Project: 14-2579 Seite A-2

INGENIEURBÜRO FÜR TRAGWERKSPLANUNG

Welded mash B500 A


Construction:
The building is designed as in-situ concrete
construction.
The spatial stability is established through walls in
combination with floor slabs.

Fondation:
The entire building is built on a pile foundation.
Based on the recommendations of the geotechnical
expert Koops & Romeijn, grondmechanica,
De Ververt 11-08, 6605 AD Wijchen
in the report from:
24.November 2014, (site investigations, foundation
recommendations
26.November 2014 (retaining construction -
excavation pit)
02. Dezember 2014 (dewatering advice)

Wind Loads:

wind region (figure NB.1) III


terrain: undevelopped area (NB. 3-4.1 II
max hight: 15,0 m
zero pressure: qp= 1,07 kN/m2

Live Loads

s. the following sketches L-01 - L-06

Fire Resistance

All structural members (walls, slabs and columns) meet the


requirements for fire resistance R 90.
1) Columns (REI 90):
In the structural calculation is considered a fire resistance
of 90 minutes ( EC2 EN 1992-1-2, e. G. structural
calculation on page 340, 343, 350 etc.)
2) Walls (REI 90):
The structural walls have a thickness of minimum 200 mm.
The concrete cover is different but the minimum coverage
is 25 mm.
3) Slabs (REI 90):
All slabs are one way ore two way solid slabs. The
minimum thickness is 250 mm. The minimum concrete
cover is 30 mm. In the reinforcement drawings, the
requirements of EN 1992-1-2, table 5.9, 5.9 etc. Will be
considered.