You are on page 1of 6

HIMAL KAJI PARIYAR

ELECTRICAL SUPERVISOR

ABOUT ME

CONTACT: Trustworthy, optimistic, determined to achieve goals, interested in learning and explore new
ideas, able to work and get along with people, preserve, hardworking, responsible, reasonable
Mobile: +974 66298070 independent and work under pressure with less supervision.
Email: himalkhotang@gmail.com

CAREER OBJECTIVE
EDUCATION:

2006 - Secondary School Certificate To become a part of a company where I can share my skills and work experience dedicatedly
to the best of my knowledge as being one of the hardworking employees of the company.

PERSONNAL DETAILS:

Date of Birth : 01-July-1989


WORK EXPERIENCE
Nationality : Nepal
SR. ELECTRICIAN/ELECTRICAL SUPERVISOR August 2007 – Present (16 Years)
Civil Status : Married
Religion : Hindu
Control, Engineering, Trading and Contracting Pvt. WLL
Present Address: Doha, Qatar General Contracting in Civil Works, MEP Works and Telecommunication Works
Languages : English, Nepali, Hindi, Arabic Doha - Qatar

Duties and Responsibilities as Electrical Supervisor


LICENSES:
▪ Site supervision for day-today task given by the Engineer.
Qatar Driving License for Light Vehicles
▪ Read and interpret drawings, schematic and electrical code specifications to determine
layout of electrical equipment installations.
CERTIFICATION: ▪ Install, examine, replace or repair electrical wiring, receptacles, switch boxes,
conduits, feeders, lighting fixtures and other electrical components.
2023 - BASIC FIRST AID AND CPR ▪ Test electrical equipment and components for continuity, current, voltage and
Venture Gulf Training Center resistance.
Doha – Qatar ▪ Maintain, repair, install and test switch-gear, transformers, switchboard meters.
▪ Troubleshoot, maintain and repair, electrical and low voltage control systems and other
2022 - T-BOSIET OPITO APPROVED
Venture Gulf Training Center related devices.
Doha – Qatar ▪ Fabrication and Installation of Cable Tray, Ladders, Trunking and Accessories.
▪ Cable Laying, Glanding, Termination and Testing on various location such as riser,
2022 - H2S / BREATHING APPARATUS duct bank, trenches and cable trays.
Venture Gulf Training Center
Doha - Qatar
▪ DB, ATC Panels and LV Panels installation, dressing and terminations
▪ Arrange and coordinate safety meetings.
2017 - H2S / BA AWARENESS ▪ Delegate tasks and responsibilities to crew members
Venture Gulf Training Center ▪ Be the point of contact with the Engineers.
Doha – Qatar

1|P a g e
▪ Maintain a safe work environment by adhering to all company guidelines and safety requirements and also through
reporting violations of policies, procedures and guidelines to the immediate Engineer/Engineers.
▪ List required materials needed at worksite.
▪ Responsible for maintaining company tools and equipment.
▪ Inspect jobs upon completion and ensure areas are clean.
▪ Detect needed repairs on buildings, grounds and equipment following established inspection procedures.
▪ Respond to emergency calls as needed.
▪ Assisting in all commissioning works.
▪ Other duties as assigned.

Duties and Responsibilities as Sr. Telecom Technician

▪ Site supervision for day-today task given by the Engineer.


▪ Installs, moves, repairs and modifies telecommunications and related equipment according to job order
specifications, standards and procedures.
▪ Installing routers, switches, multiplexors, cable trays, alarm and fire-suppression systems. Building ironwork and
ladder racks, establishing connection and other programming features.
▪ Establishes voice and data networks by running, pulling, terminating and splicing cables.
▪ Installing security cameras, panic system, door access and cabling.
▪ Verify service by testing circuits, equipment and alarms and identifying, correcting or escalating problems.
▪ Documents network by labelling and routing equipment and cables.
▪ Maintain network by troubleshooting and repairing outrages, testing network back-up procedures and updating
documentation.
▪ Maintains safe work environment by following codes, standards and legal regulations.
▪ Delegate tasks and responsibilities to crew members
▪ Be the point of contact with the Telecom Engineer.
▪ Other duties as assigned.

