You are on page 1of 3

Tech KPIs Degraded Region Day/BI Year Week

4G CSFB SR CB BI 2023 50

4G ERAB SR CB BI 2023 50

4G Throughput CB BI 2023 50

4G Latency CB BI 2023 50
compare
Improvement: to 9 to
FSD1962
KPI degraded. and 17
FSD7772.Resolve
Dec KPI were
17/12/13
Yesterday. Dec KPI
degarded
Overall
were at BI due
Trend
degraded
C5-SGD-08::CSFB
to PTI
due
SR change inJalsa
online
Improvement:
degraded BI
as dip9:00-->8:00
from in Vol also
observed
observe. due to
17/12/13
PM as 8PM
SGD0818. Dec KPI
Failures
Quarter Date CBU were
User/Vol
observed
MBU degraded
high
due
:: Issues as Issues : Actions
to
Resolved
: Details Pending
DoneIssues
(by Dept)
: Actions Done (by Dept)
Overall
due
comparechangeTrend
to 9 inLoad
BI
to
High CC
Degradation CPU
from
KPI 9:00-->8:00
degraded.
Failure issues. 17
PM
Dec
Issue as
KPI 8PM
has were
been
17/12/13
User/Vol
degarded Dec
at BIKPI
high as
due
Q4 11-17 Dec C5-C6 rectified
were and
degraded
compare
to PTI
resolved to
online
now. 9Jalsa
to
due
KPI
as dip change
in Volin
degraded. BI
17
also
C5-FSD-
from 9:00-->8:00
Dec KPI
observe.
04:Degraded weredue
PM.
degarded atsite
BI due
Q4 11-17 Dec C5-C6 to
17 L2Dec UGKPIon were
to PTI
Overall
FSD7776 online
Trend
& Jalsa
degarded
as dip in Vol
Degradation at BIalsodue
FSD7976,
to Issue
PTI online Jalsa
observe.
resolved now.
Q4 11-17 Dec as dip in Vol
C5-C6
17/12/13
C5-FSD- Decalso KPI
observe.
Overall
were Trend
degraded
05:Degraded
Multiple NRO due
Degradation
dueL2change
to UG. No in site
BI
Q4 11-17 Dec C5-C6 in
from Central B
9:00-->8:00
specific
region/ contributor
17/12/13
PM.
observed, Dec
fails KPI
are
L2100/L900
were
17 Decdegraded
KPI werelauch
distributed
on Faisalabad on all
City
due change
degarded
cluster atin BIBIdue
causing
from CSFB Jalsa
to PTI9:00-->8:00
online
degradation.
PM.
as
14 dip
Dec:: in Vol also
17 Dec KPI were
observe.
C5-KHU-11::CSFB
MBUs:
degarded
Multiple at BIsite
NRO due
SR was degraded in
to
in PTI online
Central
C5-KHU-11 Jalsa
Bmainly
C5-FSD-01:
as dip
region/ in Vol also
due
ERAB todegradation
Newly
observe.
L2100/L900
integrated lauch
site
has been NRO
Multiple
on Faisalabad observedsite
City
RUR1008.
due to temporary
in Central
causing CSFB
C6-BWP-04:CSFB B
increase
region/ in ERAB
degradation.MBUs
SR
Failsdegradation has
:beenof
L2100/L900 STY3337
observed lauchin
and
on RUR2300
Faisalabad City
C6-BWP-04
which isCSFB duedue to
to cell
causing
Newly Integrated
availability
degradation.MBUs
Sites RUR3237 &
fluctuations.
:RUR1554 On-Aired
with Zero CSFB SR
at 14th & 15th.
C6-DGK-05::The
primary
contributor to this
degradation
RUR4585,
DGK0063,
RUR4518 and
SSD7574 on which
high CSFB failures
observed on 14th
and 15th Dec.
These sites are
newly integrated
and become on-
aired on 14th Dec
and locked again
C6-LOD-02:CSFB SR
degradation has
been observed in
C6-LOD-02 due to
Newly Integrated
Sites RUR1590 &
RUR1272 On-Aired
with Zero CSFB SR
at 14th & 15th.
: Actions Done (by Dept)

You might also like