasnparancy and that the DR be
always maintained for such quoted infra in "always On-
Mode"
C. Penalties: The commercial bid doesn't have any separate cost for
"Support". Please clarify whether the penalty will be
S No. 2, Table for Penalties, Column 2 header levied on the total monthly cost (including cloud
27 69 Service Level Agreement 7 Refer Pre-Bid Query response to S. No 9
services, manpower costs, etc.) or whether it will be
"Penalty as % of the Monthly payment for Support to the levied only for a specific cost component. If so, please
Bidder" specify the cost component.
As per the table, maximum of 3% of monthly costs shall
be levied for IT infrastructure availability of up to 85%.
To avoid ambiguity, request you to please confirm
which one of the following understanding is correct:
2 The CSP must offer operating systems (Linux, RHEL, Request to modify the clause:
Annexure 1 - Windows) for the VMs for both reserved and on demand The CSP/Bidder must offer operating systems (Linux,
69 Annexure 1 - 2.1.1 Kindly refer corrigendum
2.1.1 VMs. RHEL, Windows) for the VMs for both reserved and on
demand VMs.
S.No Page No. Section Name Section No. Statement as per RFP Query by Bidder AIC Response
4 The CSP should provide/support of relational database Request to modify the clause as :
service (like but not limited to Oracle DB, MySQL, The CSP/bidder should provide/support of relational
SQL, Windows SQL as applicable) provided as a native database service with enterprise support (like but not
cloud service (and not marketplace) enabling handling limited to Oracle DB, MySQL, Windows SQL as
Annexure 1 - of routine database tasks such as provisioning, patching,
70 Annexure 1 - 2.1.2 applicable) provided as a cloud service enabling Kindly refer corrigendum
2.1.2 backup, recovery, failure detection, and repair etc. handling of routine database tasks such as provisioning,
patching, backup, recovery, failure detection, and repair
etc.
4 Annexure 1 - Compression and Deduplication: The CSP managed File Request to remove this clause as it is Internal to CSP
71 Annexure 1 - 2.1.3 No change in RFP
2.1.3 System should support compression and deduplication. internal architecture and solution.
8 The native security module should have ability to Request to modify the clause as :
Annexure 1 - provide high availability and load balancing. The native security module should have ability to
72 Annexure 1 - 2.1.3 No change in RFP
2.1.3 provide high availability with 99.9% SLA with
capability of backup and restore as per FIPS standard.
BOM Usage - on demand Request to add below point under "Important note" in
commerical template:
The CSP should offer on-demand pricing, no
Reserved instance(RI) prices will be accepted.
Annexure 2 - Reserved Instance will be considered non compliance
Annexure 2 - Bill of
73 Bill of unless specified in BOQ. As per RFP
Material
Material
Also, mention that :
Physical core to vCPU ratio- up to 1:2 for all
environments and services.
BOM 3rd & 4th Line item It seems typo.
Please make " Compute Services - Linux Red Hat
Annexure 2 -
Annexure 2 - Bill of Enterprise (RHEL) OS - Usage -1 year Reserved
74 Bill of Kindly refer corrigendum
Material Instance" as
Material
Compute Services - Linux/ Red Hat Enterprise
(RHEL) OS - Usage -1 year Reserved Instance"
6 The CSP should offer content delivery network service Request to modify the clause
to speed up distribution of static and dynamic web "The CSP/Marketplace should offer content delivery
Annexure 1 -
75 Annexure 1 - 2.1.4 content. CSPs should have content delivery network network service to speed up distribution of static and Kindly refer corrigendum
2.1.4
edge locations in India. dynamic web content. CSPs/Marketplace should have
content delivery network edge locations in India."
8 The native security module should have ability to Request to modify the clause as :
Annexure 1 - provide high availability and load balancing. The native security module should have ability to
76 Annexure 1 - 2.1.3 Refer Pre-Bid Query response to S. No 72
2.1.3 provide high availability with 99.9% SLA with
capability of backup and restore as per FIPS standard.
