Professional Documents
Culture Documents
1. Requirements Gathering
2. Schematic Capture
3. Component Selection
4. PCB Layout
1. Requirements Gathering
Key Parameters
2. Schematic Design
Review results versus intended block diagrams and topology plans to ensure
accurate translation from abstract concepts to concrete schematics.
Component Selection
Validation Checks
Trace Routing
With all checks passed and data packages completed, PCB layout concludes
ready for prototyping.
4. Verification Testing
PCB Manufacturing & Assembly Services https://www.raypcb.com/
RAYMING PCB & ASSEMBLY
Simulation
Prototyping
Conclusion
What are the first steps when starting a new PCB design?
EDA tools contain design rule checking functions validating trace geometry
spacing and widths meet fabrication and functional specifications provided by
engineers to enforce constraints.
The Gerber files specifying traces, drills along with bill of materials generating
from EDA tools comprise the primary outputs supplied to manufacturers when
completing PCB layouts to begin physical board fabrication.