APPLICANT NAME Vincent Warren Holloway

Annexure A1 – Project Profile

PROJECT 1

Name of project Espadon Marine ELIDZ Kob Farm

Type and description of project Principle Contractor & Internal Works &
Concrete, Formwork

Geographic location of project 33° 3'30.44"S, 27°51'24.19"E

Name of client and position and contact details Liam Ryan & Managing Director & Marketing &
of client representative 071 323 1764

List of participating organisations /

Year started and year completed (or planned


2012 & 2012
completed date)

Original completion date 2012

Actual completion date 2012

Percentage of practical completion 100%

Total value of project R 2 200 000.00

Percentage participation of your organisation in


100%
the project

Your specific role in the project Principle Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 2

Name of project Buffalo Toyota

Type and description of project Contractor & Internal Services & Roadworks,
Paving

Geographic location of project 32°56'52.54"S, 27°55'19.40"E

Name of client and position and contact details Steinhoff Properties & Sawgrass Consulting &
of client representative Tony Liebold & 0835655256

List of participating organisations NMC Construction Group

Year started and year completed (or planned 2011 & 2012
completed date)

Original completion date 2012

Actual completion date 2012

Percentage of practical completion 100%

Total value of project R 6 000 000.00

Percentage participation of your organisation in


75%
the project

Your specific role in the project Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 3

Name of project ELIDZ Erf 60930

Type and description of project Contractor & Roadworks, Paving Services

Geographic location of project 33° 3'8.51"S, 27°51'16.65"E

Name of client and position and contact details Nampak & SBA Consulting & Jorrie Jordaan &
of client representative 041 363 0598

List of participating organisations Aveng (Grinaker-LTA)

Year started and year completed (or planned


2011 & 2012
completed date)

Original completion date 2012

Actual completion date 2012

Percentage of practical completion 100%

Total value of project R 6 400 000.00

Percentage participation of your organisation in


50%
the project

Your specific role in the project Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 4

Name of project ELIDZ Automotive Supplier Park Ph 6

Type and description of project Contractor & Roadworks, Paving Services


Geographic location of project 33° 3'34.12"S, 27°50'56.72"E

Name of client and position and contact details ELIDZ Automotive Supplier Park & GOBA /
of client representative Lukhozi Consulting Engineers (PTY) LTD & Pat
Steele & 043 721 1321

List of participating organisations Stefanutti Stocks

Year started and year completed (or planned


2012 & 2012
completed date)

Original completion date 2012

Actual completion date 2012

Percentage of practical completion 100%

Total value of project R 16 200 000.00

Percentage participation of your organisation in


50%
the project

Your specific role in the project Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 5

Name of project MTN Remote Hub West Bank

Type and description of project Contractor & Roadworks

Geographic location of project 33° 2'16.89"S, 27°52'17.79"E

Name of client and position and contact details Blue Pencil Trading 4 cc & Sawgrass Consulting &
of client representative Tony Liebold & 0835655256

List of participating organisations Sawgrass Consulting

Year started and year completed (or planned


2012 & 2012
completed date)

Original completion date 2012

Actual completion date 2012

Percentage of practical completion 100%

Total value of project R 1 500 000.00


Percentage participation of your organisation in
25%
the project

Your specific role in the project Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 6

Name of project Kidds Beach

Type and description of project Principle Contractor & Earthworks - Services,


Roadworks

Geographic location of project 33° 8'52.39"S, 27°41'22.59"E

Name of client and position and contact details Pacific Eagle Developers & Lukhozi Consulting
of client representative Engineers (PTY) LTD & John Hayne & 043 721
1321

List of participating organisations /

Year started and year completed (or planned


2012 & 2012
completed date)

Original completion date 2012

Actual completion date 2012

Percentage of practical completion 100%

Total value of project R 5 500 000.00

Percentage participation of your organisation in


100%
the project

Your specific role in the project Principle Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 7

Name of project Royal Park Development Amalinda

Type and description of project Principle Contractor & Earthworks - Services,


Roadworks

Geographic location of project 33° 0'9.39"S, 27°51'8.80"E

Name of client and position and contact details MANUNIX (PTY) LTD & Andre Bain & 012 345
of client representative 6309
List of participating organisations /

Year started and year completed (or planned


completed date) 2013 & 2013

Original completion date 2013

Actual completion date 2013

Percentage of practical completion 100%

Total value of project R 6 600 000.00

Percentage participation of your organisation in


100%
the project

Your specific role in the project Principle Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 8

