You are on page 1of 4
‘Method of statement Opening for Air $ Biocon | handling units Module Jointing at 1808 DP New Warehouse €:systemair Doc No- 1808- SIPL-DP-MOS-01 Method of statement Air handling units Module jointing at 1808 DP New Warehouse Ref :1808-SIPL-DP-MOS-01 Rev : 00 Prepared by: Systemair India| Reviewed by: Systemair | Approved By : WKL Put Ltd. India Pvt Ltd design S/8 Name: Mr. Haresh Name: Mr. Santosh a ~ | Designation : SE Designation : DM Ee Coordinate ( Date ~ 15/11/2022 Date ~ 15/11/2022 \efs | aeaL Be Commenass Ke tow ancorgorre dh LR te Seer wotks | aa Ab/s pe g Biocon | herding units Module Method of statement ] Opening for A | systemair SIPLDP-MOS-O1 jointing at 1808 DP New Warehouse 1.0 2.0 INTRODUCTION : This method of statement shall apply works related activities. This method of statement shall be for Air Handling Units module jointing at 1808 DP New Warehouse. Described the method of work, material, manpower, machinery, equipment and tools, installation procedure and inspection to be carried out. Sequence of work and scope 1. Working area defined and agreed by Biocon & Site Owner. a. To submit JSA prior to work and obtain all working permit required. b. All PPE requirement to be followed. 2. Tools and equipment: a. Drill Machine (Reverse/forward) b. Star bits c. Drill Bits - 4mm, 6mm, 8mm d. 10mm nut runner e. Open ended / ring Spanner - Size- 10/11 f. Spirit level g. Silicon Gun h. Rivet Gun i. Hammer j. Screw driver set k. Allen Key set (mm & inches) |. Hole saw cutters Method of statement Opening for Air Doc No- 1808- i handling its Modul . ‘SIPL-DP-MOS-01 | HBiocon |rrsine nsrotis | vcomai New Warehouse 3. Materials a. Hydraulic hand pallet truck . Rubber Pads . GI Sheets |. Gasket Silicon Duct tape . Nut Bolts . Unit base legs sR *eaog 4. Work Step Unwrap the units. Align the modules as per marking/ drawing Apply gasket at the joining profile Where ever required unit will be lifted for installation of unit base legs Joining of the modules Apply silicon at joint / where ever required Housekeeping working area Joint inspection with WKL & Biocon. 2 7? F FR me ¥ Emaure toe caret AM 1S dodked a Ay leaaton D installation, v Aromas oe Be VA Oud Keay car connaction and Anged waker Connection oserr pen A6e Ad yee negro, drown AR be wd PECL on Lerndedton wn qloration /olatey TOMEEL gars Ad Spel Locator & Doda Sa corre cactions Ree aEtallion [eememo ” wg a Xe SR, env Aad SHE POLO Ko we aby SHE TO enone BQeey S02 ie Relowed and weske wn SyOREE anannee A® ee Red) Aro By WHA nicl ce Se netted of sre WRie power Yond Wa Broce Iu refs [pore alley to USE construction

You might also like