Professional Documents
Culture Documents
Start End
on: 10.10.2023 at: 04:50:54 on: 11.10.2023 at: 00:18:13
Time:
Advance: 01:16:45 Ring building: 01:04:01 Stop: 17:06:34 Total: 19:27:19
Cutting wheel:
Average value Minimum Maximum
Speed [rpm] 1.96 0.00 2.29 Rotation left 56.3 [%]
Torque [MNm] 2.323 0.000 3.870 Rotation right 43.7 [%]
Working pressure [bar] 119 1 198
Advance:
Average value [kN] Average value [bar] Minimum [bar] Maximum [bar]
2,029 89 58 110
3,418 112 3 171
5,911 155 62 185
2,455 81 31 105
Force [kN]
Force [kN]
Torque support:
Start [mm] End [mm]
Position [mm] Position [mm] Position [mm] Position [mm]
107 109 107 108
Advance 244
Chennai Metro Phase 2 Corridor 3
Project: S-01327A Page 2/3
Start End
on: 10.10.2023 at: 04:50:54 on: 11.10.2023 at: 00:18:13
Grout injection:
Average value [bar] Minimum [bar] Maximum [bar] A [l] B [l]
2.1 0.0 22.4 1,901 103
0.0 0.0 0.0 0 0
2.5 0.1 25.0 1,728 108
1.6 0.0 8.2 2,152 156
5,781 366
Pressure [bar]
Historical
Advance 235 236 237 238 239 240 241 242 243
Volume A [l] 5,074 5,377 4,945 5,241 4,073 4,062 5,180 5,180 4,931
Volume B [l] 448 450 436 436 246 362 399 404 404
11.3 : 1 11.9 : 1 11.3 : 1 12.0 : 1 16.6 : 1 11.2 : 1 13.0 : 1 12.8 : 1 12.2 : 1
Mixing proportion
8.1 [%] 7.7 [%] 8.1 [%] 7.7 [%] 5.7 [%] 8.2 [%] 7.2 [%] 7.2 [%] 7.6 [%]
Earth pressure:
Average value [bar] Minimum [bar] Maximum [bar]
Pressure [bar]
Screw conveyor:
Average value Average value
Speed [rpm] 2.7 Earth pressure front [bar] 0.2
Torque [kNm] 19 Earth pressure center [bar] 1.1
Working pressure [bar] 49 Earth pressure rear [bar] 0.0
Material transport:
[ t/ h ] [t] Advance 235 236 237 238 239 240 241 242 243
Belt scale 90 108 [t] 0 109 106 134 98 107 113 113 107
Back-up belt conveyor current [%] 32
Tailskin articulation:
Start [mm] End [mm]
52 58
63 71
48 55
30 34
Lubrication:
[g] [g]
Seal outside FA1-8 1,867 Erector pinion 1
Screw conveyor F1-2 772 Erector bearing 0
Bearing ball F3 204 Erector bearing 0
Rotary coupling FD1 520
EP2 [kg] 4
Labyrinth seal CA1-4 8,539 CONDAT [kg] 9
Advance 244
Chennai Metro Phase 2 Corridor 3
Project: S-01327A Page 3/3
Start End
on: 10.10.2023 at: 04:50:54 on: 11.10.2023 at: 00:18:13
Foam installation:
Minimum [bar] Flow air [l/min] Volume liquid [l]
Average value [bar] Maximum [bar] Flow liquid [l/min] FER
Temperature:
Average value [°C]
Hydraulic tank 47
Gearbox oil 45
Leakage oil drive 33
Gearbox oil:
Average value [bar] Minimum [bar] Maximum [bar]
Pump 18.3 15.2 23.8
Gas measuring:
Average value Minimum Maximum
Methane gas (CH4) [% LEL] 6.8 6.6 7.2
Methane gas (CH4) [% LEL] -0.6 -0.7 -0.6
Carbon monoxide (CO) [ppm] 0 0 5
Oxygen (O2) [%] 20.4 20.3 20.5
Carbon dioxide (CO2) [Vol%] 0.002 0.002 0.002
Ventilation [m³/s] 5
Ventilation [m³/s] 1
444 446