Name of project Nando's - Amalinda

Type and description of project Contractor & Earthworks - Services, Layer works

Geographic location of project 32°59'35.11"S, 27°51'58.18"E

Name of client and position and contact details Nando's & Sonnekus & Toerien CC Consulting
of client representative Engineers & Willie van der Merwe & 043 726
0025

List of participating organisations Lewcon Construction

Year started and year completed (or planned


completed date) 2013 & 2013

Original completion date 2013

Actual completion date 2013

Percentage of practical completion 100%

Total value of project R 1 100 000.00

Percentage participation of your organisation in


the project 25%

Your specific role in the project Contractor - CHSO - Duties

Was the project successfully completed Yes


PROJECT 9

Name of project ELIDZ RG Brose Factory

Type and description of project Principle Contractor & Bulk Earthworks, Services

Geographic location of project 33° 3'11.59"S, 27°51'9.54"E

Name of client and position and contact details ELIDZ RG Brose Factory & Dobie Consulting &
of client representative Len Dobie & 082 444 6918

List of participating organisations /

Year started and year completed (or planned


completed date) 2013 & 2013

Original completion date 2013

Actual completion date 2013

Percentage of practical completion 100%

Total value of project R 5 350 000.00

Percentage participation of your organisation in


the project 100%

Your specific role in the project Principle Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 10

Name of project Palm Square - Entrance Roadway

Type and description of project Principle Contractor & Earthworks - Services,


Layer works

Geographic location of project 32°57'25.13"S, 27°56'0.10"E

Name of client and position and contact details Mist Mountain Trading & Sonnekus & Toerien
of client representative CC Consulting Engineers & Willie van der Merwe
& 043 726 0025

List of participating organisations /

Year started and year completed (or planned


completed date) 2013 & 2013

Original completion date 2013

Actual completion date 2013


Percentage of practical completion 100%

Total value of project R 285 000.00

Percentage participation of your organisation in


the project 100%

Your specific role in the project Principle Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 11

Name of project ELIDZ Freiderich Boysen Factory

Type and description of project Principle Contractor & Bulk Earthworks

Geographic location of project 33° 3'6.25"S, 27°51'5.39"E

Name of client and position and contact details ELIDZ Freiderich Boysen & Sonnekus & Toerien
of client representative CC Consulting Engineers & Willie van der Merwe
& 043 726 0025

List of participating organisations

Year started and year completed (or planned


completed date) 2013 & 2013

Original completion date 2013

Actual completion date 2013

Percentage of practical completion 100%

Total value of project R 5 700 000.00

Percentage participation of your organisation in


the project 100%

Your specific role in the project Principle Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 12

Name of project Frere Hospital - Ph 3E

Type and description of project Contractor & Earthworks - Services, Roadworks

Geographic location of project 32°59'39.71"S, 27°53'31.13"E


Name of client and position and contact details Department of Health & Worley Parsons & Fanie
of client representative du Toit & 043 721 0055

List of participating organisations Aveng Grinaker-LTA

Year started and year completed (or planned


completed date) 2013 & 2015

Original completion date 2015

Actual completion date 2015

Percentage of practical completion 100%

Total value of project R 3 000 000.00

Percentage participation of your organisation in


the project 12%

Your specific role in the project Principle Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 13

Name of project ELIDZ Zone 1B Infrastructure

Type and description of project Contractor & Roadworks, Services, Retaining


Walls

Geographic location of project 33° 3'11.93"S, 27°49'57.62"E

Name of client and position and contact details


of client representative Masilakhe Consulting

List of participating organisations VDZ Construction (PTY) LTD

Year started and year completed (or planned


completed date) 2012 & (2013)

Original completion date 2013

Actual completion date 2014

Percentage of practical completion 100%

Total value of project R 35 000 000.00

Percentage participation of your organisation in


the project 90%

Your specific role in the project Contractor - CHSO - Duties


Was the project successfully completed Yes

PROJECT 14

Name of project Cedar Square

Type and description of project Contractor & Earthworks - Services, Layer works
& Paving

Geographic location of project 32°57'29.49"S, 27°56'3.58"E

Name of client and position and contact details Mist Mountain Trading & Sonnekus & Toerien
of client representative CC Consulting Engineers & Willie van der Merwe
& 043 726 0025

List of participating organisations Lewcon Construction

Year started and year completed (or planned


completed date) 2013 & 2013

Original completion date 2013

Actual completion date 2013

Percentage of practical completion 100%

Total value of project R 1 500 000.00

Percentage participation of your organisation in


the project 75%

Your specific role in the project Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 15

