You are on page 1of 39

1 PROJECT SUMMARY

: Supply of Gas Lift Compressor for Bekapai Artificial Lift Project


Project Owner : PT Pertamina Hulu Mahakam
PO Number / Date :
Supplier : PT Abemas Multitech
Project Location : Bekapai Platform
Duration : 60 weeks ARO

2 TERM OF PAYMENT
a For invoicing purpose
Description Percent of Total Price * Amount
CONTRACT Price upon delivery of GOODS at EPCI Contractor’s Yard 70% USD 2,940,000.00
CONTRACT Price upon completion of SAT 15% USD 630,000.00
CONTRACT Price upon completion of Commissioning 10% USD 420,000.00
CONTRACT Price at the end of Warranty Period 5% USD 210,000.00
TOTAL 100% USD 4,200,000.00
Note :
* Based on document Appendix 4 section INVOICING

b For PPC Purpose


Description % WF Amount *
ENGINEERING 10% USD 399,000.00
PROCUREMENT & DELIVERY MATERIAL 60% USD 2,394,000.00
INSTALLATION & TESTING 30% USD 1,197,000.00
TOTAL 100% USD 3,990,000.00 1
Note :
* Total Amount is 95% of 4.2 million USD

3 WEIGHT FACTOR FOR CONSTRUCTION

Task name Baseline Work % Work Amount % WF


Project Contract Award 8 0.05% USD 1,648.76 0.04%
Internal Kick-off meeting 8 0.05% USD 1,648.76 0.04%
Engineering
Product design
PID design completed PID 40 0.27% USD 8,243.80 0.21%
Calculation & Datasheet, Vibration Analyst 80 0.54% USD 16,487.60 0.41%
GA drawing design 80 0.54% USD 16,487.60 0.41%
GA drawing review 40 0.27% USD 8,243.80 0.21%
GA drawing modification 40 0.27% USD 8,243.80 0.21%
GA drawing release 8 0.05% USD 1,648.76 0.04%
Detail drawing design
Skid system 160 1.09% USD 32,975.21 0.83%
Main equipment system 160 1.09% USD 32,975.21 0.83%
Process gas system 160 1.09% USD 32,975.21 0.83%
Lubrication system 160 1.09% USD 32,975.21 0.83%
Instrument system 160 1.09% USD 32,975.21 0.83%
Instrument air system 160 1.09% USD 32,975.21 0.83%
Cooling system 160 1.09% USD 32,975.21 0.83%
Fuel gas system 160 1.09% USD 32,975.21 0.83%
Starting gas system 160 1.09% USD 32,975.21 0.83%
Electrical system 160 1.09% USD 32,975.21 0.83%
BOM release 16 0.11% USD 3,297.52 0.08%
Design output file release 16 0.11% USD 3,297.52 0.08%
Procurement
Material purchase
Construction Material
Compressor 1,440 9.80% USD 278,372.09 6.98%
Engine 1,440 9.80% USD 278,372.09 6.98%
Skid 800 5.44% USD 154,651.16 3.88%
Coupling 960 6.53% USD 185,581.40 4.65%
Valve 960 6.53% USD 185,581.40 4.65%
Instrument 960 6.53% USD 185,581.40 4.65%
Electrical parts 960 6.53% USD 185,581.40 4.65%
Flange, pipe fitting 800 5.44% USD 154,651.16 3.88%
Pressure vessel 960 6.53% USD 185,581.40 4.65%
Air cooler 960 6.53% USD 185,581.40 4.65%
Other materials 720 4.90% USD 139,186.05 3.49%
2 Years Spare part 328 2.23% USD 63,406.98 1.59%
Compressor Package manufacture and assmbly
Main equipment system
Compressor & Coupling installation 16 0.11% USD 3,093.02 0.08%
Engine installation 16 0.11% USD 3,093.02 0.08%
Grouting 32 0.22% USD 6,186.05 0.16%
Process gas system
Pressure vessel installation 8 0.05% USD 1,546.51 0.04%
Fitting up piping 40 0.27% USD 7,732.56 0.19%
Piping welding 48 0.33% USD 9,279.07 0.23%
NDT of piping 48 0.33% USD 9,279.07 0.23%
Hydrostatic test of piping 32 0.22% USD 6,186.05 0.16%
Piping sandblasting & painting 40 0.27% USD 7,732.56 0.19%
Assembly of piping 24 0.16% USD 4,639.53 0.12%
Electrical system 160 1.09% USD 30,930.23 0.78%
Other system 160 1.09% USD 30,930.23 0.78%
Test Final inspection
Leakage test 16 0.11% USD 3,093.02 0.08%
FAT 56 0.38% USD 10,825.58 0.27%
Final inspection & Improvement(such as Clean and paint repair) 16 0.11% USD 3,093.02 0.08%
Prepare for Ex-W Document 112 0.76% USD 21,651.16 0.54%
Packing and Transportation(CIF)
Packing 56 0.38% USD 10,825.58 0.27%
CIF Jakarta 80 0.54% USD 15,465.12 0.39%
Custom Clearance 80 0.54% USD 15,465.12 0.39%
Mobilization to EPCI Yard 56 0.38% USD 10,825.58 0.27%
Site Construction
Erection & Installation 112 0.76% USD 399,000.00 10.00%
Tie-in to Existing Facility
Piping 56 0.38% USD 199,500.00 5.00%
Insrument 56 0.38% USD 199,500.00 5.00%
Electrical 16 0.11% USD 57,000.00 1.43%
Commissioning & Start-Up
Precommisioning 40 0.27% USD 142,500.00 3.57%
Commisioning & Start-Up & Monitoring 56 0.38% USD 199,500.00 5.00%
Total 99.73% USD 3,990,000.00 100.00%
MS Project Input

Task 2 Task 3
Project Contract Award
Internal Kick-off meeting
Engineering Product design

Detail drawing design

Procurement Material purchase

Compressor Package manufacture and assmbly

Test Final inspection


Packing and Transportation(CIF)

Custom Clearance
Mobilization to EPCI Yard
Site Construction Erection & Installation
Tie-in to Existing Facility

Commissioning & Start-Up Precommisioning


Commisioning & Start-Up & Monitoring

Cummulative Plan

Task 2 Task 3
Project Contract Award
Internal Kick-off meeting
Engineering Product design

Detail drawing design

Procurement Material purchase

Compressor Package manufacture and assmbly


Test Final inspection

Packing and Transportation(CIF)

Custom Clearance
Mobilization to EPCI Yard
Site Construction Erection & Installation
Tie-in to Existing Facility

Commissioning & Start-Up Precommisioning


Commisioning & Start-Up & Monitoring
Task 4 Task 5

PID design completed PID


Calculation & Datasheet, Vibration Analyst
GA drawing design
GA drawing review
GA drawing modification
GA drawing release
Skid system
Main equipment system
Process gas system
Lubrication system
Instrument system
Instrument air system
Cooling system
Fuel gas system
Starting gas system
Electrical system
BOM release
Design output file release
Construction Material Compressor
Engine
Skid
Coupling
Valve
Instrument
Electrical parts
Flange, pipe fitting
Pressure vessel
Air cooler
Other materials
2 Years Spare part
Main equipment system Compressor & Coupling installation
Engine installation
Grouting
Process gas system Pressure vessel installation
Fitting up piping
Piping welding
NDT of piping
Hydrostatic test of piping
Piping sandblasting & painting
Assembly of piping
Electrical system
Other system
Leakage test
FAT
Final inspection & Improvement?such as Clean and paint repair?
Prepare for Ex-W Document
Packing
CIF Jakarta

Piping
Insrument
Electrical

TOTAL
Cummulative Plan

Task 4 Task 5

PID design completed PID


Calculation & Datasheet, Vibration Analyst
GA drawing design
GA drawing review
GA drawing modification
GA drawing release
Skid system
Main equipment system
Process gas system
Lubrication system
Instrument system
Instrument air system
Cooling system
Fuel gas system
Starting gas system
Electrical system
BOM release
Design output file release
Construction Material Compressor
Engine
Skid
Coupling
Valve
Instrument
Electrical parts
Flange, pipe fitting
Pressure vessel
Air cooler
Other materials
2 Years Spare part
Main equipment system Compressor & Coupling installation
Engine installation
Grouting
Process gas system Pressure vessel installation
Fitting up piping
Piping welding
NDT of piping
Hydrostatic test of piping
Piping sandblasting & painting
Assembly of piping
Electrical system
Other system
Leakage test
FAT
Final inspection & Improvement?such as Clean and paint repair?
Prepare for Ex-W Document
Packing
CIF Jakarta

Piping
Insrument
Electrical

TOTAL
Cummulative Plan
Year Quarter Week
2022 2023
Q4 Q1
Week 52 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
0.16% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.00% 0.16% 0.44% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55%
0.00% 0.16% 0.44% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55%
0.00% 0.00% 0.00% 0.16% 0.27% 0.27% 0.27% 0.27% 0.27%
0.00% 0.00% 0.00% 0.00% 0.16% 0.27% 0.27% 0.27% 0.27%
0.00% 0.00% 0.00% 0.00% 0.00% 0.05% 0.05% 0.05% 0.05%
0.00% 0.00% 0.00% 0.00% 0.00% 0.11% 0.38% 0.66% 0.93%
0.00% 0.00% 0.00% 0.00% 0.00% 0.11% 0.38% 0.66% 0.93%
0.00% 0.00% 0.00% 0.00% 0.00% 0.11% 0.38% 0.66% 0.93%
0.00% 0.00% 0.00% 0.00% 0.00% 0.11% 0.38% 0.66% 0.93%
0.00% 0.00% 0.00% 0.00% 0.00% 0.11% 0.38% 0.66% 0.93%
0.00% 0.00% 0.00% 0.00% 0.00% 0.11% 0.38% 0.66% 0.93%
0.00% 0.00% 0.00% 0.00% 0.00% 0.11% 0.38% 0.66% 0.93%
0.00% 0.00% 0.00% 0.00% 0.00% 0.11% 0.38% 0.66% 0.93%
0.00% 0.00% 0.00% 0.00% 0.00% 0.11% 0.38% 0.66% 0.93%
0.00% 0.00% 0.00% 0.00% 0.00% 0.11% 0.38% 0.66% 0.93%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.11% 0.38% 0.66% 0.93% 1.20% 1.47% 1.75% 2.02% 2.29%
0.11% 0.38% 0.66% 0.93% 1.20% 1.47% 1.75% 2.02% 2.29%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.11% 0.38% 0.66% 0.93%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.11% 0.38%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.11%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.11%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.22% 0.49% 0.76% 1.04% 1.31% 1.58% 1.86% 2.13% 2.24%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.71% 1.97% 3.33% 4.53% 5.62% 7.81% 11.63% 15.56% 19.71%

