DETAIL OF MANHOURS / TIME SHEET BIRO ENGINEERING

Name : ABDILLAH HAD ALIF ILHAMI


Discipline : MECHANICAL - BIRO ENGINEERING
Period : JANUARI 2019

TOTAL
DATE
MH
DESCRIPTION OF WORK USER CATEGORIES* PROJECT NAME APLIKASI SOFTWARE

1-Jan-19 - Libur - - - -
2-Jan-19 8.00 Diskusi design Sipil bangunan Utilitas Pak Setyo PJT MRMP Bulog AutoCAD, SAP2000
3-Jan-19 8.00 Diskusi design Sipil bangunan Drying dan Milling Pak Setyo PJT MRMP Bulog AutoCAD, SAP2001
4-Jan-19 4.00 Klarifikasi teknis Vendor Pekerjaan Sipil Pak Sakti PJT MRMP Bulog
OT 5.00 Meeting pembobotan dan create WBS MRMP Bulog Pak Fuad PJT MRMP Bulog Ms. Excel
5-Jan-19 - Libur - - - -
6-Jan-19 - Libur - - - -
7-Jan-19 3.00 Diskusi laporan bulanan engineering Mbak Ratih OTH Training Ms. Excel
3.00 Diskusi MDR untuk MRMP Bulog Mbak Uswah PJT MRMP Bulog Ms. Excel
OT 5.00 Pembahasan S-Curve overall MRMP Bulog Pak Fuad PJT MRMP Bulog Ms. Excel
8-Jan-19 4.00 Setting Pembobotan equipment BUHLER Pak Setyo PJT MRMP Bulog Ms. Excel
OT 5.00 Review RAB untuk Engineering Pak Fuad PJT MRMP Bulog Ms. Excel
Review internal Engineering membahas Kontrak Barata
9-Jan-19 8.00 - BUHLER Pak Setyo PJT MRMP Bulog -

10-Jan-19 16.00 Site Visit BULOG Jember untuk pekerjaan persiapan Pak Tri PJT MRMP Bulog -
Prepare dokumen engineering untuk persiapan Ground AutoCAD, SketchUp,
11-Jan-19 8.00 Bu Sari PJT MRMP Bulog
Breaking MRMP Bulog Jember SolidWorks
12-Jan-19 - Libur - - - -
13-Jan-19 - Libur - - - -
14-Jan-19 8.00 Benchmark Plant BUHLER Vietnam Pak Totok PJT MRMP Bulog -
15-Jan-19 12.00 Benchmark Plant BUHLER Vietnam Pak Totok PJT MRMP Bulog -
16-Jan-19 10.00 Benchmark Plant BUHLER Vietnam Pak Totok PJT MRMP Bulog -
Menyusun laporan evaluasi Management Trainee PT. Ms. Word, AutoCAD,
17-Jan-19 8.00 - OTH Training
Barata Indonesia SolidWorks
Menyusun laporan evaluasi Management Trainee PT. Ms. Word, AutoCAD,
18-Jan-19 2.00 - OTH Training
Barata Indonesia SolidWorks
4.00 Menyusun laporan benchmark Plant BUHLER Pak Totok PJT MRMP Bulog -
Meeting Internal tim MRMP Bulog terkait pekerjaan
4.00 Pak Tri PJT MRMP Bulog -
persiapan
19-Jan-19 - Libur - - - -
20-Jan-19 - Libur - - - -
21-Jan-19 3.00 Meeting Ground Breaking MRMP Bulog Jember Bu Sari PJT MRMP Bulog -
2.00 Prepare site layout MRMP Jember Bu Sari PJT MRMP Bulog AutoCAD
1.00 Interview Calon PKWT MRMP Bulog Pak Tri PJT MRMP Bulog -
Koordinasi dengan estimator dan PPC tim project
3.00 Pak Tri PJT MRMP Bulog -
MRMP Bulog
22-Jan-19 4.00 Modeling dan Simulasi vibrasi tangki Bioetanol Pak Setyo PJT PG. Gempolkerep SolidWorks, Ansys
4.00 RKM di PG. Gempolkerep Pak Setyo PJT PG. Gempolkerep Ansys
Prepare Dokumen engineering untuk meeting di
23-Jan-19 5.00 Pak Totok PJT MRMP Bulog Ms. Word, AutoCAD, SolidWorks
BULOG Divre Jatim
Koordinasi tim engineering dan sorveyor untuk kegiatan
OT 4.00 Pak Tri PJT MRMP Bulog AutoCAD
topografi di Site Sumbawa
24-Jan-19 4.00 Modeling indirect heater PG Camplong Pak Setyo PJT PG Camplong SolidWorks modeling
4.00 Simulation indirect heater PG Camplong Pak Setyo PJT PG Camplong SolidWorks Simulation
25-Jan-19 4.00 Modeling indirect heater PG Camplong Pak Setyo PJT PG Camplong SolidWorks modeling
4.00 Simulation indirect heater PG Camplong Pak Setyo PJT PG Camplong SolidWorks Simulation
26-Jan-19 - Libur - - - -
27-Jan-19 - Libur - - - -
AutoCAD, SketchUp,
28-Jan-19 8.00 review 3D design Plant MRMP Bulog Pak Tri PJT MRMP Bulog
SolidWorks
AutoCAD, SketchUp,
29-Jan-19 8.00 review 3D design Plant MRMP Bulog Pak Tri PJT MRMP Bulog
SolidWorks
Internal meeting tim MRMP Bulog membahas shcedule
30-Jan-19 8.00 Pak Tri PJT MRMP Bulog AutoCAD
BUHLER
Internal meeting tim MRMP Bulog membahas titik
31-Jan-19 8.00 Pak Tri PJT MRMP Bulog Ms. Excel
sondir dan boring Site Jember

