Rehabilitation and Up-gradation of NH-66 (Old NH-17) from

Km. 161/600 to Km. 205/400 (Kashedi-Parshuram Ghat


section) to four lanes in the State of Maharashtra under
NHDP- IV on Hybrid Annuity Mode

CHECK LIST FOR GRANULAR SUB BASE


Authority : Public Works Department- National Highway Division
Independent Engineer : Bloom Companies LLC in Association Credible Management & Consultants Pvt. Ltd.
Concessionaire : Kashedi Parshuram Highways Pvt. Ltd. (Kalyan Toll Infrastructure)
Location : Date of Inspection :
Sr. No Description Yes/No/NA Remark
1 Is the job mix formula approved?

2 Is the under laying Sub Grade layer approved?


Are there adequate grade and survey stakes available
3
for control of placement layer?
4 Is the Placing of material appropriate?
Are there adequate numbers of graders available for
5
spreading and leveling of fill?
6 Is checking of loose thickness of layer done?
Are there adequate amounts of suitable rollers
7
available for the compaction operation?
8 Is the layer free from any segregation?

Is the finished compacted layer of the specified


9
thickness?
Are there any localized wet, soft and under compacted
10
areas?
Is there any arrangement for protection of the
11
finished surface?
Is the control of moisture during rolling as per
12
method?

For Concessionaire Representative For Independent Engineer


Rehabilitation and Up-gradation of NH-66 (Old NH-17) from
Km. 161/600 to Km. 205/400 (Kashedi-Parshuram Ghat
section) to four lanes in the State of Maharashtra under
NHDP- IV on Hybrid Annuity Mode

CHECK LIST FOR DRY LEAN CONCRETE

Authority : Public Works Department- National Highway Division


Independent Engineer : Bloom Companies LLC in Association Credible Management & Consultants Pvt. Ltd.
Concessionaire : Kashedi Parshuram Highways Pvt. Ltd. (Kalyan Toll Infrastructure)
Location : Date of Inspection :
Sr. No Description Yes/No/NA Remark

1 In the mix design of DLC approved?

2 In the under laying GSB layer approved?


Are there adequate grade and survey stakes available
3
for control of placement layer?
4 Is the Placing of material appropriate?

5 Is there pever available for laying of DLC?

6 Is arrangement for curing available?


Are there adequate amounts of suitable rollers
7
available for the compaction operation?

8 Is the layer free from any segregation?

Is there any arrangement for protection of the


9
finished surface?

10 Is there adequate arrangement of light for night work?

Is the received batch sheet as per approved mix


11
design?

Whether the workers and staff have proper personal


12
protection equipment (PPE)?

For Concessionaire Representative For Independent Engineer