Rev.0
JOB SCHEDULE SHEET ( JSS ) Tanggal Berlaku: 02/01/2019
LEAD TIME MONITORING GRAPH Halaman 1 dari 1
Halaman 1 dari 1
MACHINE ENGINE Delayed Code REMARKS
MODEL S/N CODE UNIT MODEL S/N HM A = Tidak ada Spare Parts E=Tunggu comp. Target
B = Tidak ada Man Power F=Redo in Proses Actual
PC210-10M0 HEX 212 SAA6D107E-1 10841 C = Tidak ada Tools G=Negoisasi Delay
D = Tunggu Fabrikasi H=Others / Libur
DISASSEMBLY
1 12 11.8% 11.8% 12
ATTACHMENT
PREPARE TOOLS 1
MONTH Jan-22 Feb-22
T O T A L 102 100% - DATE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
SECTION : TRACK MAN HOURS
MAN POWER : OVER TIME
1 Ahmad nurwahid DELAYED CODE B14 REDO
2 Angga HOURS 12 12
3 Santoso PARTS ORDER ITEM
4 Ambo (NORMAL) PCS
5 Anam RE-ORDER ITEM
6 PCS
DELAY CODE :
B1 PREPARATION B10 REST & MEAL
B2 WAITING INSTRUCTION B11 PROGRESS BY EKSTERNAL SERVICE
B3 MOBILISASI B12 WAITING TRANSPORTATION
B4 WAITING FOR TOOL B13 WASHING UNIT
B5 WAITING PART B14 WAITING PROGRESS BY EKSTERNAL SERVICE
B6 WAITING APPROVAL PO BY HO B15 NO PROGRESS; INTERNAL MEMO LIBUR
B7 BAD WEATHER B16 WAITING BA
B8 WAITING MEKANIK B17 WAITING ACCES ROAD
B9 ON PROCESS B18 WAITING FACILITY
JOB SCHEDULE SHEET ( JSS )
TRACK SECTION
OVERHAUL UNDERCARRIAGE
(STEP 2)
WO NUMBER : 300500010894
MANPOWER : Prepared By Approved By
1.
2.
3.
4.
5. (……………………………..) (……………………………..)
6.
7. 4 LANGKAH KESELAMATAN KERJA :
8. 1. Apakah ada situasi yang berbahaya
9. 2. Apakah ada Peralatan atau Perlengkapan dalam keadaan yang
membahayakan
10. 3. Apakah ada Orang atau sesuatu yang dapat Membahayakan
4. Apa yang dapat saya lakukan untuk memperbaikinya