0 ratings0% found this document useful (0 votes) 51 views14 pagesEcoion en
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here.
Available Formats
Download as PDF or read online on Scribd
CO aaa PIV? > ttt
circulating coolant
Water Quality Improvement Equipment
ECOION “ETS-300/500
Instructions Manual
Ver. 0.01@ For safe and proper use of the ECO-ION, please fully
understand this manual before use.
Keep this manual in a safe place where it will not be lost or
damaged,
Table of Contents
Chapter 1 Introduction -
pee
Chapter 2: Precautions for Drug
Application -~ od
Chapter 3 Safety Precautions -
Chapter 4 Specifications
4-1 Equipment Overview ++
4-2 Equipment Configuration +
4-3 Specification List *
4-4 Electrical panel display section ++
4-5 Inside the electrical panel
Chapter 5 Operating Methods
5-1 Preparation for Operation *
5-2 Start of operation
5-3 Shutdown 6
5-4 What to do in case of power outage
Chapter 6 Troubleshooting
6-1 Description of indicator lights *+
6-2 Other =++ “8Chapter 7 Daily/periodic inspections -***++*+++s++=*
8
Chapter 8 Warranty/Contact Information «+
9Chapter 1 Introduction
"Tank you vy me Sor mechan BCOION “ETS-S00" and “BSS
In orderto use thi esoment fray years pease be sre ofa thi truco anu bre
parang this equips or efi any werk rod to ths espn, lb sr to udersané
‘he precast fr ue, overview ofthe eament, operating peocedues, and ens rlted to the
Mocha and spctetons ar subet to chang tout note, n such ass, ens ot tha
‘he contents of hs mana ay rin yre Hom See seed a hs aru
‘Tho corona ths tretion mio! ot em part of he cars he contractor ayo ler
‘Chapter 2: Precautions for Drug Application
Please do not use chemicals when installing this equipment. Please be sure
to observe this rule,
Before the introéuction of the equipment
‘Customers who have been using chenleals in the pst shoul stop using chemieals
approximately 2 wooks prior to the instalation ofthis systom. Tis may eauso damage
to the device and may not improve the water quality immediately after installation.
IF possible, we recemmend cleaning the coling tower and replacing tho circulating water
before installing this system,
After installatien of the equipment
Do not cuntinue to apply chemicals. Doing so may cause damage and trouble to theChapter 3 Safety Precautions
Please be sure to observe this rule as it may causo fire or electric shock.
‘This equpmert is espe and martactred as goer industrial machine othe purpose of
Improve the gully fling coli water. Dont we or any purpose thr thn this
Tadaio er rsa dine
a Hazardous. | Faiseet wold the hazards indicated may result in dest o serious
ina.
cr property damage oe destton
ution against electric shock in electrical panels.
Do not leave the electrical panel open during operation
Do not leave the electrical panel open to prevent water from splashing inside
[Never touch the wing or parts inside the electial panel during operation,
When opening the decries] panel and operating the breaker switch or checking the
lectrical eonductvity meter, be sure to check the safety ofthe surrounding are
before doing so
Caution against elettic chock inthe eletrolzar
Do not open the lof the eleeteobzer.
[Never touch the water inthe eleetrolzer with the power on.
Caution fr water supply pumps installed inthe cooing tower
‘When stopping the pump for cooing tower cleaning, et., be sure totum ofthe power tothe
unit as well
[other precautions
Do not touch eletial components with wot hands.
Do not danage the power cord by forelbly bending or pling
Do not molfy the product in any way:
Tndcto afar Ut fn eae ard bu may Boe
DY) rersng |e nen aren ine
indicts ard may osu doth o ssrou ny.
oc property damage o destruction
In case of abnornalty, stop operation immediately and contact us.
2‘Do not cmb on or place objets on this equipment
A
Caution
‘Aough tae Iwo poaly alain or oho damage, he
fallow irate must be eearved inorder ze the prst
pope
Petiodc inspection and maintenance of this equipment shouldbe performed by our company.
Cleaning, maintenance, ot
4-1 Equipment Overview
bythe eastomer may eause malfunctions or problems.
Chapter 4 Specifications
+ This device improsthe quality ef celating water coolant nal the vty of
exiting conling ewer machines to rede sel an lime component in the eli wate.
+ Ths sstom takes cevating water fom the water tank below the coal Lover (or underraund
pi) and returns i: to the water tank ar oltrofsis and exidaton-redoetion treatment. The
‘astovatrisatenatcaly charge to the sstem ater cago af resi ale
+ The dae of cetanitin ofthe water ie monitor by slate! conduct, and whan
ontainsin has rosrssg, tho crcaltng water i wutamatiealy drained to hae the cect
conduct with cert ge
1 | eect ct
Elerion of ecuting water sping tthe 9
lool ated creling waters reasied to
ogi nrc sal ed sorte mater nd ora
sale
8 [teria et
(ioe) Pe ver othe tached HGO-ION Instat toe” he rsalion
of thi dei,49 Speciation list,
a 200-0 a? 00-500m 7?
eee 20/4 20.
