BBiecon Submittal Form exyr
Projet: 808 DP New Warehouse
Pakage No, FO6 AHL
To: Me Vint Keto Ree PIS TSIPMEC-MST.01
From: Me Sai ah ate Funnae
Co Me Sey Sit
Company: Systema eda Pa a
ret Descition Nt Handing Uns md joing at 1808 DP New Washoe
“The fling tems are hereby suited fo ev. We so ceri tat he tems sub an fl bmg wih te Contract documents (NB: Any
evans ao besubt operand a request for Devan}
Jeasogues Renan T_PPawies
oanutctree Lteare riots re Prcedres
[cueutons somes ores
a Name_[ — Regan Dale Dae Oat acme ae
Ca Coan Tie
rel ee
[prove wa Comme Ra
red wih Conant Resin So STS
ined
I. 1) Approval or view brndr hal wb cord i Conia is aT er Conk
ONO Kam On
Sia (Conaion SEER Toa Saas (CRA
» Co mm CO mw OF onus, [—
‘SIGN SDN BHD
WE Oe 751080-0)
47 NOV 2022Method of statement
. Opening for Air
g Biocon | banding units Module
jointing at 1807 DP
New Warehouse
Doc No- 1808-
SIPL-DP-MOS-O1
Method of statement Air handling units Module
jointing at 1808 DP New Warehouse
Ref : 1808-SIPL-DP-MOS-01
Rev : 00
Prepared by : Systemair India
Reviewed by : Systemair
Approved By : WKL
Pvt Ltd. India Pvt Ltd. design $/B
ax
Name: Mr. Haresh Name: Mr. Mr. Santosh
,
Navin Brovg
Designation : SE Designation : DM Ee
Com dewey
Date — 15/11/2022
Date — 15/11/2022
\F [s { dept3 Biocon | handling units Module
1.0
2.0
Method of statement
Opening for Air Doc No- 1808-
| SiLDPMoso1
systemair
jointing at 1807 DP
New Warehouse
INTRODUCTION :
This method of statement shall apply works related activities.
This method of statement shall be for Air Handling Units
module jointing at 1807 DP New Warehouse. Described the
method of work, material, manpower, machinery, equipment
and tools, installation procedure and inspection to be carried
out.
Sequence of work and scope
1. Working area defined and agreed by Biocon & Site Owner.
a. To submit JSA prior to work and obtain all working permit
required.
b. All PPE requirement to be followed.
2. Tools and equipment:
a. Drill Machine (Reverse/forward)
b. Star bits
c. Drill Bits - 4mm, 6mm, 8mm
d. 10mm nut runner
e. Open ended / ring Spanner - Size- 10/11
f. Spirit level
g. Silicon Gun
h. Rivet Gun
i. Hammer
j. Screw driver set
k. Allen Key set (mm & inches)
|. Hole saw cutters; $Biocon handling units Module |.
jointing at 1807 DP €
Method of statement |
Opening for Air Doc No- 1808-
ystemair SIPL-DP-MOS-O1
New Warehouse
3. Materials
a.
. Rubber Pads
. Gl Sheets
|. Gasket
. Silicon
zsmamopans
Hydraulic hand pallet truck
Duct tape
. Nut Bolts
|. Unit base legs
4. Work Step
a.
o
m samo
reo
Insure the correct AHU is shifted to the location of
installation and air inlet, Outlet, Fresh air connection
and Chilled water connection orientation are as per
approved drawing. To be verify by WKL.
. Ahu to be placed correctly on foundation with
vibration isolator rubber pads at right location.
. Identify the correct section for installation / assembly.
. Site Engineer to be at site to ensure safety SOP is
following and work in proper manner as per approved
drawing.
. Unwrap the units.
Align the modules as per marking/ drawing
. Apply gasket at the joining profile
. Where ever required unit will be lifted for installation
of unit base legs
|. Joining of the modules
Apply silicon at joint / where ever required.
. Housekeeping working area
Joint inspection with WKL & Biocon.$ Biocon
Method of statement
Opening for Air
handling units Module
jointing at 1807 DP
New Warehouse
Doc No- 1808- *
SIPL-DP-MOS-01
m.KWH meter to be installed at site before allow to use
construction power provided by Biocon.