NOTE:
*PROJECT (PJT) / PROPOSAL (PRL) / ADMINISTRATION (ADM) / MEETING (MT) / DESAIN (DSN)
DETAIL OF MANHOURS / TIME SHEET BIRO ENGINEERING

Name : ABDILLAH HAD ALIF ILHAMI


Discipline : MECHANICAL - BIRO ENGINEERING
Period : JANUARI 2019

TOTAL
DATE DESCRIPTION OF WORK USER CATEGORIES* PROJECT NAME APLIKASI SOFTWARE
MH

1-Feb-19 3.00 Klarifikasi vendor electrical Pak Tri PJT MRMP Bulog -
Prepare document presentasi untuk Ground Breaking
5.00 Pak Tri PJT MRMP Bulog -
Site Jember
2-Feb-19 - Libur - - - -
3-Feb-19 - Libur - - - -
Prepare document engineering untuk Ground Breaking AutoCAD, SketchUp,
4-Feb-19 8.00 Pak Tri PJT MRMP Bulog
Site Jember SolidWorks
5-Feb-19
6-Feb-19
7-Feb-19
8-Feb-19
9-Feb-19
10-Feb-19
11-Feb-19
12-Feb-19
13-Feb-19
14-Feb-19
15-Feb-19
16-Feb-19
17-Feb-19
18-Feb-19
19-Feb-19
20-Feb-19
21-Feb-19
22-Feb-19
23-Feb-19
24-Feb-19
25-Feb-19
26-Feb-19
27-Feb-19
28-Feb-19

NOTE:
*PROJECT (PJT) / PROPOSAL (PRL) / ADMINISTRATION (ADM) / MEETING (MT) / DESAIN (DSN)
DETAIL OF MANHOURS / TIME SHEET BIRO ENGINEERING

Name : ABDILLAH HAD ALIF ILHAMI


Discipline : MECHANICAL - BIRO ENGINEERING
Period : JANUARI 2019

TOTAL
DATE DESCRIPTION OF WORK USER CATEGORIES* PROJECT NAME APLIKASI SOFTWARE
MH

1-Mar-19 8.00 Design Meeting dengan PMC dan BULOG Pak Meisa PJT MRMP Bulog AutoCAD
2-Mar-19 - Survey Mess Untuk Project MRMP Bulog - - - -
3-Mar-19 - Survey Mess Untuk Project MRMP Bulog - - - -
4-Mar-19 8.00 Design Meeting dengan PMC dan BULOG Pak Meisa PJT MRMP Bulog AutoCAD
5-Mar-19 8.00 Visit Site Sumbawa Pak Meisa PJT MRMP Bulog -
6-Mar-19 8.00 Visit Site Sumbawa Pak Meisa PJT MRMP Bulog -
7-Mar-19 - Libur - - - -
8-Mar-19 8.00 Management Review DIGA Pak Totok PJT MRMP Bulog -
9-Mar-19 6.00 Membahas RKP dengan tim BULOG (OT) Pak Fuad PJT MRMP Bulog -
10-Mar-19 - Libur - - - -
11-Mar-19 8.00 Meeting RKP dengan BOD Pak Dady PJT MRMP Bulog -
12-Mar-19 4.00 Meeting RKP internal tim BULOG Pak Meisa PJT MRMP Bulog -
OT 5.00 Meeting engineering dengan Tim BULOG Pak Meisa PJT MRMP Bulog -
13-Mar-19 4.00 MDR Bulog Pak Setyo PJT MRMP Bulog -
4.00 Meeting RPK Bulog Pak Rudi PJT MRMP Bulog -
14-Mar-19 8.00 Meeting DED dengan PMC Pak Meisa PJT MRMP Bulog AutoCAD
15-Mar-19 3.00 Membahas Schedule Engieering Pak Meisa PJT MRMP Bulog
5.00 Review design pile untuk silo Pak Meisa PJT MRMP Bulog AutoCAD
16-Mar-19 - Libur - - - -
17-Mar-19 - Libur - - - -
18-Mar-19 8.00 approval document dengan PMC Pak Meisa PJT MRMP Bulog -
19-Mar-19 8.00 approval document dengan PMC Pak Meisa PJT MRMP Bulog -
20-Mar-19 8.00 approval document dengan PMC Pak Meisa PJT MRMP Bulog -
21-Mar-19 4.00 Meeting tanda tangan kontrak dengan BUHLER Pak Totok PJT MRMP Bulog -
3.00 Diskusi Piling Silo Storage Pak Dady PJT MRMP Bulog -
2.00 Transfer data project MRMP BULOG Pak Deden PJT MRMP Bulog -
22-Mar-19
23-Mar-19
24-Mar-19
25-Mar-19
26-Mar-19
27-Mar-19
28-Mar-19
29-Mar-19
30-Mar-19
31-Mar-19