Year Quarter Week


2022 2023
Q4 Q1
WF Week 51 Week 52 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6
0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.21% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.41% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.41% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.21% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.21% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.83% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.83% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.83% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.83% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.83% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.83% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.83% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.83% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.83% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.83% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6.98% 0.00% 0.01% 0.03% 0.05% 0.06% 0.08% 0.10% 0.12%
6.98% 0.00% 0.01% 0.03% 0.05% 0.06% 0.08% 0.10% 0.12%
3.88% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4.65% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.01% 0.02%
4.65% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4.65% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4.65% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3.88% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4.65% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4.65% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3.49% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.59% 0.00% 0.00% 0.01% 0.01% 0.02% 0.02% 0.03% 0.03%
0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.12% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.78% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.78% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.54% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.39% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.39% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
10.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.43% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3.57% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 0.00% 0.71% 1.97% 3.33% 4.53% 5.62% 7.81% 11.63%
0.00% 0.71% 1.97% 3.33% 4.53% 5.62% 7.81% 11.63%
Q2
Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55%
0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.00% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
2.57% 2.84% 3.11% 3.38% 3.66% 3.93% 4.20% 4.48% 4.75%
2.57% 2.84% 3.11% 3.38% 3.66% 3.93% 4.20% 4.48% 4.75%
0.00% 0.00% 0.11% 0.38% 0.66% 0.93% 1.20% 1.47% 1.75%
1.20% 1.47% 1.75% 2.02% 2.29% 2.57% 2.84% 3.11% 3.38%
0.66% 0.93% 1.20% 1.47% 1.75% 2.02% 2.29% 2.57% 2.84%
0.38% 0.66% 0.93% 1.20% 1.47% 1.75% 2.02% 2.29% 2.57%
0.38% 0.66% 0.93% 1.20% 1.47% 1.75% 2.02% 2.29% 2.57%
0.00% 0.00% 0.05% 0.33% 0.60% 0.87% 1.15% 1.42% 1.69%
0.11% 0.38% 0.66% 0.93% 1.20% 1.47% 1.75% 2.02% 2.29%
0.11% 0.38% 0.66% 0.93% 1.20% 1.47% 1.75% 2.02% 2.29%
0.00% 0.16% 0.44% 0.71% 0.98% 1.26% 1.53% 1.80% 2.07%
2.24% 2.24% 2.24% 2.24% 2.24% 2.24% 2.24% 2.24% 2.24%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
23.31% 25.76% 28.38% 31.39% 34.39% 37.39% 40.39% 43.40% 46.40%

Q2
Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.14% 0.16% 0.18% 0.20% 0.22% 0.24% 0.26% 0.27% 0.29%
0.14% 0.16% 0.18% 0.20% 0.22% 0.24% 0.26% 0.27% 0.29%
0.00% 0.00% 0.00% 0.00% 0.00% 0.01% 0.03% 0.04% 0.05%
0.03% 0.04% 0.06% 0.07% 0.08% 0.09% 0.11% 0.12% 0.13%
0.01% 0.02% 0.03% 0.04% 0.06% 0.07% 0.08% 0.09% 0.11%
0.00% 0.01% 0.02% 0.03% 0.04% 0.06% 0.07% 0.08% 0.09%
0.00% 0.01% 0.02% 0.03% 0.04% 0.06% 0.07% 0.08% 0.09%
0.00% 0.00% 0.00% 0.00% 0.00% 0.01% 0.02% 0.03% 0.04%
0.00% 0.00% 0.01% 0.02% 0.03% 0.04% 0.06% 0.07% 0.08%
0.00% 0.00% 0.01% 0.02% 0.03% 0.04% 0.06% 0.07% 0.08%
0.00% 0.00% 0.00% 0.01% 0.02% 0.02% 0.03% 0.04% 0.05%
0.03% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
15.56% 19.71% 23.31% 25.76% 28.38% 31.39% 34.39% 37.39% 40.39%
15.56% 19.71% 23.31% 25.76% 28.38% 31.39% 34.39% 37.39% 40.39%
Week 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24 Week 25 Week 26
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55%
0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
5.02% 5.29% 5.57% 5.84% 6.11% 6.39% 6.66% 6.93% 7.21%
5.02% 5.29% 5.57% 5.84% 6.11% 6.39% 6.66% 6.93% 7.21%
2.02% 2.29% 2.57% 2.84% 3.11% 3.38% 3.66% 3.93% 4.20%
3.66% 3.93% 4.20% 4.48% 4.75% 5.02% 5.29% 5.57% 5.84%
3.11% 3.38% 3.66% 3.93% 4.20% 4.48% 4.75% 5.02% 5.29%
2.84% 3.11% 3.38% 3.66% 3.93% 4.20% 4.48% 4.75% 5.02%
2.84% 3.11% 3.38% 3.66% 3.93% 4.20% 4.48% 4.75% 5.02%
1.97% 2.24% 2.51% 2.78% 3.06% 3.33% 3.60% 3.88% 4.15%
2.57% 2.84% 3.11% 3.38% 3.66% 3.93% 4.20% 4.48% 4.75%
2.57% 2.84% 3.11% 3.38% 3.66% 3.93% 4.20% 4.48% 4.75%
2.35% 2.62% 2.89% 3.17% 3.44% 3.71% 3.98% 4.26% 4.53%
2.24% 2.24% 2.24% 2.24% 2.24% 2.24% 2.24% 2.24% 2.24%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
49.40% 52.40% 55.40% 58.41% 61.41% 64.41% 67.41% 70.41% 73.42%

Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24


0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.31% 0.33% 0.35% 0.37% 0.39% 0.41% 0.43% 0.45% 0.46%
0.31% 0.33% 0.35% 0.37% 0.39% 0.41% 0.43% 0.45% 0.46%
0.06% 0.07% 0.08% 0.09% 0.10% 0.11% 0.12% 0.13% 0.14%
0.14% 0.16% 0.17% 0.18% 0.20% 0.21% 0.22% 0.23% 0.25%
0.12% 0.13% 0.14% 0.16% 0.17% 0.18% 0.20% 0.21% 0.22%
0.11% 0.12% 0.13% 0.14% 0.16% 0.17% 0.18% 0.20% 0.21%
0.11% 0.12% 0.13% 0.14% 0.16% 0.17% 0.18% 0.20% 0.21%
0.06% 0.07% 0.08% 0.09% 0.10% 0.11% 0.12% 0.13% 0.14%
0.09% 0.11% 0.12% 0.13% 0.14% 0.16% 0.17% 0.18% 0.20%
0.09% 0.11% 0.12% 0.13% 0.14% 0.16% 0.17% 0.18% 0.20%
0.06% 0.07% 0.08% 0.09% 0.10% 0.11% 0.12% 0.13% 0.14%
0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
43.40% 46.40% 49.40% 52.40% 55.40% 58.41% 61.41% 64.41% 67.41%
43.40% 46.40% 49.40% 52.40% 55.40% 58.41% 61.41% 64.41% 67.41%
Q3
Week 27 Week 28 Week 29 Week 30 Week 31 Week 32 Week 33 Week 34 Week 35
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55%
0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
7.48% 7.75% 8.02% 8.30% 8.57% 8.84% 9.12% 9.39% 9.66%
7.48% 7.75% 8.02% 8.30% 8.57% 8.84% 9.12% 9.39% 9.66%
4.48% 4.75% 5.02% 5.29% 5.46% 5.46% 5.46% 5.46% 5.46%
6.11% 6.39% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
5.57% 5.84% 6.11% 6.39% 6.55% 6.55% 6.55% 6.55% 6.55%
5.29% 5.57% 5.84% 6.11% 6.39% 6.55% 6.55% 6.55% 6.55%
5.29% 5.57% 5.84% 6.11% 6.39% 6.55% 6.55% 6.55% 6.55%
4.42% 4.69% 4.97% 5.24% 5.46% 5.46% 5.46% 5.46% 5.46%
5.02% 5.29% 5.57% 5.84% 6.11% 6.39% 6.55% 6.55% 6.55%
5.02% 5.29% 5.57% 5.84% 6.11% 6.39% 6.55% 6.55% 6.55%
4.80% 4.91% 4.91% 4.91% 4.91% 4.91% 4.91% 4.91% 4.91%
2.24% 2.24% 2.24% 2.24% 2.24% 2.24% 2.24% 2.24% 2.24%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
76.42% 79.26% 81.88% 84.33% 86.52% 87.94% 88.81% 89.36% 89.90%

