4.2 Monitoring of BFG (Carbon Monoxide gas) with CO monitor by safety person at selected areas in MBF &DIP
Divisions once in a month
DIP DIVISION
1. AF-01,02,03 demister Platform Out Side
2. AF-01,02,03 U seal Pot
3. AF-01,02,03 heating zone duct platform outside
4. AF-01,02,03 socking zone main shutoff valve Platform area out side
5. AF-01,02,03 main set up valve
6. BFG gas blower
7. BFG air blower (Ground Floor)
8. BFG exhaust blower ground floor outside the duct
9. AF-01,02,03 Boiler Inlet
10. AF-01,02,03 Boiler Outlet
MBF Division
1. Power Plant Blower
1. PCI Mill Flue Gas
2. Flare Stack Seal Pot
3. Sinter Bed Pre-Heater
4. Mechanical Workshop (Top)
5. Mechanical Workshop (Ground Floor)
6. U-Seal Pot (Near to Dining Area)
7. Stoves Pre-Heater
8. Rice Hauls Area
9. Tail ESP DIP Part
10. Railway Track Road Side
11. Sinter Building
12. Tail ESP
13. Power Plant Blower
14. PCI Seal Pot
15. New Thickener Area
16. GCP Area
17. Old Thickener Area
18. Furnace Area
Cement
1. Cement Slag Dryer FD Fan
1. Cement Slag Dryer
COP- CPP
1. Battery-1 tunnel to process chimney.
1. Battery-2 tunnel to process chimney.