NOTE:
*PROJECT (PJT) / PROPOSAL (PRL) / ADMINISTRATION (ADM) / MEETING (MT) / DESAIN (DSN)
GINEERING

Name : ABDILLAH HAD ALIF ILHAMI


Discipline : MECHANICAL - BIRO ENGINEERING
Period : JANUARI 2019

TOTAL
DATE DESCRIPTION OF WORK USER CATEGORIES* PROJECT NAME APLIKASI SOFTWARE
MH

1-Apr-19 8.00 Review design civil Utilitas MRMP Bulog Pak Meisa PJT MRMP Bulog AutoCAD
2-Apr-19 8.00 Meeting
3-Apr-19
4-Apr-19
5-Apr-19
6-Apr-19
7-Apr-19
8-Apr-19
9-Apr-19
10-Apr-19
11-Apr-19
12-Apr-19
13-Apr-19
14-Apr-19
15-Apr-19
16-Apr-19
17-Apr-19
18-Apr-19
19-Apr-19
20-Apr-19
21-Apr-19
22-Apr-19
23-Apr-19
24-Apr-19
25-Apr-19
26-Apr-19
27-Apr-19
28-Apr-19
29-Apr-19
30-Apr-19

NOTE:
*PROJECT (PJT) / PROPOSAL (PRL) / ADMINISTRATION (ADM) / MEETING (MT) / DESAIN (DSN)
DETAIL OF MANHOURS / TIME SHEET BIRO ENGINEERING

