E-05 (Rev1)
E-05 (Rev1)
1. Introduction 1
1.1 Project Objectives 1
1.2 Project Scope 1
1.3 Purpose of this Report 1
1.4 Related Reports 1
1.5 ADDC Supplied Information 1
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
6.5 Power Cabling 13
6.6 Fire Alarm System 13
6.7 Summary of Action Points 13
7. Recommendations 14
Figure Index
Figure 1 Eastern Region PS 05 - Ghanada, Samha Pumping
Station DW-GND-WPS2 3
Figure 2 Computerised Graphics of Pumps Automation
System 5
Figure 3 Pump Floor Layout 6
Figure 4 Measurement Point Locations 7
Figure 5 Vibration at Location 3 on Pump 1 8
Figure 6 Acoustic Spectrum from Pump 1 9
Figure 7 Surge Tank (8,000 Litre Capacity, 16 Bar Pressure)
- One of 2 Tanks on this Site 9
Figure 8 Packaged Power Supply Substation 11
Figure 9 Station Main Switchboard 12
Figure 10 Controls Displays 12
Figure 11 Floor Chase Detail 13
Figure 12 Access Road to Site 15
Figure 13 Pipes and Connection Setup to Water Pumps 15
Appendices
A Pump Station Schematic
B Site Safety Assessment
C Civil and Infrastructure Assets
D Mechanical Assets
E Electrical Assets
F Pumps and Motors - Vibration, Alignment and Noise
G OEM vs Pump Performance
H Thermographic Images
I Vibration Spectrum
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
1. Introduction
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 1
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
2. Pump Station Overview
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 2
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Figure 1 Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 3
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
3. Pump Station Assessments
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 4
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
power cabling;
room and exterior lighting; and
fire alarm systems.
GHD’s condition assessment schedules for electrical assets are attached as Appendix E
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 5
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
4. Civil and Infrastructure Assessment
Storage Tanks
The storage tanks (ground and elevated) are generally in a satisfactory condition; however the following
operational issues are noted.
The painted storage tank walls make it harder for earlier leaks detection.
There is no digital tank level indicator only a manual wire indicator.
The incoming valve to the storage tank does not open at times.
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 6
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
5. Mechanical Assets Assessment
General Description
This station is a station with 3 small horizontal pump motor sets. Overall the equipment is in good
condition. The control room temperatures were acceptable with the temperatures in the machine room
(non air conditioned) appreciably lower than the outside temperatures.
Vibration
Vibration measurements were taken from the points shown on Figure 4 below. Individual measured
levels are shown in the enclosed inspection schedule. OEM levels were not available for correlation. All
measured velocity levels were below the accepted maximum level of 2mm/sec expected for such pumps
and indicate the pumps to be well secured and in good mechanical condition.
Vibration velocity levels were recorded as narrow band FFT levels with the data graphed as below with
all the graphs presented in the Appendix to this report.
Details of pump pipework setup
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 7
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Figure 5 Vibration at Location 3 on Pump 1
Shaft Alignment
Alignment was measured on each pump set. Individual results are presented in the appropriate
schedule. The displacement readings for all the pumps were within accepted limits.
Noise Levels
Noise measurements were performed at the start of the visit to assess the risk to hearing from noise
generated in the pump room. These results are presented in the enclosed schedule. Noise levels were
measured at 75 dB(A) with pump 1 running. The room noise levels are expected to rise by 3 dB for
every doubling of the number of running pumps. This gives a maximum level in the pump room of 80
dB(A) which is below the recommended limits of 85 dB(A) over an 8 hour period.
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 8
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Figure 6 Acoustic Spectrum from Pump 1
Thermal Imaging
Thermal images were taken of the motors during operation and the main switch board. These images
showed no over heat conditions for both the pump and motor bearing or the electrical cabinets.
Figure 7 Surge Tank (8,000 Litre Capacity, 16 Bar Pressure) - One of 2 Tanks on this Site
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 9
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
6. Electrical Assets Assessment
Rating: 22 kW @ 415 V 50 Hz
Insulation Class F
Serial Numbers
Motor 1 2 3
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 10
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Motor Condition
General Condition - Motor insulation >4 G . Insulation indexes could not be measured at 500V.
Electrical: Insulation resistance at 1000 V are included in the summary.
Motor controls: Each motor has an up stand featuring emergency stop, local controls and
pilot indicators.
