Settings

Project Details Project Role Types

Project Title: PEMBANGUNAN TERMINAL LPG REFRIG Role Code


PET PET
Project Manager: Mustopo WIKA WK
SUBKON SUB
Project Priority:
Types Project Team

# Name Role Code


1 WIKA WIKA WK
1 PET PET PET
1 PT.IMS SUBKON SUB
Gantt
PEMBANGUNAN TERMINAL LPG REFRIGERATED JAWA TIMUR TAHAP 2
Project Timespan: 1-Dec-23 - 7-Jun-24 (190) Project Manager: Mustopo Settings

Input Column Auto stage ind.start =MIN(ITEMS_START) Color By Display Show Progress Highlight
Calculated Column Auto stage workdays =NETWORKDAYS(plan_start;MAX(ITEMS_END)) Default Plan vs Base Yes Today
Snapshot Column Auto stage % =SUM(items_pecent*items_workdays)/SUM(item_workdays)
Bar Chart =IF(Type="M";IF(item_in_plan;IF(AND(Show_Progress="Yes";item_in_complete);" ⚑";" ◆");IF(AND(display="Plan vs Base";item_in_base);" ◆";""));"")

◆, ↖, ↙, ↖, ↙ Actual Plan Base Plan Volume Today

21-Sep-23
22-Sep-23
23-Sep-23
24-Sep-23
25-Sep-23
26-Sep-23
27-Sep-23
28-Sep-23
29-Sep-23
30-Sep-23

10-Oct-23
11-Oct-23
12-Oct-23
13-Oct-23
14-Oct-23
15-Oct-23
16-Oct-23
17-Oct-23
18-Oct-23
19-Oct-23
20-Oct-23
21-Oct-23
22-Oct-23
23-Oct-23
24-Oct-23
25-Oct-23
26-Oct-23
27-Oct-23
28-Oct-23
29-Oct-23
30-Oct-23
31-Oct-23
1-Nov-23
2-Nov-23
3-Nov-23
4-Nov-23
5-Nov-23
1-Oct-23
2-Oct-23
3-Oct-23
4-Oct-23
5-Oct-23
6-Oct-23
7-Oct-23
8-Oct-23
9-Oct-23
Update on: Saved on: 10
ids Item Details 25-Apr-24

id s r Type Description Role Team Member ! Ind. Ind. d.


d. item
d. d. Work Start End Start End Ra Ri Sat. % T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
id id Start End id conn lag days Completed

1 1 -1 S Pekerjaan Access Bridge SUB PT.IMS 1-Dec-23 FS 190 1-Dec-23 7-Jun-24 12-Sep-23 5-Jan-24 #VALUE!
### 2 -1 S Civil Works SUB PT.IMS 1-Dec-23 SF 54 1-Dec-23 23-Jan-24 12-Sep-23 23-Oct-23 #VALUE!
### 3 -1 S Pondasi Bore Pile SUB PT.IMS 1-Dec-23 FS 16 1-Dec-23 16-Dec-23 12-Sep-23 27-Sep-23 42 42 Titik 100%
### 3 3 T Pouring Concrete SUB PT.IMS 1-Dec-23 FS 36 1-Dec-23 5-Jan-24 12-Sep-23 27-Sep-23 40 40 Titik 100%
### 3 3 T PDA Test (4titik inc. CSL Test) SUB PT.IMS #REF! ### (T) Pouring… FS 13 5 19-Jan-24 23-Jan-24 26-Sep-23 29-Sep-23 2 2 Ttitk 100%
### 4 -1 S Persiapan Lantai Kerja Abutmen' SUB PT.IMS 24-Jan-24 SF 22 24-Jan-24 14-Feb-24 12-Oct-23 27-Oct-23 1 1 Ls 100%
### 4 3 T Persiapan & Access SUB PT.IMS 5 ### (T) PDA Tes… FS 0 22 24-Jan-24 14-Feb-24 12-Oct-23 16-Oct-23 1 1 Ls 100%
### 5 -1 S Pondasi Abutmen SUB PT.IMS Auto SF 1-Apr-24 1-Apr-24 26-Sep-23 3-Nov-23 878 0 #VALUE!
### 5 3 T Pouring Concrete Slab Abutment A SUB PT.IMS 1-Apr-24 7 ### (T) Persiap… FS 0 17 1-Apr-24 17-Apr-24 26-Sep-23 14-Oct-23 231 0 m3 0%
### 5 3 T Pouring Concrete pedestal Wingwall Abutment A (Tahap 1) SUB PT.IMS 9 ### (T) Pouring… FS 0 17 18-Apr-24 4-May-24 11-Oct-23 3-Nov-23 104 0.00 m3 0.00
### 5 3 T Pouring Concrete pedestal Wingwall Abutment A (Tahap 2) SUB PT.IMS 10 ### (T) Pouring… FS 0 17 5-May-24 21-May-24 2-Nov-23 3-Nov-23 104 0 m3 0%
### 5 3 T Pouring Concrete Slab Abutment B SUB PT.IMS 9 ### (T) Pouring… FS 0 17 18-Apr-24 4-May-24 3-Nov-23 4-Nov-23 231 0 m3 0%
### 5 3 T Pouring Concrete pedestal Wingwall Abutment B (Tahap 1) SUB PT.IMS 10 ### (T) Pouring… FS 0 17 5-May-24 21-May-24 4-Nov-23 5-Nov-23 104 0.0 m3 0%
### 5 3 T Pouring Concrete pedestal Wingwall Abutment B (Tahap 2) SUB PT.IMS 13 ### (T) Pouring… FS 0 17 22-May-24 7-Jun-24 15-Oct-23 16-Oct-23 104 0.0 m3 0%