‘Sup volane 3 phase 2000 Spee 20
Powe Mex, E00W M4
consumption “ sin
Se Wie D 60x 160mm |W 1800 TaD SH Ie
ihe oi 7
‘Operating Wolhe tes ath
4-4 Blectrial panel dsplay section
Ol:Pv 27a
1 [ey pei |r wn VAC ee
+ eeriae [C1 [terse or aroma
fe ee
[BE | [yan Cpe te
Ti in ie var
ps era Fe eos
4-5 Inside of elctial panel1 [esrhieaage rear | 1 | Used o sup power to the dvs
spiny the ler eandcty of the cain
2 |conaucvty mtr | 1 | Pm
Forced ook econ permed wile Ban =
2% | lock seeson baton | 2 | et) No perition rau bythe caster Ri nd
by ou toh sf rng mantra,
Chapter 5 Operating Methods
5-1 Preparation for operation
Contr ta he Pry Power Sopp] amps
Contin ta he wate sul pnp oper
5-2 Start of operation
‘Turn ON the leaags rok nso tho electica pane(Confirm tht he lect ends eave co the (Bectee Conduit Meer
(Check th neater ies en th lactic panel and enti tha hey a rope
(ioe or indeator ight, refer to Caper 6.
5-8 Shutdown in cae of slamed ower outages or snort)
“Toen of tho lskgebresher insite electra
“Tun of the primary power nd consi that he [inary per lang] i of‘5-4 What to dom he event ofa power flue Re:tontion rom an unprovided per source)
Inte vent of plied powcr eta, tart tho stm by flown the procedure “8-1 Preparation
{ur Operon” = 2 Stat Operation.
Inthe event ofan moped por re, rum othe [earth okage breaker fhe main it
Uns the elacc panel onc, se ter sbot $0 seconds, tart up the doi in the odor
1 Preparation ar Operation” “5-2 Start of Open”
an abnormal ccus nthe dove er stat, re othe uoubeseting sect6-1 Explanation of indeator Lights ifanyof tho flowing prblons sour, tur othe power
‘he device and contact sles representative.
Drange en Oo nds aso
Opps
in a peer sgen neem ae
meget ne dc
Tiemann act
ijle Ei Fs Primary power lamp: Aways on
Bled vole lmp: Alyson
(Lge mens th rt te
take tet
To i pone a Tere sno porer supp Tote Bc,
Check the cra wring on he pinay power
A spy.
andi ‘Check to seth roud-fnl rekors
tue ON,
2 hore so change erring ON, tbe
cath hag baker dep ted ase
TB) | coset car ses erste.
K
Motor tapped a note eel ‘Motor may be damaged
(ote of more tan 20 mites) | Phe contac our ale eres
4
‘Wien no Ses wlag is aprod The DC power spl nde elas pel as
G “ate pi ma cnt®
‘Urper and lover water vel Uns treatment | Check th wtor sly pans Feng
‘Sk he wae th ate spe
ot onze,
Tee problem persists, lone comact our sales
i)
5-20ther
Were overonng fo the
Coe fr casing india lies.
rhe elem ests, lees covet our sas representative,
borin
oes
[cick ita power upp to tho wate sup our.
she ne is spt bts ns working lease crac or sles
earesentaive
Nie tard ns
[Tarn ote ronda oro Weaker of the vce nd ontack
our ak epeceat
Chapter 7 Daily Inspection / Monthly Inspection
'stheinctr lit fhe devie normal Gee ndeatar
lec ep?
bay oft
watt, Jeon] yal et
thot td lo
idea
hg eal ar a
in dna lps
_ sm
mast | at gat tr mec
= new
ater comes cut)
“The water pumpin the colin owe (orn tho
underground pi ae vorking popes.
Ie cpa?Chapter 8 Warranty/Contact Information
ECO-ION Warranty \\
Produt pe
irl mab |
Company Nave
Go)
Address
nest
Feene mbar
“io afoot Dom
oe MALY
Waranty Per 1 yar (xing acess)
‘Te rarrany docs ot sto dlc eased by design orpodut det orto peri of ine
specie inthis docuent
tary of thse pol sold occa, we rome ores the product he of cage at ur om
responsi,
ease carat se rpar/repar arth waranty pag
‘
1. ft proc ir wd der normal contin in accordance with the pect Ine
eeu maul td tno, wl be ped ee of char
2 The waranty des not coer to flowing cases even within the waranty pid
(a) Fein erie domed ob cased by
(When the we the prec i dient ham the contre
© theres erdnee of stenpted modfeation or dbasseably
(@ Consumate parts and cose
(o) Deets sare by natural enters
(@ tts wtbout en specion seal on tis waranty card
10If you have any questions about repairs,
CO atest PIO rR
Postal Code 650-0033
Imon Kobe Building, 95 Edomachi, Chuo-ku, Kobe,
Japan
TEL : 078-335-5581 FAX : 078-335-5583
URL : [Link]
an