The station was ineffectively secured. Rust was noted on the external panels.
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 11
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Figure 9 Station Main Switchboard
PLC System
Station motor controls are via a PLC system. This is housed in a floor mounted cabinet adjacent to the
main switchboard. The system is based on Siemens Simatic components and features redundancy in
CPU and power supply modules. Internal layout and labelling is excellent.
System display is via a computer installed on the operator’s desk. The computer display is a 17 in LCD
panel. Operator control is via mouse and keyboard. Apart from the operating software the computer
appears to be ‘standard’ in nature.
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 12
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
UPS
An AEG Protect Series 3, 5 kVA free standing a double conversion / on-line UPS c/w a 16 AH 304 cell
NiCD battery is provided.
Cable tray: Cable trays are fully enclosed and in excellent condition. There is no evidence of
water ingress into the chase. Motor supply cables are steel wire armoured (SWA).
Cable layout: The rises to the individual motors are adequately secured and connections to motor
terminals are well laid out.
Access and Covers lifted via key holes. Covers fitted well and were stable under foot. Covers were
function: easily handled.
Cleanliness: There is a small amount of construction debris and dirt on the floor of the chase.
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 13
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
7. Recommendations
Safety
7. First Aid and Personal Protection Equipment needs to be issued to the ADDC operators.
8. Hearing protection should be provided to all operators.
9. Safety signs should be installed at the entrance to the station (and pump room). - Safety Shoes,
Hard Hat, Hearing Protection and Eye Protection).
10. No site lights in the compound except two small ones near the entrance of the control room.
Additional general site lighting should be provided to facilitate night operations.
11. Install lockable storage tank access hatches.
12. Pump room should be equipped with stand by air conditioning. This air conditioning system should
be used for maintenance or repair works performed during summer hot period.
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 14
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Electrical Assets Assessment
22. Fire Alarm System requires full commissioning (to be undertaken before FAC is issued)
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations 15
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Appendix A
Pump Station Schematic
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations A1
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Appendix B
Site Safety Assessment
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
SITE SAFETY ASSESSMENT
Comments
It is recommended that proper safety signs should be installed at the entrance to the station (and pump room): Safety Shoes, Hard Hat, Hearing Protection,
Eye Protection.
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations B1
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Appendix C
Civil and Infrastructure Assets
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
CONDITION ASSESSMENT - Buildings & General Infrastructure
Pum ping Station Name Gh anada Pump Station - Samha LE GEND - Asset Condition Assessment
Assessment Date 19 August 2009 Description Life Remains Rating
Time: IN / OUT 8.30AM / 12.30P M "As New" 100% 1
GPS P osition (E ntry Gate) N 24° 49.537' E 54° 47.846' Good 75% 2
AD DC GIS Object No: 8081 Fair 50% 3
Poor 25% 4
Inspection Personnel Failure Imminent 0% 5
John John (GHD) Failed / Derelict Un-useable 6
Roger Hawkins (Palmer Acoustics)
Padalchai P.
Co mm en ts
NOTE: 'NA' or 'Blank' = Not Applicable or Data N ot Available.
Ac com modation facilities and amenities for pump station operators are generally in neglect and in poor condition. No show ers.
No dedic ated office space available.
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations C1
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
CONDITION ASSESSMENT - Storage/ Transfer Water Tanks
Comments
NOTE: 'NA' or 'Blank' = Not Applicable or Data Not Available.
1) Painted storage tank walls make harder for any leakage detection.
