iF isco 18 Ge Reta Wa es as
‘Transmittal Record
Job: Contract No, CV/2000/09 Infrastructure for Penny's Bay Development
Contract 1
Issue to: Mr. C.L. Choi - Chin:
cc: PBU (w/o)
Dear Sir,
Please find enclosed the following
1a State
Our Ret
Date
1P1702095/T1.0075.03
23-Jun-03
Document Reference
7
No. of
Copies Poe Drawing No. (Revision) pa
1 | Calculation Notes 1PT02095/PP/PT/0016 (Rev. 0) 18-Jun-03
Lifting Anchors for Precast Segment
Status: For Construction
Remarks: Please disregards our 1PT02095/T100070-03 dated 18,
IPT02095/PP/PT/3001 Rev. 0.
Issue Approval : (Please contact the undersigned regarding content of above documents, if required).
June 2003, that document was wrongly issued with number
‘Name Position Signauss Date Contact Ne,
Pascal Burtet Project Manager 23-Jun-03 2983-6261
‘Transmittal By
Name. Position ‘Signature Date ‘Contact No.
Sylvia Sun Secretary 23-Jun-03 2983-6261
Please confirm receipt and return this page to + Ms, Sylvia Sun (Fax No.: 2983-6520)
Received By
Signature / Company
Full Name rN QLA Chop
m2 3Contractor
{x] | CHINA STATE CONSTRUCTION ENGRG,HONG KONG )LTD
0 | 180605 Fit ue Redland
Rev | Due Description [Psvared
PROJECT:
INFRASTRUCTURE FOR PENNY’S
BAY DEVELOPEMENT
CONTRACT 1
CONTROLLED COPY FOR CONSTRUCTION
pore 7
CALCULATION NOTES
LIFTING ANCHORS FOR PRECAST SEGMENT
DOCUMENT NO: =
4PT02095 PP PT/00/16 rev.0
Prepared: Checked
Redland PBU
fr i Hieb 3
=e
Copy Reserved
“This document isthe propery of VSL and must not be copied reece pd slept ily Tid
Party, nor sed in any manner whacever without prior writen consent of VSL
Date:
Form0004-0 created 07-01-2003,[Contractor:
‘CHINA [STATE CONSTRUCTION ENGRC.(HONG KONG )LTD_
0 _| is0605 Fit eve Redland
ats re a
PROJECT: ae
INFRASTRUCTURE FORPENNY’S @
BAY DEVELOPEMENT 2
CONTRACT 1 3
=
{TITLE :
CALCULATION NOTES
LIFTING ANCHORS FOR PRECAST SEGMENT
- mo 16
4PT02095 PP PTi36I01 rev.0
[DOCUMENT NO.:
Prepared. (Checked:
ony re
Oa ce
43.66.08 4ibeh?
Sal
Par nor se nny manne haoever without por writen consent of VSL
Sai
ft Tee
eas
ES prose agmenenes mame sername
/s
Form0004-0 created 07-01-2003Conetract No. CV/2000/09
Infrastructure for Penny's Bay Development Phase 1
Design Caleulation for Starcon Lifting Anchors
1. Design check on 20 tonne lifting anchors:
|
|
|
ELEVATION
b. Weight of Segments - Segment type III = 653 KN (worse case scenario)
‘This calculation is applicable only on segments weighing from 49 tons or heavier.
PC segments shall be lifted using a purpose designed lifting frame or beam. Therefore, the load per lifting anchor can be
assumed that they are equally shared.
Force in lifting anchor = 6S3KN_ = 163 KN =F
4 nos.
Capacity of exch lifting anchor = 200kN > -63KN
ok!
‘see attached technical date sheet Starcom Anchor 09-1203400
¢. Check Punching Shear
‘Shear failure may occur along a conical perimeter zone.
:
be
PER METER ZONE
Infrastructure for Penny's Bay Development va
Prepared by: GBPerimeter of cone = [x 680+ xx 85] x 340
2
A, = 408564.12 mm?
‘Assume a partial load factor = 1.2
Ultimate shear force, V= Fx dy
= 196 KN
v=196x10KN = 048N << 3.75N__ ok!
‘Ay mm? mnt
4d. Check the Ultimate Shear stress
‘Assume that there are 5 nos. of T32 in longitudinal direction + 5 nos. of T16 bars in transverse direction.
100s. = (4021.2 + 10053) = 2.17
bd (680 x 340)
ve = 086 => BS 8110, Part 1; Table 3.8
¥ < ve Therefore, no punching shear reinforcement are required.
fe. Check tension zone below lifting anchor base.
Effective tension length under lifting anchor = 680 mm
Vertical bars = 125@150 cle
‘No, of bars in tension zone = 680 = 5 nos.
150
‘Therefore, there are 10 legs over section
Infrastructure for Penny's Bay Development wa
es @ (S0cHe
7
Prepared by: GBUltimate tension force = 200 KN
Aseesing) = 20010°N = 500mm?
087 f
AS grouse = 4909 mm? > S00 mmm? ok!
If, considering only 2 x T2S bars are effectively carry tension force.
AS greg = 981mm? > 500 mn? okt
f. Design of U-bars for lifting anchors
‘These additional U-bars are applicable only on segments having thicker webs.
oe ane eet
fU-BARS ONTO Al
=>
ITIONAL U-BARS
G TRANSFER TENSION
TO CONCRE
Check additional U-bars to transmit tension force, assume 2nos x T20 U-bars to transfer force on the unreinforced
concrete area
‘Tension force = 81.5 kN = T
Force in bars. => T=O.87f,xAs. where; 6;= 1.4
T=4002 x As
i
As = SL5x10x 1c
400.2
Infrastructure for Penny's Bay Development 34 Prepared by: GB=285 mm?
Diameter of bar required = (Asx 4° = 20mm ok!
‘Therefore, provide 2x 120 U-bars; Area= 4.x 314mm? =
8. Calculate Bond Length of U-bars,
Bond force per leg of U-bar = 163KN = 40.75 kN
4
Check anchorage bond stress fb,
Fs = 4075x10N = 1.08_N
FOI x 20mm x 600mm mm?
CCheck values for Design Ultimate anchorage bond stress
foun Bvfei = 0.5 05
Sou= 2.5 N_ > & ok!
mm?
FOS. = 23
Infrastructure for Penny's Bay Development aia Prepared by: GBStarcon Anchor
i
canon
core:
98-1101500
aint a
corte
|08 168800"
or
oeatieenn
1087151550
os 181680
09-4162000
(05-1153000
08-1154000
108-1202000
08-1202500
——> 08-1203400
System
70.0/100
100/300)
0.83 ig
100/100,
00/100" 4.083
100/100 1.08 bg
'10.0/100" i
705/100 1d tg
=| s00106% seis:
188 tg
3,57 kg
150/150
15.0/150 187g
15.0/150 22tkg
150/150 2.8tkg
150/150 3,88 9
200/200
200/200
i
|
!
3
flip gale