PROJECT INVOLVEMENT
▪ Refurbishment of electrical works at Al Mubashir Studio-1, Al Jazeera Media Network, Doha.
▪ Alignment Electrical Network with Kahramaa Latest Scheme at AJE Area, Al Jazeera Media Network, Doha.
▪ Obsolescence Management of Page/Party System In WH- 7, WH -8 & WH -9 - QG3 & 4 Offshore.
▪ Design and Build of Gate 3 Buildings, Al Jazeera Media Network, Doha.
▪ Electrical Refurbishment in AJA Studio-5, Al Jazeera Media Network, Doha.
▪ Structural Remedial Work in AJA Studio 5 Building, Al Jazeera Media Network, Doha.
▪ Installation of Redundant Power Supply for UPS and Chiller at Old AJA, Al Jazeera Media Network, Doha.
▪ Qatar Energy – EPIC for Upgrade of Fire Detection and Fire Fighting system in Existing core store- DUKHAN.
▪ Studio Design Fit Out for AJ Plus Channel, Al Jazeera Media Networks, Doha.
▪ Qatar Chemicals company – CCR safe haven Project.
▪ Messaid Refinery.
▪ QAFAC – Revamp / Upgrade paging system QAFAC plant – Messaid Doha.
▪ Ministry of culture and sports – Upgrading of Fire alarm and Fire Fighting systems as per Civil Defense requirement
– First Grade Clubs.
▪ Fire and Security upgrade for AJA/AJE and DGO buildings at Al Jazeera media network.
▪ Qatar Energy – EPIC for emergency Response coordination center, RLIC.
▪ Qatar Gas PAGA system installation and upgradation – OFFSHORE.
▪ Royce HVAC control System Testing (Glanding & Termination), Abu Dhabi, UAE.
▪ QPD Offshore Project, Doha.
▪ PS4 Offshore Project, Doha.
▪ Road Lighting in Halul Island, Qatar.
2|P a g e
TECHNICAL QUALIFICATION

▪ Fire Alarm Cabling Works ▪ Lighting and Small Power System Installation and
▪ Structured Cabling Works Troubleshooting
▪ PAGA System Installation ▪ Earthing and Lightning protection Works
▪ Access Control System Installation ▪ Cable Glanding and Termination from Small Size up
▪ Security System Camera Installation to 400sq.mm.
▪ CAT 6 Cable Connecting and Testing ▪ Ability to read Project Drawings, Schedules and As-
built.

REFERENCES
Julius Mallari
Project Manager and Head of QHSE Department
Control Engineering, Trading and Contracting WLL
Mobile: +974 55534690

3|P a g e
Dear

State of Qatar ftis l1cense mus1 be produced Of;=-\;;;--- . .._. JLH! �


Ministry of Interior POii� offic.- In lfttormoron production ol .,......,.;1,s� i:J5 �� .U...,..:.i1 �..JV"
Traffic Department warran1 card bot' �ice office, noc in Inform � � �,S 4.b. � �Ji' J..Jt! � ;

DRIVING LICENSE . 'J,:-�; •'-


28952400593
),LJ/ ir,I.S J- .,__'j
NAME HIMAL KAJI PARIYAR

1989-07-01

201Hl6-30
2026-06-21

VENTURE GULF TRAINING CENTRE VENTURE GULF TRAINING CENTRE


www.vgtcq.t.om •dminOvgetc.com

Tl11s is to cernfy that This card is the property or the issuer and the terms ano
ccndmons laid down by the issuing company apply If trus
HIMAL KAJI PARJYAR card Is found, please return to. Venture Gulf Tratntng Centre
PO.Box·96712,Doha-Qatar,Tel:( t-974) 44602121 Ext 250
w.1-. ,uc..:c,;;-.fully .t<;'>c,;;,;cd .1i;.11n'it .md
met leammg outcomes fur

T · BOSIET OPITO APPROVED

Date Of Issue: Expiry Date: Course Code:


5501
05.Dec.2022 04.0ec.2026
Duration:
19 Hrs CAPT. SAMI SULEIMAN
Cert. No: 5146550105122258489
Companv: CONTROL ENGINEERING. TRADING AND CONTRACTING PVT \VLL Training Manager

V£NT\JRE GUl.l' SAFETY & SECURITY TIJUHING CEHTRE


vtNTURE GULF SAFETY & SECURITY ntAINJN6 CENTn
www.vgtcq.com itdmin.v9etc.com
Th,s card Is the property of tne issuer enc tne terms a1xt
conchtions laid down by the issuing comPc>nv aoply.J f this
This is to certify that card ,s round, please return to: Venture Gull Tra,n,ng Centre
P.O.Box:96712,0oha-Qatar,Tel:( .. 974) 44602121 Ext. 250
HIMAL KAJI PA.RJYAR
has successfully completed training for
BASIC FIRSf AID & CPR

Date Of Issue: Expiry Date:


02-FEB-2023 01-FEB-2026
CAPT. SAMI SULEIMAN
CcrL No: 270725
Company: CONTROL ENGINEERING, TRADING AND CONTRACTING. PVT. WIJ, Training Manager