BOM Annexure 2 - Managed file system with high availability1. Should be Request to modify as :
Annexure 2 - Bill of
77 Bill of SSD based storage Managed file System/bidder supported system with high Kindly refer corrigendum
Material
Material 2. Should support both SMB and NFS protocols. availablity.
BOM Annexure 2 - Managed File System-Backup - Should have backup of Request to modify as :
Annexure 2 - Bill of
78 Bill of 100% data stored in FileSystem Managed file System Backup /Bidder supported solution Kindly refer corrigendum
Material
Material with high durability of backup.
Annexure 2 -
BOM Annexure 2 - Bill of Managed Active Directory Request to modify as :
79 Bill of No change in RFP
Material Managed Active Directory / Bidder supported
Material
Since high availability is required to be provisioned for
all the VMs, we assume that all database nodes are also
The bidder shall ensure that the cloud platform should
to be provisioned in high availability mode and Bidder
Provisioning of Virtual provide high availability across VMs so that even if any
80 27 2.14.7 needs to provision the cost for the same in the Refer Pre-Bid Query response to S. No 1
Machines (VM) host goes down, all guest virtual machines should be
commercial bid (if needed, beyond the quantities listed
migrated to another host automatically.
in Annexure 2). Please confirm or clarify, in case this
understanding is not correct
2.21.4. There shall be either synchronous (active – Our understanding is that CSP needs to provide
active) or asynchronous replication of data between sufficient network bandwidth and connectivity between
Disaster Recovery (DR)
81 34 2.21 Primary DC and DR and the CSP will be responsible for DC and DR sites. However, Bidder needs to comply for Refer Pre-Bid Query response to S. No 2
Site
sizing and providing the DC-DR replication link so as to RPO and RTO requirements since the infrastructure is
meet the RTO and the RPO requirements. managed by the Bidder. Please confirm.
S No. 2, The Cloud Service Provider (CSP) should have
We assume that the financial data for FY 2019-20,
been offering cloud services (IaaS/PaaS) from at least
FY2020-21 and FY 2021-22 will be acceptable for
82 55 Eligibility Criteria 4.21.1 last 2 financial years with average annual turnover of at No change in RFP
average annual turnover since the data of FY2022-23 is
least Rs. 200 crores in India as on date of bid
still under audit and hence yet to be finalized.
submission.
The estimated cost of this RFP is approx. INR 60 crores
and the minimum annual turnover for the bidders should
be at least INR 50 crores from managing cloud
S No. 5,The bidder should have a minimum annual
services only. Revenue from other streams (i.e. other
turnover of Rs. 20 Crore per year during the last three
than managing cloud services) is irrelevant for the
83 56 Eligibility Criteria 4.21.1 financial years i.e. 2020-21 2021-22 and 2022-23. This Refer Pre-Bid Query response to S. No 3
purpose of this RFP. Since the entire IT infrastructure of
must be the individual company turnover and not of any
AIC, a regulated entity, will be transitioned to cloud as
group of companies.
part of this engagement, AIC must ensure that only
bidders who are well qualified and have a strong cloud
services management experience can participate.
Request customer to change the clause to “ The CSP
S No. 9, The CSP and Bidder should not have been
and Bidder as on date is not blacklisted by any
blacklisted by any Government department/ PSU/ PSE/
84 56 Eligibility Criteria 4.21.1 Central/State Government department or PSU or any No change in RFP
Banks/ Insurance Company in India as on date of the
Banks/Insurance Company owned by the Central
RFP.
Government in India"
The MAF format (provided in 11.8 Annexure 8) is
meant for hardware suppliers and is not relevant for
S No. 10, CSP authorization/Manufacturer Cloud Service Providers. We assume that in lieu of this,
85 57 Eligibility Criteria 4.21.1 CSP 's Letter of Support to the bidder is valid.
Authorization Form (MAF) CSP's Letter of Support to the bidders shall be
acceptable which is the standard practice across Central
and State Government RFPs.
