Sr No Client Project Scope Year Status

1 Oil and Natural Gas Corporation Relay coordination for offshore SHG plateform (Site • Data collection 2019 Completed
(ONGC) Loaction ‐ Offshore Bombay high, Mumbai) • ETAP modeling
• Relay setting calculation
• Preparation of TCC
• Report drafting
• Training & Discussion on report
2 Oil and Natural Gas Corporation Relay Setting Implementation, Configuration and Testing • Relay setting implementation 2019 Completed
(ONGC) (Site Loaction ‐ Offshore Bombay high, Mumbai) • Configuration of relays
• Secondary Injection testing
• Preparation of TC
3 Powerica Ltd Relay coordination for 50 MW Wind Farm (Site Location ‐ • Data collection 2020 Completed
Gujarat) • ETAP modeling
• Relay setting calculation
• Preparation of TCC
• Report drafting
4 LANCO Solar Gujarat Pvt Ltd Relay coordination for 2 nos 15 MW solar plant (Site • Data collection 2020 Completed
Location ‐ Charanka & Chadiyana) • ETAP modeling
• Relay setting calculation
• Preparation of TCC
• Report drafting
5 Tata Power Ltd Relay coordination for 20 MW solar plant (Site Location ‐ • Data collection 2020 Completed
Gujarat) • ETAP modeling
• Relay setting calculation
• Preparation of TCC
• Report drafting
6 GE Power System India Ltd Arc Flash analysis for Sanand unit • Data collection 2021 Completed
(GEPSIL) (Site Location ‐ Gujarat) • ETAP modeling
• Arc Flash Analysis
• Preparation of Arc Flash Lables
• Report drafting
• Site Activity for Label and Boundaries
• Training & Discussion on report
7 HPCL, Sugali Engineering of Auto Manaul Changeover Scheme using • Data collection 2021 Completed
numerical relay • Relay programming
(Site Location ‐ Sugali) • Relay setting calculation
• Preparation of As Buit Drawing
Sr No Client Project Scope Year Status
8 Ami Lifesciences Pvt Ltd, Karakadi Electrical Safety Audit for Karakadi unit (Site Location ‐ • Data collection & Site survey 2021 Completed
Karakadi, Vadodara) • Report drafting
• Training & Discussion on report
9 Nuvoco Vistas Corp Ltd Relay coordination for cement plant • Data collection & Site survey 2021 Completed
(Site Location ‐ Arasmeta) • ETAP modeling
• Relay setting calculation
• Unit Protection setting calculation
• Preparation of TCC
• Report drafting
• Training & Discussion on report
10 Gujarat Power Corporation Relay coordination for expansion project • Data collection & Site survey 2021 Completed
Limited, Bhavnagar (Site Location ‐ Bhavnagar) • ETAP modeling
• Relay setting calculation
• Preparation of TCC
• Report drafting
11 Gujarat State Fertilizer & Relay coordination for Nylon 6 compounding plant project • Data collection & Site survey 2021 Completed
Chemical Ltd, Vadodara (Site Location ‐ Vadodara) • ETAP modeling
• Relay setting calculation
• Preparation of TCC
• Report drafting
12 Individual ETAP Training ETAP Training • Basic of power system study, ETAP 2021 Completed
modeling, Load Flow Simulation, Short
Circuit Simulation, Relay Setting
Calculation & Coordination, TCC

13 IOCL, Vadodara Testing of numerical relays Secondary injection testing and 2021 Completed
programming of Micom P127 numerical
relay
14 Gujarat State Fertilizer & Relay coordination for11kV, 3.3kV and 415 V network of • Data collection & Site survey 2021 Completed
Chemical Ltd, Vadodara PA Substation, APS Substation and Bagging Plant • ETAP modeling
Substatoin • Relay setting calculation
(Site Location ‐ Vadodara) • Preparation of TCC
• Report drafting
15 SeaDrill Ltd, Dubai Arc Flash analysis for Rig network • Data collection 2021 Completed
• ETAP modeling
• Relay setting calculation
• Preparation of TCC
• Report drafting
• Arc Flash Analysis
Sr No Client Project Scope Year Status
16 Aquachemie Kizad, Abudhabi Review of engineering document of Storage and Blending Review of Following Electrical 2022 Completed
Terminal Engineering documents
• Design Basis
• Single Line Diagram
• Specification of various equipment
• Equipment layout (Substation)
• Earthing & Lightning Layout
(Substation)
• Cable Schedule and Layout
17 Confidential Review of Arc Flash analysis report Review of Power System Study report 2022 Completed
includes following studies.
• Load Flow study
• Short Circuit study
• Relay Coordination study
• Arc Flash study
18 Indian Oil Corporation Ltd (IOCL) Relay Coordination for IOCL, Rajahmundry • Data collection 2022 Completed
• ETAP modeling
• Relay setting calculation
• Preparation of TCC
• Report drafting
19 Indian Oil Corporation Ltd (IOCL) Relay Coordination for IOCL, Visakhapatnam • Data collection 2022 Completed
• ETAP modeling
• Relay setting calculation
• Preparation of TCC
• Report drafting
20 Apicore Pharma Pvt Ltd, Arc Flash analysis for APPL's Dhobikuwa plant. • Data collection 2022 Completed
Dhobikuwa Unit • ETAP modeling
• Relay setting calculation
• Preparation of TCC
• Report drafting
• Arc Flash study
21 Petrocon ECC, Qatar rc Flash analysis for 2049 fong du platform, North field, Qata• Data collection & Site survey 2022 Completed
(Location : Platform ‐ 2049 fong • ETAP modeling
du, North field, Qatar) • Relay setting calculation
• Preparation of TCC
• Report drafting
• Arc Flash study
22 Rubamin Pvt Ltd, Halol Arc Flash Assesment and Analysis • Data collection & Site survey 2022 Completed
• ETAP modeling
• Relay setting calculation
• Preparation of TCC
• Report drafting
• Arc Flash study
Sr No Client Project Scope Year Status
23 Sud Chemie India Pvt Ltd Arc Flash Assesment and Analysis • Data collection & Site survey 2022 Completed
(All Four Unit of Nandesari) • ETAP modeling
• Relay setting calculation
• Preparation of TCC
• Report drafting
• Arc Flash study
24 Adani Wilmar Ltd, Mundra Power System Study • Data collection & Site survey 2022 Running
• ETAP modeling
• Relay setting calculation
• Preparation of TCC
• Report drafting
25 JBF Industries Ltd, Silvassa Power System Study • Data collection & Site survey 2022 Running
• ETAP modeling
• Relay setting calculation
• Preparation of TCC
• Report drafting
26 Confidential Power System Study • Data collection & Site survey 2022 Running
• ETAP modeling
• Relay setting calculation
• Preparation of TCC
• Report drafting
27 Reliance Textile Ltd, Naroda Arc Flash Analysis • Data collection & Site survey 2022 Running
• ETAP modeling
• Relay setting calculation
• Preparation of TCC
• Report drafting
• Arc Flash study