Name of project Cecelia Makiwane Hospital Phase 4C

Type and description of project Contractor & Earthworks - Services, Roadworks

Geographic location of project 32°55'49.76"S, 27°44'31.72"E

Name of client and position and contact details Department of Health & UWP Consulting (Pty)
of client representative Ltd & Steve Richter & 043 721 0186

List of participating organisations Stefanutti Stocks Building Eastern Cape

Year started and year completed (or planned 2011 & (2015)
completed date)
Original completion date 2014

Actual completion date 2016

Percentage of practical completion 100%

Total value of project R 52 000 000.00

Percentage participation of your organisation in


the project 25%

Your specific role in the project Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 16

Name of project Buffalo City Metropolitan Municipality -


Mdantsane Roadworks

Type and description of project Principle Contractor & Bulk Earthworks

Geographic location of project 32°57'14.52"S, 27°44'21.15"E

Name of client and position and contact details Buffalo City Metropolitan Municipality & Gibb
of client representative Africa Consulting Engineers & Steve Schroeder &
043 706 3600

List of participating organisations /

Year started and year completed (or planned


completed date) 2014 & 2014

Original completion date 2014

Actual completion date 2014

Percentage of practical completion 100%

Total value of project R 5 000 000.00

Percentage participation of your organisation in


the project 100%

Your specific role in the project Principle Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 17

Name of project AJ North


Type and description of project Contractor & Bulk earthworks to Platform

Geographic location of project 33° 2'19.46"S, 27°52'32.77"E

Name of client and position and contact details Decoct Trust (Kempston) & Mike Victor & 043
of client representative 707 1718

List of participating organisations Lewcon Construction - Rod Phillips 043 701 3900

Year started and year completed (or planned


completed date) 2014 & 2014

Original completion date 2014

Actual completion date 2014

Percentage of practical completion 100%

Total value of project R 550 000.00

Percentage participation of your organisation in


the project 100%

Your specific role in the project Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 18

Name of project Specialised Petroleum Products

Type and description of project Contractor & Bulk earthworks to Platform

Geographic location of project 33° 2'7.22"S, 27°52'36.79"E

Name of client and position and contact details SPECIALISED PETROLEUM PRODUCTS (PTY) LTD
of client representative & M and B Project Services CC & PM Booysen &
043 735 2455

List of participating organisations /

Year started and year completed (or planned


completed date) 2014 & 2015

Original completion date 2015

Actual completion date 2015

Percentage of practical completion 100%

Total value of project R 550 000.00


Percentage participation of your organisation in
the project 100%

Your specific role in the project Principle Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 19

Name of project Chinatown Intersection

Type and description of project Principle Contractor & Roadworks and paving,
minor concrete works and services

Geographic location of project 32°57'4.64"S, 27°55'50.09"E

Name of client and position and contact details Roach Eraser (Pty) Ltd & Lee-Ann Nel & Project
of client representative Administrator & 043 706 3600

List of participating organisations /

Year started and year completed (or planned


completed date) 2014 & 2014

Original completion date 2014

Actual completion date 2014

Percentage of practical completion 100%

Total value of project R 1 150 000.00

Percentage participation of your organisation in


the project 100%

Your specific role in the project Principle Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 20

Name of project SASOL Abbotsford

Type and description of project Principle Contractor & Earthworks - Services,


Layer works

Geographic location of project 32°57'44.44"S, 27°55'6.75"E

Name of client and position and contact details SASOL Abbotsford & N.C. Fish & Associates &
of client representative Nigel Fish & Engineer & 082 604 5544

List of participating organisations /


Year started and year completed (or planned
completed date) 2013 & 2014

Original completion date 2014

Actual completion date 2014

Percentage of practical completion 100%

Total value of project R 2 270 000.00

Percentage participation of your organisation in


the project 100%

Your specific role in the project Principle Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 21

Name of project Cambridge Astro Turf

Type and description of project Principle Contractor & Astro Turf Layer works

Geographic location of project 32°59'0.29"S, 27°52'57.86"E

Name of client and position and contact details Cambridge High School & Sinakho Consulting &
of client representative Garth Luyt & 043 726 4389

List of participating organisations /

Year started and year completed (or planned


completed date) 2015 & 2015

Original completion date 2015

Actual completion date 2015

Percentage of practical completion 100%

Total value of project R 2 650 000.00

Percentage participation of your organisation in


the project 100%

Your specific role in the project Principle Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 22
Name of project Stirling Astro Turf