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations C2
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
CONDITION ASSESSMENT - Pipework & Valves (Suction Side)
Flexible Coupling
Flexible Coupling Diameter (mm) 100 100 100
Condition Rating (1 to 6) 1 1 1
Isolation Valve
ADDC GIS Object No: 312809 312812 312815 Not Assigned Not Assigned Not Assigned
Isolation Valve Type Gate Gate Gate
Isolation Valve Diameter (mm) 100 100 100
Condition Rating (1 to 6) 4 4 4
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations C3
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
CONDITION ASSESSMENT - Pipework & Valves (Delivery Side)
Delivery Header Pipework Pipe 1
Pipe Material STEEL
Pipe Diameter (mm) 200
Condition Rating (1 to 6) 1
Flexible Coupling
Flexible Coupling Diameter (mm) 80 80 80
Delivery Side
Condition Rating (1 to 6) 1 1 1
Non-Return Valve
ADDC GIS Object No: 312811 312814 312817
Isolation Valve Type Needle Needle Needle
Isolation Valve Diameter (mm) 80 80 80
Condition Rating (1 to 6) 4 4 4
Isolation Valve
ADDC GIS Object No: 312810 312813 312816
Isolation Valve Type Gate Gate Gate
Isolation Valve Diameter (mm) 80 80 80
Condition Rating (1 to 6) 4 4 4
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations C4
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Appendix D
Mechanical Assets
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Pump and Motor Data
Pump Data Pump 1 Pump 2 Pump 3 Pump 4 Pump 5 Pump 6
AD DC GIS Object No: 7213 7214 7215
Year of Installation 2007 2007 2007
Supply to Sheikh's Palace Supply to Sheikh's Palace Supply to Sheikh's Palace
Purpose / Function
and Villas and Villas and Villas
Brand KSB KSB KSB
Horizontal Split Casing Horizontal Split Casing H orizontal Split Casing
Type
Centrifugal Centrifugal Centrifugal
Model No ETANORM C080-315 SP ET ANORM C080-315 SP ETANORM C080-315 SP
Serial No 9970821299 000 100 02 9970821299 000 100 03 9970821299 000 100 01
Impeller Design Size (mm) unknown unknown unknown
Speed (rpm) 1460 1460 1460
Pumping Design Power (kW ) unknown unknown unknown
Pump Design Efficiency (%) unknown unknown unknown
Duty Point Flow (l/s) 35 35 35
NPSHR (kPa) unknown unknown unknown
Duty Point Pressure (kPa) 320 320 320
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations D1
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
CONDITION ASSESSMENT - Water Pumps
Overall Condition Pump 1 Pump 2 Pump 3 Pump 4 Pump 5 Pump 6
Pump Body Satisfactory Satisfactory Satisfactory
Pump Shaft Satisfactory Satisfactory Satisfactory
Pump Shaft Coupling Satisfactory Satisfactory Satisfactory
Pump Base Satisfactory Satisfactory Satisfactory
Springs / Anti Vib. Mat. NA NA NA
Pump Plinth Satisfactory Satisfactory Satisfactory
Pump Motor Satisfactory Satisfactory Satisfactory
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations D2
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
PERFORMANCE ASSESSMENT - Water Pump Duty Point
Comments
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations D3
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
PERFORMANCE CURVES - Water Pumps
400
2 26 320
350
3 45 220 300
4 250
P- 02
5 200
6 150
7 100
50
8
0
0 10 20 30 40 50
Water Flow (l/s)
350
2 24 320
300
3 45 210
250
4
P- 03 200
5
150
6
100
7
50
8
0
0 10 20 30 40 50
Water Flow (l/s)
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations D4
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
CONDITION ASSESSMENT - Other Mechanical Equipment and Systems
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations D5
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Appendix E
Electrical Assets
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
CONDITION ASSESSMENT - Pump Motors
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations E1
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
PERFORMANCE ASSESSMENT - Pump Motors
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations E2
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
CONDITION ASSESSMENT - Main Switchboard & Motor Control Panels
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations E3
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
CONDITION ASSESSMENT - Other Electrical Equipment and Systems
Electrical Equipment Description Comments Asset Condition Assessment
Schedule Parameters Rating
Power Transformer Packaged substation unit, containing HT switch and LV Elect. Equip. A-I
500 distribution board. Not secured. Corrosion on external 3
Rating
panels. Dusty. I x single phase circuit + PS circuit.
Pump Station Earthing Elect. Equip. A-I
Neutral / Earth Link Not visible Good. 1
Resistance (Earth /Neutral) 0.2
Lightning Protection Elect. Equip. A-I
Earthing resistance unknown. 3
Lightning Protection Good
Pump Room Crane Elect. Equip. A-I
Good support for control box. 1
Electrics Good
Pump Control Panel Elect. Equip. A-I
Clear Mimic (Y/N) Yes PLC based control system - LCD display. Siemens
1
Fully Operational (Y/N) Yes PSC7 software Operator's skills marginal.
Thermal Imaging (Y/N) Ok
Power Cabling Elect. Equip. A-I
Condition good. 1
Main SB to Motors Good
Room Lighting Elect. Equip. A-I
Control Room Lighting Good 2
Emergency/ Exit Lighting --
Exterior Site Lighting Elect. Equip. A-I
More required. 4
Exterior Site Lighting Nil
Fire Alarm System Elect. Equip. A-I
System was switched off owing to continual fault
Manufacturer Kidde 6
indication.
