Professional Documents
Culture Documents
19-Division 15-Section 15180 Sludge Digestion-Version 2.0
19-Division 15-Section 15180 Sludge Digestion-Version 2.0
(ADSSC)
DIVISION 15 MECHANICAL
ADSSC/GSMW Division 15 Section 15180 Sludge Digestion Rev: 02 Jan. 2011 Page 1 of 16
General Specification for Mechanical Works
Abu Dhabi Sewerage Services Company
(ADSSC)
03
04
05
06
07
08
09
10
ADSSC/GSMW Division 15 Section 15180 Sludge Digestion Rev: 02 Jan. 2011 Page 2 of 16
General Specification for Mechanical Works
Abu Dhabi Sewerage Services Company
(ADSSC)
TABLE OF CONTENTS
1. DIGESTERS .................................................................................................... 5
1.1 GENERAL ............................................................................................ 5
1.2 SLUDGE INLET AND OUTLET ............................................................ 5
1.3 HIGH LEVEL OVERFLOW ................................................................... 5
1.4 GRIT REMOVAL, AND EMERGENCY DRAIN & GUARD VALVE ........ 5
1.5 SCUM CONTROL ................................................................................ 6
1.6 INSULATION........................................................................................ 6
1.7 DIGESTER ROOF................................................................................ 6
1.8 GAS COLLECTION .............................................................................. 6
1.9 VIEWING PORTS ................................................................................ 7
1.10 DIGESTER ACCESS HATCHES ......................................................... 7
1.11 TEMPERATURE SENSING ................................................................. 7
1.12 PH MEASUREMENT............................................................................ 7
1.13 ACCESS STAIRCASE ......................................................................... 7
1.14 SLUDGE MIXING ................................................................................. 8
2. DIGESTED SLUDGE STORAGE TANK .......................................................... 8
3. GAS SYSTEM.................................................................................................. 8
3.1 GENERAL ............................................................................................ 8
3.2 GAS BLOWERS ................................................................................... 8
3.3 PIPEWORK .......................................................................................... 9
3.4 FLAME ARRESTORS .......................................................................... 9
3.5 CONDENSATE TRAPS........................................................................ 9
3.6 FLUE SYSTEMS ................................................................................ 10
4. LIQUID PETROLEUM GAS (LPG) ................................................................ 10
ADSSC/GSMW Division 15 Section 15180 Sludge Digestion Rev: 02 Jan. 2011 Page 3 of 16
General Specification for Mechanical Works
Abu Dhabi Sewerage Services Company
(ADSSC)
ADSSC/GSMW Division 15 Section 15180 Sludge Digestion Rev: 02 Jan. 2011 Page 4 of 16
General Specification for Mechanical Works
Abu Dhabi Sewerage Services Company
(ADSSC)
1. DIGESTERS
1.1 GENERAL
b) Glass coated steel tanks shall comply with Section 15200: Sectional
Storage Tanks. The life expectancy of the tanks shall be in excess of 25
years.
b) There shall be gravity flow out of the digester into the digested sludge
holding tanks. The sludge outlet shall be via an overflow weir and outlet
pipe. A rodding point and mobile compressor connection shall be
provided at this point. Also a high level probe to inhibit operation of the
thickened sludge transfer pumps.
ADSSC/GSMW Division 15 Section 15180 Sludge Digestion Rev: 02 Jan. 2011 Page 5 of 16
General Specification for Mechanical Works
Abu Dhabi Sewerage Services Company
(ADSSC)
a) Scum control will be provided in the form of a Rootes type blower and
grade 316L stainless steel air delivery pipework system.
1.6 INSULATION
The roof and walls of the tank shall be insulated with proprietary insulating
panels, fixed to the steel tank section with fixing bolts. The panels shall be
capable of being removed individually.
b) The roof shall also be provided with handrailing to provide access to all
points requiring access for operation and maintenance.
c) All roof segments shall be sealed internally and fixing bolts shall be
stainless steel and fitted external to the dome.
a) Gas collection shall take place in the digester roof dome. The design of
the gas take-off shall prevent carry over of foam into the gas system.
The gas take-off shall rise vertically from the digester roof to ensure
condensate drainage back into the digester and incorporate a lockable
isolation valve.
ADSSC/GSMW Division 15 Section 15180 Sludge Digestion Rev: 02 Jan. 2011 Page 6 of 16
General Specification for Mechanical Works
Abu Dhabi Sewerage Services Company
(ADSSC)
Two number viewing ports shall be provided adjacent to each other in the
digester roof. Provision shall be made for internal cleaning of the viewing
ports by externally operated wipers. The wiper system shall be gas tight and
each point shall also be covered with a hinged lid to prevent the formation of
algae on the viewing point.
