Rehabilitation and Up-gradation of NH-66 (Old NH-17) from
Km. 161/600 to Km. 205/400 (Kashedi-Parshuram Ghat
section) to four lanes in the State of Maharashtra under NHDP- IV on Hybrid Annuity Mode
CHECK LIST FOR GRANULAR SUB BASE
Authority : Public Works Department- National Highway Division Independent Engineer : Bloom Companies LLC in Association Credible Management & Consultants Pvt. Ltd. Concessionaire : Kashedi Parshuram Highways Pvt. Ltd. (Kalyan Toll Infrastructure) Location : Date of Inspection : Sr. No Description Yes/No/NA Remark 1 Is the job mix formula approved?
2 Is the under laying Sub Grade layer approved?
Are there adequate grade and survey stakes available 3 for control of placement layer? 4 Is the Placing of material appropriate? Are there adequate numbers of graders available for 5 spreading and leveling of fill? 6 Is checking of loose thickness of layer done? Are there adequate amounts of suitable rollers 7 available for the compaction operation? 8 Is the layer free from any segregation?
Is the finished compacted layer of the specified
9 thickness? Are there any localized wet, soft and under compacted 10 areas? Is there any arrangement for protection of the 11 finished surface? Is the control of moisture during rolling as per 12 method?
For Concessionaire Representative For Independent Engineer
Rehabilitation and Up-gradation of NH-66 (Old NH-17) from Km. 161/600 to Km. 205/400 (Kashedi-Parshuram Ghat section) to four lanes in the State of Maharashtra under NHDP- IV on Hybrid Annuity Mode
CHECK LIST FOR DRY LEAN CONCRETE
Authority : Public Works Department- National Highway Division
Independent Engineer : Bloom Companies LLC in Association Credible Management & Consultants Pvt. Ltd. Concessionaire : Kashedi Parshuram Highways Pvt. Ltd. (Kalyan Toll Infrastructure) Location : Date of Inspection : Sr. No Description Yes/No/NA Remark
1 In the mix design of DLC approved?
2 In the under laying GSB layer approved?
Are there adequate grade and survey stakes available 3 for control of placement layer? 4 Is the Placing of material appropriate?
5 Is there pever available for laying of DLC?
6 Is arrangement for curing available?
Are there adequate amounts of suitable rollers 7 available for the compaction operation?
8 Is the layer free from any segregation?
Is there any arrangement for protection of the
9 finished surface?
10 Is there adequate arrangement of light for night work?
Is the received batch sheet as per approved mix
11 design?
Whether the workers and staff have proper personal
12 protection equipment (PPE)?
For Concessionaire Representative For Independent Engineer