Q3
Week 25 Week 26 Week 27 Week 28 Week 29 Week 30 Week 31 Week 32 Week 33
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.48% 0.50% 0.52% 0.54% 0.56% 0.58% 0.60% 0.62% 0.64%
0.48% 0.50% 0.52% 0.54% 0.56% 0.58% 0.60% 0.62% 0.64%
0.15% 0.16% 0.17% 0.18% 0.19% 0.21% 0.21% 0.21% 0.21%
0.26% 0.27% 0.28% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.23% 0.25% 0.26% 0.27% 0.28% 0.30% 0.30% 0.30% 0.30%
0.22% 0.23% 0.25% 0.26% 0.27% 0.28% 0.30% 0.30% 0.30%
0.22% 0.23% 0.25% 0.26% 0.27% 0.28% 0.30% 0.30% 0.30%
0.15% 0.16% 0.17% 0.18% 0.19% 0.20% 0.21% 0.21% 0.21%
0.21% 0.22% 0.23% 0.25% 0.26% 0.27% 0.28% 0.30% 0.30%
0.21% 0.22% 0.23% 0.25% 0.26% 0.27% 0.28% 0.30% 0.30%
0.15% 0.16% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17%
0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
70.41% 73.42% 76.42% 79.26% 81.88% 84.33% 86.52% 87.94% 88.81%
70.41% 73.42% 76.42% 79.26% 81.88% 84.33% 86.52% 87.94% 88.81%
Q4
Week 36 Week 37 Week 38 Week 39 Week 40 Week 41 Week 42 Week 43 Week 44
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55%
0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
9.83% 9.83% 9.83% 9.83% 9.83% 9.83% 9.83% 9.83% 9.83%
9.83% 9.83% 9.83% 9.83% 9.83% 9.83% 9.83% 9.83% 9.83%
5.46% 5.46% 5.46% 5.46% 5.46% 5.46% 5.46% 5.46% 5.46%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
5.46% 5.46% 5.46% 5.46% 5.46% 5.46% 5.46% 5.46% 5.46%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
4.91% 4.91% 4.91% 4.91% 4.91% 4.91% 4.91% 4.91% 4.91%
2.24% 2.24% 2.24% 2.24% 2.24% 2.24% 2.24% 2.24% 2.24%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.00% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.00% 0.16% 0.22% 0.22% 0.22% 0.22% 0.22% 0.22% 0.22%
0.00% 0.00% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
0.00% 0.00% 0.16% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.00% 0.00% 0.05% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33%
0.00% 0.00% 0.00% 0.22% 0.33% 0.33% 0.33% 0.33% 0.33%
0.00% 0.00% 0.00% 0.00% 0.16% 0.22% 0.22% 0.22% 0.22%
0.00% 0.00% 0.00% 0.00% 0.00% 0.22% 0.27% 0.27% 0.27%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.16% 0.16% 0.16%
0.00% 0.27% 0.55% 0.82% 1.09% 1.09% 1.09% 1.09% 1.09%
0.00% 0.27% 0.55% 0.82% 1.09% 1.09% 1.09% 1.09% 1.09%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.05% 0.11% 0.11%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.22% 0.38%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.11%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.27% 0.55% 0.76%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
90.34% 91.16% 92.03% 93.18% 94.00% 94.27% 94.81% 95.36% 95.85%

Q4
Week 34 Week 35 Week 36 Week 37 Week 38 Week 39 Week 40 Week 41 Week 42
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.66% 0.67% 0.69% 0.69% 0.69% 0.69% 0.69% 0.69% 0.69%
0.66% 0.67% 0.69% 0.69% 0.69% 0.69% 0.69% 0.69% 0.69%
0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17%
0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
89.36% 89.90% 90.34% 91.16% 92.03% 93.18% 94.00% 94.27% 94.81%
89.36% 89.90% 90.34% 91.16% 92.03% 93.18% 94.00% 94.27% 94.81%
Week 45 Week 46 Week 47 Week 48 Week 49 Week 50 Week 51 Week 52 Week 1
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55%
0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
9.83% 9.83% 9.83% 9.83% 9.83% 9.83% 9.83% 9.83% 9.83%
9.83% 9.83% 9.83% 9.83% 9.83% 9.83% 9.83% 9.83% 9.83%
5.46% 5.46% 5.46% 5.46% 5.46% 5.46% 5.46% 5.46% 5.46%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
5.46% 5.46% 5.46% 5.46% 5.46% 5.46% 5.46% 5.46% 5.46%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
4.91% 4.91% 4.91% 4.91% 4.91% 4.91% 4.91% 4.91% 4.91%
2.24% 2.24% 2.24% 2.24% 2.24% 2.24% 2.24% 2.24% 2.24%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.22% 0.22% 0.22% 0.22% 0.22% 0.22% 0.22% 0.22% 0.22%
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33%
0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33%
0.22% 0.22% 0.22% 0.22% 0.22% 0.22% 0.22% 0.22% 0.22%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.38% 0.38% 0.38% 0.38% 0.38% 0.38% 0.38% 0.38% 0.38%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.76% 0.76% 0.76% 0.76% 0.76% 0.76% 0.76% 0.76% 0.76%
0.27% 0.38% 0.38% 0.38% 0.38% 0.38% 0.38% 0.38% 0.38%
0.00% 0.16% 0.44% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55%
0.00% 0.00% 0.00% 0.16% 0.44% 0.55% 0.55% 0.55% 0.55%
0.00% 0.00% 0.00% 0.00% 0.00% 0.16% 0.38% 0.38% 0.38%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.05% 0.33% 0.33%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
96.12% 96.40% 96.67% 96.94% 97.22% 97.49% 97.76% 98.03% 98.03%

Week 43 Week 44 Week 45 Week 46 Week 47 Week 48 Week 49 Week 50 Week 51


0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.69% 0.69% 0.69% 0.69% 0.69% 0.69% 0.69% 0.69% 0.69%
0.69% 0.69% 0.69% 0.69% 0.69% 0.69% 0.69% 0.69% 0.69%
0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17%
0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
95.36% 95.85% 96.12% 96.40% 96.67% 96.94% 97.22% 97.49% 97.76%
95.36% 95.85% 96.12% 96.40% 96.67% 96.94% 97.22% 97.49% 97.76%
2024 Grand Total
Q1
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55%
0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
9.83% 9.83% 9.83% 9.83% 9.83% 9.83% 9.83%
9.83% 9.83% 9.83% 9.83% 9.83% 9.83% 9.83%
5.46% 5.46% 5.46% 5.46% 5.46% 5.46% 5.46%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
5.46% 5.46% 5.46% 5.46% 5.46% 5.46% 5.46%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
6.55% 6.55% 6.55% 6.55% 6.55% 6.55% 6.55%
4.91% 4.91% 4.91% 4.91% 4.91% 4.91% 4.91%
2.24% 2.24% 2.24% 2.24% 2.24% 2.24% 2.24%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.22% 0.22% 0.22% 0.22% 0.22% 0.22% 0.22%
0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33%
0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33%
0.22% 0.22% 0.22% 0.22% 0.22% 0.22% 0.22%
0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.38% 0.38% 0.38% 0.38% 0.38% 0.38% 0.38%
0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.76% 0.76% 0.76% 0.76% 0.76% 0.76% 0.76%
0.38% 0.38% 0.38% 0.38% 0.38% 0.38% 0.38%
0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55%
0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55%
0.38% 0.38% 0.38% 0.38% 0.38% 0.38% 0.38%
0.60% 0.76% 0.76% 0.76% 0.76% 0.76% 0.76%
0.00% 0.11% 0.38% 0.38% 0.38% 0.38% 0.38%
0.00% 0.11% 0.38% 0.38% 0.38% 0.38% 0.38%
0.00% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
0.00% 0.00% 0.00% 0.27% 0.27% 0.27% 0.27%
0.00% 0.00% 0.00% 0.00% 0.27% 0.38% 0.38%
98.31% 98.80% 99.34% 99.62% 99.89% 100.00% 100.00%

2024 Grand Total


Q1
Week 52 Week 1 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.69% 0.69% 0.69% 0.69% 0.69% 0.69% 0.69% 0.69% 0.69%
0.69% 0.69% 0.69% 0.69% 0.69% 0.69% 0.69% 0.69% 0.69%
0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17%
0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.03% 0.03% 0.06% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08%
0.00% 0.00% 0.00% 0.01% 0.02% 0.02% 0.02% 0.02% 0.02%
0.00% 0.00% 0.00% 0.01% 0.02% 0.02% 0.02% 0.02% 0.02%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.01% 0.02% 0.02%
98.03% 98.03% 98.31% 98.80% 99.34% 99.62% 99.89% 100.00% 100.00%
98.03% 98.03% 98.31% 98.80% 99.34% 99.62% 99.89% 100.00% 100.00%
To WF
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.01%
0.01%
0.01%
0.01%
0.01%
0.01%
0.01%
0.01%
0.01%
0.01%
0.00%
0.00%
0.69%
0.69%
0.21%
0.30%
0.30%
0.30%
0.30%
0.21%
0.30%
0.30%
0.17%
0.04%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.01%
0.01%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.08%
0.02%
0.02%
0.00%
0.01%
0.02%
100.00%
100.00%
Status Document Document Progress Status

Document Type
Current Date

Submit Date
Last Update

% Progress

Discipline
Last Rev

Status
Document Number Document Title 0 Date Rev 0 0.1 Date Rev 0.1 0.2 Date Rev 0.2 0.3 Date Rev 0.3 1 Date Rev 1 1.1 Date Rev 1.1 1.2 Date Rev 1.2 1.3 Date Rev 1.3 2 Date Rev 2 2.1 Date Rev 2.1 2.2 Date Rev 2.3 2.3 Date Rev 2.3 3 Date Rev 3 Info Canceled Total Point Task Name
PROJECT MANAGEMENT

N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% VDRL Project Management Supplier Data Book 1 5-Jan-23 1 Design output file release
N/A 0 On Schedule 6-Jan-23 18-Jan-24 8% Project Execution Plan Project Management Procedure 1 6-Jan-23 1 Design output file release
N/A 0 On Schedule 7-Jan-23 18-Jan-24 8% Copy RFQ, PO Project Management Request - Requisition 1 7-Jan-23 1 BOM release
N/A 0 On Schedule 8-Jan-23 18-Jan-24 8% Deviation List Project Management Non Conformance Report 1 8-Jan-23 1 BOM release
N/A 0 On Schedule 9-Jan-23 18-Jan-24 8% Quality Assurance Manual & Certification Project Management Manual 1 9-Jan-23 1 GA drawing review
N/A 0 On Schedule 10-Jan-23 18-Jan-24 8% Organization Chart Project Management Chart - Histogram 1 10-Jan-23 1 Design output file release
N/A 0 On Schedule 11-Jan-23 18-Jan-24 8% Weekly Progress Report Project Management Weekly Report 1 11-Jan-23 1 Design output file release
N/A 0 On Schedule 13-Jan-23 18-Jan-24 8% Project Schedule & S-Curve Project Management Report 1 13-Jan-23 1 Design output file release
GENERAL