Detector Types Ionisation/Beam
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations E4
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Appendix F
Pumps and Motors - Vibration, Alignment
and Noise
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
TEMPERATURE, NOISE & VIBRATION - Pumps & Motors
Temperature Deg C
Pump Room 33.5
Control Room 26.1
Outside (Ambient) 34.6
Vibration (mm/s) / Frequency (Hz) Pump-Motor 1 Pump-Motor 2 Pump-Motor 3 Pump-Motor 4 Pump-Motor 5 Pump-Motor 6
Vibration Limit = 2mm/sec V (mm/s) w (Hz) V (mm/s) w (Hz) V (mm/s) w (Hz) V (mm/s) w (Hz) V (mm/s) w (Hz) V (mm/s) w (Hz)
Point No 1 = Motor - Top Front Bearing 0.082 100 0.062 100 0.080 147.5
Point No 2 = Motor - Rear Foot 0.100 147.5 0.105 147.5 0.097 100
Point No 3 = Motor - Top of Motor 0.110 147.5 0.181 100 0.266 100
Point No 4 = Pump - Top Front Bearing 0.271 90 0.150 75 0.169 100
Point No 5 = Pump - Top Rear Bearing 0.099 90 0.066 75 0.079 100
Point No 6 = Pump - Rear Foot 0.043 100 0.094 147.5 0.021 147.5
Point No 7 = Pump - Inlet 0.068 147.5 NA NA NA NA
Point No 8 = Pump - Outlet 0.601 50 NA NA NA NA
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations F1
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
ALIGNMENT - Pumps & Motors
Pump Shaft Alignment (mm) Pump-Motor 1 Pump-Motor 2 Pump-Motor 3 Pump-Motor 4 Pump-Motor 5 Pump-Motor 6
Angular Limit = 0.08mm/100m
mm mm mm mm mm mm
Linear Limit = 0.10mm
Angular Displacement - Horizontal 0.06 0.00 0.04
Linear Displacement - Horizontal 0.06 0.02 0.04
Angular Displacement - Vertical 0.02 0.04 0.06
Linear Displacement - Vertical 0.18 0.09 0.04
Comments
NOTE: 'NA' or 'Blank' = Not Applicable or Data Not Available. LEGEND - Asset Condition Assessment
Pumps in good condition. "As New" 100% 1
Pipework flexible connectors in good condition. Good 75% 2
Pump flexible couplings good condition. Fair 50% 3
Poor 25% 4
Failure Imminent 0% 5
Failed / Derelict Un-useable 6
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations F2
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Appendix G
OEM vs Pump Performance
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations G1
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations G1
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations G2
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations G3
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Appendix H
Thermographic Images
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Ghanada Pumping Station – Thermal Imaging
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations H1
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Visible Light Image
TI 04
Pump Set No. 1 Pump
8/19/2009 9:18:25 AM
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations H2
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Visible Light Image
TI 07
Pump Set No. 1 Motor Control Panel
8/19/2009 9:19:27 AM
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations H3
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Ghanada Pumping Station – Thermal Imaging
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations H4
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Visible Light Image
TI 04
Pump Set No. 2 Pump
8/19/2009 9:36:10 AM
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations H5
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Visible Light Image
TI 07
Pump Set No. 2 Motor Control Panel
8/19/2009 9:36:42 AM
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations H6
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Ghanada Pumping Station – Thermal Imaging
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations H7
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Visible Light Image
TI 04
Pump Set No. 3 Pump
8/19/2009 10:02:16 AM
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations H8
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Visible Light Image
TI 07
Pump Set No. 3 Motor Control Panel
8/19/2009 10:03:09 AM
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations H9
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Appendix I
Vibration Spectrum
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Ghanada Pumping Station – Pump Set No. 1
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations I1
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Ghanada Pumping Station – Pump Set No. 2
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations I2
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2
Ghanada Pumping Station – Pump Set No. 3
76/10239/11981 Condition Assessment and Energy Management Survey of ADDC Water Pumping Stations I3
Eastern Region PS 05 - Ghanada, Samha Pumping Station DW-GND-WPS2