S.No Page No. Section Name Section No. Statement as per RFP Query by Bidder AIC Response
For DR, in case the bidder has quoted a value, the bill
amount payable is limited to the number quoted and
ii. In case service is not listed in BoM or a variation of
cannot be higher than the quoted value irrespective of
90 66 Payment Schedule 6.2 service is not listed in BoM, the payments shall be made Refer Pre-Bid Query response to S. No 8
DR required. Also, how are you ensuring that DR
based on actual invoice.
capacity provisioned is exactly 25% or more for every
minute of the project as this cost is taken as lumpsum.
Any deviation in such measurement will give undue
advantage to bidder undertaking financial engineering in
bid price. Also, we request that BoM be proposed by
bidder for DR to ensure trasnparancy and that the DR be
always maintained for such quoted infra in "always On-
Mode"
C. Penalties: The commercial bid doesn't have any separate cost for
"Support". Please clarify whether the penalty will be
S No. 2, Table for Penalties, Column 2 header levied on the total monthly cost (including cloud
91 69 Service Level Agreement 7 Refer Pre-Bid Query response to S. No 9
services, manpower costs, etc.) or whether it will be
"Penalty as % of the Monthly payment for Support to the levied only for a specific cost component. If so, please
Bidder" specify the cost component.
As per the table, maximum of 3% of monthly costs shall
be levied for IT infrastructure availability of up to 85%.
To avoid ambiguity, request you to please confirm
which one of the following understanding is correct:
For DR, in case the bidder has quoted a value, the bill
amount payable is limited to the number quoted and
ii. In case service is not listed in BoM or a variation of
cannot be higher than the quoted value irrespective of
108 66 Payment Schedule 6.2 service is not listed in BoM, the payments shall be made Refer Pre-Bid Query response to S. No 8
DR required. Also, how are you ensuring that DR
based on actual invoice.
capacity provisioned is exactly 25% or more for every
minute of the project as this cost is taken as lumpsum.
Any deviation in such measurement will give undue
advantage to bidder undertaking financial engineering in
bid price. Also, we request that BoM be proposed by
bidder for DR to ensure trasnparancy and that the DR be
always maintained for such quoted infra in "always On-
Mode"
C. Penalties: The commercial bid doesn't have any separate cost for
"Support". Please clarify whether the penalty will be
S No. 2, Table for Penalties, Column 2 header levied on the total monthly cost (including cloud
109 69 Service Level Agreement 7 Refer Pre-Bid Query response to S. No 9
services, manpower costs, etc.) or whether it will be
"Penalty as % of the Monthly payment for Support to the levied only for a specific cost component. If so, please
Bidder" specify the cost component.
As per the table, maximum of 3% of monthly costs shall
be levied for IT infrastructure availability of up to 85%.
To avoid ambiguity, request you to please confirm
which one of the following understanding is correct:
Amendment sought-:
141 (iv) Effect of Termination: No change in RFP
Notwithstanding any other rights and remedies provided
elsewhere in the Agreement, or the terms of the/Tender
document/Purchase Order, on termination of the
Agreement:
a. AICIL shall have the right to forfeit the Performance
Security of the Successful Bidder in the event of
Termination for Cause in the event of default by the
Bidder.
9.14 Page 81 9.14 Page 81 9.14 Delay’s in Bidder’s Performance The bidder must strictly adhere to the implementation
schedule, as specified in the purchase order / contract,
executed between the Parties for performance of the
obligations, arising out of the purchase contract and any
delay in completion of the obligations by the bidder will
enable AIC to resort to any or all of the following:
9.14.1. Claiming Liquidated Damages
9.14.2. Termination of the purchase agreement fully or
partly and claim liquidated damages.
9.14.3. Forfeiting of Earnest Money Deposit/ invoking
EMD Performance Bank Guarantee
Amendments sought-:
9.14 Delay’s in Bidder’s Performance @Pg. 81
142 The bidder must strictly adhere to the No change in RFP
implementation schedule, as specified in the purchase
order / contract, executed between the Parties for
performance of the obligations, arising out of the
purchase contract and any delay in completion of the
obligations by the bidder will enable AIC to resort to
any or all of the following:
9.14.1. Claiming Liquidated Damages
9.14.2. Termination of the purchase agreement fully
or partly
9.14.3. Forfeiting of Earnest Money Deposit/
invoking EMD Performance Bank Guarantee
2.1.3 Page 5 2.1.3 Page 5 Annexure 1 The CSP should offer ability to retrieve archived data in
143 No change in RFP
of Annexure 1 of Annexure milliseconds.