ID-BKP-ALL-3990-530001-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% SUPPLIER document register + Plan date to Issue Project Management Supplier Data Book 7-Jan-23 1 5-Jan-23 1 BOM release
ID-BKP-ALL-3990-530002-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Installation and operating manual index Field Operations Manual 6-Jun-23 1 5-Jan-23 1 Design output file release
ID-BKP-ALL-3990-530003-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Installation and operating manual Field Operations Manual 6-Jun-23 1 5-Jan-23 1 Design output file release
ID-BKP-ALL-3990-530004-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Preservation procedure Field Operations Procedure Not supply separately 1 5-Jan-23 1 Design output file release
ID-BKP-ALL-3990-530005-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Special tools list Field Operations List - Index - Schedule - Listing 2-May-23 1 5-Jan-23 1 BOM release
ID-BKP-ALL-3990-530006-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Start up and commissioning spare parts list QA - QC - Certification List - Index - Schedule - Listing 2-May-23 1 5-Jan-23 1 Design output file release
ID-BKP-ALL-3990-530007-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Operating spare parts list (2 years operation or 1 overhaul)
st
Field Operations List - Index - Schedule - Listing 2-May-23 1 5-Jan-23 1 BOM release
ID-BKP-ALL-3990-530008-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Capital spare parts list Mechanical (Machinery) List - Index - Schedule - Listing 2-May-23 1 5-Jan-23 1 BOM release
ID-BKP-ALL-3990-530009-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Declaration of conformity for ATEX and associated dossier QA - QC - Certification Dossier (mix of diff. types of docs) 1 week before delivery 1 5-Jan-23 1 Design output file release
Certificates of conformity for ATEX (issued by a notified Body) for each
ID-BKP-ALL-3990-530010-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% QA - QC - Certification Certificates 1 week before delivery 1 5-Jan-23
electrical equipment and component 1 Design output file release
N/A 0 On Schedule 12-Jan-23 18-Jan-24 8% Monthly report Project Management Monthly Report Last day every month 1 12-Jan-23 1 Design output file release
ID-BKP-ALL-3990-530011-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Packing list Logistics List - Index - Schedule - Listing 1 week before delivery 1 5-Jan-23 1 BOM release
ID-BKP-ALL-3990-530012-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Shipping Documentation Logistics Accounting document Not supply separately 1 5-Jan-23 1 BOM release
ID-BKP-ALL-3990-530013-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Training Syllabus Project Management Guideline 1 week before commissioning 1 5-Jan-23 1 Design output file release
ID-BKP-ALL-3990-530014-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Operation and Control Philosophy Field Operations Guideline 23-May-23 1 5-Jan-23 1 Design output file release
ID-BKP-ALL-3990-530015-P-BKP-21-001 0% Vendor List 14-Mar-23

ENGINEERING

Procedures & Reports

ID-BKP-ALL-3990-530016-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Painting procedure Piping - Valves - Vessels Procedure 14-Feb-23 1 5-Jan-23 1 Skid system
ID-BKP-ALL-3990-530017-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Packing procedure Logistics Procedure 23-May-23 1 5-Jan-23 1 Skid system
ID-BKP-ALL-3990-530018-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Weight data sheets with COG QA - QC - Certification Procedure 2-May-23 1 5-Jan-23 1 Main equipment system
ID-BKP-ALL-3990-530019-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Calibration test procedure QA - QC - Certification Procedure Not supply separately 1 5-Jan-23 1 Main equipment system
ID-BKP-ALL-3990-530020-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Compressor mechanical test procedure Mechanical (Machinery) Procedure Not supply 1 5-Jan-23 1 Main equipment system
ID-BKP-ALL-3990-530021-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Gas engine test procedure Mechanical (Machinery) Procedure Not supply 1 5-Jan-23 1 Main equipment system
Factory Acceptance Test (FAT) Procedure, include (but not limited to)
ID-BKP-ALL-3990-530022-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% QA - QC - Certification Procedure 23-May-23 1 5-Jan-23
Package no/partial load test procedure & IFAT procedure 1 Main equipment system
Package Site Acceptance Test (SAT) procedure, include Site
ID-BKP-ALL-3990-530023-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% QA - QC - Certification Procedure 2 week before commissioning 1 5-Jan-23
Instrumentation Test (SIT) procedure. 1 Main equipment system
ID-BKP-ALL-3990-530024-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Reports for all the above tests QA - QC - Certification Procedure 1 week after test finished 1 5-Jan-23 1 Main equipment system
Instruction for handling, loading, unloading (y jacking & lifting method),
ID-BKP-ALL-3990-530025-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Logistics Procedure 28-Feb-23 1 5-Jan-23
transportation, and storage 1 Main equipment system
Capacity control procedure for early, mid, late life also for minimum flow
ID-BKP-ALL-3990-530026-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Electrical Procedure Not supply separately 1 5-Jan-23
of Gas Lift Compressor Package. 1 Instrument system
Manufacturing / Quality / HSE documents

ID-BKP-ALL-3990-530027-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Quality control plan QA - QC - Certification Acceptance and Performance Test 14-Feb-23 1 5-Jan-23 1 Main equipment system
ID-BKP-ALL-3990-530028-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Inspection and test plan QA - QC - Certification Acceptance and Performance Test 14-Feb-23 1 5-Jan-23 1 Main equipment system
ID-BKP-ALL-3990-530029-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% NDE procedures Piping - Valves - Vessels Procedure 14-Feb-23 1 5-Jan-23 1 Main equipment system
ID-BKP-ALL-3990-530030-P-BKP-21-001 0% WPS for Pressure Vessel 23-May-23

ID-BKP-ALL-3990-530031-P-BKP-21-001 0% WPS for Piping Connection 23-May-23

ID-BKP-ALL-3990-530032-P-BKP-21-001 0% WPS for Structural (Skid) 23-May-23

ID-BKP-ALL-3990-530033-P-BKP-21-001 0% WPS for Air Cooler 23-May-23

ID-BKP-ALL-3990-530034-P-BKP-21-001 0% Fabrication Procedure for Pressure Vessel/Exchanger 23-May-23

ID-BKP-ALL-3990-530035-P-BKP-21-001 0% Assembly Procedure 23-May-23

ID-BKP-ALL-3990-530036-P-BKP-21-001 0% Welder List and Certificate 23-May-23

ID-BKP-ALL-3990-530037-P-BKP-21-001 0% Welding Map and NDE Plan 23-May-23

ID-BKP-ALL-3990-530038-P-BKP-21-001 0% PMI Procedure 14-Mar-23

ID-BKP-ALL-3990-530039-P-BKP-21-001 0% PMI Report Not supply separately

ID-BKP-ALL-3990-530040-P-BKP-21-001 0% Hardness Test for Piston Not supply separately

ID-BKP-ALL-3990-530041-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Vessels Calculation(Fuel Gas Filter & Scrubeer& Pulsation Bottles) Piping - Valves - Vessels Study 11-Apr-23 1 5-Jan-23 1 Calculation & Datasheet, Vibration Analyst
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Welding procedures Piping - Valves - Vessels Procedure 1 5-Jan-23 1 Main equipment system
ID-BKP-ALL-3990-530042-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Material certificates QA - QC - Certification Certificates 2 Week before delivery 1 5-Jan-23 1 Main equipment system
All tests and inspections certificates, including but not limited to
ID-BKP-ALL-3990-530043-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Performance test certificate, Megger Test Certificate, T3 Certificate, Loop QA - QC - Certification Certificates Not supply separately 1 5-Jan-23
Test Certificate, Continuity Test Certificate, etc.) 1 Process gas system
ID-BKP-ALL-3990-530044-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% QA/ QC (Manufacturing data book) index QA - QC - Certification List - Index - Schedule - Listing 14-Mar-23 1 5-Jan-23 1 Process gas system
ID-BKP-ALL-3990-530045-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% QA/ QC (Manufacturing data book) Dossier QA - QC - Certification Dossier (mix of diff. types of docs) 2 Week before delivery 1 5-Jan-23 1 Process gas system
STRUCTURAL

ID-BKP-ALL-3990-530046-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Foundation drawing Civil Engineering General Arrangement 1 5-Jan-23 1 Skid system
ID-BKP-ALL-3990-530047-P-BKP-21-001 0% Lifting equipments (Spreader bar) Calculations 6-Apr-23

ID-BKP-ALL-3990-530048-P-BKP-21-001 0% Lifting equipments (Spreader bar) GA drawing 6-Apr-23

ID-BKP-ALL-3990-530049-P-BKP-21-001 0% Lifting Gear load test Porcedure 6-Apr-23

ID-BKP-ALL-3990-530050-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Lifting equipment general arrangement Civil Engineering General Arrangement 2-May-23 1 5-Jan-23 1 Skid system
ID-BKP-ALL-3990-530051-P-BKP-21-001 0% Drawing for Handrail and Ladder 2-May-23

ID-BKP-ALL-3990-530052-P-BKP-21-001 0% Drawing Base Plate/Skid Structural General Assembly 2-May-23

MECHANICAL

Arrangements

ID-BKP-ALL-3990-530053-P-BKP-21-001 0% General Arrangement Drawing 28-Feb-23

Data sheets 0 Calculation & Datasheet, Vibration Analyst


ID-BKP-ALL-3990-530054-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Package reciprocating compressor data sheet Mechanical (Machinery) Study 14-Feb-23 1 5-Jan-23 1 Calculation & Datasheet, Vibration Analyst
ID-BKP-ALL-3990-530055-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Engine datasheet Mechanical (Machinery) Study 14-Feb-23 1 5-Jan-23 1 Calculation & Datasheet, Vibration Analyst
Utility system (Air Cooler, Lubrication, Water coolant, Electrical etc.)
ID-BKP-ALL-3990-530056-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Process Study 14-Mar-23 1 5-Jan-23
datasheet 1 Calculation & Datasheet, Vibration Analyst

