Professional Documents
Culture Documents
MV distribution
factory built assemblies
at your service
Anglais
installation
instructions
ERT
and
extraction table
GROUPE SCHNEIDER
contents
general description 3
general information 3
description 4
dimensions and weight 4
07897268EN indice : B0 1
2 07897268EN indice : B0
general description
general information
safety rules These tools are exclusively These tools must not be modified.
reserved for MCset cubicle
operation and must only be used
when the cubicles are installed
on civil engineering works.
handling Lifting points are intended to Position the device under the
facilitate handling of the device crane or the bridge, and put on
using a crane or a rolling bridge. the parking brake.
Check that the means being used The devices rails must not be loaded.
are sufficient and choose a Only use the lifting points indicated
suitable sling. on the device.
Any other point may generate risks.
application These tools are adjustable ...using the extraction and insertion
(see the following chapters) and removal tool of the ERT mobile
The application operations are parts, the operating method is identĆ
described in the MCset 1-2-3 ical when using the extraction
operating manual in the chapter table.for width and height.
operation instructions"
07897268EN indice : B0 3
description
ERT
A : circuit-breaker support A
C
rail height
adjustment crank
B : notching operating
mechanism on cubicle
C : circuit-breaker support rail
D : positioning pin in relation B D
to the cubicle
E : adjustment in function of E
the cubicle width
F : castor locking
extraction table C C
A : crank
B : notching operating
mechanism on cubicle D
C : circuit-breaker support rail
D : positioning pin in relation B
to the cubicle
E : adjustment in function B
of the cubicle width
F : castor locking
E
F F
4 07897268EN indice : B0
placing into operation
A C
B
Remove the 2 screws A. ...and put the pin back in.
Remove the pin, raise the Remove screw B. loosen screw C.
crosspiece to the following hole...
Horizontally fold down the crosspiece Remove the pin then slide the
and replace screws B and C without crosspiece until the holes
blocking them. on the 2 crosspieces line up.
Replace 2 screws A without blockĆ
ing them.
E
F
D
07897268EN indice : B0 5
choice of tool pitch
B : MCset 1 position
C : MCset 2 position
D : position for MCset 3
E : blocking pin location
Letter marking is located on the left E
of the holes so that it can be seen B C D
during width adjustment.
extraction table
width adjustment B
A : width adjustment screws
B : guide rails D
C : guide rail support blocking pin
D : centring pins
E : handles (mobile part locking). C
and extraction table
notching on a cubicle.
The device supported by its
4 castors:
H loosen screw A, separate
the frame at the desired width.
H block the screw. A
E
6 07897268EN indice : B0
height adjustment
ÉÉ
ÉÉ
positioning adjustment
NB:
The access door to the mobile part
is open.
Ç
Ç
Ç
Ç
ÇÇ
ÇÇ A
8 07897268EN indice : B0
groupe Schneider service
centers are there for:
engineering and technical
assistance
startĆup
training
preventive and corrective
maintenance
adaptation work
spare parts
Call your sales representative
who will put you in touch with
your nearest groupe Schneider
service centers, or call directly in
Grenoble, France
(33) 04 76 57 60 60
Schneider Electric SA Merlin Gerin As standards, specifications and designs change from time
to time, please ask for confirmation of the information given
F-38 050 Grenoble cédex 9 in this publication.
tél: (33) 04 76 57 60 60
télex: merge 320 842 F
Conception, rédaction: Service Documentation
Technique T&D