You are on page 1of 17

Aprobado

cgonzalezt, 25-10-2023, 9:00:27

河北万生环保工程有限公司
He Bei WanSheng environmentai protection engineering co.ltd
Aprobado
cgonzalezt, 25-10-2023, 9:00:27

ELEVATION

河北万生环保工程有限公司
He Bei WanSheng environmentai protection engineering co.ltd
TAG REMARKS SIZE QUANTITY NOZZLE LENGTH NOZZLE LENGTH ANGLE(°) MATERIAL
ELEVATION
INSIDE(mm) OUT INSIDE(mm)

N1 WATRE INLET DN150 1 / 200 mm 240° 9100 mm HDG


N2 OUTLET DN150 1 / 200 mm 225° 500 mm HDG
N3 OVERFLOW DN150 1 / 200 mm 120° 9300mm HDG
N4 FILLING LINE DN50 1 / 200 mm 90° 400mm HDG
E1/E2 LIQUID LEVEL GAUGE DN20 1 / 200 mm 198.21° 550mm/9300mm HDG
M1 MANWAY DN600 1 / 200 mm 282.86° 683mm HDG

282.86°
0° 270° 240° 225° 180° 120° 90° 0°
Aprobado 198.21°
cgonzalezt, 25-10-2023, 9:00:27

N1 E2 N3

M1 N2
E1 N4
0.00

河北万生环保工程有限公司
He Bei WanSheng environmentai protection engineering co.ltd

PLAN VIEW
TAG REMARKS SIZE QUANTITY NOZZLE LENGTH NOZZLE LENGTH ANGLE(°) MATERIAL
ELEVATION
INSIDE(mm) OUT INSIDE(mm)

N1 WATRE INLET DN150 1 / 200 mm 240° 9100 mm HDG


N2 OUTLET DN150 1 / 200 mm 225° 500 mm HDG
N3 OVERFLOW DN150 1 / 200 mm 120° 9300mm HDG
N4 FILLING LINE DN50 1 / 200 mm 90° 400mm HDG
E1/E2 LIQUID LEVEL GAUGE DN20 1 / 200 mm 198.21° 550mm/9300mm HDG
M1 MANWAY DN600 1 / 200 mm 282.86° 683mm HDG


Aprobado
cgonzalezt, 25-10-2023, 9:00:27
N3

N4
M1

270° 90°

N3
N1

N2 E1/E2
180°
河北万生环保工程有限公司
He Bei WanSheng environmentai protection engineering co.ltd

PURLIN LAYOUT
0° 270° 180° 90° 0°

270° 90°

180°

河北万生环保工程有限公司
He Bei WanSheng environmentai protection engineering co.ltd

Aprobado
cgonzalezt, 25-10-2023, 9:00:27
0° 270°251.78° 180° 90° 71.78°
354.64° 331.07° 311.78° 288.21° 211.07° 174.64° 151.07° 131.78° 108.21° 31.07° 0°

270° 90°

180°

河北万生环保工程有限公司
He Bei WanSheng environmentai protection engineering co.ltd
Aprobado
cgonzalezt, 25-10-2023, 9:00:27
Purlin Layout

270° 90°

A-A
BIRD AND INSECT PROOFING DETAIL

180°

ROOF PLATE DETAILS

TANK ROOF PLAN VIEW

河北万生环保工程有限公司
He Bei WanSheng environmentai protection engineering co.ltd

Aprobado
cgonzalezt, 25-10-2023, 9:00:27
ELECTRIC DRILL
THE THIRD STEP

THE FIRST STEP THE SECOND STEP

GET RID OF PREVIOUS SILICONE


WASHER WHEN USING ISOLATION GASKET

THE END

TANK ROOF PLATE CONNECTION

河北万生环保工程有限公司
Aprobado
He Bei WanSheng environmentai protection engineering co.ltd

cgonzalezt, 25-10-2023, 9:00:27


Aprobado
cgonzalezt, 25-10-2023, 9:00:27

河北万生环保工程有限公司
He Bei WanSheng environmentai protection engineering co.ltd

Straight ladder assembly


Aprobado
cgonzalezt, 25-10-2023, 9:00:27

( )

TANK FOUNDATION-REBATE CONSTRUCTION

NOTICE:
1、THIS FIGURE ONLY PROVIDES CONNECTION MODE, CAN NOT
BE USED AS CONSTRUCTION DRAWINGS (FOR REFERENCE ONLY)
2、AFTER THE ERECTION OF THE MAIN TANK BODY
FINISHED,PUT THE ANGLES AT THE GROOVE,WILL FIX THEM TO
THE FOUNDATION AT THE LOCATIONS OF THE HOLES RESERVED
FOR THE OUTSIDE ANGLES,THIS WILL SATISFY THE USING 河北万生环保工程有限公司
REQUIREMENTS BY ONLY USING OUTSIDE ANGLES,NO NEED TO He Bei WanSheng environmentai protection engineering co.ltd

USE INSIDE ANGLES TO FIX,AFTER THEY ARE FIXED,WE WILL


USE CONCRETE FOR THE SECONDARY POURING OF THE
GROOVE,AND THEN DO THE WATERPROOF WORK IN THE TANK.
Aprobado
cgonzalezt, 25-10-2023, 9:00:27

河北万生环保工程有限公司
He Bei WanSheng environmentai protection engineering co.ltd
Aprobado
cgonzalezt, 25-10-2023, 9:00:27

SIDEWALL SEALANT DETAILED

河北万生环保工程有限公司
He Bei WanSheng environmentai protection engineering co.ltd
SINGLE FLANGE NOZZLE
(HDG)

Aprobado
cgonzalezt, 25-10-2023, 9:00:27

DN600 MANWAY
(HDG)

河北万生环保工程有限公司
He Bei WanSheng environmentai protection engineering co.ltd


MANWAY & FLANGE NOZZLE
Aprobado
cgonzalezt, 25-10-2023, 9:00:27

河北万生环保工程有限公司
He Bei WanSheng environmentai protection engineering co.ltd
Aprobado
cgonzalezt, 25-10-2023, 9:00:27

河北万生环保工程有限公司
He Bei WanSheng environmentai protection engineering co.ltd
Aprobado
cgonzalezt, 25-10-2023, 9:00:27
Aprobado
cgonzalezt, 25-10-2023, 9:00:27

You might also like