N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Gas Engine Mechanical (Machinery) Data sheet 1 5-Jan-23
1 GA drawing modification
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Gas Compressor Mechanical (Machinery) Data sheet 1 5-Jan-23 1 GA drawing modification
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Interstage Separator Mechanical (Machinery) Data sheet 1 5-Jan-23 1 GA drawing modification
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Interstage Cooler Mechanical (Machinery) Data sheet 1 5-Jan-23 1 GA drawing modification
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Pressure Safety Valve Mechanical (Machinery) Data sheet 1 5-Jan-23 1 GA drawing modification
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Shutdown Valve Instrumentation Data sheet 1 5-Jan-23 1 GA drawing modification
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Control Valve Instrumentation Data sheet 1 5-Jan-23 1 GA drawing modification
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Level Control Valve / Drain Valve Instrumentation Data sheet 1 5-Jan-23 1 GA drawing modification
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Pressure Trasmitter/Indicator Instrumentation Data sheet 1 5-Jan-23 1 GA drawing modification
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Temperature Trasmitter/Indicator Instrumentation Data sheet 1 5-Jan-23 1 GA drawing modification
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Weight data sheets with COG Mechanical (Machinery) Data sheet 1 5-Jan-23 1 GA drawing review
P&IDs & Lists

ID-BKP-ALL-3990-530057-P-BKP-21-001 0% PID for Gas Compressor 14-Mar-23


Status Document Document Progress Status

Document Type
Current Date

Submit Date
Last Update

% Progress

Discipline
Last Rev

Status
Document Number Document Title 0 Date Rev 0 0.1 Date Rev 0.1 0.2 Date Rev 0.2 0.3 Date Rev 0.3 1 Date Rev 1 1.1 Date Rev 1.1 1.2 Date Rev 1.2 1.3 Date Rev 1.3 2 Date Rev 2 2.1 Date Rev 2.1 2.2 Date Rev 2.3 2.3 Date Rev 2.3 3 Date Rev 3 Info Canceled Total Point Task Name
ID-BKP-ALL-3990-530058-P-BKP-21-001 0% Utility list 14-Mar-23

ID-BKP-ALL-3990-530059-P-BKP-21-001 0% Equipment list 14-Mar-23

ID-BKP-ALL-3990-530060-P-BKP-21-001 0% Lubrication list and schedule 18-Apr-23

N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Process Flow Diagram Process Process Flow Diagram 1 5-Jan-23 1 PID design completed PID
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% P&ID Gas Compressor Package Process Process and Instruments Diagram 1 5-Jan-23 1 PID design completed PID
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% GA Drawing Piping - Valves - Vessels General Arrangement 1 5-Jan-23 1 Skid system
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Detail Drawing Skid System Civil Engineering General Arrangement 1 5-Jan-23 1 Skid system
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Detail Drawing Main Equipment System Mechanical (Machinery) General Arrangement 1 5-Jan-23 1 Main equipment system
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Detail Drawing Process System Process General Arrangement 1 5-Jan-23 1 Process gas system
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Detail Drawing Lubrication System Mechanical (Machinery) General Arrangement 1 5-Jan-23 1 Lubrication system
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Detail Drawing Instrument System Process General Arrangement 1 5-Jan-23 1 Instrument system
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Detail Drawing Instrument Air System Process General Arrangement 1 5-Jan-23 1 Instrument air system
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Detail Drawing Fuel Gas System Process General Arrangement 1 5-Jan-23 1 Fuel gas system
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Detail Drawing Starting System Process General Arrangement 1 5-Jan-23 1 Starting gas system
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Detail Drawing Electrical System Electrical General Arrangement 1 5-Jan-23 1 Electrical system
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% DC distribution schematic diagram Electrical Logic Diagram 1 5-Jan-23 1 Electrical system
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Control system architecture Instrumentation Layout 1 5-Jan-23 1 Starting gas system
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Interconnecting diagram (instrumentation and electrical) Instrumentation Logic Diagram 1 5-Jan-23 1 Starting gas system
Detail drawings

ID-BKP-ALL-3990-530061-P-BKP-21-001 0% Compressor drawing 14-Mar-23

ID-BKP-ALL-3990-530062-P-BKP-21-001 0% Gas engine outline drawing 14-Mar-23

ID-BKP-ALL-3990-530063-P-BKP-21-001 0% Couplings outline drawings 9-Apr-23

ID-BKP-ALL-3990-530064-P-BKP-21-001 0% Nameplate drawings 14-Feb-23

ID-BKP-ALL-3990-530065-P-BKP-21-001 0% Heat Exchanger Cooler Drawings(Lube Oil) 11-Apr-23

ID-BKP-ALL-3990-530066-P-BKP-21-001 0% Auxiliary equipment drawing (i.e., lube oil pumps, filters etc.) 11-Apr-23

ID-BKP-ALL-3990-530067-P-BKP-21-001 0% Lube Oil Day Tanks and Cooling Water Expansion Tanks Drawing 25-Apr-23

Calculation & Simulation

N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Gas Compressor Heat Material Balance Process Analysis 1 5-Jan-23 1 Calculation & Datasheet, Vibration Analyst
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Insterstage Cooler Performance Calculation Mechanical (Machinery) Study 1 5-Jan-23 1 Calculation & Datasheet, Vibration Analyst
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Insterstage Scrubber Process Calculation Mechanical (Machinery) Study 1 5-Jan-23 1 Calculation & Datasheet, Vibration Analyst
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% Line Sizing Process Study 1 5-Jan-23 1 Calculation & Datasheet, Vibration Analyst
N/A 0 On Schedule 5-Jan-23 18-Jan-24 8% PSV Load List & Calculation Process Study 1 5-Jan-23 1 Calculation & Datasheet, Vibration Analyst
ID-BKP-ALL-3990-530068-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Reciprocating compressor performance data & curves Mechanical (Machinery) Study 14-Feb-23 1 5-Jan-23 1 Calculation & Datasheet, Vibration Analyst
ID-BKP-ALL-3990-530069-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Gas engine performances data and curves Mechanical (Machinery) Chart - Histogram 14-Feb-23 1 5-Jan-23 1 Calculation & Datasheet, Vibration Analyst
ID-BKP-ALL-3990-530070-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Process calculations (balance) Process Study 14-Mar-23 1 5-Jan-23 1 Calculation & Datasheet, Vibration Analyst
ID-BKP-ALL-3990-530071-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Package noise data Mechanical (Machinery) Details 14-Mar-23 1 5-Jan-23 1 Calculation & Datasheet, Vibration Analyst
ID-BKP-ALL-3990-530072-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Skid and deck dynamic analysis Civil Engineering Study 11-Apr-23 1 5-Jan-23 1 Calculation & Datasheet, Vibration Analyst
Unbalance force calculation / vibration / running frequencies / max
ID-BKP-ALL-3990-530073-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Mechanical (Machinery) Study Not supply separately 1 5-Jan-23
deflection 1 Calculation & Datasheet, Vibration Analyst

ID-BKP-ALL-3990-530074-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Torsional analysis (including coupling selection) Mechanical (Machinery) Study 18-Apr-23 1 5-Jan-23
1 Calculation & Datasheet, Vibration Analyst

ID-BKP-ALL-3990-530075-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Pulsation control study / acoustical report Mechanical (Machinery) Study 18-Apr-23 1 5-Jan-23
1 Calculation & Datasheet, Vibration Analyst

ID-BKP-ALL-3990-530076-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Process Simulation and Heat Material Balance Process Study 14-Mar-23 1 5-Jan-23
1 Calculation & Datasheet, Vibration Analyst
ID-BKP-ALL-3990-530077-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Blowdown calculation Process Study 14-Mar-23 1 5-Jan-23 1 Calculation & Datasheet, Vibration Analyst

ID-BKP-ALL-3990-530078-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Weight control report Project Management Study 1 week before delivery 1 5-Jan-23
1 GA drawing design

ID-BKP-ALL-3990-530079-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Max. acceptable nozzle force and moments Mechanical (Machinery) Specification Not supply separately 1 5-Jan-23
1 GA drawing review
ID-BKP-ALL-3990-530080-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Flexibility analysis for on skid piping Piping - Valves - Vessels Study 9-May-23 1 5-Jan-23
1 Calculation & Datasheet, Vibration Analyst
Utility calculation (balance) including Lube Oil Day Tanks and Cooling
ID-BKP-ALL-3990-530081-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Piping - Valves - Vessels Study 9-Apr-23 1 5-Jan-23
Water Expansion Tanks 1 Calculation & Datasheet, Vibration Analyst
ID-BKP-ALL-3990-530082-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Gas engine specific fuel consumption and exhaust emission data Mechanical (Machinery) Specification 14-Mar-23 1 5-Jan-23
1 Calculation & Datasheet, Vibration Analyst

ID-BKP-ALL-3990-530083-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Safety relief valve sizing and selection Process Study 14-Mar-23 1 5-Jan-23
1 Calculation & Datasheet, Vibration Analyst

ID-BKP-ALL-3990-530084-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Recycle valve sizing and selection Instrumentation Study Not supply separately 1 5-Jan-23
1 Calculation & Datasheet, Vibration Analyst
ELECTRICAL

ID-BKP-ALL-3990-530085-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% List Electrical Equipment Electrical List - Index - Schedule - Listing 28-Feb-23 1 5-Jan-23
1 Instrument air system

ID-BKP-ALL-3990-530086-P-BKP-21-001 0% Electrical General arrangement drawings Field Operations Specification 14-Mar-23

