The document is a midterm exam for a Software Project Management course, consisting of 20 multiple choice questions testing concepts related to software engineering processes and project management. Some of the key topics covered in the questions include software development lifecycles (e.g. waterfall model), project management goals, risk assessment, software estimation techniques like COCOMO, and aspects of software quality management.
The document is a midterm exam for a Software Project Management course, consisting of 20 multiple choice questions testing concepts related to software engineering processes and project management. Some of the key topics covered in the questions include software development lifecycles (e.g. waterfall model), project management goals, risk assessment, software estimation techniques like COCOMO, and aspects of software quality management.
The document is a midterm exam for a Software Project Management course, consisting of 20 multiple choice questions testing concepts related to software engineering processes and project management. Some of the key topics covered in the questions include software development lifecycles (e.g. waterfall model), project management goals, risk assessment, software estimation techniques like COCOMO, and aspects of software quality management.
Yerrakota, Yemmiganur – 518 360, Kurnool (Dist) A)P. I -Mid Term Examination [Objective Type] Academic Year 2023-24 Branch & Year & Semester III B.Tech. I-Semester Regulation R20 Section CSE Subject Name Software Project Management Dept. CSE Date of Exam 07-011-2023 AN Max. Marks 10
Student Signature of the Invigilator
Name Regd No.
I. Answer the following questions: 20 x 1/2 = 10 Marks
1. The best thing about software is its ___ []
A. Flexibility B. Reliability C. Availability D. Manageable 2. Software development is still highly ___ [] A. Predictable B. Accountable C. Unpredictable D. All the above 3. Software engineering texts present the __ model as the source of the conventional software process [] A. V model B. Waterfall model C. Spiral model D. All the above 4. Which of the following is not a project management goal? [] a) Keeping overall costs within budget b) Delivering the software to the customer at the agreed time c) Maintaining well-functioning development team d) Avoiding customer complaints
5. __A serious issue associated with the waterfall lifecycle []
A. Quality issue B. Time consuming C. Late risk resolution D. All the above 6. Waterfall Model was first introduced by Winston W. Royce in__ [] A. 1990 B. 1960 C. 1980 D. 1970 7. ____ has a greater effect on the success or failure of a project [] A. Management B. Developers C. Testers D. All above 8. Which generation is used craftsmanship in its period [] A. Modern B. Conventional C. Transition D. All the above 9. COCOMO is example for which estimation [] A. Quality estimation B. Time estimation C. Cost estimation D. None of this 10. What is the time period of Meta process () A. 1 to 6 months B. 6 to 12 months C. 15 months D. 2 years 11.___needs to configure a balance of solid talent with highly skilled people in the team [] A. Developers B. Project manager C. Stakeholder D. All the above 12. CMM stands for __ [] A. Control maturity model B. Conventional maturity model C. Capability maturity model D. None 13. ___phase has the small team size and it is usually less predicted [] A. Engineering phase B. Production phase C. Transition Phase D. None 14. ___phase focuses on implementation [] A. Inception phase B. Construction phase C. Transition phase D. Elaboration 15. ___elaborates the process framework into a fully detailed plan [] A. Management plan B. Software development plan C. Design plan D. None 16. ___ Artifact supports the contract between funding authority and development organization [ ] A. Vision document B. Architecture description C. Software user manual D. None 17. Which of the following is not considered as a risk in project management? [] a) Specification delays b) Product competition c) Testing d) Staff turnover 18. Quality planning is the process of developing a quality plan for [] a) team b) project c) customers d) project manager 19. Which of the following is incorrect activity for the configuration management of a software system? [] a) Internship management b) Change management c) Version management d) System management 20. Project managers have to assess the risks that may affect a project. a) True b) False