Material Properties
Cube Comp. Strength of Concrete, fcu = 30 N/mm2
Yield Strength of Reinforcement, fy = 400 N/mm2
Concrete Strength Reduction Factor, gc = 1.5 ECP 203-2020 Eq. (3-15-a)
Steel Strength Reduction Factor, gs = 1.15 ECP 203-2020 Eq. (3-15-b)

Column and Slab Properties


Column Length, c1 = 600 mm
Column Width, c2 = 300 mm
Type of Column Under Consideration: Edge
Slab Thickness, t = 250 mm ECP 203-2020 Cl. 4-2-2-3
Cover to the C.G. of Reinforcement, cc = 40 mm
Effective Slab Depth, d = 210 mm
Edge Distance, e1 = 0 mm
Edge Distance, e2 = 0 mm
Ineffective Length = 0 mm
Short Span of Slab = 5000 mm
Long Span of Slab = 9000 mm

Straining Actions
Ultimate Shear Force, Qu = 400 kN.m
Ultimate Bending Moment about (x-axis), Mux = 25 kN.m
Ultimate Bending Moment about (y-axis), Muy = 75 kN.m

Calculations of Critical Section Properties


First Dimension of Critical Section, a1 = 705 mm
Second Dimension of Critical Section, b1 = 510 mm
Perimeter of Critical Section, bo = 1920 mm
CAB = 259 mm ECP 203-2020 Eq. (6-24-b)
CCB = 255 mm
CCD = 446 mm
CAD = 255 mm
Jcy = 2.313E+10 mm4
ECP 203-2020 Eq.(6-23&24)
Jcx = 2.468E+10 mm4

Calculations of Fraction Coefficients


Fraction of the Unbalanced Moment Mux, gfx = 0.638 ECP 203-2020 Eq. (6-20)
Fraction of the Unbalanced Moment Muy, gfy = 0.561 ECP 203-2020 Eq. (6-20)
Fraction of the Eccentric Shear, gqx = 1 - gfx = 0.362 ECP 203-2020 Eq. (6-21)
Fraction of the Eccentric Shear, gqy =1 - gfy = 0.439 ECP 203-2020 Eq. (6-21)

Calculations of Shear Stress due to Bending Moment


Shear Stress due to Moment (Muy), qy1 = 0.37 N/mm2 ECP 203-2020 Eq. (6-22-b)
Shear Stress due to Moment (Muy), qy2 = 0.64 N/mm2 ECP 203-2020 Eq. (6-22-b)
Shear Stress due to Moment (Mux), qx1 = 0.09 N/mm2 ECP 203-2020 Eq. (6-22-a)
Shear Stress due to Moment (Mux), qx2 = 0.09 N/mm2 ECP 203-2020 Eq. (6-22-a)

Calculations of Shear Stress due to Shear Force


Shear Stress due to Shear Force (Qu), qp = 0.99 N/mm2 ECP 203-2020 Eq. (4-44)

Calculations of Shear Stresses Combinations


Shear Stress at Point (A), qA = 1.27 N/mm2
Shear Stress at Point (B), qB = 1.45 N/mm2
Shear Stress at Point (C), qc = 0.45 N/mm2
Actual Shear Stress, qup = 1.45 N/mm2

Calculations of Concrete Punching Shear Strength


Factor of Column Type, a = 3.00
qcup1 = 0.316*(0.5+a/b)*(fcu/gc)^0.5 = 1.41 N/mm2 ECP 203-2020 Eq. (4-46-b)
qcup2 = 0.8*(a*d/bo+0.2)*(fcu/gc)^0.5 = 1.89 N/mm2 ECP 203-2020 Eq. (4-46-a)
qcup3 = 0.316*(fcu/gc)^0.5 = 1.41 N/mm2 ECP 203-2020 Eq. (4-46-c)
qcup4 = 1.7 N/mm =2 1.70 N/mm2 ECP 203-2020 Eq. (4-46-c)

Concrete Punching Shear Strength, qcup = 1.41 N/mm2


Punching Shear Ratio = 1.03 qup > qcup Shear Reinforcment is Required.

Check Max. Permissible Punching Shear Stress with Reinforcement


Max Shear Strength, qup,max = 0.45*(fcu/gc)^0.5 = 2.01 N/mm2 qup < qup,max SAFE, Slab Thickness is OK. ECP 203-2020 Eq. (4-47-c)

Calculations of Required Shear Reinforcement


Shear Stress Resisted by Concrete, qcp = 0.537 N/mm2 qcp = 0.12*(fcu/gc)^0.5
ECP 203-2020 Eq. (4-47-a)
Shear Stress Resisted by RFT, qsup = 0.918 N/mm2 qsup = qup - qcp
Max. Steel RFT Yield Strength, fy = 350 N/mm2
Spacing Between Stirrups, s = 100 mm
Total Area of Steel Required, Ast = 579 mm2 Ast = qsup*s*bo*gs/fy ECP 203-2020 Eq. (4-47-b)
Area of Steel Required (per side), Ast1 = 193 mm2
Bar Diameter Used, Ø = 12 mm
No. of Branches (per side) Required = 2
Distance of Stirrups (x) = 1500 mm

Then, Use Closed Stirrups 2L - T12@100 For a Distance (x) = 1,500 mm


Check of Punching Shear in Flat Slabs and Raft Under Biaxially Unbalanced Moments and Qu ECP 203-2020

This spreadsheet is prepared and developed by Ehab Attalla, BSc (Hons.) Civil, CEng
2
Copyright © 2021-2023 Ehab Attalla. All rights reserved.

Disclaimer:
THE AUTHOR DISCLAIM ALL WARRANTIES RELATING TO THIS SPREADSHEET/SOFTWARE, WHETHER EXPRESSED OR IMPLIED, INCLUDING BUT NOT
LIMITED TO ANY IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. THE AUTHOR SHALL NOT BE LIABLE FOR
ANY INDIRECT, CONSEQUENTIAL, OR INCIDENTAL DAMAGES ARISING OUT OF THE USE OR INABILITY TO USE SUCH SPREADSHEET/SOFTWARE, EVEN
IF THE AUTHOR HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES OR CLAIMS. THE PERSON USING THE SPREADSHEET/SOFTWARE
BEARS ALL RISK AS TO THE QUALITY AND PERFORMANCE OF THE SPREADSHEET/SOFTWARE.
ALTHOUGH EVERY EFFORT HAS BEEN MADE TO ENSURE THE ACCURACY OF THIS SPREADSHEET/SOFTWARE, USERS SHOULD VERIFY THE RESULTS
FOR THEMSELVES.

Revision History:
Revision Date(yyyy/mm/dd) Description
I
0 2021/10/02 Check of Punching Shear in Flat Slabs and Raft Under Biaxially Unbalanced Moments and Qu ECP 203-2020 v1.0 n
t
e
r
n
Edge
a
Corner
l

###
###
###
###
###
###
###
###
###

You might also like