9.15 Page 81 9.15 Page 81 9.15 Liquidated Damages 9.15.3. The liquidated damages shall be applicable
under the following circumstances: (i) If the deliverables
are not submitted as per schedule, the Bidder shall be
liable to pay 1% of the total cost of the services for delay
of each week or part thereof.
(ii) If the deliverables are not acceptable to AIC, and
144 defects are not rectified to the satisfaction of AIC within No change in RFP
30 days of the receipt of the notice, the Bidder shall be
liable for Liquidated Damages for an amount equal to
1% of the total cost of the Services for every week or
part thereof for the delay.
9.23 Page 85 9.23 Page 85 9.23 Contract Period Contract Continuity- The contract shall terminate only
on explicit correspondence to that effect. Until that time,
successful bidder shall continue to provide the service at
the contracted price per the agreement. As and when
AIC decides to change the current business model/
vendor, successful bidder has to coordinate for
migration of existing AIC Applications to AIC’s new
model without causing disruption of the Services at no
extra cost to AIC. The migration period and the support
required from successful bidder shall be communicated
to successful bidder one month before the transition
starts. AIC shall reserve right to revise the migration
period. During transition period successful bidder shall
145 at least, but not limited to, provide support in terms of No change in RFP
migration support of assets and data, training and
knowledge transfer and any other type of support during
the defined transition period.
Amendments sought-:
9.2.3 Contract Period @Pg. 85
Contract Continuity- The contract shall terminate only
on explicit correspondence to that effect. Until that time,
successful bidder shall continue to provide the service at
the contracted price per the agreement. As and when
AIC decides to change the current business model/
vendor, successful bidder has to coordinate for
migration of existing AIC Applications to AIC’s new
model without causing disruption of the Services at
S.No Page No. Section Name Section No. Statement as per RFP Query by Bidder AIC Response
2.2 page 19 2.2 page 19 2.2 Cloud Infrastructure Design 2.2.16. The Selected Bidder shall ensure that the
proposed solution is working as intended and as per
AIC’s satisfaction post migration and implementation.
Amendments sought-:
146 2.2 Cloud Infrastructure Design @Pg. 19 No change in RFP
2.2.16. The Selected Bidder shall ensure that the
proposed solution is working as per the agreed
documentation post migration and implementation.
4.21.1 (Point 4.21.1 (Point 4.21.1. Eligibility Criteria Purchase Order with the client’s confirmation on having
13) Page 57 13) Page 57 executed the PO to satisfaction.
Amendments sought
Purchase Order with the client’s confirmation on having
147 No change in RFP
executed the PO.
NA NA Query- Legal Content requiring Clarification: This RFP does not have
148 Kindly refer 10.1.9 of the RFP.
a limitation of liability clause.
2.19.2 / Pg 30 2.19.2 / Pg 30 The Selected Bidder shall provide backup solution Please confirm if bidder need to provide "Enterprise
(Disk based backups), covering but not limited to daily, Backup Solution" as part of solution or can propose
weekly, monthly, quarterly, and annual backup functions cloud Native backups.
149 (full volume and incremental) for VM, DB, File system, Refer Pre-Bid Query response to S. No 64
Applications, data and software maintained on the VMs, Also request to clarify if the line item "Backup
Servers and storage systems using Enterprise Backup Management" service in BOM pertains to Enterprise
Solution. Backup requirement
2.19.23 / Pg 2.19.23 / Pg Backup data from DC must be copied to another facility Requst to remove this clause as you have already DC &
32 32 of the Selected Bidder (offsite: except DC & DR) DR. Keeping 3rd copy with bidder will not solve any
monthly. The report and location for the same must also technical purpose.
150 Refer Pre-Bid Query response to S. No 65
be shared with AIC monthly and shall be kept in
encrypted and secured manner.
