You are on page 1of 1

NOTES:

CROSS SECTION B-B

ISSUE FOR : DATE :

CONSTRUCTION DRAWING JAN. 2024

KM393.0 SB
GEOTECHNICAL
PROPOSED PERMANENT REPAIR WORK TO THE ROCK
CROSS SECTION B-B
SLOPE FAILURE AT KM393.4 NORTH BOUND AND DAMAGED (SHEET 2 OF 3)
Lebuhraya Pantai Timur 2 Sdn Bhd
AS SHOWN
Lebuhraya Pantai Timur 2 Sdn Bhd
CASCADE DRAIN AT KM393.0 SOUTH BOUND,
AN EDGENTA COMPANY
LEBUHRAYA PANTAI TIMUR 2 (LPT2)
W/OCM/LPT2-KM393.0 SB/CS/GT/CS/002 0

You might also like