NO ACTIVITY/ HAZARD RISK CONTROL MEASURES

1 Shoring Installation  Collapse of shoring system  Ensure proper design and


leading to injuries or fatalities. installation by qualified
personnel. Regular
 Soil instability may lead to inspections during
excavation collapse. construction.
 Install protective systems
 Failure of shoring equipment like sloping, benching, or
(e.g., hydraulic jacks, beams) shielding. Monitor soil
may result in accidents. conditions regularly.
 Regular inspection and
 Adverse weather conditions maintenance of shoring
(e.g., heavy rain) may impact equipment. Use equipment
soil stability and shoring within specified load limits.
effectiveness.  Monitor weather forecasts
and take preventive
actions. Suspend work
 Inadequate communication during severe weather
between team members may conditions
lead to errors or  Establish clear
misunderstandings. communication protocols.
 Conduct regular safety
- briefings.
 Ensure shoring systems
meet industry standards.
 Conduct thorough soil
analysis before shoring
installation.
 Regularly inspect and
maintain shoring
equipment.
 Training program for
personnel involved in
shoring activities.
 Providing appropriate PPE,
including hard hats, steel-
toed boots, and reflective
vests.