Mekdela Amba Tuluawlya Campus SCS work

Professional Service unit price

1 45 cm height concert Fiber path 50 Pcs


Path indicator with labor work indicator production and
installation with level 120.00
2 manhole Production with reinforced cover 154 Pcs
 60 cm Cover diameter
 100 cm depth
 Bedding
1,250.00
3 Excavation and refill of soil Trench excavation not more 3500 meter
than 100 cm depth minimum
60cm and fiber warning tape
work

95.00
4 Installation of FTP/Fiber Cable 5000 meter
Installation FTP/Fiber inside UPVC, inside HDP on road
crosing, manhole placment as
per design
15.00
5 Coble stone and another road Road Crossing and recovering to 100 meter
crossing Original
200.00
6 Camera Mounting with foot Camera Mounting, pool foot 100 pc
construction construction, pole eraction,
camera mounting and Testing
-
7 Fiber Splicing Fiber cable splicing 200 core -
8 Node Instalation Node Instalation (Trunking and 160 pcs
cable installation , Punching …
for one card and CCTV camera
600.00
9 Node instalation though PPR node installation for cameras 500 meter
through PPR tube for security -
10 9u rack mounting , UPS 20 pcs
Rack mounting mounting, Fiber Termination ,
patch pannal mounting 500.00
11 42 U Rack Mounting 42U rack mounting 3 set 1,000.00
12 4 pc
stand alsone camera
Stand Alone camera installation installation, foorting and testing
-
Total
Total Price

6,000.00

192,500.00

332,500.00

75,000.00

20,000.00

-
-

96,000.00

10,000.00
3,000.00

-
735,000.00