101(4) Removal of existing concrete/Asphalt Pavement sq.m. 173.62 - 570.00 628.64 98,963.40 109,144.48
105 Subgrade Preparation sq.m. 25.79 - 570.00 - 14,700.30
200 Aggregate Sub Base Course cu.m. 914.91 - 85.50 - 78,224.81
311 Portland Cement Concrete Pavement sq.m. 1,193.07 - 570.00 - 680,049.90
103 Excavation for Structure cu.m. 447.44 - 7.04 - 3,149.98
600 Curb & Gutter (including canal cover) cu.m. 10,279.13 - 1.86 8.52 19,119.18 87,625.73
SPL-1 Line Canal l.m. 1,792.76 - 11.00 5.70 19,720.36 10,218.73
SPL-2 Mobilization & Demobilization l.s. - - 1.00 - 21,000.00
SPL-3 Project Signboard - - - l.s. - 3,530.63
SPL-4 Construction Safety & Health - - - l.s. - 10,500.00
Additional :
Area 1 = 15.60 x 1.80 = 28.08
Area 2 = 6.00 x 1.10 = 6.60
Area 3 = 5.70 x 0.80 = 4.56
Area 4 = 1.95 x 1.60 = 3.12
Area 4 = 14.80 x 1.10 = 16.28
58.64
TOTAL 628.64
600 Curb & Gutter (including canal cover) 8.52 cu.m. 10,279.13 87,625.73
Original/Actual :
Volume : 1.86
Additional :
Vol. 1 = 15.60 x 1.65 x 0.10 = 2.57
Vol. 2 = 15.60 x 0.15 x 0.15 = 0.35
Vol. 3 = 6.00 x 0.95 x 0.10 = 0.57
Vol. 4 = 6.00 x 0.15 x 0.15 = 0.14
Vol. 5 = 5.70 x 1.45 x 0.10 = 0.83
Vol. 6 = 5.70 x 0.15 x 0.15 = 0.13
Vol. 7 = 1.80 x 1.45 x 0.10 = 0.26
Vol. 8 = 3.55 x 0.15 x 0.15 = 0.08
Vol. 9 = 14.80 x 0.95 x 0.10 = 1.41
Vol. 10 = 14.80 x 0.15 x 0.15 = 0.33
6.66
TOTAL 8.52
ITEM % of
DESCRIPTION Unit Quantity Unit Cost Total Cost
No. Total
BREAKDOWN OF ESTIMATED
Err:509
EXPENDITURES I. ESTIMATED COST Err:509
1. Labor 1. Direct Cost
2. Materials 2. Indirect Cost
3. Eng'g Adm. Overhead II. EST. GOV'T EXPENDITURES
4. Indirect Cost 1. Eng'g & Adm. Overhead
5. Others II. CONTIGENCIES
6. Equipment 1. Price Escalation
TOTAL TOTAL PROJECT COST P Err:509
SAY P 300,000.00
Construction of 9.0 m. x 7.0 m. One Classroom, painted finish with floor tiles.
ITEM % of
DESCRIPTION Unit Quantity Unit Cost Total Cost
No. Total
BREAKDOWN OF ESTIMATED
100.00
EXPENDITURES I. ESTIMATED COST 1,000,162.43
1. Labor 1. Direct Cost
2. Materials 2. Indirect Cost
3. Eng'g Adm. Overhead II. EST. GOV'T EXPENDITURES
4. Indirect Cost 1. Eng'g & Adm. Overhead
5. Others II. CONTIGENCIES
6. Equipment 1. Price Escalation
TOTAL TOTAL PROJECT COST P 1,000,162.43
SAY P 1,000,000.00