Client’s Temporary Office Extension

(CTOE)

MEP Design Report - Rev 00

Table of Contents page

1. LIGHTING LUX STUDY BY DIALUX EVO 12

1.1 Introduction 12
1.2 Codes and Regulations 12
1.3 Ground Floor Lux Study 13
1.4 First Floor Lux Study 14

2. HVAC CALCULATION REPORT 30

2.1 Introduction 30
2.2 Codes and Regulations 30
2.3 Floor Plan Drawings 33
2.4 Design Weather Parameters & MSHGs 37
2.5 Wall Constructions 44
2.6 Roof Constructions 51
2.7 Space Input Data 56
2.8 Air System Sizing Summary for 01-GR-FCU 79
2.9 Air System Sizing Summary for 02-1ST-FCU 85

3. PLUMBING CALCULATION REPORT 111

3.1 Introduction 111


3.2 Codes and Regulations 111
3.3 Floor Plan Drawings 111
3.4 Potable Cold water daily demand 112
3.5 Pump flow and head calculations 112
3.6 Hot water storage calculations 112
3.7 Storm drainage calculations Space Input Data 112

27 December 2023 Page 1 of 200


Client’s Temporary Office Extension
(CTOE)

MEP Design Report - Rev 00

27 December 2023 Page 2 of 200