Name : ABDILLAH HAD ALIF ILHAMI


Discipline : MECHANICAL - BIRO ENGINEERING
Period : MEI 2019

TOTAL
DATE DESCRIPTION OF WORK USER CATEGORIES* PROJECT NAME APLIKASI SOFTWARE
MH

1-May-19 - Libur - - - -
2-May-19 4.00 Meeting Schedule overall Pak Deden PJT MRMP Bulog Excel, Ms. Project
OT 5.00 Review RAB berdasarkan Penawaran dari vendor Pak Deden PJT MRMP Bulog Excel
3-May-19 8.00 Visit Site Sumbawa kunjungan kementerian BUMN Pak Meisa PJT MRMP Bulog -
4-May-19 8.00 Visit Site Sumbawa kunjungan kementerian BUMN Pak Meisa PJT MRMP Bulog -
5-May-19 - Libur - - - -
6-May-19 4.00 Review design steel structure Milling Plant Pak Setyo PJT MRMP Bulog Excel, SAP200
Meeting internal project BULOG terkait kontrak yg blm
4.00 Pak Setyo PJT MRMP Bulog -
di tandatangani
7-May-19 5.00 Review design steel structure Milling Plant Pak Setyo PJT MRMP Bulog -
3.00 Laporan Visit site Sumbawa Pak Setyo PJT MRMP Bulog -
8-May-19 8.00 Stock Opname Pak Meisa PJT MRMP Bulog -
9-May-19 8.00 Stock Opname Pak Meisa PJT MRMP Bulog -
10-May-19 8.00 Jumat Bersih Pak Setyo
11-May-19 - Libur - - - -
12-May-19 - Libur - - - -
13-May-19 8.00 Crane Calculation PLTU Tenggarong Pak Eko PJT PLTU Tenggarong -
14-May-19 8.00 Crane Calculation PLTU Tenggarong Pak Eko PJT PLTU Tenggarong -
15-May-19 2.00 KOM internal DIGA Project Tangki JTB Pak Eko PJT Tangki JTB -
6.00 Lifting plant crane PLTU Tenggaron Pak Eko PJT PLTU Tenggarong -
16-May-19 8.00 Collect Doc. MRMP Bulog Pak Meisa PJT MRMP Bulog -
17-May-19 8.00 Collect Doc. MRMP Bulog Pak Meisa PJT MRMP Bulog -
18-May-19 - Libur - - - -
19-May-19 - Libur - - - -
20-May-19 8.00 Collect Doc. MRMP Bulog Pak Meisa PJT MRMP Bulog -
21-May-19 8.00 Prepare Doc. Preliminary Tangki JTB Pak Setyo PJT Tangki JTB -
22-May-19 3.00 Meeting Project JTB Pak Meisa PJT Tangki JTB -
5.00 MDR JTB Pak Eko PJT Tangki JTB -
23-May-19 8.00 Prepare Doc. MPS JTB Tank Pak Eko PJT Tangki JTB Ms. Excel
24-May-19 8.00 Pre Design JTB Tank Pak Eko PJT Tangki JTB AMETANK
25-May-19 - Libur - - - -
26-May-19 - Libur - - - -
27-May-19 8.00 Prepare Doc. Loading Data JTB Tank Pak Eko PJT Tangki JTB Ms. Excel
28-May-19 4.00 Membuat Doc. Engineeing List JTB Tank Pak Eko PJT Tangki JTB Ms. Excel
OT 5.00 Tamplare Drawing GA JTB Tank Pak Eko PJT Tangki JTB Auto Cad
29-May-19 8.00 Review Shell, plate, anchor, rafter, top member Pak Setyo PJT Tangki JTB -
30-May-19 - Libur - - - -
31-May-19 3.00 Revisi Tank JTB Pak Setyo PJT Tangki JTB AMETANK
5.00 Design RFQ Vessel Pak Eko PJT Tangki JTB Compress

NOTE:
*PROJECT (PJT) / PROPOSAL (PRL) / ADMINISTRATION (ADM) / MEETING (MT) / DESAIN (DSN)
DETAIL OF MANHOURS / TIME SHEET BIRO ENGINEERING

Name : ABDILLAH HAD ALIF ILHAMI


Discipline : MECHANICAL - BIRO ENGINEERING
Period : JUNI 2019

TOTAL
DATE DESCRIPTION OF WORK USER CATEGORIES* PROJECT NAME APLIKASI SOFTWARE
MH

1-Jun-19 - Libur Lebaran - - - -


2-Jun-19 - Libur Lebaran - - - -
3-Jun-19 - Libur Lebaran - - - -
4-Jun-19 - Libur Lebaran - - - -
5-Jun-19 - Libur Lebaran - - - -
6-Jun-19 - Libur Lebaran - - - -
7-Jun-19 - Libur Lebaran - - - -
8-Jun-19 - Libur Lebaran - - - -
9-Jun-19 - Libur Lebaran - - - -
10-Jun-19 5.00 Review Design Tangki JTB Pak Setyo PJT Tangki JTB AMETANK
OT 4.00 Revisi Tangki NPK Pak Setyo PJT Tangki NPK AMETANK
11-Jun-19 8.00 Review Calculatioan dan Loading Data Pak Setyo PJT Tangki JTB -
Meeting koordinasi dengan Vendor Erection Site Tangki
12-Jun-19 8.00 JTB Pak Meisa PJT Tangki JTB -

