You are on page 1of 28

Flight

Operations
Update Webinar
Véronique Elaphos
Head Of Operational Engineering
Mickaël Devièse
Head of Technical Publication Services
Emile Rausel
Head Of Flight Operations Support

April 2021
Webminar rules

Computers microphones muted for clearness and noise reduction on the line

Dedicated Q&A time after presentation

RAISE HAND…
Before asking question. ATR (Host)

We will unmute your microphone.


Don’t forget to cancel it. ATR (Host)
Or use CHAT…
If you deem it more convenient
Ask your question to the HOST.

2
1. General update
2. Operational Manuals releases to come
3. Recommended retrofits
1 General update
ATR worldwide FLEET OVERVIEW

STATUS AS OF MARCH 2021

1179
IN SERVICE A/C

PAGE 5

ATR F/OPS Webinar 2021-04


ATR aircraft in operation by world region

Status as of March 2021

813 AIRCRAFT

~70% OF THE
FLEET

PAGE 6

ATR F/OPS Webinar 2021-04


To deal with most frequent questions linked to COVID-19

Dedicated web page on ATRactive


https://www.atractive.com/ATRCommunity/Events/Events/COVID-19.aspx

• With useful links on International bodies (ICAO, EASA, IATA) recommendations


• With ATR Specific recommendations for:
‒ A/C Preservation : OIM 2020-04
‒ Cleaning & Disinfection: OIM 2020-07
‒ Light Cargo transportation: OIM 2020-03
Maintenance
‒ Cabin Air Supply: OIM 2020-02
& Flight Operations
‒ Resuming Operations: AOM 2020-08

ATR F/OPS Webinar 2021-04 Local Aviation Authorities instructions prevail 7


To deal with strictest sanitary rules ATR has certified the most
advanced filtration technology
High Efficiency Particulates Air (HEPA) filters

Retrofit solution for –500/-600 series


• General overview
• Upgrade solution description catalogue
• Service Bulletin ATR 42-21-0080
• Service Bulletin ATR 72-21-1057

8
ATR F/OPS Webinar 2021-04
To support vaccine transportation

Dry Ice
Existing Service Letters (available on ATRactive/ATRDOC)
General Guidelines for Transportation of Dry Ice
• ATR 42: SL-21-5017
• ATR 72: SL-21-6009

SL update in progress to include:


• New graphs to include lower sublimation rates
• Minor improvements & clarifications
To be
extended

9
ATR F/OPS Webinar 2021-04
Specific Covid-19 protocol for non-EU
customers in Toulouse ATR Training Center

"Safe Corridor" protocol arranged by ATR during the


mandatory 7 days quarantine to enable immediate training
Safe corridor protocol fully managed by ATR

For more information:


atc@atr-aircraft.com

Training also possible in


other ATR Centers

10
ATR F/OPS Webinar 2021-04
To cope with travelling and budget restrictions

VIRTUAL CLASSROOM CONCEPT

Airline Various courses available for:


student

Instructor • Pilot refresh


Video Airline
student Home or • Flight Operations Engineers &
Conference
Airline Dispatchers
• Maintenance personel
Airline
student

Contact: ATC@atr-aircraft.com

11
ATR F/OPS Webinar 2021-04
FOIM highlights
Available on ATRactive
• FOIM 2020-08 Flight Crew
Training
• FOIM 2021-02 Environmental
Awareness

Memory Items cards reflecting QRH 10.0 « Fly Eco Responsibly » iBrochure
A briefing & toolkit for all airline personel.
2 Operational Manuals releases to
come
Scheduled Revisions of ATR Operational Documentation and
performance software from last Webinar

Jul 2020 Dec 2020 Apr 2021 Q4


2021
WBM Rev 7.0 EASA FAA AFM Rev 19.0
CCOM Rev 1.0 MMEL Rev 7.0 EASA AFM Rev 22.0
TCCA AFM Rev 13.0 GHM
FCOM/QRH Rev 22.0 AC
-600 ECL MMEL