Total Progress #VALUE!


MONITORING PEKERJAAN ACESS BRIDGE

Baseline
id Uraian Pekerjaan
Start Finish
ACESS BRIDGE

1 Pekerjaan Access Bridge


3 Pondasi Bore Pile 12-Sep-2023 27-Sep-2023
4 Pouring Concrete 12-Sep-2023 27-Sep-2023
5 PDA Test (4titik inc. CSL Test) 26-Sep-2023 29-Sep-2023
6 Persiapan Lantai Kerja Abutmen' 12-Oct-2023 27-Oct-2023
7 Persiapan & Access 12-Oct-2023 16-Oct-2023
8 Pondasi Abutmen 26-Sep-2023 03-Nov-2023
9 Pouring Concrete Slab Abutment A 26-Sep-2023 14-Oct-2023
10 Pouring Concrete pedestal Wingwall Abutment A (Tahap 1) 11-Oct-2023 03-Nov-2023
11 Pouring Concrete pedestal Wingwall Abutment A (Tahap 2) 02-Nov-2023 03-Nov-2023
12 Pouring Concrete Slab Abutment B 03-Nov-2023 04-Nov-2023
13 Pouring Concrete pedestal Wingwall Abutment B (Tahap 1) 04-Nov-2023 05-Nov-2023
14 Pouring Concrete pedestal Wingwall Abutment B (Tahap 2) 15-Oct-2023 16-Oct-2023
Cut Off 28-Mar

RA RI DEV
Dur Bobot Total Vol % dur Sat
Vol % Vol % Vol
100% 45%

100% 45.1%
16 0.23 42.00 100% Titik 42.00 100% 42.00 100% -
16 40.00 100% Titik 40.00 100% 40.00 100% -
4 2.00 100% Ttitk 2.00 100% 2.00 100% -
16 0.23 1.00 100% Ls 1.00 100% 1.00 100% -
5 1.00 100% Ls 1.00 100% 1.00 100% -
39 0.55 878.44 100% 878.44 100% - 0% - 878.44
19 230.91 100% m3 230.91 100% - 0% - 230.91
24 104.16 100% m3 104.16 100% - 0% - 104.16
2 104.16 100% m3 104.16 100% - 0% - 104.16
2 230.91 100% m3 230.91 100% - 0% - 230.91
2 104.16 100% m3 104.16 100% - 0% - 104.16
2 104.16 100% m3 104.16 100% - 0% - 104.16
28-Mar

DEV
Ket
%
-55% Delay

0% Finished
0% Finished
0% Finished
0% Finished
0% Finished
-100% Delay
-100% Delay
-100% Delay
-100% Delay
-100% Delay
-100% Delay
-100% Delay