You are on page 1of 1

ANNEXURE 4: Traffic Planning Team (TPT) job list

S.No Task Details


Collation of data - Preparation of inventory of the data (R.L., curvature, survey
available in demarcation and other relevant data)
Roads & Traffic - Review of the data and finalization of methodology along with GIS data
1 structure for incorporation.
Dept and
incorporation in - Incorporation of data in GIS
GIS
Capacity Preparation of Training design, schedule and conducting training for the
2 Building and Roads & Traffic Department officers (Planning knowledge transfer & GIS
GIS training skills imparting)
- Identification of intersections for junction improvements, installation of
Comprehensive new traffic signals, etc. and execution
3
Mobility Plan - Identification of missing links and problem solving for congestion points
- Establishment of NMT cell
Carry out project preparatory works (Pre-feasibility, Feasibility, Detailed
Project Report, etc. for implementation of traffic and transport
4 Feasibility study
infrastructure) in coordination with other relevant departments of BMC
and organizations MMR/ State Government
Assistance in preparation of annual plan and budgets for the Traffic
5 Annual Plan
Department
- Identification of critical stretches having high pedestrian volume
Pedestrianisation - Survey/ audit and Pedestrian facility assessment to identify gaps in the
6 & Footpath infrastructure
assessment - Preparation of at-grade or grade separated pedestrian facility proposal
for the streets
Junction or - Review of transport proposals prepared by consultants
any other - Preparation of junction designs and implementation in coordination with
7 Dept or ward, ex: traffic island, junction or new RL
transport
related work
- Legal framework follow up with the State
- Institutional set up within BMC
- Support in Mumbai Parking Interface RFP evaluation, scrutiny, selection
of vendor, on-boarding work
- Policy approval from the Corporation
Mumbai Parking - Mumbai Parking Pool
8
Authority - Ward Parking Management Plan implementation
- Signage, enforcement establishment
- Communication and behavior change strategy implementation
- Support for setting up the Mumbai Parking Interface
- Impact assessment after WPMP implementation
- Scrapyard establishment
- Mapping and preparation of plans etc. as per EP notifications for RDDP
2034 and those for 3 SPA areas issued by the UDD from time to time.
- Revision of GIS data of RDDP 2034 and 3 SPA areas incorporating
GIS work for the
requisite changes approved by the State Government vide SM & EP
9 Development
notifications.
Plan Department
- Preparation of Know Your Wards as per the final sanctioned data.
- Providing GIS data for DP remark application and/or providing statistics
as required by DP department.

You might also like