Round Report Summary: iSURE Project Information Drilled Holes, Navigation Plane
Round Report Summary: iSURE Project Information Drilled Holes, Navigation Plane
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
Round Time
Boom 1 Boom 2 Sum
Before Drilling [h] 0:01 0:06 0:08
Boom Movements [h] 0:02 0:00 0:02
Drilling [h] 0:03 0:00 0:03
Idle [h] 0:00 0:00 0:00
After Drilling [h] 0:01 0:06 0:07
Sum [h] 0:07 0:13 0:20
Comments
Total 0:13 h
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 2/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
Table of Contents
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 3/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
NAVIGATION
1. Navigation
Time 25-12-2023 10:09:06
Navigation Type Bolt Plan Navigation
Fan Distance from Navgation Plane 0.00 m
Operator
Curve Table TUNNEL-11 (ET).tl
Auxiliary ID
Method Tachymeter
Laser ID
PEG Number 75137.80 m
Excavation Direction Growing PEG Numbers
Navigation Boom 0
Camber Angle 0.0°
Pivot Point Drill Plan Coordinates X: 0.00 m; Z: 0.00 m
Pivot Point Site Coordinates X: 0.00 m; Z: 0.00 m
Carrier Swing -0.1°
Carrier Tilt 0.5°
Rig front prism point X: 287546.78 m; Y: 3344519.18 m; Z: 565.70 m
Rig rear prism point X: 287545.66 m; Y: 3344520.44 m; Z: 566.21 m
Rig prism measurement side Right
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 4/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
DRILLING EFFICIENCY
ROUND COUNTERS
General
Hours [h]
Basket Boom 0:00
Compressor 0:06
Water Pump 0:06
Round Time
Boom 1 Boom 2 Sum Average
Before Drilling [h] 0:01 0:06 0:08 0:04
Boom Movements [h] 0:02 0:00 0:02 0:01
Drilling [h] 0:03 0:00 0:03 0:02
Idle [h] 0:00 0:00 0:00 0:00
After Drilling [h] 0:01 0:06 0:07 0:04
Sum [h] 0:07 0:13 0:20 0:10
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 5/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
Drilling Time
Boom 1 Boom 2 Sum Average
Approach [h] 0:01 0:00 0:01 0:00
Effective [h] 0:02 0:00 0:02 0:01
Finishing [h] 0:00 0:00 0:00 0:00
Disturbance [h] 0:00 0:00 0:00 0:00
Manual [h] 0:00 0:00 0:00 0:00
Rod Handling Hours[h] 0:00 0:00 0:00 0:00
Sum [h] 0:03 0:00 0:03 0:02
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 6/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
USER COUNTERS
General
Hours [h]
Basket Boom 0:00
Compressor 2219:01
Water Pump 2222:27
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 7/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
Round Time
Boom 1 Boom 2 Sum Average
Before Drilling [h] 777:55 442:00 1219:54 609:57
Boom Movements [h] 339:32 390:54 730:25 365:13
Drilling [h] 621:25 910:44 1532:09 766:05
Idle [h] 0:00 0:00 0:00 0:00
After Drilling [h] 836:50 388:53 1225:42 612:51
Sum [h] 2575:41 2132:30 4708:11 2354:05
Drilling Time
Boom 1 Boom 2 Sum Average
Approach [h] 17:44 15:07 32:51 16:25
Effective [h] 603:41 895:37 1499:18 749:39
Finishing [h] 0:00 0:00 0:00 0:00
Disturbance [h] 0:00 0:00 0:00 0:00
Manual [h] 0:00 0:00 0:00 0:00
Rod Handling Hours[h] 0:00 0:00 0:00 0:00
Sum [h] 621:25 910:44 1532:09 766:05
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 8/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
SERVICE COUNTERS
General
Hours [h]
Basket Boom 0:00
Compressor 2219:01
Water Pump 2222:27
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 9/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
Round Time
Boom 1 Boom 2 Sum Average
Before Drilling [h] 777:55 442:00 1219:54 609:57
Boom Movements [h] 339:32 390:54 730:25 365:13
Drilling [h] 621:25 910:44 1532:09 766:05
Idle [h] 0:00 0:00 0:00 0:00
After Drilling [h] 836:50 388:53 1225:42 612:51
Sum [h] 2575:41 2132:30 4708:11 2354:05
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 10/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
Drilling Time
Boom 1 Boom 2 Sum Average
Approach [h] 17:44 15:07 32:51 16:25
Effective [h] 603:41 895:37 1499:18 749:39
Finishing [h] 0:00 0:00 0:00 0:00
Disturbance [h] 0:00 0:00 0:00 0:00
Manual [h] 0:00 0:00 0:00 0:00
Rod Handling Hours[h] 0:00 0:00 0:00 0:00
Sum [h] 621:25 910:44 1532:09 766:05
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 11/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
TOTAL COUNTERS
General
Hours [h]
Basket Boom 0:00
Compressor 2221:20
Water Pump 2224:56
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 12/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
Round Time
Boom 1 Boom 2 Sum Average
Before Drilling [h] 777:55 442:00 1219:54 609:57
Boom Movements [h] 340:41 392:06 732:47 366:24
Drilling [h] 622:03 911:30 1533:33 766:47
Idle [h] 0:00 0:00 0:00 0:00
After Drilling [h] 839:53 391:58 1231:52 615:56
Sum [h] 2580:32 2137:34 4718:07 2359:03
Drilling Time
Boom 1 Boom 2 Sum Average
Approach [h] 17:53 15:17 33:10 16:35
Effective [h] 604:11 896:13 1500:23 750:12
Finishing [h] 0:00 0:00 0:00 0:00
Disturbance [h] 0:00 0:00 0:00 0:00
Manual [h] 0:00 0:00 0:00 0:00
Rod Handling Hours[h] 0:00 0:00 0:00 0:00
Sum [h] 622:03 911:30 1533:34 766:47
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 13/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 14/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
HOLE TYPES
Number of holes
Hole Type
Total length in rock
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 15/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 16/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
BLAST PLANE
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 17/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
Contr
Roll-
Depth Length Hole ol
Hole ID Boom Seq X [m] Y [m] Z [m] α [˚] β [˚] over
[m] [m] Type Metho
[˚]
d
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 18/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
BOLTING HOLES
BOLTING FAN 1
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 19/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
MWD
FACE DRILLING HOLES
MWD Holes
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 20/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
BOLTING FAN
Bolting Fan 1
MWD Holes
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 21/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2
Project: - 22/22
Tunnel Plan: -
PEG Number: 75137.8 Printed: 01/04/2008 05:06:00 AM
Drill Plan:
Rig: 5063-1 (Round 2780)
Bolt Plan: ET B3 (10 Holes).bp
Round Started: 25-12-2023 10:09:12 Holes Drilled: 2