1.12 PH MEASUREMENT
a) Access to the digester tank roof shall be via a single galvanised steel
staircase. Alternative GRP construction staircases may be submitted for
approval by the ADSSC. At the top of the staircase an access platform
shall be provided on the tank roof for access to the viewing ports, gas
take-off pressure/vacuum relief valves and the access hatch. Galvanised
ADSSC/GSMW Division 15 Section 15180 Sludge Digestion Rev: 02 Jan. 2011 Page 7 of 16
General Specification for Mechanical Works
Abu Dhabi Sewerage Services Company
(ADSSC)
handrailing 1.5m high shall be supplied. The area between the upper rail
and the toe board will be filled with robust galvanised steel mesh.
b) Gas Mixing.
c) Sludge shall be drawn from a central bellmouth by the road tanker via
the sludge outlet valve and road tanker connection. A rodding point and
compressor connection shall be provided at the periphery of the tank
base.
3. GAS SYSTEM
3.1 GENERAL
Unconfined gas mixing shall be achieved by not less than three in number,
gas nozzles. Re-cycled gas shall totally mix the sludge, maintaining uniform
sludge temperature; preventing water/sludge banding, minimising grit
settlement and inhibiting scum/foam build up. Each gas nozzle shall
incorporate an integral "non-clog" non-return valve and an isolating valve.
The non-return valves shall be mounted on the gas supply pipes external to
the tank.
ADSSC/GSMW Division 15 Section 15180 Sludge Digestion Rev: 02 Jan. 2011 Page 8 of 16
General Specification for Mechanical Works
Abu Dhabi Sewerage Services Company
(ADSSC)
use with sludge gas, and bearing materials, seals, etc shall take into
account the nature of sludge gas and associated moisture related
corrosion products. The unit shall be capable of automatic operation,
unattended with the minimum of maintenance. A flow failure switch shall
be fitted to the blower.
b) Each blower shall discharge into a common gas supply manifold of 316L
stainless steel via a non-return valve and an isolating valve. Each
blower discharge shall incorporate a pressure relief valve and a pressure
operated under pressure switch which shall trip the blower on loss of gas
supply. A discharge pressure gauge shall be provided on the delivery
branch of the air supply manifold.
3.3 PIPEWORK
a) All gas handling pipework shall be in stainless steel and run at high
level. The pipework shall include a condensate trap.
b) The gas supply to the blower shall be direct from the gas holder.
Branched connections on the digester/gas holder gas main shall not be
acceptable.
Flame arrestors shall be fitted on the upstream and downstream of the gas
pipework in association with the blower isolation valves.
c) Dip pipes may be of ABS or uPVC be of full pipeline diameter and shall
drain into the supernatant return chamber.
d) In the event of high gas holder volumes the waste gas burner shall be
brought on line to consume excess gas. Facilities will be provided for
taking off and burning the gas yield from the digesters, through a waste
ADSSC/GSMW Division 15 Section 15180 Sludge Digestion Rev: 02 Jan. 2011 Page 9 of 16
General Specification for Mechanical Works
Abu Dhabi Sewerage Services Company
(ADSSC)
c) Flues shall terminate not less than 1m above roof level or in accordance
with local Building regulation requirements whichever is the greater.
b) The Contractor shall provide the first fill and shall use what fuel he
requires for the test before completion and extending operating tests.
5.1 GENERAL
b) Gas storage bells and gas bag units with an internal bladder type
storage unit may be considered.
ADSSC/GSMW Division 15 Section 15180 Sludge Digestion Rev: 02 Jan. 2011 Page 10 of 16
General Specification for Mechanical Works
Abu Dhabi Sewerage Services Company
(ADSSC)
d) The gas pressure shall be thrown by the self weight of the bell. Where
trimming is required then the ballast shall be mounted external to the
bell.
Not less than two in number pressure relief/vacuum relief valves shall be
provided in the gas bell dome. Each shall be fitted directly to the gas bell via
a lockable isolation valve. The locking device shall incorporate a mechanical
interlock that shall ensure that one of the isolating valves will always be
open.
a) The Contractor shall supply a minimum of 2 no. waste gas burner units.
These units shall operate on a duty/ standby basis.
c) Waste gas and gas not used to fire the digester heating boilers shall be
pumped to the water gas burners for burning.
6. PUMPS
6.1 GENERAL
ADSSC/GSMW Division 15 Section 15180 Sludge Digestion Rev: 02 Jan. 2011 Page 11 of 16
General Specification for Mechanical Works
Abu Dhabi Sewerage Services Company
(ADSSC)
6.2 INSTRUMENTATION
7. SCADA
i. Sludge Flow.
ii. Gas Flow.
iii. Water Flow.
iv. Overall Flow.
v. Alarms.
vi. Supernatant Plant.
vii. Sludge Pressing Plant (Where Applicable).
viii. Digester Temperature.
ix. Digester Plant Retention (Auto calculation from daily flow &
hydraulic capacity).
