Professional Documents
Culture Documents
ULIAN RIVER
PAJO, LAMBUNAO, ILOIL
1987
987
1986 - 1987 : Maximum discharge, same as above
20 liters/second
REMARKS : Records are fair. B.M. No. 1 is located on top of concrete
nail embedded on the rip-rap at the left river bank about 14.0
meters from the gage with assumedd eelevation of 114.937
meters.
REMARKS : Records are fair. B.M. No. 1 is located on top of concrete nail
embedded on the rip-rap at the left river bank about 14.0
meters from the gage with assumedd eelevation of 114.937
meters.
1993
1998
136 liters/second
REMARKS : Records are fair. B M # 1 is located on top of the concrete
nail embedded on the rip-rap at the left river bank about
14.0 meters from the gage with an assumed elevation of
114.937 meters
2001
2004
2005
2006
2007
2009
2010
2011
2012