Jun 2021
Jul 2020 Oct 2020 Feb 2021 WBM
EASA
AFM/FCOM/QRH Rev 10.0
TCCA
AFM/FCOM/QRH Rev 8.0
FAA
AFM/FCOM/QRH Rev 13.0
CCOM
AFM/FCOM/QRH Q2 2022
FOS / SPS 2.4 FOS / SPS 2.5 AFM/FCOM/QRH

-600 ECL

ATR F/OPS Webinar 2021-04


EASA current documentation status
Minimum applicable revisions
​ MEL
M ​AFM
EASA operators ​FCOM ​QRH ECL ​WBM ​GHM ​CCOM FOS ​SPS
EASA approved EASA approved

LAST 2.4
V26 for NAS 3.1
SCHEDULED ​7.0 10.0 10.0 10.0 7.0 ​RN 01 1.0 2.4 (Windows &
V27 for NAS 2.2
PUBLICATION 2020 iOS)

(DEC 2020) (AUG 2020) (AUG 2020) (AUG 2020) Q3 2019 (JUL 2020) (JUN 2018) (JUL 2020) (JUL 2020) (JUL 2020)

V28 for NAS 3.1


Next SCHEDULED V29 for NAS 2.2
PUBLICATION 22.0 22.0 22.0 V32 for NAS
(APRIL 2021) 3.1/NAMS

(APR 2021) (APR 2021) (APR 2021) (APR 2021)


FAA current documentation status

Minimum applicable revisions


​MMEL
​AFM
FAA operators EASA ​FCOM ​QRH ECL ​WBM ​GHM ​CCOM FOS ​SPS
FAA approved
approved

LAST 2.4
V26 for NAS 3.1
SCHEDULED 7.0 13.0 19.0 19.0 7.0 ​RN 01 1 2.4 (Windows &
V27 for NAS 2.2
PUBLICATION iOS)

(JUL
2020/2021 (DEC 2020) (JAN 2021) (DEC 2020) (DEC 2020) Q3 2019 (JUL 2020) (JUN 2018) (JUL 2020) (JUL 2020)
2020)

V28 for NAS 3.1


Next SCHEDULED V29 for NAS 2.2
PUBLICATION 19.0 22.0 22.0 V32 for NAS
(APRIL 2021) 3.1/NAMS

(APR 2021) (APR 2021) (APR 2021) (APR 2021)


TCCA current documentation status
Minimum applicable revisions
​MMEL ​AFM
TCCA operators ​FCOM ​QRH ​WBM ​GHM ​CCOM FOS ​SPS
EASA approved TCCA approved

LAST
2.4
SCHEDULED 7.0 8.0 10.0 10.0 7.0 ​RN 01 1.0 2.4
(Windows & iOS)
PUBLICATION

2020 (DEC 2020) (SEP 2020) (JUL 2020) (JUL 2020) (JUL 2020) (JUN 2018) (JUL 2020) (JUL 2020) (JUL 2020)

Next
SCHEDULED
13.0 22.0 22.0
PUBLICATION
(APRIL 2021)

(APR 2021) (APR 2021) (APR 2021)


Apr 2021
Main reasons for AFM/FCOM/QRH revision FAA AFM Rev 19.0
EASA AFM Rev 22.0
FCOM/QRH Rev 22.0
(APRIL 2021 SCHEDULED PUBLICATION)
• 72-600F Freighter certification by EASA (Nov. 2020) and FAA (Mar. 2021)

• Procedures associated to “SMOKE” alerts (PRO.NNO.EMR.26 SMOKE) for a better guidance:


• to identify the smoke source
and
• to restore electrical equipment in case of electrical smoke when the source is identified

• AFM/FCOM/QRH update + new OEB n°55 following EASA AD 2021-0024 issued 19 January 2021 applicable to all ATR42-200/-
300/-320. Refer to AOM 2020/13 issue 4 dated 28 January 2021, “Risk of spurious activation of stall warning system – EASA AD

2020-0221 and EASA AD 2021-0024”

• Changes from APQs (around 120)

ATR F/OPS Webinar 2021-04 More information in FOIMs 2021-04/05/06 18


New OEB since last scheduled publications of FCOM/QRH

OEB Impacted
Nb
Title
model
Risk of spurious stick All ATR 42-
55
pusher/shaker activation 200/-300/-320

Operational recommendations following suspicious in-


service events of spurious activation of the STICK
PUSHER/SHAKER system.

