18 2
27-Dec-23 4 8
DATE : 27-Dec-23
NO UNIT MODEL SMU START BREAKDOWN AGING MAIN JOB / TROUBLE BD CATEG DESCRIPTION JOB KENDALA SOLUSI NOMO/PO TANGGAL MO POSISI PART PIC MAN POWER ETA ESTIMASI RFU REMARKS ACTIVITY
TIME
POPULASI: 3 UNIT
PLAN RUNNING: 3 UNIT
1
DOZER SML/MED
POPULASI: 13 UNIT
PLAN RUNNING: 10 UNIT
1
MOTOR GRADER
POPULASI: 4 UNIT
PLAN RUNNING: 2 UNIT
1
HD775
POPULASI: 9 UNIT
PLAN RUNNING:
1
CMT96 MANPOWER WHEEL PENGAWAS 1 ORANG
IZIN : 0 ORANG
POPULASI: 7 UNIT 10 ORANG + 3 FGM SAKIT : 0 ORANG
CUTI EMERGENCY : 1 ORANG (SUNANTO)
TRAINING BMC : 2 ORANG (LEIFISIKA & HERI SAMUEL)
PLAN RUNNING: 6 UNIT
1
CMT106
POPULASI: 30 UNIT
PLAN RUNNING: 30 UNIT
POPULASI: 12 UNIT
PLAN RUNNING: 11 UNIT
EVAKUASI UNIT KE WS CLOSE
REMOVE FENDER RH CLOSE
REMOVE MIRROR CLOSE
REMOVE BAMPER FR CLOSE
INSPEKSI KERUSAKAN UNIT UNTUK LISTING ABR CLOSE MO 154001687 (ENGINE) RFU
INSTALL V-BELT CLOSE
REMOVE CABIN CLOSE REGISTER CODE MATERIAL KE SAP CLOSE ESTIMASI TGL 14 NOVEMBER 2023 ==>
INSTALL CABIN CLOSE MO 154001688 (STEERING)
REMOVE GEAR BOX CLOSE WIFI DI WORKSHOP BERMASALAH CLOSE UPDATE POSISI PART DARI SM TGL 13 NOV 2023 15 NOVEMBER 2023 (PENGIRIMAN KE
REMOVE DRAG LINK CLOSE PO 1100185999
INSTALL GEAR BOX CLOSE
INSTALL LONG TIE ROD CLOSE CABIN BELUM DI BONGKAR SEHINGGA BELUM BISA DILAKUKAN REPAIR CABIN CLOSE SITE TGL 16 NOV 2023) ==> 18
INSTALL DRAG LINK CLOSE
REPLACE COMPRESSOR AC CLOSE
REPLACE CONDENSOR AC CLOSE
WAITING HOUSING AIR CLEANER CLOSE ESTIMASI CRANE 60 TON TGL 4 DESEMBER 2023 CLOSE MO 154001689 (HYRAULIC) RFU NOVEMBER 2023
MODIFIKASI CABIN CLOSE
INSTALL ACCESORIS CABIN CLOSE WAITING ACCELELATOR PEDAL GAS CLOSE
ACCIDENT REMOVE CYLINDER DUMP CLOSE
MO 154001686 (CABIN)
REPLACE HOUSING AIR CLEANER CLOSE
UTILISASI PART SUPPLY PUMP (MSJ) CLOSE FADHIL PART PEDAL ACCELELATOR DI
1 DT7198 DFH3310A12 6.313,5 11-Oct-23 17:33 77 PCR DIFFERENTIAL RR ACD MODIFIKASI LINE WIRING HARNESS CABIN & PIPE AC CLOSE
REPLACE PEDAL ACCELELATOR CLOSE NAINGGOLAN N/A N/A B5
INSTALL RADIO CLOSE WAITING FABRIKASI BUSHING CYLINDER DUMP (VENDOR ADAM) BAHAN DI VENDOR MO 154000420 (CAB ASSY) RFU DAYAT BALIKPAPAN
RADIO PROBLEM CHECK CHASSIS CLOSE
REPLACE DIFF RR CLOSE
REFILL OIL FD CLOSE ADAM TIDAK ADA (MODIFIKASI PARITAN GREASE & HOLE GREASE) FABRIKASI BUSHING CYLINDER DUMP NO. RESI 3529584130004 CLOSE
T/A RADIO CLOSE
INSTALL RADIO CLOSE PENGUKURAN ULANG BUSHING CYLINDER DUMP MO 130040615 (HOUSING AIR CLEANER RFU &
REPLACE CYLINDER DUMP CLOSE
PEDAL ACCELELATOR (UTILISASI DARI 1400005557
SPOORING DAN BALANCING SUPPLY PUMP SWAP KE DT7197 (REPAIR, INSTALL NEW) BUSHING CYLINDER DUMP ETA 11
STO TDM) CLOSE