13-Jun-19 8.00 Review Calculatioan dan Loading Data Pak Setyo PJT Tangki JTB -
14-Jun-19 4.00 Revisi Tamplate Drawing JTB (as per datahseet) Pak Setyo PJT Tangki JTB -
4.00 Revisi Loading Data Pak Eko PJT Tangki JTB -
15-Jun-19 - Libur - - - -
16-Jun-19 - Libur - - - -
17-Jun-19 4.00 Meeting PreKOM Pak Meisa PJT Tangki JTB -
OT 6.00 Meeting RKP dan RAB internal Pak Rudi PJT MRMP Bulog -
18-Jun-19 8.00 Meeting PreKOM dan Prepace document KOM Pak Meisa PJT Tangki JTB -
19-Jun-19 4.00 Prekick Off Meeting JTB Tank Pak Meisa PJT Tangki JTB -
4.00 Konsinyering Doc. Engineering Pak Meisa PJT Tangki JTB AMETANK
20-Jun-19 8.00 Kick Off Meeting JTB Tank Pak Meisa PJT Tangki JTB -
21-Jun-19 8.00 Konsinyering Doc. Engineering dan MPS Pak Meisa PJT Tangki JTB AMETANK
22-Jun-19 - Libur - - - -
23-Jun-19 - Libur - - - -
24-Jun-19 5.00 Desing Anchor Detail JTB Tank Pak Hana PJT Tangki JTB AMETANK
25-Jun-19 5.00 Revisi Calculation, MPS dan Loading Data Pak Meisa PJT Tangki JTB -
OT 5.00 MTO JTB Tank Pak Eko PJT Tangki JTB -
26-Jun-19 8.00 MTO JTB Tank Pak Eko PJT Tangki JTB -
8.00 Review GA Drawing Pak Eko PJT Tangki JTB -
27-Jun-19 4.00 Teleconference VPS Barata to Rekind Pak Eko PJT Tangki JTB Ms. Excel
4.00 Meeting Tender PPI-MRMP Pak Eko PJT Tangki JTB Ms. Excel
28-Jun-19 5.00 Revisi VPS Barata to Rekind Pak Eko PJT Tangki JTB Auto Cad
8.00 Review GA Drawing (add Nozzel Orientation) Pak Setyo PJT Tangki JTB -
29-Jun-19 - Libur - - - -
30-Jun-19 - Libur - - - -

NOTE:
*PROJECT (PJT) / PROPOSAL (PRL) / ADMINISTRATION (ADM) / MEETING (MT) / DESAIN (DSN)
DETAIL OF MANHOURS / TIME SHEET BIRO ENGINEERING

Name : ABDILLAH HAD ALIF ILHAMI


Discipline : MECHANICAL - BIRO ENGINEERING
Period : JULI 2019

TOTAL
DATE DESCRIPTION OF WORK USER CATEGORIES* PROJECT NAME APLIKASI SOFTWARE
MH

1-Jul-19 8.00 Anwijzing Teknis Tender RMU PT PPI Pak Eko PRL RMU PPI -
2-Jul-19 3.00 Revisi VPS to Rekind Pak Meisa PJT Tangki JTB Excel
3.00 Revisi Anchor chair & Bolt Tank JTB Pak Meisa PJT Tangki JTB AMETANK, Excel
(OT) 4.00 Desing PFD dan P&ID Proposal Tender PPI Pak Eko PRL RMU PPI AutoCAD
3-Jul-19 2.00 Desing PFD dan P&ID Proposal Tender PPI Pak Eko PRL RMU PPI AutoCAD
4.00 BoQ Sipil Tender PPI Pak Eko PRL RMU PPI AutoCAD, SAP 2000
2.00 MTO JTB Tank Pak Meisa PJT Tangki JTB Excel
4-Jul-19 8.00 Prepare Document Teknis Tender RMU PT PPI Pak Eko PRL RMU PPI AutoCAD, Excel
5-Jul-19 8.00 Prepare Document Teknis Tender RMU PT PPI Pak Eko PRL RMU PPI AutoCAD, Excel
Prepare Document Teknis Tender RMU PT PPI (Over
6-Jul-19 8.00 Pak Eko PRL RMU PPI AutoCAD, Excel
Time)
7-Jul-19 - Bintal - - - -
8-Jul-19 - Bintal - - - -
9-Jul-19 - Bintal - - - -
10-Jul-19 - Bintal - - - -
11-Jul-19 - Bintal - - - -
12-Jul-19 - Bintal - - - -
13-Jul-19 - Bintal - - - -
14-Jul-19 - Libur - - - -
15-Jul-19 4.00 Review VPS Update from Rekind Pak Meisa PJT Tangki JTB -
4.00 Review Update Nozzel Orientation JTB Tank Pak Rudi PJT MRMP Bulog -
16-Jul-19 3.00 Revisi Loading Data JTB Tank Pak Meisa PJT Tangki JTB Excel
5.00 Review Roof Struckture JTB Tank Pak Meisa PJT Tangki JTB AMETANK, SAP 2000
17-Jul-19 3.00 Review GA JTB Tank Pak Meisa PJT Tangki JTB -
Review Document Feedback klarifikasi Teknis Tender
3.50 Pak Eko PRL RMU PPI AutoCAD, Excel
RMU PPI
OT 3.50 Review Mass Balance RMU PPI Pak Eko PRL RMU PPI Excel
18-Jul-19 3.00 Meeting Management Resiko Proyek JTB Pak Eko PRL RMU PPI Excel
3.00 Review GA Drawing Pak Eko PRL RMU PPI Excel
OT 4.00 Prepare document klarifikasi teknis RMU PPI Pak Hana PJT Tangki JTB AMETANK
Teleconference koordinasi klarifikasi teknis tender PPI
19-Jul-19 8.00 Pak Eko PRL RMU PPI Excel
dengan BUHLER
20-Jul-19 - Libur - - - -
Prepare document klarifikasi teknis RMU PPI (Over
21-Jul-19 5.00 Pak Eko PRL RMU PPI Excel, AutoCAD
Time)
Klarifikasi Teknis Tender RMU PT PPI
22-Jul-19 9.00 Pak Eko PRL RMU PPI Excel, AutoCAD
(proses dan mechanical)
Meeting koordinasi JTB (Progress Eng, persiapan KOM
23-Jul-19 5.00 Pak Meisa PJT Tangki JTB -
Site)
Koordinasi hasil klarifikasi Klarifikasi Teknis Tender
OT 4.00 RMU PT PPI Pak Eko PRL RMU PPI Excel, AutoCAD
(proses dan mechanical) dan prepare document
Revisi document teknis tende PPI Mehcanical dan
24-Jul-19 10.00 Pak Eko PRL RMU PPI Excel, AutoCAD
Proses (OT)
Review bottom plate, shell plate detail drawing JTB
25-Jul-19 4.00 Pak Meisa PJT Tangki JTB Excel, AutoCAD
Project
Review & Prepare Document klarifikasi teknis Sipil dan
OT 6.00 Pak Eko PRL RMU PPI Excel, AutoCAD
Elektrikal tender PPI
26-Jul-19 8.00 Klarifikasi Teknis Tender PPI Sipil dan Eletrikal Pak Eko PRL RMU PPI Excel, AutoCAD
27-Jul-19 - Libur - - - -
28-Jul-19 - Libur - - - -
29-Jul-19 3.00 Meeting internal progress JTB Tank Pak Meisa PJT Tangki JTB -
5.00 Update MTO JTB Tank (Main Material Tank) Pak Meisa PJT Tangki JTB Excel, AutoCAD, AMETank
30-Jul-19 1.00 Update MTO JTB Tank Pak Meisa PJT Tangki JTB Excel
Review equpment list & loadlist electrical tender RMU
5.00 Pak Eko PRL RMU PPI Excel, AutoCAD, SAP 2000
PPI
2.00 Review Roof Struckture JTB tank Pak Eko PJT Tangki JTB -
31-Jul-19 4.00 Meeting Dust Collector Pak Suhariyono DSN Dust Collector
3.00 Revisi MPS JTB Pak Eko PJT Tangki JTB Excel
OT 1.00 Review roof plate JTB Tank (OT) Pak Eko PJT Tangki JTB -
NOTE:
*PROJECT (PJT) / PROPOSAL (PRL) / ADMINISTRATION (ADM) / MEETING (MT) / DESAIN (DSN)
DETAIL OF MANHOURS / TIME SHEET BIRO ENGINEERING