8. SAMPLING POINTS
ADSSC/GSMW Division 15 Section 15180 Sludge Digestion Rev: 02 Jan. 2011 Page 12 of 16
General Specification for Mechanical Works
Abu Dhabi Sewerage Services Company
(ADSSC)
10.1 GENERAL
All tanks, including digesters shall be subject to leak tests before the
introduction of the stored medium. The tank tests shall be in the form of a
"Drop Test". All tanks shall be filled with final effluent at a rate approved by
the ADSSC After allowing a period of seven days or such other period as
ADSSC may decide for absorption, the water level shall be recorded by a
hook gauge with vernier attachment or by other approved means and the
water shall be allowed to stand for a period of seven days during which the
time the maximum permissible drop shall not exceed 1/500 of the average
water depth of the full tank or 2mm whichever is the less.
a) The digester and gas bell shall be water tested in accordance with Tank
Site Installation Test prior to the installation of insulation cladding.
b) The digester roof and the gas bell shall be tested by water or air
pressure and the relief valve operation/setting confirmed.
c) All gas lines, including the digester roof, gas bell and blowers shall be
tested in accordance with Abu Dhabi Gas Testing Procedures for
Industrial and Commercial Gas Installations".
e) Purging All pipework and vessels which will ultimately contain sludge
gas shall be purged of air prior to commencing sludge feeding. The
purging shall be carried out in an approved systematic manner using the
atmospheric pressure method for nitrogen. Digester purging shall apply
to the whole of the vessel. Purging shall continue until the oxygen level
is less than 3% in accordance with BOC Nitrogen process data sheet
002. Sufficient gas shall be left in the gas holder so that the gas
recirculation mixing system can be started as soon as the digester is
sealed. The digester shall then be brought up to process temperature
whilst containing the static volume of final effluent used for testing.
ADSSC/GSMW Division 15 Section 15180 Sludge Digestion Rev: 02 Jan. 2011 Page 13 of 16
General Specification for Mechanical Works
Abu Dhabi Sewerage Services Company
(ADSSC)
a) Before gas storage is initiated the gas holder shall be tested for
soundness.
b) The gas tank shall be filled to the top gas level and allowance to stand
for 48 hours.
c) A level check shall then be carried out and the tank left for a further 5
days during which no loss of water shall be acceptable.
d) On satisfactory completion of the water test the gas bell shall be run
from bottom limit to top limit using air to set up the level control
equipment, the guide rail carriages and to prove the pressure relief
valves.
e) The gas bell shall be left at its uppermost limit under air pressure. After
not less than 10 minutes the air pressure shall be noted and a gas
soundness test carried out for not less than one hour during which time
the pressure shall not decrease.
f) Finally the gas bell shall be "purged" of air before testing of the
associated gas, heat and power systems are carried out.
During the period of the Tests before Completion the ADSSC will take
regular tests on:
a) Feed sludge
b) Digested sludge
ADSSC/GSMW Division 15 Section 15180 Sludge Digestion Rev: 02 Jan. 2011 Page 14 of 16
General Specification for Mechanical Works
Abu Dhabi Sewerage Services Company
(ADSSC)
c) Sludge gas
i. % methane.
ii. net calorific value.
e) Thickened sludge
h) The works shall have passed the tests before completion with respect to
treatment if during 60 days of continuous operation the guaranteed
reduction in volatile solids within the digesters has been achieved.
i) The works shall be deemed to have passed the tests before completion
with respect to operating costs (power consumption/manpower
requirements/sludge disposal costs) if after 60 days continuous
operation the overall performance has been equal to or better than
that guaranteed. Where the Contractor considers that the works is
unlikely to achieve the guaranteed performance, modifications may be
carried out as agreed by ADSSC.. In this case the 60 day test period
shall be restarted after completion of the modifications. If the
guaranteed performance has not been achieved within a period of 180
days from the date of the start of the tests before completion the Tests
before Completion shall be terminated and it shall be deemed that a
fundamental failure has occurred.
a) The works shall operate in automatic mode for the whole period of the
Tests before Completion.
ADSSC/GSMW Division 15 Section 15180 Sludge Digestion Rev: 02 Jan. 2011 Page 15 of 16
General Specification for Mechanical Works
Abu Dhabi Sewerage Services Company
(ADSSC)
i. 2 No Assistant Engineers.
ii. 1 No Supervisor.
iii. 3 No Plant Operators.
iv. 6 No Mechanical, Electrical and Instrumentation Craftsmen.
v. 3 No Others.
END OF SECTION
ADSSC/GSMW Division 15 Section 15180 Sludge Digestion Rev: 02 Jan. 2011 Page 16 of 16