You are on page 1of 22

Project: - 1/22

Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

ROUND REPORT SUMMARY


iSURE Project Information Drilled Holes, Navigation Plane
File 75137.8.dcl
Project -
Tunnel Plan -
Constructor -
Customer -
Round Information
Started 25-12-2023 10:09:12
Finished 25-12-2023 10:15:39
Time Used [h] 00:06:27
Gross Drilling Capacity
83.22
[m/h]
Drilled Meters [m] 8.16
Rig Information
Serial Number 5063-1
Nick Name Rig Data Missing
Type Rig Data Missing
Drill Plan
Drill Plan
Bolt Plan ET B3 (10 Holes).bp
Face Area 0
Planned: 0
Length [m]
Realized: -9999.9
Planned: 0
Face Drilling Holes
Realized: 0
Planned: 10
Bolting
Realized: 2

Round Time
Boom 1 Boom 2 Sum
Before Drilling [h] 0:01 0:06 0:08
Boom Movements [h] 0:02 0:00 0:02
Drilling [h] 0:03 0:00 0:03
Idle [h] 0:00 0:00 0:00
After Drilling [h] 0:01 0:06 0:07
Sum [h] 0:07 0:13 0:20

Round Time Navigation


Operator
Curve Table TUNNEL-11 (ET).tl
Auxiliary ID
PEG Number 75137.80 m
Excavation Direction Growing PEG Numbers

Comments

Total 0:13 h

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 2/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

Table of Contents

ROUND REPORT SUMMARY.................................................................................................................... 1


NAVIGATION.............................................................................................................................................. 3
DRILLING EFFICIENCY............................................................................................................................. 4
Round Counters....................................................................................................................................... 4
General................................................................................................................................................. 4
Round Time.......................................................................................................................................... 4
Drilling Time......................................................................................................................................... 5
Boom Movement Time......................................................................................................................... 6
User Counters.......................................................................................................................................... 6
General................................................................................................................................................. 6
Round Time.......................................................................................................................................... 7
Drilling Time......................................................................................................................................... 7
Boom Movement Time......................................................................................................................... 8
Service Counters..................................................................................................................................... 8
General................................................................................................................................................. 8
Round Time.......................................................................................................................................... 9
Drilling Time....................................................................................................................................... 10
Boom Movement Time....................................................................................................................... 11
Total Counters....................................................................................................................................... 11
General............................................................................................................................................... 11
Round Time........................................................................................................................................ 12
Drilling Time....................................................................................................................................... 12
Boom Movement Time....................................................................................................................... 13
HOLE TYPES............................................................................................................................................ 14
FACE DRILLING HOLES.......................................................................................................................... 15
Navigation Plane.................................................................................................................................... 15
Blast Plane............................................................................................................................................. 16
Sequences and Roll-Over Angles.......................................................................................................... 17
Hole Information Table........................................................................................................................... 17
BOLTING HOLES..................................................................................................................................... 18
Bolting Fan 1.......................................................................................................................................... 18
MWD......................................................................................................................................................... 19
Face Drilling Holes................................................................................................................................. 19
Bolting Fan............................................................................................................................................. 20
Bolting Fan 1...................................................................................................................................... 20

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 3/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

NAVIGATION
1. Navigation
Time 25-12-2023 10:09:06
Navigation Type Bolt Plan Navigation
Fan Distance from Navgation Plane 0.00 m
Operator
Curve Table TUNNEL-11 (ET).tl
Auxiliary ID
Method Tachymeter
Laser ID
PEG Number 75137.80 m
Excavation Direction Growing PEG Numbers
Navigation Boom 0
Camber Angle 0.0°
Pivot Point Drill Plan Coordinates X: 0.00 m; Z: 0.00 m
Pivot Point Site Coordinates X: 0.00 m; Z: 0.00 m
Carrier Swing -0.1°
Carrier Tilt 0.5°
Rig front prism point X: 287546.78 m; Y: 3344519.18 m; Z: 565.70 m
Rig rear prism point X: 287545.66 m; Y: 3344520.44 m; Z: 566.21 m
Rig prism measurement side Right

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 4/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

DRILLING EFFICIENCY
ROUND COUNTERS
General
Hours [h]
Basket Boom 0:00
Compressor 0:06
Water Pump 0:06

