You are on page 1of 4

Issue # : 03

ELECTROSTEEL CASTINGS LIMITED


Rachagunneri –
517641
SRIKALAHASTHI,AP
E Vg Common Work Instructions
Dept. Code CS SHE Department G7 CS Safety
Manual Code E WICS Standard ISO 14001:2015
Docu. Code EWIG/MM/SHE/01 Ref. Clause # 9.1
Docu. Title Monitoring & Measurement of Noise Level & CO
Level
1.0 PURPOSE:
Electrosteel Castings Limited shall establish, document, implement and maintain instructions to
monitoring CO and Noise level s
2.0 SCOPE
This work instruction is applicable for CO gas and Noise level measuring and monitoring under taken at
Electrosteel Castings Limited.
3.0 RESPONSIBILITY AND AUTHORITY
Safety Dept measures the Noise and CO gas levels at selected areas once in month
Safety dept. will send the collected data to respective dept. at the end of the month.
Any deviations in the data, Safety Dept. will send that data to unit head for corrective actions.
4.0 INSTRUCTIONS
4.1 Measuring and monitoring noise levels using noise meter by safety person at selected areas in all divisions once
in a month i.e. DIP, MBF, COP, FA, STP and CPP & Cement Divisions near the equipment.
Specified ranges will be mentioned in PR stage to get specified range of calibration.
Equipment should be calibrated and calibration certificates should be available
DIP DIVISION
1. Generator room
2. Melting I/F –U/G
3. Melting 1st floor
4. Convertor area
5. Peening M/C – 1
6. Peening M/C – 2
7. Peening M/C – 3
8. Casting shop M/C – 01
9. Casting shop M/C – 08
10. Compressor room
11. Hydraulic room
12. Annealing –Loading
13. Annealing – Unloading
14. FL-1, 2, 3, 4 pipe cutting
15. Zinc coating
MBF division
1. RMHS
2. KSS
3. Blower house
4. PCM
5. Boiler house

Prepared By Approved By Issued By

SIC Safety Senior Vice President SIC Systems


09-02-2023 09-02-2023 09-02-2023
Revision # : 03 Page 1 of 4
Issue # : 03

ELECTROSTEEL CASTINGS LIMITED


Rachagunneri –
517641
SRIKALAHASTHI,AP
E Vg Common Work Instructions
Dept. Code CS SHE Department G7 CS Safety
Manual Code E WICS Standard ISO 14001:2015
Docu. Code EWIG/MM/SHE/01 Ref. Clause # 9.1
Docu. Title Monitoring & Measurement of Noise Level & CO
Level
6. Turbine hall
7. Compressor Room
8. Crusher House
9. Sinter Main Building
10. Finished Sinter Building
11. SMD
12. PMD
13. New Blower House
14. Screening (Proportionate Building)
15. Nitrogen Compressor Room
16. Hammer Mill
17. PCI
18. Sinter Main ID Fan
Cement
1. Kiln – 1 G/F
2. Kiln – 2 G/F
3. Blower house
COP
1. Crusher house
2. Stamping car running
3. stamping station
4. D.G. Room
CPP
1. Turbine hall
2. Blower house
3. B.F.P Room
4. Compressor room
5. D.G.Room
FERRO ALLOYS
1. Metal Yard
1. Compressor Room
2. De-Dusting Unit
3. Main Building-1st , 2nd , 3rd ,4th Floor
4. Feeding Area
5. Workshop
6. Charcoal Shed & Quartz Screening
7. DG Room
STP
1. DG Room
1. RO Plant
2. Equalization Tank Area (STP-1)
3. Final Treated Tank

Prepared By Approved By Issued By

SIC Safety Senior Vice President SIC Systems


09-02-2023 09-02-2023 09-02-2023
Revision # : 03 Page 2 of 4
Issue # : 03

ELECTROSTEEL CASTINGS LIMITED


Rachagunneri –
517641
SRIKALAHASTHI,AP
E Vg Common Work Instructions
Dept. Code CS SHE Department G7 CS Safety
Manual Code E WICS Standard ISO 14001:2015
Docu. Code EWIG/MM/SHE/01 Ref. Clause # 9.1
Docu. Title Monitoring & Measurement of Noise Level & CO
Level
4. Equalization Tank Area (STP-2)

4.2 Monitoring of BFG (Carbon Monoxide gas) with CO monitor by safety person at selected areas in MBF &DIP
Divisions once in a month
DIP DIVISION
1. AF-01,02,03 demister Platform Out Side
2. AF-01,02,03 U seal Pot
3. AF-01,02,03 heating zone duct platform outside
4. AF-01,02,03 socking zone main shutoff valve Platform area out side
5. AF-01,02,03 main set up valve
6. BFG gas blower
7. BFG air blower (Ground Floor)
8. BFG exhaust blower ground floor outside the duct
9. AF-01,02,03 Boiler Inlet
10. AF-01,02,03 Boiler Outlet

MBF Division
1. Power Plant Blower
1. PCI Mill Flue Gas
2. Flare Stack Seal Pot
3. Sinter Bed Pre-Heater
4. Mechanical Workshop (Top)
5. Mechanical Workshop (Ground Floor)
6. U-Seal Pot (Near to Dining Area)
7. Stoves Pre-Heater
8. Rice Hauls Area
9. Tail ESP DIP Part
10. Railway Track Road Side
11. Sinter Building
12. Tail ESP
13. Power Plant Blower
14. PCI Seal Pot
15. New Thickener Area
16. GCP Area
17. Old Thickener Area
18. Furnace Area
Cement
1. Cement Slag Dryer FD Fan
1. Cement Slag Dryer
COP- CPP
1. Battery-1 tunnel to process chimney.
1. Battery-2 tunnel to process chimney.

Prepared By Approved By Issued By

SIC Safety Senior Vice President SIC Systems


09-02-2023 09-02-2023 09-02-2023
Revision # : 03 Page 3 of 4
Issue # : 03

ELECTROSTEEL CASTINGS LIMITED


Rachagunneri –
517641
SRIKALAHASTHI,AP
E Vg Common Work Instructions
Dept. Code CS SHE Department G7 CS Safety
Manual Code E WICS Standard ISO 14001:2015
Docu. Code EWIG/MM/SHE/01 Ref. Clause # 9.1
Docu. Title Monitoring & Measurement of Noise Level & CO
Level
2. Battery-3 tunnel to process chimney.
3. Battery-4 tunnel to process chimney.
4. ID Fan-1 inlet and outlet area.
5. ID Fan-2 inlet and outlet area.
6. ID Fan-3 inlet and outlet area.
7. ID Fan-4 inlet and outlet area.
8. Boiler-1 manhole.
9. Boiler-2 manhole.
10. Boiler-3 manhole.
11. Boiler-4 manhole.
4.3 Online monitors cross checked with portable monitors and record the both values, if there is any
deviation approach calibration party for rectification.
4.4 Will compare with the result with the log book results maintained by the control room operator for BFG
only
4.5 The collected data will be send to respective divisions at the end of every month.
4.6 If there is any deviation in the data, the report will be send to unit head for corrective action.

Prepared By Approved By Issued By

SIC Safety Senior Vice President SIC Systems


09-02-2023 09-02-2023 09-02-2023
Revision # : 03 Page 4 of 4