You are on page 1of 8
iF isco 18 Ge Reta Wa es as ‘Transmittal Record Job: Contract No, CV/2000/09 Infrastructure for Penny's Bay Development Contract 1 Issue to: Mr. C.L. Choi - Chin: cc: PBU (w/o) Dear Sir, Please find enclosed the following 1a State Our Ret Date 1P1702095/T1.0075.03 23-Jun-03 Document Reference 7 No. of Copies Poe Drawing No. (Revision) pa 1 | Calculation Notes 1PT02095/PP/PT/0016 (Rev. 0) 18-Jun-03 Lifting Anchors for Precast Segment Status: For Construction Remarks: Please disregards our 1PT02095/T100070-03 dated 18, IPT02095/PP/PT/3001 Rev. 0. Issue Approval : (Please contact the undersigned regarding content of above documents, if required). June 2003, that document was wrongly issued with number ‘Name Position Signauss Date Contact Ne, Pascal Burtet Project Manager 23-Jun-03 2983-6261 ‘Transmittal By Name. Position ‘Signature Date ‘Contact No. Sylvia Sun Secretary 23-Jun-03 2983-6261 Please confirm receipt and return this page to + Ms, Sylvia Sun (Fax No.: 2983-6520) Received By Signature / Company Full Name rN QLA Chop m2 3 Contractor {x] | CHINA STATE CONSTRUCTION ENGRG,HONG KONG )LTD 0 | 180605 Fit ue Redland Rev | Due Description [Psvared PROJECT: INFRASTRUCTURE FOR PENNY’S BAY DEVELOPEMENT CONTRACT 1 CONTROLLED COPY FOR CONSTRUCTION pore 7 CALCULATION NOTES LIFTING ANCHORS FOR PRECAST SEGMENT DOCUMENT NO: = 4PT02095 PP PT/00/16 rev.0 Prepared: Checked Redland PBU fr i Hieb 3 =e Copy Reserved “This document isthe propery of VSL and must not be copied reece pd slept ily Tid Party, nor sed in any manner whacever without prior writen consent of VSL Date: Form0004-0 created 07-01-2003, [Contractor: ‘CHINA [STATE CONSTRUCTION ENGRC.(HONG KONG )LTD_ 0 _| is0605 Fit eve Redland ats re a PROJECT: ae INFRASTRUCTURE FORPENNY’S @ BAY DEVELOPEMENT 2 CONTRACT 1 3 = {TITLE : CALCULATION NOTES LIFTING ANCHORS FOR PRECAST SEGMENT - mo 16 4PT02095 PP PTi36I01 rev.0 [DOCUMENT NO.: Prepared. (Checked: ony re Oa ce 43.66.08 4ibeh? Sal Par nor se nny manne haoever without por writen consent of VSL Sai ft Tee eas ES prose agmenenes mame sername /s Form0004-0 created 07-01-2003 Conetract No. CV/2000/09 Infrastructure for Penny's Bay Development Phase 1 Design Caleulation for Starcon Lifting Anchors 1. Design check on 20 tonne lifting anchors: | | | ELEVATION b. Weight of Segments - Segment type III = 653 KN (worse case scenario) ‘This calculation is applicable only on segments weighing from 49 tons or heavier. PC segments shall be lifted using a purpose designed lifting frame or beam. Therefore, the load per lifting anchor can be assumed that they are equally shared. Force in lifting anchor = 6S3KN_ = 163 KN =F 4 nos. Capacity of exch lifting anchor = 200kN > -63KN ok! ‘see attached technical date sheet Starcom Anchor 09-1203400 ¢. Check Punching Shear ‘Shear failure may occur along a conical perimeter zone. : be PER METER ZONE Infrastructure for Penny's Bay Development va Prepared by: GB Perimeter of cone = [x 680+ xx 85] x 340 2 A, = 408564.12 mm? ‘Assume a partial load factor = 1.2 Ultimate shear force, V= Fx dy = 196 KN v=196x10KN = 048N << 3.75N__ ok! ‘Ay mm? mnt 4d. Check the Ultimate Shear stress ‘Assume that there are 5 nos. of T32 in longitudinal direction + 5 nos. of T16 bars in transverse direction. 100s. = (4021.2 + 10053) = 2.17 bd (680 x 340) ve = 086 => BS 8110, Part 1; Table 3.8 ¥ < ve Therefore, no punching shear reinforcement are required. fe. Check tension zone below lifting anchor base. Effective tension length under lifting anchor = 680 mm Vertical bars = 125@150 cle ‘No, of bars in tension zone = 680 = 5 nos. 150 ‘Therefore, there are 10 legs over section Infrastructure for Penny's Bay Development wa es @ (S0cHe 7 Prepared by: GB Ultimate tension force = 200 KN Aseesing) = 20010°N = 500mm? 087 f AS grouse = 4909 mm? > S00 mmm? ok! If, considering only 2 x T2S bars are effectively carry tension force. AS greg = 981mm? > 500 mn? okt f. Design of U-bars for lifting anchors ‘These additional U-bars are applicable only on segments having thicker webs. oe ane eet fU-BARS ONTO Al => ITIONAL U-BARS G TRANSFER TENSION TO CONCRE Check additional U-bars to transmit tension force, assume 2nos x T20 U-bars to transfer force on the unreinforced concrete area ‘Tension force = 81.5 kN = T Force in bars. => T=O.87f,xAs. where; 6;= 1.4 T=4002 x As i As = SL5x10x 1c 400.2 Infrastructure for Penny's Bay Development 34 Prepared by: GB =285 mm? Diameter of bar required = (Asx 4° = 20mm ok! ‘Therefore, provide 2x 120 U-bars; Area= 4.x 314mm? = 8. Calculate Bond Length of U-bars, Bond force per leg of U-bar = 163KN = 40.75 kN 4 Check anchorage bond stress fb, Fs = 4075x10N = 1.08_N FOI x 20mm x 600mm mm? CCheck values for Design Ultimate anchorage bond stress foun Bvfei = 0.5 05 Sou= 2.5 N_ > & ok! mm? FOS. = 23 Infrastructure for Penny's Bay Development aia Prepared by: GB Starcon Anchor i canon core: 98-1101500 aint a corte |08 168800" or oeatieenn 1087151550 os 181680 09-4162000 (05-1153000 08-1154000 108-1202000 08-1202500 ——> 08-1203400 System 70.0/100 100/300) 0.83 ig 100/100, 00/100" 4.083 100/100 1.08 bg '10.0/100" i 705/100 1d tg =| s00106% seis: 188 tg 3,57 kg 150/150 15.0/150 187g 15.0/150 22tkg 150/150 2.8tkg 150/150 3,88 9 200/200 200/200 i | ! 3 flip gale

You might also like