Boom 1 Boom 2 Sum Average


Percussion Hours [h] 0:04 0:00 0:04 0:02
Auxiliary Drilling Time [h] 0:00 0:00 0:00 0:00
Powerpack Hours [h] 0:06 0:06 0:13 0:06
Power Extractor Hours [h] 0:00 0:00 0:00 0:00
Drilled Meters [m] 9.69 0.00 9.69 4.84
Gross Drilling Capacity [m/h] 83.22 0.00 83.22 41.61
Average Drilling Capacity
179.74 - 179.74
[m/h]
Net Penetration [m/min] 2.30 - 2.30

Round Time
Boom 1 Boom 2 Sum Average
Before Drilling [h] 0:01 0:06 0:08 0:04
Boom Movements [h] 0:02 0:00 0:02 0:01
Drilling [h] 0:03 0:00 0:03 0:02
Idle [h] 0:00 0:00 0:00 0:00
After Drilling [h] 0:01 0:06 0:07 0:04
Sum [h] 0:07 0:13 0:20 0:10

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 5/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

Drilling Time
Boom 1 Boom 2 Sum Average
Approach [h] 0:01 0:00 0:01 0:00
Effective [h] 0:02 0:00 0:02 0:01
Finishing [h] 0:00 0:00 0:00 0:00
Disturbance [h] 0:00 0:00 0:00 0:00
Manual [h] 0:00 0:00 0:00 0:00
Rod Handling Hours[h] 0:00 0:00 0:00 0:00
Sum [h] 0:03 0:00 0:03 0:02

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 6/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

Boom Movement Time


Boom 1 Boom 2 Sum Average
Automatic [h] 0:00 0:00 0:00 0:00
Manual [h] 0:02 0:00 0:02 0:01
Sum [h] 0:02 0:01 0:02 0:01

USER COUNTERS
General
Hours [h]
Basket Boom 0:00
Compressor 2219:01
Water Pump 2222:27

Boom 1 Boom 2 Sum Average


Percussion Hours [h] 638:42 937:07 1575:49 787:55
Auxiliary Drilling Time [h] 95:53 101:43 197:35 98:48
Powerpack Hours [h] 2737:30 2613:59 5351:29 2675:45
Power Extractor Hours [h] 0:00 0:00 0:00 0:00
Drilled Meters [m] 78196.99 77177.09 155374.08 77687.04
Gross Drilling Capacity [m/h] 30.36 36.19 66.55 33.28
Average Drilling Capacity
125.84 84.74 105.29
[m/h]
Net Penetration [m/min] 2.03 1.35 1.69

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 7/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

Round Time
Boom 1 Boom 2 Sum Average
Before Drilling [h] 777:55 442:00 1219:54 609:57
Boom Movements [h] 339:32 390:54 730:25 365:13
Drilling [h] 621:25 910:44 1532:09 766:05
Idle [h] 0:00 0:00 0:00 0:00
After Drilling [h] 836:50 388:53 1225:42 612:51
Sum [h] 2575:41 2132:30 4708:11 2354:05

Drilling Time
Boom 1 Boom 2 Sum Average
Approach [h] 17:44 15:07 32:51 16:25
Effective [h] 603:41 895:37 1499:18 749:39
Finishing [h] 0:00 0:00 0:00 0:00
Disturbance [h] 0:00 0:00 0:00 0:00
Manual [h] 0:00 0:00 0:00 0:00
Rod Handling Hours[h] 0:00 0:00 0:00 0:00
Sum [h] 621:25 910:44 1532:09 766:05

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 8/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

Boom Movement Time


Boom 1 Boom 2 Sum Average
Automatic [h] 0:00 0:00 0:00 0:00
Manual [h] 339:32 390:54 730:25 365:13
Sum [h] 339:32 390:54 730:25 365:13

SERVICE COUNTERS
General
Hours [h]
Basket Boom 0:00
Compressor 2219:01
Water Pump 2222:27

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 9/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

Boom 1 Boom 2 Sum Average


Percussion Hours [h] 638:42 937:07 1575:49 787:55
Auxiliary Drilling Time [h] 95:53 101:43 197:35 98:48
Powerpack Hours [h] 2737:30 2613:59 5351:29 2675:45
Power Extractor Hours [h] 0:00 0:00 0:00 0:00
Drilled Meters [m] 78200.00 77177.09 155377.08 77688.54
Gross Drilling Capacity [m/h] 30.36 36.19 66.55 33.28
Average Drilling Capacity
125.84 84.74 105.29
[m/h]
Net Penetration [m/min] 2.03 1.35 1.69