ID-BKP-ALL-3990-530087-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Single Line Diagram / Schematic Electrical Single Line Diagram 14-Mar-23 1 5-Jan-23
1 Electrical system
ID-BKP-ALL-3990-530088-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Electrical equipment data sheets Electrical Data sheet 14-Mar-23 1 5-Jan-23 1 GA drawing release
ID-BKP-ALL-3990-530089-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Detailed equipment information (technical documentation) Mechanical (Machinery) Data sheet Not supply separately 1 5-Jan-23 1 GA drawing release
ID-BKP-ALL-3990-530090-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Component/equipment obsolescence plan Field Operations Plan - Program 9-Apr-23 1 5-Jan-23 1 Electrical system
ID-BKP-ALL-3990-530091-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Arrangement details of electrical equipment Electrical Layout 14-Mar-23 1 5-Jan-23 1 Electrical system
ID-BKP-ALL-3990-530092-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Schematic diagrams of switchboards and control panels Instrumentation Logic Diagram 14-Mar-23 1 5-Jan-23 1 Electrical system
ID-BKP-ALL-3990-530093-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Layout of switchboards and control panels Instrumentation Layout Not supply separately 1 5-Jan-23 1 Electrical system
ID-BKP-ALL-3990-530094-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Load List Electrical Study 31-Jan-23 1 5-Jan-23 1 Calculation & Datasheet, Vibration Analyst
ID-BKP-ALL-3990-530095-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Chargers and batteries sizing calculation note Electrical Calculation note 28-Feb-23 1 5-Jan-23 1 Calculation & Datasheet, Vibration Analyst
ID-BKP-ALL-3990-530096-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% DC distribution schematic diagram Instrumentation Specification 14-Feb-23 1 5-Jan-23 1 Instrument system
ID-BKP-ALL-3990-530097-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Electrical Cable schedule Electrical Specification 9-Apr-23 1 5-Jan-23 1 Electrical system
ID-BKP-ALL-3990-530098-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Interconnection and external wiring diagrams Electrical Wiring Diagram 1 5-Jan-23 1 Electrical system
Installation drawings including equipment location, cable routing and cable
ID-BKP-ALL-3990-530099-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Electrical Loop Diagram 1 5-Jan-23
trays 1 Electrical system
Specification/data sheets/ product catalogue related to supplied
ID-BKP-ALL-3990-530100-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Field Operations Specification Not supply separately 1 5-Jan-23
equipment 1 Electrical system
Details drawings of battery terminal boxes including battery circuit breaker
ID-BKP-ALL-3990-530101-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Electrical Logic Diagram 1 5-Jan-23
box 1 Starting gas system

ID-BKP-ALL-3990-530102-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Earthing Diagram / Layout Electrical Guideline 1 5-Jan-23
1 Starting gas system

ID-BKP-ALL-3990-530103-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Hazardous & compliance certificate QA - QC - Certification Specification Not supply 1 5-Jan-23
1 Electrical system

ID-BKP-ALL-3990-530104-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Declaration of ATEX & associated dossier QA - QC - Certification Specification 2 week before delivery 1 5-Jan-23
1 Electrical system

ID-BKP-ALL-3990-530105-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Certification of Conformity for ATEX QA - QC - Certification Specification 2 week before delivery 1 5-Jan-23
1 Electrical system

ID-BKP-ALL-3990-530106-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Schedule of Electrical equipment in Hazardous area Electrical Specification Not supply separately 1 5-Jan-23
1 Electrical system
Electric Starter and Alternator schematic, general arrangement & its
ID-BKP-ALL-3990-530107-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Electrical General Arrangement 1 5-Jan-23
electrical specification/characteristic 1 Electrical system

ID-BKP-ALL-3990-530108-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Local Control Station Drawing Instrumentation List - Index - Schedule - Listing 28-Feb-23 1 5-Jan-23
1 Instrument air system

INSTRUMENTATION

General

Package functional analysis (including compressor, driver, fire and gas


ID-BKP-ALL-3990-530109-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Mechanical (Machinery) Study 9-Apr-23 1 5-Jan-23
system and all auxiliaries) 1 Calculation & Datasheet, Vibration Analyst
ID-BKP-ALL-3990-530110-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Instruments hook ups Instrumentation Logic Diagram 9-Apr-23 1 5-Jan-23
1 Instrument system
ID-BKP-ALL-3990-530111-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% All UCP & ECU general arrangements Instrumentation General Arrangement 28-Feb-23 1 5-Jan-23
1 Instrument system
ID-BKP-ALL-3990-530112-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% VDU displays (HMI video pages) Instrumentation Video Not supply separately 1 5-Jan-23 1 Instrument system

ID-BKP-ALL-3990-530113-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% PLC software Instrumentation Specification Not supply separately 1 5-Jan-23
1 Instrument system
ID-BKP-ALL-3990-530114-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% UCP & ECU factory tests procedure Instrumentation Procedure 6-Jun-23 1 5-Jan-23 1 Instrument system
ID-BKP-ALL-3990-530115-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Obsolescence dossier QA - QC - Certification Procedure 1 5-Jan-23 1 Main equipment system
ID-BKP-ALL-3990-530116-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% UCP & ECU Functional Design Specification Instrumentation Specification 9-Apr-23 1 5-Jan-23 1 Instrument system

ID-BKP-ALL-3990-530117-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% UCP & ECU Control Narrative (Software) Instrumentation Specification Not supply separately 1 5-Jan-23
1 Instrument system
ID-BKP-ALL-3990-530118-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% UCP & ECU Programming: Typical Function Blocks Instrumentation Specification Not supply separately 1 5-Jan-23 1 Instrument system
ID-BKP-ALL-3990-530119-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% SIL Certificate and Availability Data Instrumentation Specification 1-Aug-23 1 5-Jan-23 1 Instrument system
ID-BKP-ALL-3990-530120-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% UCP HMI Display Design Instrumentation Specification 23-May-23 1 5-Jan-23 1 Instrument system
ID-BKP-ALL-3990-530121-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Control/Instrument/equipment Supplier/Vendor Documentation Instrumentation Specification Not supply separately 1 5-Jan-23 1 Electrical system
ID-BKP-ALL-3990-530122-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Control/Instrument/Equipment ATEX Certification Instrumentation Specification Not supply separately 1 5-Jan-23 1 Electrical system
ID-BKP-ALL-3990-530123-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Power consumption calculation for UCP and instrumentation Electrical Study 14-Feb-23 1 5-Jan-23 1 Calculation & Datasheet, Vibration Analyst
ID-BKP-ALL-3990-530124-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% UCP HMI Display Operating Manual QA - QC - Certification Procedure Not supply separately 1 5-Jan-23 1 Instrument air system
ID-BKP-ALL-3990-530125-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Gas Lift Compressor Start-up Sequence Logic & Operating Manual Field Operations Procedure Not supply separately 1 5-Jan-23 1 Instrument system
ID-BKP-ALL-3990-530126-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Engine Controller Unit specification Instrumentation Specification Not supply separately 1 5-Jan-23 1 Electrical system
Data sheets 1 5-Jan-23 1 Instrument air system
Instrument data sheets include all sensors / transducers, transmitters,
ID-BKP-ALL-3990-530127-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Instrumentation Data sheet 14-Feb-23 1 5-Jan-23
switches, valves, gauges on skid compressor and engine. 1 GA drawing modification
Instrument & Control equipment vendor technical data, brochure, or
ID-BKP-ALL-3990-530128-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Instrumentation Data sheet 2 week before delivery 1 5-Jan-23
literature. 1 GA drawing modification
Instrument Datasheet (PSV, Pneumatic Valves,Control valve etc. it shall
ID-BKP-ALL-3990-530129-P-BKP-21-001 0% 14-Mar-23
be provided as well)

ID-BKP-ALL-3990-530130-P-BKP-21-001 0% Calculation (PSV, Control valve, orifice etc. it shall be provided as well) 14-Mar-23

Lists 1 5-Jan-23
1 Electrical system
ID-BKP-ALL-3990-530131-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Vibration and temperature PID Process Process and Instruments Diagram Not supply separately 1 5-Jan-23
1 PID design completed PID
ID-BKP-ALL-3990-530132-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Instruments list including service, range, set point trip, and alarm levels Instrumentation List - Index - Schedule - Listing 28-Mar-23 1 5-Jan-23 1 GA drawing release
ID-BKP-ALL-3990-530133-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Instruments and electrical cables Instrumentation List - Index - Schedule - Listing 14-Mar-23 1 5-Jan-23 1 GA drawing release
ID-BKP-ALL-3990-530134-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Modbus register/list including addressing Instrumentation List - Index - Schedule - Listing 25-Apr-23 1 5-Jan-23 1 GA drawing release
ID-BKP-ALL-3990-530135-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% I/O list Instrumentation List - Index - Schedule - Listing 1-Mar-23 1 5-Jan-23 1 Instrument air system
ID-BKP-ALL-3990-530136-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% List of engineering software Process List - Index - Schedule - Listing 1-Mar-23 1 5-Jan-23 1 Instrument air system
ID-BKP-ALL-3990-530137-P-BKP-21-001 0% Heat Dissipation Calculation 1-Mar-23

Drawings

ID-BKP-ALL-3990-530138-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Instrument location layout. Instrumentation Layout 14-Mar-23 1 5-Jan-23 1 Instrument system
ID-BKP-ALL-3990-530139-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% UCP arrangement Instrumentation General Arrangement Not supply separately 1 5-Jan-23 1 Instrument system
ID-BKP-ALL-3990-530140-P-BKP-21-001 0% Junction box wiring diagram 14-Mar-23

0% Diagrams

ID-BKP-ALL-3990-530141-P-BKP-21-001 0% Control system architecture 31-Jan-23

ID-BKP-ALL-3990-530142-P-BKP-21-001 0% Instrument Interconnecting diagram 1-Mar-23

ID-BKP-ALL-3990-530143-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Earthing diagrams Electrical Logic Diagram 1 5-Jan-23 1 Instrument system
ID-BKP-ALL-3990-530144-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Shutdown Logic diagrams Instrumentation Logic Diagram 9-Apr-23 1 5-Jan-23 1 Instrument system
ID-BKP-ALL-3990-530145-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Cause and effect chart Instrumentation List - Index - Schedule - Listing 28-Feb-23 1 5-Jan-23 1 Instrument air system
Status Document Document Progress Status