4.21.1/ Pg 55 4.21.1/ Pg 55 Copy of Certificate of Incorporation or Certified copy of As CSP need to meet the criteria of 200 crores of annual
Partnership Deed turnover, document proof to be modified as :
Letter from Statutory Auditors / Certificate from " Letter from Statutory Auditors / Certificate from
151 Refer Pre-Bid Query response to S. No 66
Chartered Accountant on their letterhead mentioning the Chartered Accountant on their letterhead mentioning the
annual revenue from Provisioning Cloud Services in annual revenue of Rs. 200 Crores in India"
India.
Point 4 & Point 4 & No Target performance has been define. Request to define the RTO of 120 minutes & RPO of 30
152 Point 5 / Page Point 5 / minutes post confirmation of declaration of "Disaster" Refer Pre-Bid Query response to S. No 67
69 Page 69 by AIC management/or SPOC.
Annexure 1 - Annexure 1 - All CSP services should be native to CSP’s cloud Request to modify the clause:
1.1 / Pg 1 1.1 / Pg 1 environment. All CSP services should be native to CSP’s cloud
environment, until specified to use from
153 marketplace/bidder provided service in TQ/BOQ with Refer Pre-Bid Query response to S. No 68
enterprise grade support.
Annexure 1 - Annexure 1 - The CSP must offer operating systems (Linux, RHEL, Request to modify the clause:
2.1.1 / Pg 2 2.1.1 / Pg 2 Windows) for the VMs for both reserved and on demand The CSP/Bidder must offer operating systems (Linux,
154 Refer Pre-Bid Query response to S. No 69
VMs. RHEL, Windows) for the VMs for both reserved and on
demand VMs.
Annexure 1 - Annexure 1 - The CSP should provide/support of relational database Request to modify the clause as :
2.1.2 / Pg 4 2.1.2 / Pg 4 service (like but not limited to Oracle DB, MySQL, The CSP/bidder should provide/support of relational
SQL, Windows SQL as applicable) provided as a native database service with enterprise support (like but not
cloud service (and not marketplace) enabling handling limited to Oracle DB, MySQL, Windows SQL as
155 of routine database tasks such as provisioning, patching, applicable) provided as a cloud service enabling Refer Pre-Bid Query response to S. No 70
backup, recovery, failure detection, and repair etc. handling of routine database tasks such as provisioning,
patching, backup, recovery, failure detection, and repair
etc.
Annexure 1 - Annexure 1 - Compression and Deduplication: The CSP managed File Request to remove this clause as it is Internal to CSP
156 Refer Pre-Bid Query response to S. No 71
2.1.3 / Pg 4 2.1.3 / Pg 4 System should support compression and deduplication. internal architecture and solution.
Annexure 1 - Annexure 1 - The native security module should have ability to Request to modify the clause as :
2.1.3 / Pg 8 2.1.3 / Pg 8 provide high availability and load balancing. The native security module should have ability to
157 Refer Pre-Bid Query response to S. No 72
provide high availability with 99.9% SLA with
capability of backup and restore as per FIPS standard.
Annexure 2 - Annexure 2 - Usage - on demand Request to add below point under "Important note" in
Bill of Bill of commerical template:
Material Material The CSP should offer on-demand pricing, no
Reserved instance(RI) prices will be accepted.
Reserved Instance will be considered non compliance
158 unless specified in BOQ. Refer Pre-Bid Query response to S. No 73
Annexure 1: The CSP must offer operating systems (Linux, RHEL, Is OS upgrade is required
187 2 SERVICE NAME: 8 Windows) for the VMs for both reserved and on demand As per scope of work defined in the RFP.
COMPUTE SERVICES VMs.
We request AIC to kindly amend this criteria as below:
Bidder Should have experience in migration to the
Cloud environment along with "Bidder Should have experience in migration to the
Clause No. Clause No.