VENTURE GULF TRAINING CENTRE VENTURE GULF TRAINING CENTRE


www.vg-tcq.com adminttvgetc.com
ThtS card is the property of the issuer enc tne terms and
This is to certify that conditions laid down bv � ,ssu,09 a,mpanv appty..lf this
card ,s found, please ret\Jm to": 'Venture Gulf Tra,mng Ccntrt
HIMAL KAJI PA.RJYAR P.O.Bo•:967J2,0ctia�Qat.ar:,Tel;( "-91.t) 4f&o:!J21 Exl. 2SD

has successfully completed training for


H2S/BREATHING APPARATUS

Date Of Issue: Expiry Date:


03-DEC-2022 02-DEC-2023 CAPT. SAMI SULEIMAN
CcrL No: 265169
Company: CONTROi. ENGINEERING, TRADING AND CONTRACTING. PVT. WIJ,

4|P a g e
Company:
VENTURE GULF TRAINING CENTRE CCTC
www.vgtcq.com •dm1n _ vgetc.com

Job Title:
This is to certify that
ELECTRICIAN
HIMAL KAJI PARIYAR
has successfully completed training for

H2S / BA AWARENESS
Date Of Issue: Expiry Date:
Dec'. 28, 2017 Dec. 27, 2018 Staff No.:
CAPT. SAMI SULEIMAN
Serial Number: 139491
.Training Manager

CONTRACTOR _Company · CCTC (QP) :u.,..i

SECURITY PASS
Authorised Areas � c.-.n .:is,...'11
RL:
Validity:
24/08/2023 :�I
1,2,27,42
QIDIV,sa No 289524()0593 : ·�/ � �
Nation11i,y· NEPALI �
lid From: 10/06/2023
Stiff No

Name
t: RL53580003170825
HIMAL KAJI PARIYAR

Or Call Tel :-91600


QSPP 2402763 ICIASS l2JC

-
SUPPLEMENTARY Authorised Areas

SECURITY PASS OF : 1, 1 '\ 12,22,23,88


II 1111111111111111 From 15106/2023 To 24/08/2023
Apr,#: RL5358000317082tS.Cwd #: 2402763
OID I Visa No: 28952400593
Name: HIMAL KAJI PARIYAR

This card is only valid when used in conjunction This card is Ille property of Qatar Petroleum.
with MOI issued Badge If found, pleaM return bl S.CU<IIY Pass Ollie• or ca144525147 / 4'

:..s.,...:
CCTC (QP)
CONTRACTOR Company:

Authorised Areas
'41�.i,c;.,..._.Jl.:,<l.,'l\

SECURl1Y PASS
RL:
Validity: 08/06/2023 :�
1,2,27
QID/ Visa No:28952400593 : ;.,..i;/ � �
Nationality: NEPALI . '+'°>
lid from: 07/12/2022
Slaff No : �P
ul;, .,JI ,-_; RL53578102967317
#:
Name: HIMAL KAJI PARIYAR
or call Tel :44491�5
21(
QSPP 4727301

5|P a g e
MEDICAL FrrNESS TO WORK

Blood Group B+
Health-Sur. Code 3,SA,8
HIMAL KAJI PARIYAR
CONTROL CONTRACTING Med.Cert.Validated By : BH02
Qatar ID Number :28952400593
Approved By :
QP Sponsoring Dpt :QPD
Dr Abdel Rahman MSW 2
Card Expiry Date :03/01/2020

SAFETY TRAINING CARD


CONTRACTOR
QATAttOAS Name : Himal Kaji Pariyar

QG Training ID : 4180088784
Company : Control Engineering (9740)
Designation : Supervisor/ Chargehand


Dept./ Project : Long Term/ Maintenance

...
Lift S.vln1

! Emergency No.: 4473 7777 (Qatargas); 135 (RLIC) J

SHl:&Q Group
Safety Training Section
P Gas �afety PassPort

Name: H1mal KaJI Pariyar


Company: Qcon
Dept/Section:
SAP/ID No: 28952400593
QID ID No:

1111 imm 1111111 �1111111111


2581&

Company ARCHIRODON CONSTRUCTION· SA ;<1�1


Authorised Areas

RL:
1,2,3

;�l�I
I Valid From: 19/02/2016

This en II the proporty o1 Qour Ptlroloum.


W-pluMlllumtos.cu.tlyOopt. or Call Tol:44491600
Nome HIMAL PARIYAR
991357 4• 42101os1s19-r

6|P a g e

You might also like