Document Type
Current Date

Submit Date
Last Update

% Progress

Discipline
Last Rev

Status
Document Number Document Title 0 Date Rev 0 0.1 Date Rev 0.1 0.2 Date Rev 0.2 0.3 Date Rev 0.3 1 Date Rev 1 1.1 Date Rev 1.1 1.2 Date Rev 1.2 1.3 Date Rev 1.3 2 Date Rev 2 2.1 Date Rev 2.1 2.2 Date Rev 2.3 2.3 Date Rev 2.3 3 Date Rev 3 Info Canceled Total Point Task Name
ID-BKP-ALL-3990-530146-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Instrument loop diagrams Instrumentation Logic Diagram 14-Mar-23 1 5-Jan-23 1 Instrument system
ID-BKP-ALL-3990-530147-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% UCP Wiring diagram Instrumentation Logic Diagram 14-Mar-23 1 5-Jan-23 1 Instrument air system
ID-BKP-ALL-3990-530148-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Junction boxes terminal strips Instrumentation Plan - Program Not supply separately 1 5-Jan-23 1 Instrument air system
ID-BKP-ALL-3990-530149-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Cable Block Diagram Electrical Logic Diagram 31-Jan-23 1 5-Jan-23 1 Instrument air system
Certificates

ID-BKP-ALL-3990-530150-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% IEC/ATEX Certificates Electrical Specification Not supply separately 1 5-Jan-23 1 Electrical system
ID-BKP-ALL-3990-530151-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% SIL Certificates Electrical Specification 2 week before delivery 1 5-Jan-23 1 Electrical system
ID-BKP-ALL-3990-530152-P-BKP-21-001 0% IP Certificates 2 week before delivery

ID-BKP-ALL-3990-530153-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Calibration Certificates QA - QC - Certification Specification 2 week before delivery 1 5-Jan-23 1 Electrical system
PIPING

General

ID-BKP-ALL-3990-530154-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Piping list and classes Piping - Valves - Vessels List - Index - Schedule - Listing 11-Apr-23 1 5-Jan-23 1 Electrical system
ID-BKP-ALL-3990-530155-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Piping layout Piping - Valves - Vessels Layout Not supply separately 1 5-Jan-23 1 Fuel gas system
ID-BKP-ALL-3990-530156-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Isometric drawings Piping - Valves - Vessels isometric 25-Apr-23 1 5-Jan-23 1 Fuel gas system
ID-BKP-ALL-3990-530157-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Tie in points list and location Piping - Valves - Vessels List - Index - Schedule - Listing Not supply separately 1 5-Jan-23 1 Electrical system
ID-BKP-ALL-3990-530158-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Piping list Piping - Valves - Vessels List - Index - Schedule - Listing Not supply separately 1 5-Jan-23 1 Electrical system
ID-BKP-ALL-3990-530159-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% List of valves (manual & Pneumatic valves & PSV) Civil Engineering List - Index - Schedule - Listing 9-Apr-23 1 5-Jan-23 1 Electrical system
ID-BKP-ALL-3990-530160-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% List of pressure vessels (including heat exchangers) Mechanical (Machinery) List - Index - Schedule - Listing 14-Mar-23 1 5-Jan-23 1 Electrical system
ID-BKP-ALL-3990-530161-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% List of SDV Instrumentation List - Index - Schedule - Listing Not supply separately 1 5-Jan-23 1 Electrical system
Data sheets

ID-BKP-ALL-3990-530162-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Valves data sheet Mechanical (Machinery) Data sheet Not supply separately 1 5-Jan-23 1 GA drawing release
ID-BKP-ALL-3990-530163-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Gas Coolers data sheets Mechanical (Machinery) Data sheet 25-Apr-23 1 5-Jan-23 1 GA drawing release
ID-BKP-ALL-3990-530164-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Oil heat exchanger data sheet Mechanical (Machinery) Data sheet 11-Apr-23 1 5-Jan-23 1 GA drawing release
ID-BKP-ALL-3990-530165-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Vessels Data Sheet (Scrubeer& Pulsation Bottles) Mechanical (Machinery) Data sheet 11-Apr-23 1 5-Jan-23 1 GA drawing release
ID-BKP-ALL-3990-530166-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Scrubbers’ data sheet Mechanical (Machinery) Data sheet Not supply separately 1 5-Jan-23 1 GA drawing review
ID-BKP-ALL-3990-530167-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Lube oil filters data sheets Mechanical (Machinery) Data sheet 11-Apr-23 1 5-Jan-23 1 GA drawing review
ID-BKP-ALL-3990-530168-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Make up lube oil datasheet Mechanical (Machinery) Data sheet 11-Apr-23 1 5-Jan-23 1 GA drawing review
Drawings

ID-BKP-ALL-3990-530169-P-BKP-21-001 0% PFD (Gas recycle drawing) Not supply separately

ID-BKP-ALL-3990-530170-P-BKP-21-001 0% Gas Coolers drawing (general arrangement and internals drawings) 18-Apr-23

ID-BKP-ALL-3990-530171-P-BKP-21-001 0% Vessels Drawings (Scrubeer& Pulsation Bottles) 25-Apr-23

ID-BKP-ALL-3990-530172-P-BKP-21-001 0% Pulsation bottles drawing (general arrangement and internals drawings) Not supply separately

ID-BKP-ALL-3990-530173-P-BKP-21-001 0% Oil coolers, filters, and tank drawings 18-Apr-23

Calculations & Performances data

ID-BKP-ALL-3990-530174-P-BKP-21-001 0% Calculation notes for safety relief valves 9-Apr-23


Pressure vessels calculation notes as per required construction code
ID-BKP-ALL-3990-530175-P-BKP-21-001 0 On Schedule 5-Jan-23 18-Jan-24 8% Piping - Valves - Vessels Study Not supply separately 1 5-Jan-23
and/or notified body 1 Cooling system
PROCUREMENT PLAN

WBS INFO MATERIAL RECIVING AT SITE


WEIGHT REQUIRED ON SITE (ROS DATE)
NO ITEM DESCRIPTION FACTOR SELECTED VENDOR REQUESITION NO PO NUMBER FLOAT (DAYS) REMARK
% ETA SITE SITE QC CHECK
DICIPLINE AREA UNIT

PLAN ACTUAL DATE DATE

A MECHANICAL - ROTATING 0.00%

1 Gas Compressor 0 0 0 0.00% 0.00% 0 0 Err:504 30-Dec-99 Err:504 Err:504 30-Dec-99


Gas Engine Include Fuel Gas System 0 0 0 0.00% 0.00% 0 0 30-Dec-99 30-Dec-99 30-Dec-99 0.00 30-Dec-99
Gas Cooler 0 0 0 0.00% 0.00% 0 0 30-Dec-99 30-Dec-99 30-Dec-99 0.00 30-Dec-99
Vessel 0 0 0 0.00% 0.00% 0 0 30-Dec-99 30-Dec-99 30-Dec-99 0.00 30-Dec-99
Vessel Internal Part 0 0 0 0.00% 0.00% 0 0 30-Dec-99 30-Dec-99 30-Dec-99 0.00 30-Dec-99
Coupling 0 0 0 0.00% 0.00% 0 0 30-Dec-99 30-Dec-99 30-Dec-99 0.00 30-Dec-99
Lube Oil System 0 0 0 0.00% 0.00% 0 0 30-Dec-99 30-Dec-99 30-Dec-99 0.00 30-Dec-99
Valve 0 0 0 0.00% 0.00% 0 0 30-Dec-99 30-Dec-99 30-Dec-99 0.00 30-Dec-99
Instrument & Control 0 0 0 0.00% 0.00% 0 0 30-Dec-99 30-Dec-99 30-Dec-99 0.00 30-Dec-99
Electrical 0 0 0 0.00% 0.00% 0 0 Err:504 30-Dec-99 Err:504 Err:504 30-Dec-99
Pipe, Flange, Fitting 0 0 0 0.00% 0.00% 0 0 Err:504 30-Dec-99 Err:504 Err:504 30-Dec-99
Consumable 0 0 0 0.00% 0.00% 0 0 Err:504 30-Dec-99 Err:504 Err:504 30-Dec-99
5t EOT CRANE for Chemical Storage Area (SNO-ME-9903) 0 0 0 0.00% 0.00% 0 0 Err:504 30-Dec-99 Err:504 Err:504 30-Dec-99
3 x 5t for Mechanical Workshop/Warerhouse/Open Area (SNO-ME-9904A/B) 0 0 0 0.00% 0.00% 0 0 Err:504 30-Dec-99 Err:504 Err:504 30-Dec-99
2 x 3t for Instrument & Electrical Workshop (SNO-ME-9905A/B) 0 0 0 0.00% 0.00% 0 0 Err:504 30-Dec-99 Err:504 Err:504 30-Dec-99

TOTAL PROCUREMENT #REF!