CHECK & REPAIR VESSEL HUJAN IT PROGRESS SETTING RADIO DESEMBER 2023 ==> 16 DESEMBER 2023
REPLACE SUPPLY PUMP SUPPORT IT UNTUK SETTING RADIO MOTOROLA MO 130040710 (MO SUPPLY PUMP CANIBAL KE ==> 23 DESEMBER 2023
DT7197)
INSTALL BRACKET ATAS CYLINDER
CLEANING HOUSING AXLE A3 CLOSE
REMOVE DIFF A3 & DIFF A4 CLOSE DIAN
2 DT7278 DFH3310A12 6.687,0 21-Dec-23 19:05 6 DIFFERENTIAL A3 NOISE BUS CREATE WO NAINGGOLAN N/A N/A B5
CLEANING HOUSING AXLE A4 CLOSE TEDI
FLUSHING & RETORQUE FINAL DRIVE ALL
DT OB
POPULASI: 3 UNIT
PLAN RUNNING: 2 UNIT
PENGAWAS 1 ORANG
WELDER
IZIN : 1 ORANG (SANDRA)
MAN POWER : 5 ORANG SAKIT : 0 ORANG
INDUKSI : 0 ORANG
FABRIKASI START DATE START TIME BS+J59+K59:N59+K59:O59+K59:Q59+J59+K59:N59+J59+K59:N59+K59:P59+K59:Q59+K59:O59+K59:
KENDALA SOLUSI ETA PART EST RFU FINISH TIME REMARKS
Q+K59:P59
6 WELDER 27-Dec-23 7:00 0 FABRIKASI BASE TYRE CAGE INSTALL TIANG X9450 MENGHALANGI BASE TYRE CAGE PINDAH X9450 KE TEMPAT AMAN JULIADI 10:00
AMRIN
1 ELECTRIC 27-Dec-23 0 FT630 T/A GS MODULE T/A HARNESS GS MODULE RAGIL
DANI
AMRIN
2 ELECTRIC 27-Dec-23 0 REPLACE ALL KABEL MESIN LAS RAGIL
DANI
AMRIN
3 ELECTRIC 27-Dec-23 0 REPLACE LAMPU PENERANGAN RUANG GENSET RAGIL
DANI
MANPOWER TYRE PENGAWAS 0 ORANG STOK TYRE EX REPAIR 12.00 R20 : 5 PCS
TYRE START DATE START TIME AGING MAN POWER : 6 ORANG IZIN : 0 ORANG STOK TYRE EX REPAIR 16.00 R25 : 6 PCS
SAKIT : 0 ORANG
ALPHA : 0 ORANG
3 TYRE 27-Dec-23 06:00 0 REPAIR PANAS 20.5-25 1 PCS TYRE GRADER EX REPAIR BUSTONI B9
4 TYRE 27-Dec-23 06:00 0 REPAIR PANAS 12.00R20 1 PCS TYRE DONGFENG EX REPAIR BUSTONI B9
HT81014 STB
HT81044 STB
5 TYRE 27-Dec-23 06:00 0 SCHEDULE INSPEKSI TYRE ( MAINPRO ) DT7275 BUSTONI B9
DT7276
DT7386
FT635 (CLOSE)
DT7387 (CLOSE)
HT81039 (CLOSE)
6 TYRE 27-Dec-23 06:00 0 ROLLING TYRE HT81231 (CLOSE) BUSTONI B9
HT81040 (OPEN) UNIT STB
HT81160 (CLOSE)
HT81230 (OPEN) *PLAN TGL 27 DESEMBER 2023*
START DATE START TIME KENDALA SOLUSI PIC ETA PART EST RFU FINISH TIME REMARKS
PR 2400017739
ESTIMASI MASUK INDONESIA TANGGAL 21 OKTOBER 2023
W3 OKTOBER 2023
ESTIMASI ON SITE W4 OKTOBER 2023
(MASUK KE INDONESIA)
PENGIRIMAN KE SITE TGL 21 OKTOBER 2023 PR 2400016961
1 SUPPORT 01/09/2023 06:00 117 WATER CANON WST MO 1 PCS WEEK 1 DESEMBER 2023 (SUDAH DI PASAR KAMIS, DIKIRIM KE SITE TGL 1 DES 2023) PR 2400011230
APRIANTO ==> W4 OKTOBER 2023 ON SITE (24
OKTOBER 2023) ==>W4 NOV
N/A
(22/11/2023) MASUK KE Indonesia
ESTIMASI TGL 4 DESEMBER 2023 ON SITE ==> 6 DESEMBER 2023 ==> 18 DESEMBER
MASUK INDONESIA ==> ESTIMASI TIDAK ADA (WAITING FEED BACK DARI BSM)
VENDOR PET ESTIMASI PART COMPLETED TGL 20 NOV 2023 (GTI) FABRIKASI ==> 23
NOV 2023 ==> 7 DES 2023 (OUTSTANDING 5 SET)
PO 1100180070