188 commissioning/implementation/rollout/go live and Cloud environment along with No change in RFP
13, Page 57 13, Page 57
support & maintenance in at least two organization in commissioning/implementation/rollout/go live and
India in the last ten years as of March 31, 2023 support & maintenance in at least ONE organization in
India in the last ten years as of March 31, 2023"
In case of corporate restructuring of a company, We understand that this clause is applicable for all
documentary evidence prior to such any documentary Eligibility Criteria and Technical Marking (4.21.3)
189 Page 58 Page 58 As per RFP
proofs of earlier entity may be considered for eligibility Criteria as well. Kindly confirm if our understanding is
criteria evaluation. correct.
Our understanding is that supporting documents against
this technical scoring will be the same as that of
Supporting Documents under Technical Scoring for
190 Page 60 Page 60 eligibility criteria, i.e. Proof of Payment/ Invoices/ Self As per RFP
Section IV (Experience)
Certification Letter. Kindly confirm if our understanding
is correct.
Supporting Document for Turnover Criteria: We understand that since the RFP Criteria is for the
average annual turnover of the CSP, the average "total"
Clause No. 2 - Clause No. 2 Letter from Statutory Auditors / Certificate from turnover of the CSP should be mentioned on the CA
191 No change in RFP
Page 55 - Page 55 Chartered Accountant on their letterhead mentioning the Certificate and not just turnover from provisioning of
annual revenue from Provisioning Cloud Services in cloud services. Kindly confirm if our understanding is
India correct.
S.No Page No. Section Name Section No. Statement as per RFP Query by Bidder AIC Response
We request AIC to kindly amend this criteria as below:
Bidder should have experience of executing FIVE (5)
Bidder should have experience of executing FIVE (5)
Projects comprising operation and maintenance of
Clause No. Clause No. Projects comprising operation and maintenance of
192 Cloud Services (IAAS and PAAS) to any Government No change in RFP
12, Page 57 12, Page 57 Cloud Services (IAAS/PAAS) to any Government
Departments/PSU’s/Private Clients from the cloud
Departments/PSU’s/Private Clients from the cloud
service…....
service
Point 4 & Point 4 & Request to define the RTO of 120 minutes & RPO of 30
433 Point 5 / Page Point 5 / No Target performance has been define. minutes post confirmation of declaration of "Disaster" Refer Pre-Bid Query response to S. No 67
69 Page 69 by AIC management/or SPOC.
Request to modify the clause:
All CSP services should be native to CSP’s cloud
environment, until specified to use from
Annexure 1 - Annexure 1 - All CSP services should be native to CSP’s cloud
434 marketplace/bidder provided service in TQ/BOQ with Refer Pre-Bid Query response to S. No 68
1.1 / Pg 1 1.1 / Pg 1 environment.
enterprise grade support.
Annexure 1 - Annexure 1 - Compression and Deduplication: The CSP managed File Request to remove this clause as it is Internal to CSP
437 Refer Pre-Bid Query response to S. No 71
2.1.3 / Pg 4 2.1.3 / Pg 4 System should support compression and deduplication. internal architecture and solution.
Request to modify the clause as :
Annexure 1 - Annexure 1 - The native security module should have ability to The native security module should have ability to
438 Refer Pre-Bid Query response to S. No 72
2.1.3 / Pg 8 2.1.3 / Pg 8 provide high availability and load balancing. provide high availability with 99.9% SLA with
capability of backup and restore as per FIPS standard.
Request to add below point under "Important note" in
commerical template:
The CSP should offer on-demand pricing, no Reserved
instance(RI) prices will be accepted. Reserved Instance
Annexure 2 - Annexure 2 -
will be considered non compliance unless specified in
439 Bill of Bill of Usage - on demand Refer Pre-Bid Query response to S. No 73
BOQ.
Material Material
Also, mention that :
Physical core to vCPU ratio- up to 1:2 for all
environments and services.
It seems typo.