Name : ABDILLAH HAD ALIF ILHAMI


Discipline : MECHANICAL - BIRO ENGINEERING
Period : JULI 2019

TOTAL
DATE DESCRIPTION OF WORK USER CATEGORIES* PROJECT NAME APLIKASI SOFTWARE
MH

1-Aug-19 3.00 Prepare document meeting progress JTB Pak Meisa PJT Tangki JTB Excel
3.00 Revew drawing Roof Pak Meisa PJT Tangki JTB AutoCAD
2.00 Review referensi dust collector Pak Suhariyono DSN Dust Collector -
2-Aug-19 3.00 Meeting progress JTB w/ Rekind Pak Meisa PJT Tangki JTB Excel
4.00 Modeling sugar Bin Asembagoes Pak Eko PJT PG Asembagoes Solidworks
OT 2.00 Review cutting plan Produce water tank Pak Meisa PJT Tangki JTB AutoCAD
3-Aug-19 - Libur - - - -
4-Aug-19 - Libur - - - -
5-Aug-19 3.00 Meeting internal team Project JTB Pak Eko PRL RMU PPI AutoCAD
3.00 Meeting FGD Bisnis development Foundry Pak Suhariyono DSN Dust Collector -
OT 3.00 Simulasi Dust Collector Pak Suhariyono DSN Dust Collector Solidworks, Ansys
OT 1.00 Rekap kebutuhan plate Produce & Lean Pak Meisa PJT Tangki JTB AutoCAD
6-Aug-19 4.00 Simulasi & Permodelna Dust Collector Pak Eko PRL RMU PPI AutoCAD, SAP 2000
2.00 MTO plate for roof structure Pak Meisa PJT Tangki JTB AutoCAD, Excel
2.00 Review structure roof JTB Tank Pak Meisa PJT Tangki JTB AutoCAD
7-Aug-19 5.00 Meeting Dust Collector Foundry Pak Suhariyono DSN Dust Collector -
3.00 Visit workshop 1 Pak Suhariyono DSN Dust Collector -
8-Aug-19 3.00 MTO JTB Tank Pak Meisa PJT Tangki JTB Excel
5.00 Design dust collectiong alternative 1 Pak Suhariyono DSN Dust Collector -
9-Aug-19 4.00 Meeting mingguan dust collector Pak Suhariyono DSN Dust Collector -
4.00 Meeting schedule JTB Pak Meisa PJT Tangki JTB -
10-Aug-19 - Libur - - - -
11-Aug-19 - Libur - - - -
12-Aug-19 5.00 Meeting internal JTB Pak Meisa PJT Tangki JTB -
3.00 Revisi MTO main material Pak Meisa PJT Tangki JTB -
13-Aug-19 8.00 MTO detail nozzel and piping Pak Meisa PJT Tangki JTB Excel

