This document provides a daily work assessment for a construction project in Zone 2 of Al-Wathba. It shows that as of April 13th, a total of 2198 joints had been completed with 364mm of total excavation. It then lists the daily progress from April 13th to April 30th, including the number of joints completed, excavation depth, backfilling depth, and number of pipes offloaded each day. The total work completed as of April 30th is listed at the bottom.
This document provides a daily work assessment for a construction project in Zone 2 of Al-Wathba. It shows that as of April 13th, a total of 2198 joints had been completed with 364mm of total excavation. It then lists the daily progress from April 13th to April 30th, including the number of joints completed, excavation depth, backfilling depth, and number of pipes offloaded each day. The total work completed as of April 30th is listed at the bottom.
This document provides a daily work assessment for a construction project in Zone 2 of Al-Wathba. It shows that as of April 13th, a total of 2198 joints had been completed with 364mm of total excavation. It then lists the daily progress from April 13th to April 30th, including the number of joints completed, excavation depth, backfilling depth, and number of pipes offloaded each day. The total work completed as of April 30th is listed at the bottom.
REPORT till 13: Total joints;2198 Total Excavation 364
SI NO DATE NO OF JOINTS EXCAVATION (mm) BACKFILLING (mm) No of pipe off loaded 1 13/04/2023 7 96mm 96mm 2 14/02/2023 off off 0ff 3 15/04/2023 4 84mm 84mm 4 16/04/2023 4 108mm 108mm 5 17/04/2023 7 0 0 6 18/04/2023 5 75mm 72mm 8 19/04/2023 5 72mm 72mm 9 20/04/2023 6 96mm 96mm 10 4/21/2023 off off off 11 4/22/2023 off off off 12 4/23/2023 off off off 14 4/24/2023 10 216mm 216mm 15 4/25/2023 10 264mm 264mm 16 4/26/2023 9 180mm 180mm 17 4/27/2023 11 132mm 132mm 18 4/28/2023 off off off 19 4/29/2023 12 252mm 252mm 20 4/30/2023 9 168mm 168mm
TOTAL complete 2128mm 2128 375
. BDI MONTHLY WORK ASSESSMENT project: AL Wathba Month : MAY 2023
SI NO DATE No of JOINTS EXCAVATION BACKFILLING PIPE OFFLOADING Trial pitting