METHOD OF STATEMENT

Document WHMTS/2023/08/09 Date 05.08.2023


Reference No.

Issue No. & Date 20230805 Pages 05

Prepared by Yuvakanth KS Approved by Stephen Rajkumar

Review Period After any significant change

I confirm that I have been instructed on the method of work, the hazards, risks involved
and the necessary control measures including the rescue plan

Name Signature Date

05.08.2023
Yuvakanth KS
05.08.2023
Stephen Rajkumar

W386, Dubai Maritime City – P.Box. 6177 – Dubai, UAE


:+971 4 4229230,  + 9 7 1 5 5 3 7 3 2 6 3 5
 : E Mail: info.uae@wintech-group.net, www.wintech-group.net
METHOD OF STATEMENT

Client
SIDRA AL WAJBAH, C/O Inter Ocean Ship Repair LLC
1. Overhaul of Mooring Winch Motor
2. Overhaul of Mid Ship Crane Control valve
Description 3. Supply & Fixing Mid Ship Crane Hoses
of the Work 4. Overhaul of Steering Control Block
5. Overhaul of Steering Cylinder

Dubai
Client PO
S/50/941/22120077 Location Maritime City-
reference
Dry Berth 3
Project Start Date 05.08.2023
Our
090/2023 REV Project End Date 17.08.2023
reference
Demobilize/Removal
Setting up
of equipment

MANPOWER

Name Designation
Mr.Dharmendar Kushwaha Technician
Mr. Markanduyulu Gangalolu Technician
Personnel
Mr. Nitish Thakur Technician
details
Mr. Adnan Masih Bashir Masih Technician
Mr. Stephen Rajkumar Manager
Remote Mr. Yuvakanth Kanyamadugu Somasekar
Engineer
• Coveralls
• Hard hat with chin strap
PPE • Safety shoes
• Googles
• Gloves

PLANT AND EQUIPMENT

• Basic hand tool box


• Chain Block
Other
• Safety belt
materials
• D Shackle
/Machinery
• Wire rope
• Mobile crane

W386, Dubai Maritime City – P.Box. 6177 – Dubai, UAE


:+971 4 4229230,  + 9 7 1 5 5 3 7 3 2 6 3 5
 : E Mail: info.uae@wintech-group.net, www.wintech-group.net
METHOD OF STATEMENT
1. INTRODUCTION
This method statement addresses the approach to be adopted by Wintech Hydraulics
Maintenance & Trading Services LLC whilst carrying out all the necessary site operations to
complete, as described, in a safe manner.
This document aims to offer an insight into the procedures and methods to be implemented
by Wintech Hydraulics Maintenance & Trading Services LLC and our proposed methods of
material delivery, handling, access and undertaking the work.
This method statement shall be read and understood by all operatives.
2. GENERAL SCOPE AND EXTENT OF WORKS

✓ Overhaul of Mooring Winch Motor


✓ Overhaul of Mid Ship Crane Control valve
✓ Supply & Fixing Mid Ship Crane Hoses
✓ Overhaul of Steering Control Block
✓ Overhaul of Steering Cylinder

3. METHOD STATEMENT
3.1 PRECAUTIONS
1. Barricade the area where dismantling is to be carried out with proper signage’s /
warnings.
2. Pressure in the lines is to be released in consultation with the client’s representative.
3.2 DISMANTLING AND SHIFTING OF WINCH
1. Remove all the connections and mounting bolts from the winch assembly.
2. Barricade the lifting area and don’t allow anyone within 2mtrs. distance around the
hanging load.
3. Pathway should be even and free from any other obstructions.
4. SITE COMMUNICATION
All appropriate Site Supervision personnel shall be equipped with appropriate communication
system, as may be assessed as a requirement by Site Procedures.
5. DELIVERY LOGISTICS
Deliveries to site shall be made in accordance with site specific requirement and notice shall
be given to the client / control room / site team prior to any arrival of the transport on-site.
The materials and equipment shall be packed in a manner suitable for offloading at any site /
installation. Any discrepancies and or damage shall be notified and withdrawn from service as
necessary and recorded.

W386, Dubai Maritime City – P.Box. 6177 – Dubai, UAE


:+971 4 4229230,  + 9 7 1 5 5 3 7 3 2 6 3 5
 : E Mail: info.uae@wintech-group.net, www.wintech-group.net
6. OFF LOADING / DISTRIBUTION
The vessel in charge shall be responsible for all the unloading and movement of any materials
/ equipment and waste management during the works.
Weights of any individual items to be lifted are to be manageable and alternative measures
shall be used if identified by the risk assessment.

7. EQUIPMENT/ PERSONNEL
• All supervisors and technicians are experienced and qualified to carry out the given task.
• All equipment is internally tested and fit for use.
• An exclusion zone / warnings under any work area shall be in place and fit for purpose
prior to any operation being carried out.
• All equipment shall be checked prior to use.
8. STORAGE REQUIREMENTS
All equipment/materials shall be stored on site within a safe and dry area and allocated as
required by the work activity.
9. OPERATION PLAN
The following sequence should be followed when undertaking the work.
• All team members shall attend a site and company induction.
• All team members shall read and understand permit / risk assessments and this
method statement.
• All team members shall discuss and familiarize the scope of work and risk associated
with it.
• No work is to be carried out if this is not achievable or unable to be done safely.
• All team members shall conduct, document and sign onto on-site safety toolbox talks.
• Set up exclusion zone with highly visible tape.
• All personnel shall wear the appropriate PPE.
• All Team Members shall be conversant with the Detail of Specific Method Statement.

W386, Dubai Maritime City – P.Box. 6177 – Dubai, UAE


:+971 4 4229230,  + 9 7 1 5 5 3 7 3 2 6 3 5
 : E Mail: info.uae@wintech-group.net, www.wintech-group.net