DOC NO.

QSP/PROD/03
QUALITY SYSTEM PROCEDURE MANUAL
REV. NO. 02

EFF. DATE 08.05.2019


TITLE 4M CHANGE PROCEDURE
PAGE 01

PURPOSE : This proedure define the system control of 4M change and prevention from any non-conformance by 4M change and effectively monitoring.

Scope : This is applicable in entire plant to control 4M change.

RESPONSIBILITY ACTIVITY DOCUMENT/RECORD

Identify change in Man / Machine / Material / Method as per 4M Change Management F-PROD-16
PRODUCTION SUPERVISOR System.

PRODUCTION SUPERVISOR Update 4M change board withing 15 minutes of change occur by changing indicator on
4M change board from Green to Red. Shop- FloorMonitoring Board

By following 4M change management system , Monitor 4M change detail in 4M change


F-PROD-13A
PRODUCTION SUPERVISOR tracking sheet

Follow 4M change management system matrix for taking action after 4M Change

Record inspection detail in 4M change tracking sheet . F-PROD-13A


Annexure 4M
QUALITY INSPECTOR ( Follow annexure-4M for Non Applicability of retro check in case of breakdowns )

PRODUCTION SUPERVISOR
4M change sticker used for traceability for product and idetification on part by "C"
Mark.

02 Annexure 4M added 08.05.2019

01 IATF standard added 23.05.2017

REV NUMBER REVISION DESCRIPTION REVISION DATE

Prepared By Approved BY Issued By