19
ATR F/OPS Webinar 2021-04
Jun 2021
Next updates of operational manuals WBM
CCOM
AFM/FCOM/QRH (SCHEDULED PUBLICATION JUNE 2021) AFM/FCOM/QRH
FOS / SPS 2.5

• Landing Distance at Time of Arrival (LDTA):


• Applicable by August 12th 2021 for EASA operators
LDTA/GRF dedicated
• implementation in FCOM/QRH + editorial changes in AFM Webinar in May 2021
• ICAO Annex 14 – Modifications of Rules for aerodromes applicable by November 2021
• New Global Report Format (GRF) for runway condition ICAO Standards and PANS related
to the Global Reporting Format for
runway surface conditions
• Introduction in AFM PRO.SPO Contaminated runways (advisory material) deferred from 5 November 2020 to
4 November 2021

Other topics

• Work in progress for the reduction of applicable OEBs

ATR F/OPS Webinar 2021-04


Change in Manuals format

Background: ATR privilege to approve minor changes to AFM under EASA PART 21J agreement
New revision number for each AFM change (A/C mod. or content) submitted to EASA or ATR Design Organization Approval

AFM revisions linked to A/C mod Discontinuity in the revision


certification distributed only to numbering of publications
impacted customers released to customers

Simplification

• "Issue date" (date of publication for airline) will replace "Revision number/date"
• Preliminary pages (LEDM, Reason for change,…) totally reworked

 Format changes available for publications starting beg. of Q3-2021

21
ATR F/OPS Webinar 2021-04
3 Recommended retrofits
ECLs applicable status

ECLs to be aligned with applicable AFM

​AFM EASA ​ FM FAA


A
Warning : Status
approved approved
Required ECL / NAS

V26 for NAS 3.1


With NAS 3.0 or 2.1 : Current 10.0 13.0 V27 for NAS 2.2

• No ECL available in line with the latest


V30/V31 for NAS 3.1/NAMS

applicable AFM V28 for NAS 3.1


Imminent V29 for NAS 2.2
• ECLs cannot be used in operation (April 2021)
22.0 19.0
V32 for NAS 3.1/NAMS

Retrofit to NAS 3.1 and 2.2 is required Obsolete < 10.0 < 13.0
< 3.1 or 2.2
< V26 or V27
NAS STD 3.1 / 2.2 Retrofit STATUS
As of end of March 2021

ATR recommends to:

• Continue retrofit to achieve


100% of the fleet

• Report immediately retrofit


accomplisment to have the
change taken into account at
the following scheduled
revision
24
ATR F/OPS Webinar 2021-04
ECL distribution

Feedback on FOIM 2021-03


ECLs are now part of the operational documentation subscription
Therefore, they will be sent to any –600 operator having a valid subscription in place.
In order to ease these ECLs subscriptions, we do need the following information to be sent /
confirmed to ATR
• Delivery address and addressee
• Freight forwarder to be used and related customer account number (EXW delivery)
• Do you need to provide ATR with a Purchase Order (PO) to allow goods incoming ?

Answers have to be sent using the following online form : Link to the online form
(answer expected no later than April 15th 2021)
25
ATR F/OPS Webinar 2021-04
4 SUMMARY
SUMMARY

• Specific recommendations / information linked to Covid-19 context


• Jump from AFM/FCOM/QRH Rev. 10 (July 20) to AFM/FCOM/QRH Rev. 22 (Apr 21):
Ø Airlines haven’t missed any information in between
Ø New ECLs pushed to all -600 operators

• LDTA/GRF impacts (doc & perf software) to be published in June 2021

• ATR -600 NAS Std 2.2 & 3.1 FOC.


100% retrofit to achieve to use latest ECLs

27
ATR F/OPS Webinar 2021-04
QUESTIONS & ANSWERS

Should you need additional information and/or support, please contact ATR Flight Operations
Support through ATRactive
Or by e-mail ops.support@atr-aircraft.com

For Commercial aspect please contact techpub.services@atr-aircraft.com

28

You might also like