Tech KPIs Degraded Region Day/BI Year Week

4G CSFB SR CB BI 2023 50

4G ERAB SR CB BI 2023 50

4G Throughput CB BI 2023 50

4G Latency CB BI 2023 50
last week however
Increase
Overall
BI remain inat 9:00
Trend
user/Vol
PM.It hasobserve
Degradation
Overall Trendbeen
at BI 9PM that DL
Improvement:
observed
impacting
Increase
BLER, latency in KPIs.
ducting
is
Multiple
since
BI remain 20 Dec
significantly NRO
at 9:00
appears
impacted
PM.It
increased hasinRemote
been
with an
different
MBUs.
observed
increase MBU
inthat DL Issues : Actions
PRACH
Quarter Date CBU MBU :: Issues
impacting
No chnage Resolved
in: BI
CSFB Details Pending
DoneIssues
(by Dept)
: Actions Done (by Dept)
BLER,
Collision latency
number is in
intially
last week
significantly
indicating then however
the
resolve
ducting later
Increase
increased inwith
effect on.an
for
Q4 11-17 Dec C5-C6
user/Vol
increase
the remote observe
in PRACH
MBU.
MBUs:
at BIincrease
Collision
An 9PMnumber in RRC
18 Dec to till
impacting
indicating
Connected KPIs.
the
Yesterday.
Multiple
ducting
users/VOL NRO
effecthasforalso
Q4 11-17 Dec
C5-SGD-08
appears
the
beenremote in MBU.
observed at
C5-C6
multiple
different
An
BI increase
which KPIs
MBU
lead inare
inRRC
degraded
degrdationdue
impacting
Connected in to
CSFB
sudden
intially
MBUs then
users/VOL increase
has also in
Q4 11-17 Dec C5-C6 interference
resolve
been observedlater on.at
suspectdly
BI whichTrend
Overall leaddueinto
Jail
MBUs: Interference
degrdation
Degradation in
Q4 11-17 Dec C5-C6 issue.
21
MBUsDECMultiple
sites in vicnity
C5-JHG-06::
Increase of
Volte
in ducting
SGD
traffic
Overall Jail are
spike
since 20 Dec Trend
impacted
observed
impacted on
Degradation and site
Remote
contributing
GMR8719
MBUs. forinone
degradation
daychnage
that caused
Increase
No in in at
ducting
BI in
MBU
high
since
last week level.
number
20 Dec of
however
C6-MUL-
ERAB
impacted
Increase failures
inRemoteon
08/07/06:Multiple
site
MBUs. affecting
user/Vol observeERAB
KPI
SR
No onare
chnage
at BI 9PM degreaded
MBU in BI in
due to Multan
level.Moreover,cell
last week
impacting however
KPIs.
district
MultipleJail
L1JHG10042B
Increase in
NRO
interference
dismantled
user/Vol
appears on site
inobserve
on/off.
JHG10042
at BI 9PMMBU
different after
4T4R
impacting activity and
KPIs.
CSFB
22
thisDEC:
is causing
Multiple
intially NRO
then
C6-LOD-
ERBAB SR
appears
resolve in on.
later
02:Temporary
degradation
different MBU in the
degradation
MBU
impacting sinceCSFB 7thdue
to Availability
DEC.Issue
intially then has
issues
alreadyon
resolve 46 Cells
been
later on.
and
raised majorwithsitesRANPare
DUR8373,HWY304
team.
6,RUR5555,LDH34
36,KRP4870 and
RUR1232 which
recovered later.
23 DEC:
C6-LOD-
02:Temporary
degradation due
to Availability
issues on 35 Cells
and major sites are
DUR8373,HWY304
6,RUR5555,LDH34
36,KRP4870 and
RUR1232 which
recovered later
: Actions Done (by Dept)
KPIs
Tech Degraded Region Day/BI Year Week Quarter Date CBU MBU
18-DEC
Decline C5-SGD-
4G ERAB CB BI 2023 50 Q4 trend C5 08
C6-LOD-
4G ERAB CB BI 2023 50 Q4 23-Dec C6 02
C6-LOD-
4G ERAB CB BI 2023 50 Q4 22-Dec C6 02
Resolved Pending
Issue : Issues : Issues :
Details of Actions Actions
degradatio Done (by Done (by
n/issue Dept) Dept)

multiple KPIs are degraded due to sudden increase in interference suspectdly due to Jail Interference issue. Multiple sites in vi

Temporary degradation due to Availability issues on 35 Cells and major sites are DUR8373,HWY3046,RUR5555,LDH3436,KRP4

Temporary degradation due to Availability issues on 46 Cells and major sites are DUR8373,HWY3046,RUR5555,LDH3436,KRP4
ence issue. Multiple sites in vicnity of SGD Jail are impacted and contributing in degradation at MBU level.

3046,RUR5555,LDH3436,KRP4870 and RUR1232 which recovered later

3046,RUR5555,LDH3436,KRP4870 and RUR1232 which recovered later