Professional Documents
Culture Documents
Rollout
Clean-Up Check list
SITE: IT Contact:
FURTHER WORK
TASK COMPLETED
REQUIRED
Network
Patch panel labeled properly
Cabling traceable
HUB, CSU/DSU, ROUTER readable
HUB, CSU/DSU, ROUTER located in environmentally
controlled area
HUB ports total
HUB ports used
Patch panel ports total
Patch panel ports used
CPU Clock Speed
SITE:
Hard
LHD RAM Drive Windows
Equipment Inventory Computer Computer Serial Computer CPU Speed INSTALLED Capacity NT Office Anti-Virus
Number Name IP Address Number Manufacturer Number Model (MHz) (MB) (MB) License License License
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23