You are on page 1of 2

Kentucky Information Highway (KIH)

Rollout
Clean-Up Check list
SITE: IT Contact:

FURTHER WORK
TASK COMPLETED
REQUIRED
Network
Patch panel labeled properly
Cabling traceable
HUB, CSU/DSU, ROUTER readable
HUB, CSU/DSU, ROUTER located in environmentally
controlled area
HUB ports total
HUB ports used
Patch panel ports total
Patch panel ports used
CPU Clock Speed

Atleast a Pentium 300 on all computers on the LHD domain


RAM
Atleast 64 MB of RAM on all computers
PRINTERS
All printers installed with the correct drivers for BRIDGE to
work properly (I.e. Epson FX3010 for lexmark forms
printers and Generic Text for Data South forms printers)
Network printers installed
OPERATING SYSTEM
Windows NT 4.0 Workstation installed on all computers
SOFTWARE
Outlook set-up properly for each user
Microsoft Office 2000 Installed
Microsoft Office 97 Installed on HANDS computers
Bridge 32 installed on all computers
Secure remote installed on all computers with the new
userc.c file
Any additional software installed properly if the user has
the proper license
NetMeeting
BRIDGE
Terminal Environment set-up properly
--Hold in receive turned off in Datacomm handling
--5B and 5D in keyboard functions
Printer environment set-up properly
--Hold in receive turned on in Datacomm handling
--Form feed checked in printer set-up
CONSULTATION TIME
Consultation time with director and/or IT contact
CDP SUPPORT CONTRACT
Site have a contract with CDP for support
IP RANGE
IP Address Range
Gateway
Subnet Mask

KIH CLEAN-UP ACCEPTANCE

LHD Director or Delegate (Print Name and Signature)


Kentucky Information Highway (KIH)
Rollout
Clean-Up Check list

LHD Network Inventory

SITE:

Hard
LHD RAM Drive Windows
Equipment Inventory Computer Computer Serial Computer CPU Speed INSTALLED Capacity NT Office Anti-Virus
Number Name IP Address Number Manufacturer Number Model (MHz) (MB) (MB) License License License
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

You might also like