Please make " Compute Services - Linux Red Hat
Annexure 2 - Annexure 2 -
Enterprise (RHEL) OS - Usage -1 year Reserved
440 Bill of Bill of 3rd & 4th Line item Refer Pre-Bid Query response to S. No 74
Instance" as
Material Material
Compute Services - Linux/ Red Hat Enterprise (RHEL)
OS - Usage -1 year Reserved Instance"
Request to modify the clause
The CSP should offer content delivery network service
"The CSP/Marketplace should offer content delivery
Annexure 1 - Annexure 1 - to speed up distribution of static and dynamic web
441 network service to speed up distribution of static and Refer Pre-Bid Query response to S. No 75
2.1.4 / Pg 6 2.1.4 / Pg 6 content. CSPs should have content delivery network
dynamic web content. CSPs/Marketplace should have
edge locations in India.
content delivery network edge locations in India."
Request to modify the clause as :
Annexure 1 - Annexure 1 - The native security module should have ability to The native security module should have ability to
442 Refer Pre-Bid Query response to S. No 72
2.1.3 / Pg 8 2.1.3 / Pg 8 provide high availability and load balancing. provide high availability with 99.9% SLA with
capability of backup and restore as per FIPS standard.
Annexure 2 - Annexure 2 - Managed file system with high availability1. Should be Request to modify as :
443 Bill of Bill of SSD based storage Managed file System/bidder supported system with high Refer Pre-Bid Query response to S. No 77
Material Material 2. Should support both SMB and NFS protocols. availablity.
S.No Page No. Section Name Section No. Statement as per RFP Query by Bidder AIC Response
Annexure 2 - Annexure 2 - Request to modify as :
Managed File System-Backup - Should have backup of
444 Bill of Bill of Managed file System Backup /Bidder supported solution Refer Pre-Bid Query response to S. No 78
100% data stored in FileSystem
Material Material with high durability of backup.
Annexure 2 - Annexure 2 -
Request to modify as :
445 Bill of Bill of Managed Active Directory Refer Pre-Bid Query response to S. No 79
Managed Active Directory / Bidder supported
Material Material
The selected bidder shall be required to migrate, host, for Lift & Shift exisring environment; Migration tool
support and maintain the operations of the cloud infra cosideration is required for which we request you to
and related functions. The existing system will be please share existing environment details below.
1.2 Purpose 1.2 Purpose
446 migrated (Lift & Shift) with all the customizations from 1) No of Environment such as (Prod, UAT, Dev, DR etc). Kindly refer corrigendum
of RFP of RFP
existing legacy platform and should be deployed on 2) No of VM's and Databases in each environment to be
latest generation (Standard x86 based) compatible Cloud migrated.
Infrastructure
The selected bidder shall be required to migrate, host,
support and maintain the operations of the cloud infra
Please confirm Whether all the applicaitons and DB
and related functions. The existing system will be
1.2 Purpose 1.2 Purpose VM's are running on VMWare 6.5 virtalization
447 migrated (Lift & Shift) with all the customizations from Current version being used is VMWare 6.7
of RFP of RFP environment?
existing legacy platform and should be deployed on
latest generation (Standard x86 based) compatible Cloud
Infrastructure
Are you planning to upgrade Database and Forms &
Report. If yes,
1) Please share Source & Target Version of the
Database?
2) Please share Total no of Database environment and
1.3 Page no 1.3 Page no Transaction Data Store:- MySQL Enterprise Edition
448 Its size. As per scope of work defined in the RFP.
is 10 & 11 is 10 & 11 Oracle Business Intelligence (Existing solution)
3) Please share Source and Target version of the Forms
and Report
4) total No of Forms and Report.
5) Please o confirm whether all are stadalone OR in
cluster.
1.3 Page no 1.3 Page no DC H/W Details Will be Okay If we will Propose Cloud Native Key
449 May be provisioned.
is 12 is 12 Regarding HSM Management service instead of HSM?
1.4 Page no 1.4 Page no Assuming; Only cloud infra level Support will be
450 The selected bidder has to set up the existing As per scope of work defined in the RFP.
is 12 is 12 required.
connectivity with the SEWA systems to be shifted.
These need to be provisioned in the cloud as File
These are local servers where various AIC users access
1.8 Local 1.8 Local System Servers or equivalent service to meet the same Assuming; all the application servers standalone. Pls
451 departmental files and folders,which are to be migrated
Servers Servers functionality to users (included in Annexure 2, Bill of confirm.
to the cloud.