APPROVED BY,

Project Manager ABM / JEREH

36 of 39
PROCUREMENT PLAN

WBS INFO COST INFORMATION MANUFACTURING TRANSPORTATION MATERIAL REQUEST FOR QUOTATION PO AWARD ENGINEERING DOCUMENT MAJOR MATERIAL EXWORK/ FOB DELIVERY FINAL INSPECTION TEST OCEAN TRANSPORTATION MATERIAL RECIVING AT SITE FINAL VENDOR DOC
LONG LEAD TECHNICAL BID EVALUATION
WEIGHT READY ON SITE
(DELIVERY (DURATION > 40 MILESTONE CONTRACT REQUIRED ON SITE (ROS DATE)
NO ITEM DESCRIPTION FACTOR SELECTED VENDOR IMPORT/ PERMIT + REQUESITION NO PO NUMBER RFQ ISSUED DATE RFQ ISSUED DATE RECEIVED VENDOR RECEIPT BY VENDOR @ VENDOR SHOP/ FOB MILESTONE FLOAT (DAYS) REMARK
QTY UNIT LOCAL IMPORTED TOTAL COST % TERM ORIGIN MANUFACTURING JAKARTA PORT JKT - SITE TOTAL TIME) WEEKS) ISSUED TO JOB APPROVED BY JOB PO AWARD RECEIPT OF VENDOR ENG DOC MANF DUR FINAL INSPECTION TEST ORIGIN - SBY @ SBY PORT READY FOR SHIPMENT DURATION UP
ETA SITE SITE QC CHECK FINAL VENDOR DOC
DICIPLINE AREA UNIT LOCAL CLEARANCE FROM ENG TO VENDOR QUOTATION MAJOR MATERIAL PORT TO BKP TO SITE CONTRACT

USD USD USD Month Week Day Day Day Week Week Week PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL DATE ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL WEEK PLAN ACTUAL PLAN ACTUAL DAYS DATE DATE WEEK PLAN ACTUAL DATE PLAN ACTUAL DATE DATE

B MECHANICAL - ROTATING 0.00%

1 Gas Compressor 2 Unit FOB Belgium Import 12 53 35 30 7 11 64 LL Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 35 Err:504 Err:504 64 Err:504 Err:504 Err:504 30-Dec-99 Err:504
Gas Engine Include Fuel Gas System
Gas Cooler
Vessel
Vessel Internal Part
Coupling
Lube Oil System
Valve
Instrument & Control
Electrical Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Pipe, Flange, Fitting 2 Unit FOB IDN Local 6 27 0 30 7 6 33 NO Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0 Err:504 Err:504 33 Err:504 Err:504 Err:504 30-Dec-99 Err:504
Consumable 1 Unit FOB IDN Local 6 27 0 30 7 6 33 NO Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0 Err:504 Err:504 33 Err:504 Err:504 Err:504 30-Dec-99 Err:504
5t EOT CRANE for Chemical Storage Area (SNO-ME-9903) 1 Unit FOB IDN Local 6 27 0 30 7 6 33 NO Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0 Err:504 Err:504 33 Err:504 Err:504 Err:504 30-Dec-99 Err:504
3 x 5t for Mechanical Workshop/Warerhouse/Open Area (SNO-ME-9904A/B) 1 Unit FOB IDN Local 6 27 0 30 7 6 33 NO Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0 Err:504 Err:504 33 Err:504 Err:504 Err:504 30-Dec-99 Err:504
2 x 3t for Instrument & Electrical Workshop (SNO-ME-9905A/B) 1 Unit FOB IDN Local 6 27 0 30 7 6 33 NO Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0 Err:504 Err:504 33 Err:504 Err:504 Err:504 30-Dec-99 Err:504

TOTAL PROCUREMENT #REF! #REF!

ACKNOWLEDGE BY, APPROVED BY,

Engineering Manager/Site Manager Project Manager ABM / JEREH

37 of 39
DATA ENTRY ( ACTUAL WORK ) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

2022 2023 2024


Task name % WF Progress Actual
W1 W2 W3 W4 W5 W6 W7 W8 W9 W 10 W 11 W 12 W 13 W 14 W 15 W 16 W 17 W 18 W 19 W 20 W 21 W 22 W 23 W 24 W 25 W 26 W 27 W 28 W 29 W 30 W 31 W 32 W 33 W 34 W 35 W 36 W 37 W 38 W 39 W 40 W 41 W 42 W 43 W 44 W 45 W 46 W 47 W 48 W 49 W 50 W 51 W 52 W 53 W 54 W 55 W 56 W 57 W 58 W 59 W 60 W 61
% Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Project Contract Award 0.04% 0.00%
% Progress 0.00% 12.00%
% Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Internal Kick-off meeting 0.04% 0.00%
% Progress 0.00% 12.00%
Engineering 9.92% 0.10% % Bobot 0.00% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Product design 1.49% 0.01% % Bobot 0.00% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PID design completed PID 0.21% % Progress 0.00% 1.00%
Calculation & Datasheet, Vibration Analyst 0.41% 0.00% 1.00%
GA drawing design 0.41% 0.00% 1.00%
GA drawing review 0.21% 0.00% 1.00%
GA drawing modification 0.21% 0.00% 1.00%
GA drawing release 0.04% 0.00% 1.00%
Detail drawing design 8.43% 0.08% % Bobot 0.00% 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Skid system 0.83% 0.00% 1.00%
Main equipment system 0.83% 0.00% 1.00%
Process gas system 0.83% 0.00% 1.00%
Lubrication system 0.83% 0.00% 1.00%
Instrument system 0.83% 0.00% 1.00%
Instrument air system 0.83% 0.00% 1.00%
% Progress
Cooling system 0.83% 0.00% 1.00%
Fuel gas system 0.83% 0.00% 1.00%
Starting gas system 0.83% 0.00% 1.00%
Electrical system 0.83% 0.00% 1.00%
BOM release 0.08% 0.00% 1.00%
Design output file release 0.08% 0.00% 1.00%
Procurement 60.00% 0.53% % Bobot 0.00% 0.53% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Material purchase 54.69% 0.53% % Bobot 0.00% 0.53% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Construction Material 53.10% 0.53% % Bobot 0.00% 0.53% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Compressor 6.98% 0.00% 1.00%
Engine 6.98% 0.00% 1.00%
Skid 3.88% 0.00% 1.00%
Coupling 4.65% 0.00% 1.00%
Valve 4.65% 0.00% 1.00%
Instrument 4.65% % Progress 0.00% 1.00%
Electrical parts 4.65% 0.00% 1.00%
Flange, pipe fitting 3.88% 0.00% 1.00%
Pressure vessel 4.65% 0.00% 1.00%
Air cooler 4.65% 0.00% 1.00%
Other materials 3.49% 0.00% 1.00%
% Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Years Spare part 1.59% 0.00%
% Progress 0.00% 0.00%
Compressor Package manufacture and assmbly 3.02% 0.00% % Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Main equipment system 0.31% 0.00% % Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Compressor & Coupling installation 0.08% 0.00% 0.00%
Engine installation 0.08% % Progress 0.00% 0.00%
Grouting 0.16% 0.00% 0.00%
Process gas system 1.16% 0.00% % Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Pressure vessel installation 0.04% 0.00% 0.00%
Fitting up piping 0.19% 0.00% 0.00%
Piping welding 0.23% 0.00% 0.00%
NDT of piping 0.23% % Progress 0.00% 0.00%
Hydrostatic test of piping 0.16% 0.00% 0.00%
Piping sandblasting & painting 0.19% 0.00% 0.00%
Assembly of piping 0.12% 0.00% 0.00%
% Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Electrical system 0.78% 0.00%
% Progress 0.00% 0.00%
% Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Other system 0.78% 0.00%
% Progress 0.00% 0.00%
Test Final inspection 0.97% 0.00% % Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Leakage test 0.08% 0.00% 0.00%
FAT 0.27% 0.00% 0.00%
% Progress
Final inspection & Improvement(such as Clean and paint repair) 0.08% 0.00% 0.00%
Prepare for Ex-W Document 0.54% 0.00% 0.00%
Packing and Transportation(CIF) 0.66% 0.00% % Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Packing 0.27% 0.00% 0.00%
% Progress
CIF Jakarta 0.39% 0.00% 0.00%
% Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Custom Clearance 0.39% 0.00%
% Progress 0.00% 0.00%
% Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Mobilization to EPCI Yard 0.27% 0.00%
% Progress 0.00% 0.00%
Site Construction 21.43% 0.00% % Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
% Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Erection & Installation 10.00% 0.00%
% Progress 0.00% 0.00%
Tie-in to Existing Facility 11.43% 0.00% % Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Piping 5.00% 0.00% 0.00%
Insrument 5.00% % Progress 0.00% 0.00%
Electrical 1.43% 0.00% 0.00%
Commissioning & Start-Up 8.57% 0.00% % Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
% Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Precommisioning 3.57% 0.00%
% Progress 0.00% 0.00%
% Bobot 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Commisioning & Start-Up & Monitoring 5.00% 0.00%
% Progress 0.00% 0.00%
Total 100.00% 0.64%
Cummulative Actual Progress 0.00% 0.64% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Progress Report ( For Persentation Purpose )

Weight Last Week Achievement This Week


Task name
Factor
Plan Actual Plan Actual Plan Actual
Project Contract Award 0,04% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%
Internal Kick-off meeting 0,04% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%
Engineering
Product design 1,49% 0,00% 0,00% 0,00% 0,01% 0,00% 0,01%
Detail drawing design 8,43% 0,00% 0,00% 0,00% 0,08% 0,00% 0,08%
Procurement
Material purchase 54,69% 0,00% 0,00% 0,02% 0,53% 0,02% 0,53%
Compressor Package manufacture and assmbly 3,02% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%
Test Final inspection 0,97% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%
Packing and Transportation(CIF) 0,66% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%
Custom Clearance 0,39% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%
Mobilization to EPCI Yard 0,27% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%
Site Construction
Erection & Installation 10,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%
Tie-in to Existing Facility 11,43% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%
Commissioning & Start-Up
Precommisioning 3,57% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%
Commisioning & Start-Up & Monitoring 5,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%
0,00% 0,00% 0,02% 0,64% 0,02% 0,64%
Total 100,00%
0,00% 0,62% 0,62%

S-Curve

s-curve

110.00%

90.00%

70.00%
Progress (%)

50.00%

30.00%

10.00%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
Planning 0.00% 0.71% 1.97% 3.33% 4.53% 5.62% 7.81% 11.63% 15.56% 19.71% 23.31% 25.76% 28.38% 31.39% 34.39% 37.39% 40.39% 43.40% 46.40% 49.40% 52.40% 55.40% 58.41% 61.41% 64.41% 67.41% 70.41% 73.42% 76.42% 79.26% 81.88% 84.33% 86.52% 87.94% 88.81% 89.36% 89.90% 90.34% 91.16% 92.03% 93.18% 94.00% 94.27% 94.81% 95.36% 95.85% 96.12% 96.40% 96.67% 96.94% 97.22% 97.49% 97.76% 98.03% 98.03% 98.31% 98.80% 99.34% 99.62% 99.89% 100.00
%

You might also like