STAR RAFINERI A.S. CONTRACT N°
AEGEAN REFINERY PROJECT (ARP) S3ST
SH/OF
Project IT requirements and 2/15
Electronic Deliverable STAR SPECIFICATION N°
instruction 000-A-PE-0020002
REV 0 1 2 3 4
TABLE OF CONTENTS
1 General ....................................................................................................................................3
1.1 Scope ..........................................................................................................................3
1.2 Basic Description.........................................................................................................3
1.3 Automation Plan ..........................................................................................................3
1.4 References ..................................................................................................................3
2 IT REQUIREMENTS ................................................................................................................5
2.1 Network Requirements................................................................................................5
2.2 Information Security requirements ..............................................................................5
2.3 Communication ...........................................................................................................5
2.4 IT Requirements for Resident team ............................................................................6
2.5 Site IT Infrastructure....................................................................................................6
3 SOFTWARE APPLICATIONS..................................................................................................7
3.1 2D CAD .......................................................................................................................7
3.2 3D MODEL ..................................................................................................................8
3.3 Instrument Database .................................................................................................10
3.4 Electrical Database ...................................................................................................11
3.5 Line List Data ............................................................................................................11
3.6 Mechanical Equipment List .......................................................................................11
4 ELECTRONIC DELIVERABLES AND FORMATS.................................................................12
4.1 Document Requirements...........................................................................................12
4.2 Additional drawing requirements ...............................................................................13
4.3 Data Handling............................................................................................................13
4.4 Metadata ...................................................................................................................14
4.5 TAG-Document relationships ....................................................................................15
STAR RAFINERI A.S. CONTRACT N°
AEGEAN REFINERY PROJECT (ARP) S3ST
SH/OF
Project IT requirements and 3/15
Electronic Deliverable STAR SPECIFICATION N°
instruction 000-A-PE-0020002
REV 0 1 2 3 4
1 GENERAL
1.1 Scope
The purpose of this specification is to define the Contractor’s automation requirements
with respect to electronic deliverables, electronic deliverable formats and required
software applications to create the electronic deliverables. Additionally, this specification
outlines the requirements for implementation of the automation systems.
All electronic deliverables shall be consolidated at the conclusion of the project for delivery
to Owner. Contractor is responsible for managing all documents and deliverables
produced and or updated as part of the Services of the Project. The requirements outlined
in this specification shall also apply to all Contractor’s vendors and Subcontractors.
1.4 References
Table 1 – Abbreviations
Abbreviation Description
CAD Computer-Assisted Design
EDMS Electronic Document Management System
EPC Engineering, Procurement and Construction
PDF Portable Document Format
PFD Process Flow Diagram
P&ID Piping & Instrumentation Diagram
PDS Integraph Plant Design System
SP3D Integraph SmartPlant 3D
SPE Integraph SmartPlant Electrical
SPI Integraph SmartPlant Instrumentation
Number Description
000-A-PE-0020001 Owner Drawing and Document numbering
000-A-PE-0020003 Handling of Engineering and Design documents
000-A-PE-0020005 3D-Model Review and Required Content of a 3D-Model
000-L-PE-0020001 Line list Preparation Instructions
000-J-PE-0020002 Minimum requirements for SPI database
STAR RAFINERI A.S. CONTRACT N°
AEGEAN REFINERY PROJECT (ARP) S3ST
SH/OF
Project IT requirements and 5/15
Electronic Deliverable STAR SPECIFICATION N°
instruction 000-A-PE-0020002
REV 0 1 2 3 4
2 IT REQUIREMENTS
Data sent electronically from Contractor and suppliers to Owner shall be free from viruses.
2.3 Communication
3 SOFTWARE APPLICATIONS
Contractors shall use the following software applications and versions:
Contractor shall comply with all requirements to implement the Owner approved versions
of the project applications.
Any deviations or alternatives from the above listed software applications, versions or
formats must have prior approval from the Owner.
Contractor shall provide native formats of all final project deliverables.
New versions of the above listed applications may be released during the life cycle of the
Work.
All decisions to implement newer versions of the project applications will be at the
discretion of the Owner.
Versions selected shall be identical for all locations.
3.1 2D CAD
3.1.1 General
AutoCAD shall be used to create the 2D drawings of the Facilities with the exception of
drawings developed using 3D software. 2D drawings include the following:
Process Flow Diagrams (PFD)
Material Selection Diagrams (MSD)
Piping & Instrumentation Diagrams (P&ID)
All other drawings not generated from 3D systems.
STAR RAFINERI A.S. CONTRACT N°
AEGEAN REFINERY PROJECT (ARP) S3ST
SH/OF
Project IT requirements and 8/15
Electronic Deliverable STAR SPECIFICATION N°
instruction 000-A-PE-0020002
REV 0 1 2 3 4
3.2 3D MODEL
3.2.1 General
Contractor shall develop a 3D electronic model of the facilities.
The 3D model shall be a complete representation of the plant design, including spatial
configuration, database content, drawing production, document meta-data, etc.
The 3D model shall be utilized during design, constructability reviews, construction
sequencing reviews, and for operator training.
The 3D model shall be delivered to the Owner (as built) prior to the start of
commissioning of each Plant for operator training purposes.
The 3D modeling system must be used to produce required documents like isometrics,
plan and elevation drawings, etc., as well as piping material take-offs.
One of the main objectives of the 3D model is interference checking and data integrity to
reduce the rework during construction to a minimum. This means that all physical objects
that are part of these drawings, reports and/or interference checking will need to be
modeled.
Contractor shall prepare a clash detection procedure, including proposed construction
tolerances and submit to Owner for approval.
STAR RAFINERI A.S. CONTRACT N°
AEGEAN REFINERY PROJECT (ARP) S3ST
SH/OF
Project IT requirements and 9/15
Electronic Deliverable STAR SPECIFICATION N°
instruction 000-A-PE-0020002
REV 0 1 2 3 4
For details see CSA reference documentation. Contractor shall prepare a drawing defining
the partitions physical boundaries.
Resolution:
Sub Units = 1000
Positional Units = 100
File conversions
Be fully compatible with the standard Adobe Acrobat Reader
Documents must be clear and easy to read
Not include any third party file compression
No external references to text fonts are allowed
Pages & drawings correctly orientated
Fast Web View optimized
Fully indexed and searchable text content
For documents over 25 pages chapters to be defined by book marks
Page numbering shown in the Acrobat Reader must match with page number of the
document in the PDF file.
Documents with attachments (appendix, Annex, etc.) should be sent as one merged
PDF file.
4.4 Metadata
Below are several tables of metadata information in the form of Database Tables. Each
Contractor shall deliver the metadata for each document including Tag-Document
relationships in a MS-Access database.
Table 4 - Format of Database Tables
Table Name: Sample
Attribute # 1 data Type Attribute # 1 description
Attribute # n data Type Attribute # n description
The document number must be the same as listed in the Document & Drawing Index. All
major and minor Tag’s shall be captured. Tag numbers must be the same as listed in SPI,
SPE, Mechanical Equipment list and Line List.
End of Specification