Type and description of project Principle Contractor & Astro Turf Layer works

Geographic location of project 32°59'32.64"S, 27°55'27.71"E

Name of client and position and contact details Stirling High School & Sinakho Consulting &
of client representative Garth Luyt & 043 726 4389

List of participating organisations /

Year started and year completed (or planned


completed date) 2015 & 2015

Original completion date 2015 (2015)

Actual completion date 2015

Percentage of practical completion 100%

Total value of project R 3 200 000.00

Percentage participation of your organisation in


the project 100%

Your specific role in the project Principle Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 23

Name of project Phezula Views Phase 1

Type and description of project Principle Contractor & Civil Infrastructure -


Pipelines & Roadworks

Geographic location of project 32°57'9.48"S, 27°54'43.90"E

Name of client and position and contact details Wildcoastgetafix cc & Anthony Suter & 043 745
of client representative 0020

List of participating organisations S2 Builders

Year started and year completed (or planned


completed date) 2015 (2015)

Original completion date 2015

Actual completion date

Percentage of practical completion 100%


Total value of project R 3 500 000.00

Percentage participation of your organisation in


the project 100%

Your specific role in the project Principle Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 24

Name of project Hudson Park High School

Type and description of project Principle Contractor & Roadworks and paving,
minor concrete works and services

Geographic location of project 32°59'10.95"S, 27°54'59.62"E

Name of client and position and contact details Hudson Park High School & Andrew Harrison &
of client representative 043 726 4389

List of participating organisations /

Year started and year completed (or planned


completed date) 2015 & (2016)

Original completion date 2016

Actual completion date 2016

Percentage of practical completion 100%

Total value of project R 3 000 000.00

Percentage participation of your organisation in


the project 100%

Your specific role in the project Principle Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 25

Name of project E Cape Dept Roads & PW Wriggleswade Dam


Road Stutterheim Area

Type and description of project Contractor & Layer works & Roadworks

Geographic location of project 32°59'36.1"S, 27°55'30.6"E

Name of client and position and contact details Royal Haskoning DHV & S. Kaffka & 043 7073000
of client representative
List of participating organisations /

Year started and year completed (or planned


completed date) 2016 & (2016)

Original completion date 2016

Actual completion date 2016

Percentage of practical completion 100%

Total value of project R 3 060 000.00

Percentage participation of your organisation in


the project 95%

Your specific role in the project Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 26

Name of project Cedar Square Slip Road

Type and description of project Principle Contractor & Earthworks, roadworks,


services

Geographic location of project 32°57'29.49"S, 27°56'3.58"E

Name of client and position and contact details Misty Mountain Trading & ST Consulting
of client representative Engineers & Willie van der Merwe & 043 726
0025

List of participating organisations /

Year started and year completed (or planned


completed date) 2016 & (2016)

Original completion date 2016

Actual completion date 2016

Percentage of practical completion 100%

Total value of project R 1 360 000.00

Percentage participation of your organisation in


the project 100%

Your specific role in the project Principle Contractor - CHSO - Duties

Was the project successfully completed Yes


PROJECT 27

Name of project Waterside Retirement Complex Phase 1 -


Crossways

Type and description of project Principle Contractor & Earthworks, roadworks,


services

Geographic location of project 32°54'28,53" S 28°01'15,08" E

Name of client and position and contact details Soleprops PTY LTD & Craig Lindhorrst & 083 268
of client representative 3841

List of participating organisations /

Year started and year completed (or planned


completed date) 2015 & (2016)

Original completion date 2016

Actual completion date 2016

Percentage of practical completion 100%

Total value of project R 2 800 000.00

Percentage participation of your organisation in


the project 100%

Your specific role in the project Principle Contractor - CHSO - Duties

Was the project successfully completed Yes

PROJECT 26

Name of project BCMM - Mdantsane Roadworks Cluster 2

Type and description of project Contractor & Construction of Upgrading of


Gravel Roads - Layer works, Kerbing &
Stormwater

Geographic location of project 32°55'55.95"S, 27°43'50.51"E

Name of client and position and contact details Buffalo City Metropolitan Municipality & Gibb
of client representative Africa Consulting Engineers & Wouter Du Toit &
0825647261

List of participating organisations Down Touch Investments

Year started and year completed (or planned 2014 & (2017)
completed date)

