CUMULATIVE PROGRESS
SCHEDULED
ITEM NO. ACTIVITY DESCRIPTION UNIT
QUANTITY (PERT-CPM)
Total
Page No.:
o City
T REPORT
CUMULATIVE PROGRESS
CUMMULATIVE
HEDULED ACCOMPLISHMENT
NET WT. NET WT. REMARKS
QUANTITY
% %
1.070 - -
4.233 0.00
0.011 14.25 0.01 half of existing RCPC
0.036 6 0.02 demolished
0.053 3 0.03
0.043 0.00 After Box Culvert
100 61.757
Km.7 Tigatto Road, Buhangin, Davao City
CUMULATIVE PROGRESS
CUMMULATIVE ACCOMPLISHMENT TO
SCHEDULED
ACCOMPLISHMENT
TARGET DATE Month of JULY
ITEM NO. ACTIVITY DESCRIPTION UNIT REMARKS
QUANTITY NET WT. NET WT. NET WT. NET WT.
(PERT-CPM)
QUANTITY QUANTITY QUANTITY Week 1 Week 2 Week 3 Week 4
% % % %
PART B: Other General Requirements 1 2 3 4 5 6 8 9 10 11 12 13 15 16 17 18 19 20 22 23 24 25 26 27
B.5 Project Billboard /Signboard each 4.00 0.040 4.00 0.040 - - Completed
B.7(1) Occupational Safety and Health Program mo 4.00 0.144 4.00 0.144 - - Completed
B.7(1) Traffic Management mo 4.00 0.103 4.00 0.103 - - Completed
B.9 Mobilization and Demobilization ls 1.00 0.031 0.50 0.016 - -
B.4(1) Construction Survey & Staking km 2.04 0.082 2.04 0.082 - - Completed
PART C: Earthworks
Removal of Structures and Obstructions
101(1) (including Restorations-wooden house) ls 1.00 0.207 0.85 0.176 With Revisions
510(1) Bed Course Granular Material cu.m. 1,736.04 3.369 361.35 0.701 319.16 0.619 52.610 0.102 On going 0.155 0.155 0.155 0.155
510(2) Concrete (Slope Protection) cu.m. 2,280.68 35.407 347.86 5.400 419.28 6.509 69.090 On going
1.070 1.627 1.627 1.627 1.627
TOTAL 100.00 53.940 7.62 1.22 Total 1.828 1.782 1.782 2.225
Cummulative 7.62
Prepared by:
Renzo Ray M. Olivar
Office Engineer
Verified Correct by:
Project Inspector / Assistant Chief Engineer
Approved by:
Chief Engineer