Start End
on: 10.10.2023 at: 01:50:47 on: 10.10.2023 at: 04:50:54
Time:
Advance: 01:13:39 Ring building: 01:01:46 Stop: 00:44:42 Total: 03:00:07
Cutting wheel:
Average value Minimum Maximum
Speed [rpm] 1.99 1.31 2.21 Rotation left 50.8 [%]
Torque [MNm] 2.041 0.630 3.102 Rotation right 49.2 [%]
Working pressure [bar] 104 32 159
Advance:
Average value [kN] Average value [bar] Minimum [bar] Maximum [bar]
2,021 89 57 120
4,193 138 55 167
5,290 139 62 161
2,406 79 49 89
Force [kN]
Force [kN]
Torque support:
Start [mm] End [mm]
Position [mm] Position [mm] Position [mm] Position [mm]
108 107 107 109
Advance 243
Chennai Metro Phase 2 Corridor 3
Project: S-01327A Page 2/3
Start End
on: 10.10.2023 at: 01:50:47 on: 10.10.2023 at: 04:50:54
Grout injection:
Average value [bar] Minimum [bar] Maximum [bar] A [l] B [l]
2.2 0.1 12.4 1,720 141
0.0 0.0 0.0 0 0
3.3 0.2 5.7 1,476 115
2.3 0.2 10.8 1,920 156
4,931 404
Pressure [bar]
Historical
Advance 234 235 236 237 238 239 240 241 242
Volume A [l] 5,074 5,074 5,377 4,945 5,241 4,073 4,062 5,180 5,180
Volume B [l] 448 448 450 436 436 246 362 399 404
11.3 : 1 11.3 : 1 11.9 : 1 11.3 : 1 12.0 : 1 16.6 : 1 11.2 : 1 13.0 : 1 12.8 : 1
Mixing proportion
8.1 [%] 8.1 [%] 7.7 [%] 8.1 [%] 7.7 [%] 5.7 [%] 8.2 [%] 7.2 [%] 7.2 [%]
Earth pressure:
Average value [bar] Minimum [bar] Maximum [bar]
Pressure [bar]
Screw conveyor:
Average value Average value
Speed [rpm] 1.9 Earth pressure front [bar] 0.4
Torque [kNm] 10 Earth pressure center [bar] 1.5
Working pressure [bar] 35 Earth pressure rear [bar] 0.0
Material transport:
[ t/ h ] [t] Advance 234 235 236 237 238 239 240 241 242
Belt scale 92 107 [t] 105 0 109 106 134 98 107 113 113
Back-up belt conveyor current [%] 39
Tailskin articulation:
Start [mm] End [mm]
38 52
52 63
58 48
39 30
Lubrication:
[g] [g]
Seal outside FA1-8 1,119 Erector pinion 1
Screw conveyor F1-2 446 Erector bearing 1
Bearing ball F3 57 Erector bearing 0
Rotary coupling FD1 438
EP2 [kg] 2
Labyrinth seal CA1-4 4,754 CONDAT [kg] 5
Advance 243
Chennai Metro Phase 2 Corridor 3
Project: S-01327A Page 3/3
Start End
on: 10.10.2023 at: 01:50:47 on: 10.10.2023 at: 04:50:54
Foam installation:
Minimum [bar] Flow air [l/min] Volume liquid [l]
Average value [bar] Maximum [bar] Flow liquid [l/min] FER
Temperature:
Average value [°C]
Hydraulic tank 54
Gearbox oil 52
Leakage oil drive 37
Gearbox oil:
Average value [bar] Minimum [bar] Maximum [bar]
Pump 14.7 14.2 22.3
Gas measuring:
Average value Minimum Maximum
Methane gas (CH4) [% LEL] 6.9 6.7 7.1
Methane gas (CH4) [% LEL] -0.6 -0.7 -0.6
Carbon monoxide (CO) [ppm] 0 0 1
Oxygen (O2) [%] 20.3 20.3 20.3
Carbon dioxide (CO2) [Vol%] 0.002 0.002 0.003
Ventilation [m³/s] 5
Ventilation [m³/s] 1
458 460