You are on page 1of 6
BBiecon Submittal Form exyr Projet: 808 DP New Warehouse Pakage No, FO6 AHL To: Me Vint Keto Ree PIS TSIPMEC-MST.01 From: Me Sai ah ate Funnae Co Me Sey Sit Company: Systema eda Pa a ret Descition Nt Handing Uns md joing at 1808 DP New Washoe “The fling tems are hereby suited fo ev. We so ceri tat he tems sub an fl bmg wih te Contract documents (NB: Any evans ao besubt operand a request for Devan} Jeasogues Renan T_PPawies oanutctree Lteare riots re Prcedres [cueutons somes ores a Name_[ — Regan Dale Dae Oat acme ae Ca Coan Tie rel ee [prove wa Comme Ra red wih Conant Resin So STS ined I. 1) Approval or view brndr hal wb cord i Conia is aT er Conk ONO Kam On Sia (Conaion SEER Toa Saas (CRA » Co mm CO mw OF onus, [— ‘SIGN SDN BHD WE Oe 751080-0) 47 NOV 2022 Method of statement . Opening for Air g Biocon | banding units Module jointing at 1807 DP New Warehouse Doc No- 1808- SIPL-DP-MOS-O1 Method of statement Air handling units Module jointing at 1808 DP New Warehouse Ref : 1808-SIPL-DP-MOS-01 Rev : 00 Prepared by : Systemair India Reviewed by : Systemair Approved By : WKL Pvt Ltd. India Pvt Ltd. design $/B ax Name: Mr. Haresh Name: Mr. Mr. Santosh , Navin Brovg Designation : SE Designation : DM Ee Com dewey Date — 15/11/2022 Date — 15/11/2022 \F [s { dept 3 Biocon | handling units Module 1.0 2.0 Method of statement Opening for Air Doc No- 1808- | SiLDPMoso1 systemair jointing at 1807 DP New Warehouse INTRODUCTION : This method of statement shall apply works related activities. This method of statement shall be for Air Handling Units module jointing at 1807 DP New Warehouse. Described the method of work, material, manpower, machinery, equipment and tools, installation procedure and inspection to be carried out. Sequence of work and scope 1. Working area defined and agreed by Biocon & Site Owner. a. To submit JSA prior to work and obtain all working permit required. b. All PPE requirement to be followed. 2. Tools and equipment: a. Drill Machine (Reverse/forward) b. Star bits c. Drill Bits - 4mm, 6mm, 8mm d. 10mm nut runner e. Open ended / ring Spanner - Size- 10/11 f. Spirit level g. Silicon Gun h. Rivet Gun i. Hammer j. Screw driver set k. Allen Key set (mm & inches) |. Hole saw cutters ; $Biocon handling units Module |. jointing at 1807 DP € Method of statement | Opening for Air Doc No- 1808- ystemair SIPL-DP-MOS-O1 New Warehouse 3. Materials a. . Rubber Pads . Gl Sheets |. Gasket . Silicon zsmamopans Hydraulic hand pallet truck Duct tape . Nut Bolts |. Unit base legs 4. Work Step a. o m samo reo Insure the correct AHU is shifted to the location of installation and air inlet, Outlet, Fresh air connection and Chilled water connection orientation are as per approved drawing. To be verify by WKL. . Ahu to be placed correctly on foundation with vibration isolator rubber pads at right location. . Identify the correct section for installation / assembly. . Site Engineer to be at site to ensure safety SOP is following and work in proper manner as per approved drawing. . Unwrap the units. Align the modules as per marking/ drawing . Apply gasket at the joining profile . Where ever required unit will be lifted for installation of unit base legs |. Joining of the modules Apply silicon at joint / where ever required. . Housekeeping working area Joint inspection with WKL & Biocon. $ Biocon Method of statement Opening for Air handling units Module jointing at 1807 DP New Warehouse Doc No- 1808- * SIPL-DP-MOS-01 m.KWH meter to be installed at site before allow to use construction power provided by Biocon.

You might also like