Round Time
Boom 1 Boom 2 Sum Average
Before Drilling [h] 777:55 442:00 1219:54 609:57
Boom Movements [h] 339:32 390:54 730:25 365:13
Drilling [h] 621:25 910:44 1532:09 766:05
Idle [h] 0:00 0:00 0:00 0:00
After Drilling [h] 836:50 388:53 1225:42 612:51
Sum [h] 2575:41 2132:30 4708:11 2354:05

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 10/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

Drilling Time
Boom 1 Boom 2 Sum Average
Approach [h] 17:44 15:07 32:51 16:25
Effective [h] 603:41 895:37 1499:18 749:39
Finishing [h] 0:00 0:00 0:00 0:00
Disturbance [h] 0:00 0:00 0:00 0:00
Manual [h] 0:00 0:00 0:00 0:00
Rod Handling Hours[h] 0:00 0:00 0:00 0:00
Sum [h] 621:25 910:44 1532:09 766:05

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 11/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

Boom Movement Time


Boom 1 Boom 2 Sum Average
Automatic [h] 0:00 0:00 0:00 0:00
Manual [h] 339:32 390:54 730:25 365:13
Sum [h] 339:32 390:54 730:25 365:13

TOTAL COUNTERS
General
Hours [h]
Basket Boom 0:00
Compressor 2221:20
Water Pump 2224:56

Boom 1 Boom 2 Sum Average


Percussion Hours [h] 639:25 937:57 1577:22 788:41
Auxiliary Drilling Time [h] 95:53 101:43 197:36 98:48
Powerpack Hours [h] 2753:33 2628:45 5382:17 2691:09
Power Extractor Hours [h] 0:00 0:00 0:00 0:00
Drilled Meters [m] 78293.27 77281.12 155574.39 77787.19
Gross Drilling Capacity [m/h] 30.34 36.15 66.49 33.25
Average Drilling Capacity
125.86 84.78 105.32
[m/h]
Net Penetration [m/min] 2.03 1.35 1.69

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 12/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

Round Time
Boom 1 Boom 2 Sum Average
Before Drilling [h] 777:55 442:00 1219:54 609:57
Boom Movements [h] 340:41 392:06 732:47 366:24
Drilling [h] 622:03 911:30 1533:33 766:47
Idle [h] 0:00 0:00 0:00 0:00
After Drilling [h] 839:53 391:58 1231:52 615:56
Sum [h] 2580:32 2137:34 4718:07 2359:03

Drilling Time
Boom 1 Boom 2 Sum Average
Approach [h] 17:53 15:17 33:10 16:35
Effective [h] 604:11 896:13 1500:23 750:12
Finishing [h] 0:00 0:00 0:00 0:00
Disturbance [h] 0:00 0:00 0:00 0:00
Manual [h] 0:00 0:00 0:00 0:00
Rod Handling Hours[h] 0:00 0:00 0:00 0:00
Sum [h] 622:03 911:30 1533:34 766:47

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 13/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

Boom Movement Time


Boom 1 Boom 2 Sum Average
Automatic [h] 0:00 0:00 0:00 0:00
Manual [h] 340:41 392:06 732:47 366:24
Sum [h] 340:41 392:06 732:47 366:23

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 14/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

HOLE TYPES
Number of holes
Hole Type
Total length in rock

Hole Type Boom 1 Boom 2 Sum


2 holes 0 holes 2 holes
Bolt
8.16 m 0.00 m 8.16 m

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 15/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

FACE DRILLING HOLES


NAVIGATION PLANE

, Drilled ( ) holes, Hole length in rock shown

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 16/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

BLAST PLANE

, Drilled ( ) holes, Hole length in rock shown

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 17/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

SEQUENCES AND ROLL-OVER ANGLES

, Drilled ( ) holes, Hole length in rock shown

HOLE INFORMATION TABLE


Hole ID Planned hole information Warning
Drilled hole information Note

Contr
Roll-
Depth Length Hole ol
Hole ID Boom Seq X [m] Y [m] Z [m] α [˚] β [˚] over
[m] [m] Type Metho
[˚]
d

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 18/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

BOLTING HOLES
BOLTING FAN 1

Bolting Fan Holes

ET B3 (10 Holes).bp, Drilled ( ) , Hole length in rock shown

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 19/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

MWD
FACE DRILLING HOLES

MWD Holes

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 20/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

BOLTING FAN
Bolting Fan 1

MWD Holes

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 21/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

Hole B1b (Only bars)

Hole B1b (All units except bars)

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 22/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM

Hole B1d (Only bars)

Hole B1d (All units except bars)

Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2