HAZARD IDENTIFICATION /RISK ASSESSMENT

DOCUMENT WHMTS/RA/ 2023/09/10 REV. NO. & DATE 009/2023


REFERENCE 23.09.2023
NO.
ISSUE NO. & ISNORA230923 & 23.09.2023 PAGES 3
DATE
PREPARED BY Yuvakanth K S APPROVED BY Stephen Rajkumar

CLIENT TIAN KUN HAO, C/O Al Nashwan Ship Repair LLC


DESCRIPTION OF Removal and Replacement of Swivel Bearings of Luffing
THE WORK Cylinders incrane
CLIENT PO E-Mail LOCATION Port Rashid, Wet Berth 33
REFERENCE Confirmation on
23.09.2023
2354 Dtd START DATE 25.09.2023
OUR REFERENCE 22.9.2023 END DATE 30.09.2023

W386, Dubai Maritime City – Post Box No. 6177 – Dubai, UAE
:+971 4 4229230,  + 9 7 1 5 5 3 7 3 2 6 3 5
 : E Mail: info.uae@wintech-group.net, www.wintech-group.net
HAZARD IDENTIFICATION /RISK ASSESSMENT

RISK ASSESSMENT - HYDRAULIC JOBS


ACTIONS TO MINIMIZE
S.NO. RISK DESCRIPTION PROBABILITY SEVERITY
RISK
1 JOB RELATED RISKS
1.1 Crane in Operating Unlikely Moderate Shut the Crane and
operational Crane without remove start key and to
mode notice be kept with the
supervisor till such time
repair is completed
Movement of Operating Unlikely Catastrophic Boom to be supported in
1.2 Crane Boom Hydraulic a frame and latched
System without securely
Notice
1.3 Improper Fall from height Unlikely Catastrophic When climbing and
Scaffolding descending, use the
handgrips and platforms
provided. Always
support yourself on at
least three points at a
time.
1.4 Unskilled Job Failure and Unlikely Moderate All personnel performing
Workforce resulting in the job should be well
accidents trained and have
awareness of risk
involved in the job and
the method to handle it.
1.5 PPE Injury Unlikely Catastrophic Personnel entering the
site should be inducted
and briefed about site
safety requirement, areas
of access, etc. Proper PPE
to be used at all times at
work site

W386, Dubai Maritime City – Post Box No. 6177 – Dubai, UAE
:+971 4 4229230,  + 9 7 1 5 5 3 7 3 2 6 3 5
 : E Mail: info.uae@wintech-group.net, www.wintech-group.net
Improper Job Delay and Unlikely Moderate Technicians to use the
1.6 Tools Injury correct tools for the job
in order to avoid injuries
and to complete the job
on time
Oil Spills Activity being Moderate Hoses and Pipelines and
1.7 a Hydraulic Oil Likely ports removed are to be
oriented job plugged with proper port
oil spills are plug to prevent oil from
bound to dripping to the floor of
happen the crane
resulting in
injury to
personnel
1. Property Unlikely Moderate 1. Housekeeping should
Housekeeping damage, slip, 2. be addressed daily
trip and fall basis.
1.8 hazard. 3. Waste to be collected
2. Cut and in the designated area
bleed cases provided by
bruise or bodily concerned person.
3. Environmen
tal impact
1.9 Collision Collision with Unlikely Catastrophic 1. Check the work area,
people or nearby structures, aerial
objects in hazards.
work area 2. Consult the principal
contractor, site
supervisor, the other
crane operators and
everyone involved with
the work and prepare a
safety plan for the job.