14-Aug-19 8.00 Review simulation design Crane Rendeng dan Redesign Pak Eko DSN Biodiesel -

15-Aug-19 4.00 Review drawing Shell Detail JTB Tank Pak Meisa PJT Tangki JTB -
4.00 Review Crane Design dan Simulasi Pak Eko DSN Biodiesel -
Meeting klarifikasi teknis dengan vendor Plate
16-Aug-19 4.00 - - - -
Stainless SteelNACE
4.00 Review drawing roof structure
17-Aug-19 - Libur - - - -
18-Aug-19 - Libur - - - -
19-Aug-19 8.00 MTO internal pipe & fitting JTB Tank Pak Meisa PJT Tangki JTB -
20-Aug-19 4.00 Meeting pra tender SPS Crane with Seyang Pak Rudi PJT MRMP Bulog -
Visit ke Cargill untuk prospek pekerjaan Tangki dan
4.00 Pak Suhariyono PRL - -
Vessel
OT 2.00 Meeting untuk visit site Biodiesel Jhonlin Pak Suhariyono PRL Biodiesel -
21-Aug-19 8.00 Site Visit Batulicin Pak Suhariyono PRL Biodiesel -
22-Aug-19 8.00 Site Visit Batulicin Pak Suhariyono PRL Biodiesel -
23-Aug-19 8.00 Site Visit Batulicin Pak Suhariyono PRL Biodiesel -
24-Aug-19 - Libur - - - -
25-Aug-19 - Libur - - - -
26-Aug-19 3.00 Datasheet pompa biodiesel Pak Eko PRL Biodiesel Excel
3.00 Update MTO for Produce water Tank Pak Meisa PJT Tangki JTB -
2.00 Diskusi struktur granul Pak Setyo PJT Pupuk Granul Solidworks
27-Aug-19 3.00 Meeting JTB dgn rekind Pak Meisa PJT Tangki JTB Excel
3.00 Modeling static dudukan granul Pak Setyo PJT Pupuk Granul Solidworks
OT 4.00 Update dimensi tangki Biodiesel Jhonlin Pak Suhariyono PRL Biodiesel -
28-Aug-19 8.00 Simulasi static dan dinamic Struktur Granul Pak Setyo PJT Pupuk Granul Solidworks
29-Aug-19 8.00 Konsinyering rekind-barata JTB Project Pak Meisa PJT Tangki JTB -
30-Aug-19 - Finalisasi document tender Biodiesel Pak Suhariyono PRL Biodiesel -
31-Aug-19 - Libur - - - -
- - - - -
- - - - -

NOTE:
*PROJECT (PJT) / PROPOSAL (PRL) / ADMINISTRATION (ADM) / MEETING (MT) / DESAIN (DSN)
DETAIL OF MANHOURS / TIME SHEET BIRO ENGINEERING