Materials).
2.1.9. In order to deliver the Scope, the selected bidder
1) The Bidder need to propose the Solution? OR AICIL
will ensure audit logging is enabled on all VMs,
2.1 will provide antivirus and Bidder need to managed ?
2.1 Managing network devices, security devices etc., and the logs are
Managing 2) Are currently Using AD and want to migrate the same
452 the cloud captured & stored. The bidder will ensure logs from As per scope of work defined in the RFP.
the cloud on Cloud? OR A cloud Native user and Domain
infrastructure devices like Anti-Virus, IPS, firewalls, Active Directory,
infrastructure management (IAM & IDS) will be okay?
VPN etc. and logs from the SEWA core application infra
3)
will be suitably integrated and stored
2.3.2. Proposed Solution should be compatible with
2.3 2.3 IPv4 and IPv6 both, and Selected Bidder shall provide
Infrastructure Infrastructure High-level architectural diagram showing different Assuming, MPLS Links and availability will be taken MPLS links and network connectivity are provided by a
453
Analysis and Analysis and layers of solution like Internet, ILL & MPLS care by AICIL. separate vendor.
Build Build Connectivity, Network, Security, Compute, Hardware,
Storage & Backup layers.
The Selected Bidder shall ensure that there is a set of IT
security management processes and tools to ensure
Please confirm Whehter Single biddler can front end
complete security of AIC Cloud solution. An IT security
2.24 Page no 2.24 Page no and can have Back to back with partner for SOC Service Kindly refer section "2.24 Managed Security Services
454 policy, framework, and operational guidelines as per
36 36 . (MSS) & Security Operations Centre (SOC)" of the RFP.
ISO 20000, ISO 27001, ISO 27017, ISO 27018, PCI-
DSS, SOC1, SOC2 and SOC3 must be maintained &
implemented by the Selected Bidder.
Kindly refer "1.3 Current InfoTech Project “SEWA”,
Please confirm whehter this solution will be migrated to point h, under The details of Security Components
455 h) Page no 14 h) Page no 14 Arc Sight SIEM cloud OR it will be continue on Premises with cloud implemented under Project “SEWA ” of the RFP.
integration Kindly refer section "2.24 Managed Security Services
(MSS) & Security Operations Centre (SOC)" of the RFP.
S.No 2 of S.No 2 of
Eligibility Eligibility
The Cloud Service Provider (CSP) should have been Please consider group company turnover. Definition of
Criteria to be Criteria to be
offering cloud services (IaaS/PaaS) from at least last 2 Group Company: A group as defined in Accounting
456 met by the met by the No change in RFP
financial years with average annual turnover of at least Standard (AS) 21 or the companies whose majority
CSP/Bidder CSP/Bidder
Rs. 200 crores in India as on date of bid shareholding is with the
and Page no and Page no
55 55
S.No 3 of S.No 3 of
The Cloud Service Provider (CSP)should have a For CSP and For competitive and vendor agnostic
Eligibility Eligibility
positive net worth for any two years in the last three (3) consideration we request you to consider positive
Criteria to be Criteria to be
financial years in India.Net worth is to be calculated as networth of the bidder for the latest financial year and
457 met by the met by the No change in RFP
follows: Capital Funds (Paid up equity capital + Paid up we humbly seek ammendedment in the clause as
CSP/Bidder CSP/Bidder
preference shares + Free reserves) – (Accumulated follows:The CSP should have positive net worth* for the
and Page no and Page no
balance of last financial year i.e. FY 2022-23.
55 55
S.No 4 of S.No 4 of
Eligibility Eligibility
For bidder and For competitive and vendor agnostic
Criteria to be Criteria to be Bidder should have maintained a positive net-worth in
consideration we request you to consider positive
458 met by the met by the the last three financial years 2020-21 2021-22 and 2022- No change in RFP
networth of the bidder for the latest financial year and
CSP/Bidder CSP/Bidder 23.
we humbly seek ammendedment in the clause as follows:
and Page no and Page no