Professional Documents
Culture Documents
On This Site
On This Site
A · FLOOR PLAN
· FRONT ELEVATION
· LEFT SIDE ELEVATION
2 · SCHEDULE OF FLOOR AND WALL FINISH
ARCHITECTURAL
SANITARY/PLUMBING
8075
8075
E · SCHEMATIC DIAGRAM
· GENERAL NOTES AND SPECIFICATIONS
2
1925
9500
PROJECT TITLE: PREPARED BY: CHECKED BY: CONCURRED BY: APPROVED BY: SHEET CONTENT: SHEET NO.
Republci of the Philippines
Province of Biliran
Municipality of Maripipi
CONSTRUCTION OF BRGY.
HEALTH STATION
JOENYL FERNAND C. CAINGCOY ENGR. LOU STANLEY I. PULVERA MARY GRACE R. LLEVER, MD. HON. JOSEPH C. CAINGCOY, RPsy. Ph.D.
·
·
·
PERSPECTIVE
SITE DEVELOPMENT PLAN
VICINITY MAP
A
OFFICE OF THE MUNICIPAL ENGINEER
LOCATION: BRGY. VIGA MARIPIPI, BILIRAN DRAFTSMAN DESIGNATE MUNICIPAL ENGINEER MHO MUNICIPAL MAYOR 1