Name : ABDILLAH HAD ALIF ILHAMI


Discipline : MECHANICAL - BIRO ENGINEERING
Period : JULI 2019

TOTAL
DATE DESCRIPTION OF WORK USER CATEGORIES* PROJECT NAME APLIKASI SOFTWARE
MH

1-Aug-19 3.00 Prepare document meeting progress JTB Pak Meisa PJT Tangki JTB Excel
3.00 Revew drawing Roof Pak Meisa PJT Tangki JTB AutoCAD
2.00 Review referensi dust collector Pak Suhariyono DSN Dust Collector -
2-Aug-19 3.00 Meeting progress JTB w/ Rekind Pak Meisa PJT Tangki JTB Excel
4.00 Modeling sugar Bin Asembagoes Pak Eko PJT PG Asembagoes Solidworks
OT 2.00 Review cutting plan Produce water tank Pak Meisa PJT Tangki JTB AutoCAD
3-Aug-19 - Libur - - - -
4-Aug-19 - Libur - - - -
5-Aug-19 3.00 Meeting internal team Project JTB Pak Eko PRL RMU PPI AutoCAD
3.00 Meeting FGD Bisnis development Foundry Pak Suhariyono DSN Dust Collector -
OT 3.00 Simulasi Dust Collector Pak Suhariyono DSN Dust Collector Solidworks, Ansys
OT 1.00 Rekap kebutuhan plate Produce & Lean Pak Meisa PJT Tangki JTB AutoCAD
6-Aug-19 4.00 Simulasi & Permodelna Dust Collector Pak Eko PRL RMU PPI AutoCAD, SAP 2000
2.00 MTO plate for roof structure Pak Meisa PJT Tangki JTB AutoCAD, Excel
2.00 Review structure roof JTB Tank Pak Meisa PJT Tangki JTB AutoCAD
7-Aug-19 5.00 Meeting Dust Collector Foundry Pak Suhariyono DSN Dust Collector -
3.00 Visit workshop 1 Pak Suhariyono DSN Dust Collector -
8-Aug-19 3.00 MTO JTB Tank Pak Meisa PJT Tangki JTB Excel
5.00 Design dust collectiong alternative 1 Pak Suhariyono DSN Dust Collector -
9-Aug-19 4.00 Meeting mingguan dust collector Pak Suhariyono DSN Dust Collector -
4.00 Meeting schedule JTB Pak Meisa PJT Tangki JTB -
10-Aug-19 - Libur - - - -
11-Aug-19 - Libur - - - -
12-Aug-19 5.00 Meeting internal JTB Pak Meisa PJT Tangki JTB -
3.00 Revisi MTO main material Pak Meisa PJT Tangki JTB -
13-Aug-19 8.00 MTO detail nozzel and piping Pak Meisa PJT Tangki JTB Excel

14-Aug-19 8.00 Review simulation design Crane Rendeng dan Redesign Pak Eko DSN Biodiesel -

15-Aug-19 4.00 Review drawing Shell Detail JTB Tank Pak Meisa PJT Tangki JTB -
4.00 Review Crane Design dan Simulasi Pak Eko DSN Biodiesel -
Meeting klarifikasi teknis dengan vendor Plate
16-Aug-19 4.00 - - - -
Stainless SteelNACE
4.00 Review drawing roof structure
17-Aug-19 - Libur - - - -
18-Aug-19 - Libur - - - -
19-Aug-19 8.00 MTO internal pipe & fitting JTB Tank Pak Meisa PJT Tangki JTB -
20-Aug-19 4.00 Meeting pra tender SPS Crane with Seyang Pak Rudi PJT MRMP Bulog -
Visit ke Cargill untuk prospek pekerjaan Tangki dan
4.00 Pak Suhariyono PRL - -
Vessel
OT 2.00 Meeting untuk visit site Biodiesel Jhonlin Pak Suhariyono PRL Biodiesel -
21-Aug-19 8.00 Site Visit Batulicin Pak Suhariyono PRL Biodiesel -
22-Aug-19 8.00 Site Visit Batulicin Pak Suhariyono PRL Biodiesel -
23-Aug-19 8.00 Site Visit Batulicin Pak Suhariyono PRL Biodiesel -
24-Aug-19 - Libur - - - -
25-Aug-19 - Libur - - - -
26-Aug-19 3.00 Datasheet pompa biodiesel Pak Eko PRL Biodiesel Excel
3.00 Update MTO for Produce water Tank Pak Meisa PJT Tangki JTB -
2.00 Diskusi struktur granul Pak Setyo PJT Pupuk Granul Solidworks
27-Aug-19 3.00 Meeting JTB dgn rekind Pak Meisa PJT Tangki JTB Excel
3.00 Modeling static dudukan granul Pak Setyo PJT Pupuk Granul Solidworks
OT 4.00 Update dimensi tangki Biodiesel Jhonlin Pak Suhariyono PRL Biodiesel -
28-Aug-19 8.00 Simulasi static dan dinamic Struktur Granul Pak Setyo PJT Pupuk Granul Solidworks
29-Aug-19 8.00 Konsinyering rekind-barata JTB Project Pak Meisa PJT Tangki JTB -
30-Aug-19 - Finalisasi document tender Biodiesel Pak Suhariyono PRL Biodiesel -
31-Aug-19 - Libur - - - -
- - - - -
- - - - -

NOTE:
*PROJECT (PJT) / PROPOSAL (PRL) / ADMINISTRATION (ADM) / MEETING (MT) / DESAIN (DSN)