St.

Johns College of Engineering & Technology


Yerrakota, Yemmiganur – 518 360, Kurnool (Dist) A)P.
I -Mid Term Examination [Objective Type] Academic Year 2023-24
Branch &
Year & Semester III B.Tech. I-Semester Regulation R20 Section CSE
Subject Name Software Project Management Dept. CSE
Date of Exam 07-011-2023 AN Max. Marks 10

Student Signature of the Invigilator


Name Regd No.

I. Answer the following questions: 20 x 1/2 = 10 Marks

1. The best thing about software is its ___ []


A. Flexibility B. Reliability C. Availability D. Manageable
2. Software development is still highly ___ []
A. Predictable B. Accountable C. Unpredictable D. All the above
3. Software engineering texts present the __ model as the source of the conventional software process
[]
A. V model B. Waterfall model C. Spiral model D. All the above
4. Which of the following is not a project management goal? []
a) Keeping overall costs within budget b) Delivering the software to the customer at the agreed time c)
Maintaining well-functioning development team d) Avoiding customer complaints

5. __A serious issue associated with the waterfall lifecycle []


A. Quality issue B. Time consuming C. Late risk resolution D. All the above
6. Waterfall Model was first introduced by Winston W. Royce in__ []
A. 1990 B. 1960 C. 1980 D. 1970
7. ____ has a greater effect on the success or failure of a project []
A. Management B. Developers C. Testers D. All above
8. Which generation is used craftsmanship in its period []
A. Modern B. Conventional C. Transition D. All the above
9. COCOMO is example for which estimation []
A. Quality estimation B. Time estimation C. Cost estimation D. None of this
10. What is the time period of Meta process ()
A. 1 to 6 months B. 6 to 12 months C. 15 months D. 2 years
11.___needs to configure a balance of solid talent with highly skilled people in the team []
A. Developers B. Project manager C. Stakeholder D. All the above
12. CMM stands for __ []
A. Control maturity model B. Conventional maturity model C. Capability maturity model D. None
13. ___phase has the small team size and it is usually less predicted []
A. Engineering phase B. Production phase C. Transition Phase D. None
14. ___phase focuses on implementation []
A. Inception phase B. Construction phase C. Transition phase D. Elaboration
15. ___elaborates the process framework into a fully detailed plan []
A. Management plan B. Software development plan C. Design plan D. None
16. ___ Artifact supports the contract between funding authority and development organization [ ]
A. Vision document B. Architecture description C. Software user manual D. None
17. Which of the following is not considered as a risk in project management? []
a) Specification delays b) Product competition c) Testing d) Staff turnover
18. Quality planning is the process of developing a quality plan for []
a) team b) project c) customers d) project manager
19. Which of the following is incorrect activity for the configuration management of a software system?
[]
a) Internship management b) Change management c) Version management d) System management
20. Project managers have to assess the risks that may affect a project.
a) True
b) False