‘Method of statement
Opening for Air
$ Biocon | handling units Module
Jointing at 1808 DP
New Warehouse
€:systemair
Doc No- 1808-
SIPL-DP-MOS-01
Method of statement Air handling units Module
jointing at 1808 DP New Warehouse
Ref :1808-SIPL-DP-MOS-01
Rev : 00
Prepared by: Systemair India| Reviewed by: Systemair | Approved By : WKL
Put Ltd. India Pvt Ltd design S/8
Name: Mr. Haresh Name: Mr. Santosh a ~ |
Designation : SE Designation : DM Ee
Coordinate (
Date ~ 15/11/2022 Date ~ 15/11/2022 \efs | aeaL
Be Commenass Ke tow ancorgorre dh
LR te Seer wotks |
aa Ab/s peg Biocon | herding units Module
Method of statement ]
Opening for A |
systemair
SIPLDP-MOS-O1
jointing at 1808 DP
New Warehouse
1.0
2.0
INTRODUCTION :
This method of statement shall apply works related activities.
This method of statement shall be for Air Handling Units
module jointing at 1808 DP New Warehouse. Described the
method of work, material, manpower, machinery, equipment
and tools, installation procedure and inspection to be carried
out.
Sequence of work and scope
1. Working area defined and agreed by Biocon & Site Owner.
a. To submit JSA prior to work and obtain all working permit
required.
b. All PPE requirement to be followed.
2. Tools and equipment:
a. Drill Machine (Reverse/forward)
b. Star bits
c. Drill Bits - 4mm, 6mm, 8mm
d. 10mm nut runner
e. Open ended / ring Spanner - Size- 10/11
f. Spirit level
g. Silicon Gun
h. Rivet Gun
i. Hammer
j. Screw driver set
k. Allen Key set (mm & inches)
|. Hole saw cuttersMethod of statement
Opening for Air Doc No- 1808-
i handling its Modul . ‘SIPL-DP-MOS-01
| HBiocon |rrsine nsrotis | vcomai
New Warehouse
3. Materials
a. Hydraulic hand pallet truck
. Rubber Pads
. GI Sheets
|. Gasket
Silicon
Duct tape
. Nut Bolts
. Unit base legs
sR *eaog
4. Work Step
Unwrap the units.
Align the modules as per marking/ drawing
Apply gasket at the joining profile
Where ever required unit will be lifted for installation
of unit base legs
Joining of the modules
Apply silicon at joint / where ever required
Housekeeping working area
Joint inspection with WKL & Biocon.
2
7? F
FR me
¥ Emaure toe caret AM 1S dodked a Ay leaaton D installation, v
Aromas oe Be VA Oud Keay car connaction and Anged waker
Connection oserr pen A6e Ad yee negro, drown
AR be wd PECL on Lerndedton wn qloration /olatey
TOMEEL gars Ad Spel Locator
& Doda Sa corre cactions Ree aEtallion [eememo
” wg a
Xe SR, env Aad SHE POLO Ko we aby SHE TO enone
BQeey S02 ie Relowed and weske wn SyOREE anannee A® ee
Red) Aro
By WHA nicl ce Se netted of sre WRie
power Yond Wa Broce Iu refs [pore
alley to USE construction