Original completion date 2017

Actual completion date Ongoing

Percentage of practical completion 90%

Total value of project R 9 000 000.00

Percentage participation of your organisation in


the project 75%

Your specific role in the project Contractor - CHSO - Duties

Was the project successfully completed Ongoing

PROJECT 27

Name of project Kidds Beach Retirement Village

Type and description of project Principal Contractor & Civil Infrastructure -


Pipelines & Roadworks

Geographic location of project 32°59'11.62" S 27°53'31.58" E

Name of client and position and contact details COPACOL (Pty) Ltd. & ST Consulting Engineers &
of client representative Willie van der Merwe & 043 726 0025

List of participating organisations Eastern Cape Khula Nathi Construction (PTY) LTD

Year started and year completed (or planned


completed date) 2016 & (2017)

Original completion date 2017

Actual completion date Ongoing

Percentage of practical completion 50%

Total value of project R 8 850 000.00

Percentage participation of your organisation in


the project 100%

Your specific role in the project Principal Contractor - CHSM - Duties

Was the project successfully completed Ongoing

PROJECT 28

Name of project Turner Bro's Warehouse


Type and description of project Principal Contractor & Earthworks, Concrete
Works & Platform

Geographic location of project 32°59'28.84" S 27°49'58.35" E

Name of client and position and contact details EDCOT TRUST & Chris Clack + Associates & Chris
of client representative Clack & 082 202 4860

List of participating organisations /

Year started and year completed (or planned


completed date) 2017 & (2017)

Original completion date 2017

Actual completion date 2017

Percentage of practical completion 75%

Total value of project R 1 940 000.00

Percentage participation of your organisation in


the project 75%

Your specific role in the project Principal Contractor - CHSM - Duties

Was the project successfully completed Ongoing

PROJECT 29

Name of project KWT Taxi Ranks

Type and description of project Contractor & Civil Works - Roadworks & Services

Geographic location of project 32°52'32.32" S 27°23'20.84" E

Name of client and position and contact details Buffalo City Metropolitan Municipality & Royal
of client representative Haskoning DHV & S. Kaffka & 043 7073000

List of participating organisations MWP Construction

Year started and year completed (or planned


completed date) 2016 & (2019)

Original completion date 2019

Actual completion date 2019

Percentage of practical completion 45%


Total value of project R 14 300 000.00

Percentage participation of your organisation in


the project 75%

Your specific role in the project Principal Contractor - CHSM - Duties

Was the project successfully completed Ongoing

PROJECT 30

Name of project Turner Bro's

Type and description of project Principal Contractor & Roadway, Parking Area,
Wash bay

Geographic location of project 32°59'28.84" S 27°49'58.35" E

Name of client and position and contact details EDCOT TRUST & Chris Clack + Associates & Chris
of client representative Clack & 082 202 4860

List of participating organisations /

Year started and year completed (or planned


completed date) 2017 & (2017)

Original completion date 2017

Actual completion date 2017

Percentage of practical completion 95%

Total value of project R 2 000 000.00

Percentage participation of your organisation in


the project 75%

Your specific role in the project Principal Contractor - CHSM - Duties

Was the project successfully completed Ongoing

PROJECT 31

Name of project Gwili Gwili

Type and description of project Principal Contractor & Reservoir & Pipelines

Geographic location of project 32°40'15.79" S 27°12'52.56" E

Name of client and position and contact details Amatola District Municipality & Sky High
of client representative Consulting & Claudious Nhawu & 043 721 1996
List of participating organisations /

Year started and year completed (or planned


completed date) 2017 & (2017)

Original completion date 2017

Actual completion date 2017

Percentage of practical completion 75%

Total value of project R 3 500 000.00

Percentage participation of your organisation in


the project 95%

Your specific role in the project Principal Contractor - CHSM - Duties

Was the project successfully completed Ongoing

PROJECT 32

Name of project Erf 72557 Beacon Bay

Type and description of project Principal Contractor & Earthworks

Geographic location of project 32°56'48.42" S 27°55'12.40" E

Name of client and position and contact details EDCOT TRUST & Chris Clack + Associates & Chris
of client representative Clack & 082 202 4860

List of participating organisations /

Year started and year completed (or planned


completed date) 2017 & (2017)

Original completion date 2017

Actual completion date 2017

Percentage of practical completion 75%

Total value of project R 1 500 000.00

Percentage participation of your organisation in


the project 100%

Your specific role in the project Principal Contractor - CHSM - Duties

Was the project successfully completed Ongoing