Professional Documents
Culture Documents
Checklist of Block Work
Checklist of Block Work
Note:
Signature
Name
Title
Date
1|Page
Checklist: Fill/Backfill Materials Receiving inspection
Department Civil WIR No.
Fill/Backfill Materials Receiving ITP NO. R03-C02C02-AAP-ITP-CI-0003
Description
inspection
Drawing No.
Location
SN. Description Accepted Rejected Remarks
2|Page
Note:
Signature
Name
Title
Date
3|Page
Checklist: Site Preparation and Excavation
Department Civil WIR No.
Site Preparation and Excavation ITP NO. R03-C02C02-AAP-ITP-CI-0003
Description
Drawing No.
Location
SN. Description Accepted Rejected Remarks
Note:
4|Page
Issued By Sub-Contractor Site Engineer QC Engineer Saud Consult
Signature
Name
Title
Date
Signature
Name
Title
Date
7|Page
A Compaction Testing
Control soil and fill compaction,
providing minimum percentage of density
A1 specified for each area classification indicated
below. Correct improperly compacted areas or
lifts as directed by the Engineer if soil density
tests indicate inadequate compaction.
Percentage of Maximum Density
Requirements: Compact soil to not less than the
A2 following percentages of maximum density, in
accordance with ASTM D 1557
Signature
Name
8|Page
Title
Date
9|Page
Percentage of Maximum Density
Requirements: Compact soil to not less than the
following percentages of maximum density, in
accordance with ASTM D 1557:
1. Under structures, building slabs and steps, and
pavements, compact top 300 mm of subgrade and
each layer of backfill or fill material at 95 percent
maximum density.
A1 2. Under lawn or unpaved areas, compact top 150
mm of subgrade and each layer of backfill or fill
material at 90 percent maximum density.
3. Under walkways, compact top 150 mm of
subgrade and each layer of backfill/fill material at
95 percent maximum density.
4. General Fill: Compact each layer of backfill or
fill material at 90 percent maximum density.
Pavements and Walks: Shape surfaces of
areas under pavement and walks to line, grade
A2 cross-section with finish surface not more than 20
mm above or below the required subgrade
elevation.
Under Building Slabs: Provide final
A3 grades within a tolerance of 12 mm when tested
in a 3 m straight edge.
Foundations: Finish surfaces on which
A4 footing shall be placed to within 25 mm or below
the required grades
Landscaped Areas and Rough Grading:
A5 Finish all areas to within 50 mm above or below
the elevations, grades and cross-sections shown
Note:
Signature
Name
Title
Date
10 | P a g e
11 | P a g e